HomeMy WebLinkAbout20171605 Ver 1_Post-construction Baseline Condition_20210727From: Davis, Erin B
To: Baker, Caroline D
Subject: FW: [External] Post -construction Baseline Conditions- Daniels Creek Mitigation Site (Harnett Co. -near Sanford)
Date: Friday, February 11, 2022 9:54:06 AM
Attachments: Daniels Creek Release.pdf
Laserfiche Upload: Email & Attachment
DWR# 20171605 v.1
Doc Type: Mitigation As -built
*please make sure to note the date 7/27/2021
From: Sugg, Mickey CIV USARMY CESAW (USA)[ma iIto: Mickey.T.Sugg@usace.army.mi1]
Sent: Tuesday, July 27, 20214:13 PM
To: kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov>; Wilson, Travis W.
<travis.wilson@ncwildlife.org>; Davis, Erin B <erin.davis@ncdenr.gov>; Turlington, Chad
<chad.turlington@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US)
<Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>;
Haywood, Casey M CIV (USA)<Casey.M.Haywood@usace.army.miI>
Cc: Chris Roessler <croessler@wildlandseng.com>; Jessop, Jordan E CIV USARMY CESAW (USA)
<Jordan.E.Jessop@usace.army.mil>
Subject: [External] Post -construction Baseline Conditions- Daniels Creek Mitigation Site (Harnett Co. -
near Sanford)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Good afternoon,
PIS see below email to access the As -built Report for Daniels Creek. This was delivered using our ftp
site due its size and looks like access expires this Sunday. Also, pls take a look at their YouTube
drone footage for each individual reach. In fielding an inquiry from Chris on temperature data
loggers, I have asked Wildlands to develop a protocol for establishing a start of the growing season
timeframe if wanting to claim a pre -March 1 date. Along with the temperature readings, this would
include documenting vegetative indicators set forth in the AGCP Regional Supplement Manual:
"The growing season has begun on a site when two or more different non -evergreen
vascular plant species growing in the wetland or surrounding areas exhibit one or more of
the following indicators of biological activity:
a. Emergence of herbaceous plants from the ground.
b. Appearance of new growth from vegetative crowns (e.g., in
graminoids, bulbs, and corms)
c. Coleoptile/cotyledon emergence from seed
d. Bud burst on woody plants (i.e., some green foliage is visible
between spreading scales)
e. Emergence or elongation of leaves of woody plants
f. Emergence or opening of flowers"
Our office will be preparing the additional credit release letter in the coming weeks (attaching our
last release w/ MBI signing). Call if you have comments/questions.
-mickey
Mickey Sugg, Chief
Wilmington Regulatory Field Office
U.S. Army Corps of Engineers
69 Darlington Avenue
Wilmington, NC 28403
(910) 251-4811 (direct line)
(910) 251-4025 (fax)
"The Wilmington District is committed to providing the highest level of support to the public. To
help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at:
"http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 "
From: NoReplyTo@mail.mil <NoReplyTo@mail.mil>
Sent: Monday, July 26, 2021 5:36 PM
To: Sugg, Mickey T CIV USARMY CESAW (USA) <mickey.t.sugg.civ@mail.mil>
Subject: [DoD SAFE] Chris Roessler has dropped off files for you
This is an automated message sent to you by the DoD SAFE service.
Chris Roessler <croessler@wildlandseng.com> has dropped off 2 files for you.
IF YOU TRUST THE SENDER and are expecting to receive a file from them, you may choose to
retrieve the drop-off by clicking the following link (or copying and pasting it into your web browser):
https://safe.apps.mil/pickup.php?claimlD=Zk2ZWQWor4RG6FbC&recipCode=B8bi2T
You will be required to enter the claim passcode, which is:
fnx8M9zVFMUD9KmA
You have 7 days to retrieve the drop-off; after that the link above will expire.
The sender has left you a note:
https://www.youtube.com/watch?v=fIWFuCw6xKw
Drone Video Link
Full information about the drop-off:
Claim ID: Zk2ZWQWor4RG6FbC
Recipient Code: B8bi2T
Claim Passcode: fnx8M9zVFMUD9KmA
Date of Drop-off: 2021-07-26 21:36:08 UTC
— Sender —
Name: Chris Roessler
Organization: USARMY
Email Address: croessier@wildlandseng.com
— Files —
Name: Daniels Creek Baseline Monitoring Report - DRAFT.pdf
Size: 104.2 MB
SHA-256
41FODCED7B66AEDA1DD1DD13622472453130BDD7A83BD2F1BOD1D88C144BEA93
Checksum:
Content Type: application/pdf
Name: Daniels Creek Baseline Monitoring Report - DRAFT Reduced.pdf
Size: 50.3 MB
SHA-256
Checksum: 3A9E56371AF3E11FA8EBED60877AE30DA4C60D6B89213248C989C59EBC8F1AD3
Content Type: application/pdf
From: Davis, Erin B
To: Baker, Caroline D
Subject: FW: [External] Milestone 2 Credit Release for Daniels Creek Mitigation Site (Harnett Co, near Sanford)
Date: Friday, February 11, 2022 9:54:27 AM
Attachments: Daniels Creek Signed Credit Release Construction Biological improvements-odf
Laserfiche Upload: Email & Attachment
DWR# 20171605 v.1
Doc Type: Mitigation Evaluation
*please make sure to note the date 8/30/2021
From: Sugg, Mickey TCIV USARMY CESAW (USA)[maiIto: Mickey.T.Sugg@usace.army.mil]
Sent: Monday, August 30, 2021 4:49 PM
To: kathryn_matthews@fws.gov; Bowers, Todd <bowers.todd@epa.gov>; Wilson, Travis W.
<travis.wilson@ncwildlife.org>; Davis, Erin B <erin.davis@ncdenr.gov>; Turlington, Chad
<chad.turlington@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US)
<Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV (USA)
<Casey.M.Haywood@usace.army.miI>; Kim Browning <Kimberly.D.Browning@usace.army.mil>
Cc: Chris Roessler <croessler@wildlandseng.com>; Jessop, Jordan E CIV USARMY CESAW (USA)
<Jordan.E.Jessop@usace.army.mil>
Subject: [External] Milestone 2 Credit Release for Daniels Creek Mitigation Site (Harnett Co, near
Sanford)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Good afternoon,
Attached is the letter releasing the next 15% of riparian, non -riparian, and stream credits based
upon the as -built report. Let me know if you have questions.
-mickey
Mickey Sugg, Chief
Wilmington Regulatory Field Office
U.S. Army Corps of Engineers
69 Darlington Avenue
Wilmington, NC 28403
(910) 251-4811 (direct line)
(910) 251-4025 (fax)
"The Wilmington District is committed to providing the highest level of support to the public. To
help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at:
"http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 "
T of
G2,� STATES Of
Regulatory Division
Action ID. SAW-2017-00998
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
August 30, 2021
Wildlands Holdings III, LLC
c/o: Mr. Shawn Wilkerson
312 West Millbrook Road, Suite 225
Raleigh, North Carolina 27609
Dear Mr. Wilkerson:
This letter serves to verify our July 26, 2021 receipt of the "July 23, 2021 Baseline
Monitoring Document and As -Built Baseline Report" and your effort to satisfy Milestone
2 in the August 2021 Updated Credit Release Schedule Tables for Riparian Wetlands,
Non -Riparian Wetlands, and Stream (enclosed) for the November 5, 2019 executed
Mitigation Banking Instrument (MBI) establishing from the Middle Cape Fear Umbrella
Mitigation Bank (Bank). The Bank's initial project site is Daniels Creek Mitigation Site
located in Broadway, Harnett County, North Carolina. Additionally, please reference
Mr. Jordan Jessop and my March 23, 2021 onsite inspection of the bank's construction
with Mr. John Hutton of Wildlands.
Based on the submitted report and the inspection, our office has confirmed that all
initial construction and biological improvements have been completed and that
Milestone 2 requirements have been satisfied. Additionally, our office acknowledges
that the tables in the enclosed modified credit release schedules have been adjusted to
reflect the results of the as -built or baseline measurements. By fulfilling Milestone 2, this
letter serves to confirm the release of 15% of all credits, which total 2.097 riparian
wetland credits, 0.059 non -riparian wetland credits, and 1,765.2 stream credits. To
date, the cumulative release of credits total 4.177 riparian wetland credits, 0.118 non -
riparian wetland credits, and 3,607.2 stream credits.
The release of additional credits will be contingent on the review of the subsequent
monitoring reports by the Interagency Review Team and our office. Please be
reminded that all annual monitoring reports, as stated in the August 2019 final mitigation
plan, must be submitted to our office no later than April 1 of each year.
-2-
If you have any questions or comments, please contact me at telephone (910)
251-4811 mickey.t.su.. (cDusace.army.mil or Mr. Jordan Jessop at (910) 251-4810,
iordan.e.iessop(aD-usace.army.m il.
Sincerely,
Mickey Sugg, Chief
Wilmington Regulatory Field Office
Hard Copy furnished:
Messrs. Tim and Joshua Patterson
Patterson & Sons, Inc.
78 Patterson Lane
Broadway North Carolina 27505
Copies furnished via email:
Mr. Shawn Wilkerson, Wildlands
Mr. Chris Roessler, Wildlands
Mr. John Hutton, Wildlands
Ms. Kathy Matthews, U.S. Fish and Wildlife Service
Mr. Todd Bowers, US EPA
Mr. Erin Davis, NC Division of Water Resources
Mr. Travis Wilson, NC Wildlife Resource Commission
Mr. Chad Turlington, NC Division of Water Resources
Ms. Gabriela Garrison, NC Wildlife Resources Commission
1.0 Credit Release Schedule
All credit releases will be based on the total credit generated as reported by the as -built survey of the
mitigation site. Under no circumstances shall any mitigation project be debited until the necessary DA
authorization has been received for its construction or the District Engineer (DE) has otherwise provided
written approval for the project in the case where no DA authorization is required for construction of
the mitigation project. The DE, in consultation with the Interagency Review Team (IRT), will determine if
performance standards have been satisfied sufficiently to meet the requirements of the release
schedules below. In cases where some performance standards have not been met, credits may still be
released depending on the specifics of the case. Monitoring may be required to restart or be extended,
depending on the extent to which the site fails to meet the specified performance standard. The release
of project credits will be subject to the criteria described as follows:
Riparian Wetlands Credit Release Schedule
Daniels Creek Mitigation Site
Riparian Wetlands Credit Release Schedule
Credit
Release
Interim
Milestone
Credit Release Activity
Release
Total Released
1
Site Establishment
15%/ 2.080
15%/ 2.080
2
Completion of an initial physical and biological
15%/ 2.097
30%/ 4.177
improvements made pursuant to the Mitigation Plan
3
First year monitoring report demonstrates interim
10%/ 1.392
40%/ 5.569
performance standards are being met
4
Second year monitoring report demonstrates interim
10%/ 1.392
50%/ 6.961
performance standards are being met
5
Third year monitoring report demonstrates interim
15%/ 2.088
65%/ 9.049
performance standards are being met
6*
Fourth year monitoring report demonstrates interim
o
5/ / 0.696
0
70/ / 9.745
performance standards are being met
7
Fifth year monitoring report demonstrates interim
15%/ 2.089
85%/ 11.834
performance standards are being met
8*
Sixth year monitoring report demonstrates interim
5%/ 0.696
90%/ 12.530
performance standards are being met
9
Seventh year monitoring report demonstrates
10%/ 1.393
100%/ 13.923
performance standards have been met
*Please note that vegetation plot data may not be required with monitoring reports submitting during these
monitoring years unless otherwise required by the Mitigation Plan or directed by the USACE in consultation with
the IRT.
Daniels Creek Mitigation Site Appendix 9
USACE Action ID No. SAW-2017-00998 Page 1 updated August 2021
Non -Riparian Wetlands Credit Release Schedule
Daniels Creek Mitigation Site
Non -Riparian Wetlands Credit Release Schedule
Credit
Release
Interim
Total
Milestone
Credit Release Activity
Release
Released
1
Site Establishment
15% / 0.059
15% / 0.059
2
Completion of an initial physical and biological
o
15/ / 0.059
0
30/ / 0.118
improvements made pursuant to the Mitigation Plan
3
First year monitoring report demonstrates interim
10%/ 0.039
40%/ 0.157
performance standards are being met
4
Second year monitoring report demonstrates interim
10%/ 0.039
50%/ 0.196
performance standards are being met
5
Third year monitoring report demonstrates interim
15% / 0.059
65% / 0.255
performance standards are being met
6*
Fourth year monitoring report demonstrates interim
5% / 0.020
70%/ 0.275
performance standards are being met
7
Fifth year monitoring report demonstrates interim
15%/ 0.059
85%/ 0.334
performance standards are being met
8*
Sixth year monitoring report demonstrates interim
o
5/ / 0.020
0
90/ / 0.354
performance standards are being met
9
Seventh year monitoring report demonstrates
10%/ 0.038
100%/ 0.392
performance standards have been met
*Please note that vegetation plot data may not be required with monitoring reports submitting during these
monitoring years unless otherwise required by the Mitigation Plan or directed by the USACE in consultation with
the IRT.
Daniels Creek Mitigation Site Appendix 9
USACE Action ID No. SAW-2017-00998 Page 2 updated August 2021
Stream Credit Release Schedule
Daniels Creek Mitigation Site
Stream Credit Release Schedule
Credit
Release
Interim
Milestone
Credit Release Activity
Release
Total Released
1
Site Establishment
15%/ 1,842
15%/ 1,842
2
Completion of all initial physical and biological
o
15/ / 1765.2
0
30/ / 3,607.2
improvements made pursuant to the Mitigation Plan
3
First year monitoring report demonstrates performance
10%/ 1,202.4
40% / 4,809.6
standards are being met
4
Second year monitoring report demonstrates
10%/ 1,202.4
50%/ 6,012
performance standards are being met
5
Third year monitoring report demonstrates
10%/ 1,202.4
60%/ 7,214.4
performance standards are being met
6*
Fourth year monitoring report demonstrates
5% / 601.2
65% (75%) /
performance standards are being met
7,815.6 (9,018')
Fifth year monitoring report demonstrates performance
75% (85%*) /
7
standards are being met and project has received
10%/ 1,202.4
closeout approval
9,018 (10,220.4')
Sixth year monitoring report demonstrates
80% (90%) /
8
performance standards are being met
5/ o / 601.2
9619.2 (10,821.6')
Seventh year monitoring report demonstrates
90% (100%.) /
9
performance standards are being met and project has
10%/ 1,202.4
received closeout approval
10,821.6 (12,024')
t 10% of credits will be reserved for the site that can be subsequently released after four bankfull events have
occurred in separate monitoring years, provided that the channel is stable and all other performance standards are
being met.
1.1 Initial Allocation of Released Credits
The initial allocation of released credits is defined as Bank Establishment in the 2013 Wilmington District
credit release schedule guidance document. The initial allocation can be released without prior written
approval of the DE upon satisfactory completion of the following activities:
a. Execution of the UMBI by the Sponsor and the USACE
b. Approval of the Final Mitigation Plan
c. Recordation of the conservation easement, as well as delivery of a title opinion that is
acceptable to the USACE.
d. Delivery of the financial assurances described in the Mitigation Plan.
e. 404 permit verification for construction of the site, if required.
Daniels Creek Mitigation Site Appendix 9
USACE Action ID No. SAW-2017-00998 Page 3 updated August 2021
1.2 Subsequent Credit Releases
All subsequent credit releases must be approved by the DE, in consultation with the IRT, based on a
determination that required performance standards have been achieved. For stream projects, a reserve
of 10% of a site's total stream credits shall be released after four bankfull events have occurred in separate
years, provided the channel is stable and all other performance standards are met. In the event that less
than four bankfull events occur during the monitoring period, release of these reserve credits shall be at
the discretion of the IRT. As projects approach milestones associated with the credit release, Wildlands
will submit a request for credit release to the DE along with documentation substantiating achievement
of criteria required for release to occur. This documentation will be included with the annual monitoring
report.
Daniels Creek Mitigation Site Appendix 9
USACE Action ID No. SAW-2017-00998 Page 4 updated August 2021