HomeMy WebLinkAbout20211572 Ver 1_Site Inspection 2.11.22 Br5 over Pisgah Creek_20220211Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20211572
TPB NCDOT - Replace Bridge 5 on SR 1888
Haywood
TPB NCDOT - Replace Bridge 5 on SR 1888
NC DOT Division 14 - Sylva
2/11/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-82° 47' 56''+35° 25' 44''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on February 11, 2022. Jeff Stockton
and Levi McFalls were present during the inspection. Site is compliant with the 401 WQC with additional conditions.
NPDES records were up to date.
- Add coir fiber matting on unconsolidated soils adjacent to sheet piles. This was discussed with the inspectors.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20211572
2/11/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2