Loading...
HomeMy WebLinkAbout20171295 Ver 1_Year 1 Monitoring Credit Release_1Feb2022 (SAW-2017-01469)_20220201From: Davis, Erin B To: Baker, Caroline D Subject: FW: [External] RES Yadkin 01 Umbrella Mitigation Bank MY1 Credit Release for the Scout Mitigation Site (SAW- 2017-01469) Date: Friday, February 11, 2022 9:14:14 AM Attachments: SAW-2017-01469 RESYadkin 01UMB-Scout-MY1CreditRelease 1Feb2022.Ddf Laserfiche Upload: Email & Attachment DWR#: 20171295 v.l Doc Type: Mitigation Evaluation -----Original Message ----- From: Kichefski, Steven L CIV USARMY CESAW (USA) [mailto:Steven.L.Kichefski�a)tisace.army.mil] Sent: Tuesday, February 1, 2022 11:46 AM To: Bradley Breslow <bbreslow(a)res.us>; Matt Butler <mbutler@res.us> Cc: Davis, Erin B <erin.davis(0ncdenr.gov>; Hamstead, Byron A <byron hamstead@fws.gov>; Bowers, Todd <bowers.todd@epa.gov>; Munzer, Olivia<olivia.munzer(oncwildlife.org>; Wilson, Travis W. <travis.wilson(oncwildlife.org>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell(ousace.army.mil>; Kim Browning <Kimberly.D.Browning(ousace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Jones, M Scott (Scott) CIV USARMY CESAW (USA) <Scott.Jones(0usace.army.mil> Subject: [External] RES Yadkin 01 Umbrella Mitigation Bank MY Credit Release for the Scout Mitigation Site (SAW-2017-01469) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.<mailt0:rel2ort.si2am(g)nc. oo Brad/Matt, Please find attached the MY Credit Release letter for the RES Yadkin 01 Umbrella Mitigation Bank: Scout Mitigation Site (SAW-2017-01469). As requested, 10% credit is being released for satisfying the third (MYI) release requirement pursuant to the Mitigation Banking Instrument (UMBI) entitled, Agreement to Establish the RES Yadkin 01 Umbrella Mitigation Bank, signed by USACE on November 25, 2019, and the Scout Final Mitigation Plan, dated August 2019. In accordance with the plan, 291.8 stream mitigation units (SMU's) are now available for the Scout Mitigation Site. Feel free to contact me with any questions. This electronic copy is your official Department of the Army Notification. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at https://urldefense.com/v3/ http://corpsmapu.usace.army.mil/cm apex/f? 12=136:4:0_: I I HYmSToo I P l 5HYIjvJEXgGMcgRuKKwD- eDgij6xrDaietZYEAPX9c3OUTyhKDOp2S80siJLxeAJSs$ to complete the survey online. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 151 PATTON AVENUE ROOM 208 ASHEVILLE, NORTH CAROLINA 28801-5006 February 1, 2022 Regulatory Division Re: MY1 Credit Release of the RES Yadkin 01 Umbrella Mitigation Banking Instrument and Scout Mitigation Site; SAW-2017-01469 Mr. Brad Breslow Resource Environmental Solutions 3600 Glenwood Avenue, Suite 100 Raleigh, North Carolina 27612 Dear Mr. Breslow: This correspondence is in reference to the Monitoring Year 1 (MY1) Report dated September 2021, submitted in support of your request for the third credit release for the Scout Mitigation Site. The Scout Mitigation Site is part of the RES Yadkin 01 Umbrella Mitigation Bank, located approximately eight miles west of Clemmons and five miles northwest of Bermuda Run, in Davie County, North Carolina. The 13.22-acre project presents stream restoration and enhancement generating 2,918 warm Stream Mitigation Units (SMU), after non- standard width buffer adjustments, along Hauser Creek and two unnamed tributaries in the Upper Yadkin Watershed of the Upper Pee Dee River Basin (03040101). The purpose of this letter is to confirm the MY1 release of credits for this mitigation site. Pursuant to the Mitigation Banking Instrument (UMBI) entitled, Agreement to Establish the RES Yadkin 01 Umbrella Mitigation Bank, approved December 4, 2019; and the site -specific Scout Final Mitigation Plan dated August 2019, ten percent (10%) of the mitigation site's total restoration and enhancement credits shall be available for sale immediately upon completion of the required tasks pursuant to the Mitigation Plan. By copy of this correspondence, we confirm that you have satisfied the above requirements for the MY credit release for all parcels within the bank; and 291.8 SMU's constituting 10% of the mitigation site's total restoration and enhancement credits are now available for sale. Including this credit release, 1167.2 SMU's have now been released for the Scout Mitigation Site which totals, 40% of the approved credit. During the NCIRT review of the MY report the following comments were by agency representatives regarding concerns noted with the MY conditions: USACE comments: 1. Retaining comment from As -Built review so that black walnut will continue to be managed throughout monitoring - In order to address concerns regarding changes made to the planting plan (including species planted), RES staff will begin removing all black walnut stems throughout the site, including within vegetation plots. 2. In future reports, please include a list of the species that were in the supplemental planting and identify areas that were supplementally plant on the CCPV. 3. Please identify all repair areas on the CCPV in future reports. It would also be helpful to discuss the condition of the repair areas in the narrative. 4. Several plots had only 2 or 3 species and were dominated by a single species. Recommend selecting species that will increase diversity in future supplemental plantings. Appreciate that this is being done for the area around veg plot 4. Was the 51 sycamores in veg plot I a typo? DWR comments: 1. Please list species installed as part of supplemental planting efforts. This was done for Twiman, but not Scout or Compass Point. 2. All three projects had some veg plots with only 2 or 3 species present. Since this is only MY1, please consider species diversity when potentially supplemental planting in these areas. With the MY review by the IRT and subsequent credit release completed, please move forward with providing the appropriate bond for the monitoring phase of the project as approved in the Scout final mitigation plan/UMBI. This involves releasing the MY1 Performance Bond No. SUR0069926. Thank you for your time and cooperation. If you have any questions, please contact Steve Kichefski at (828) 271-7980 extension 4234. for Electronic Copies Furnished: Erin Davis (NCDWR) Olivia Munzer (NCWRC) Travis Wilson (NCWRC) Byron Hamstead (USFWS) Todd Bowers (USEPA) Renee Gledhill -Earley (NCSHPO) Todd Tugwell (USACE) Kim Browning (USACE) Casey Haywood (USACE) Scott Jones (USACE) Sincerely, Scott Jones, Chief Asheville and Charlotte Regulatory Field Offices