HomeMy WebLinkAbout20220240 Ver 1_ePCN Application_20220210fr.,f DW R
mrlsloa of ware. Resources
Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
December 6, 2021 Ver 4.2
Initial Review
Has this project met the requirements for acceptance in to the review process?*
Yes
No
Is this project a public transportation project?*
Yes No
Change only if needed.
BIMS # Assigned*
20220240
Is a payment required for this project?
No payment required
Fee received
Fee needed - send electronic notification
Select Project Reviewer*
Colleen Cohn:eads\cmcohn
Information for Initial Review
1a. Name of project:
COURTESY COPY Longfellow Watkins Development
1a. Who is the Primary Contact?*
Jennifer Burdette
1 b. Primary Contact Email:
burdette@nrconsultne.com
Date Submitted
2/10/2022
Nearest Body of Water
Crabtree Creek
Basin
Neuse
Water Classification
B; NSW
Site Coordinates
Latitude:
35.850439
A. Processing Information
County (or Counties) where the project is located:
Wake
Is this a NCDMS Project
Yes No
Longitude:
-78.835335
Is this project a public transportation project?*
Yes No
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Version# *
1
Reviewing Office*
Raleigh Regional Office - (919) 791-4200
1c. Primary Contact Phone:*
(919)422-3605
Has this PCN previously been submitted?*
Yes
No
1 b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
39 - Commercial/Institutional Developments
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application?*
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1 h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Durham Watkins Road 6, LLC
2b. Deed book and page no.:
DB 018332; PG 01393
2c. Contact Person:
Lindsey Brown
2d.Address
Street Address
260 Franklin St
Address Line 2
Ste 1920
City
Boston
Postal / Zip Code
02110-3115
2e. Telephone Number:
(919)616-1531
2g. Email Address:*
(brown@lfrep.com
401 Water Quality Certification - Express
Riparian Buffer Authorization
State / Province / Region
MA
Country
us
2f. Fax Number:
Yes No
Yes No
U
2a. Name(s) on recorded deed:
Durham Watkins Road Holdings, LLC
2b. Deed book and page no.:
DB 018174; PG 00488 & DB 018174; PG 00481
2c. Contact Person:
Lindsey Brown
2d.Address
Street Address
260 Franklin St
Address Line 2
Ste 1920
City
Boston
Postal / Zip Code
02110-3115
2e. Telephone Number:
(919)616-1531
2g. Email Address:'
(brown@lfrep.com
2a. Name(s) on recorded deed:
Durham Watkins Road 7, LLC
2b. Deed book and page no.:
DB 018552; PG 02441
2c. Contact Person:
Lindsey Brown
2d.Address
Street Address
260 Franklin St
Address Line 2
Ste 1920
City
Boston
Postal / Zip Code
02110-3115
2e. Telephone Number:
(919)616-1531
2g. Email Address:
(brown@lfrep.com
3. Applicant Information (if different from owner)
3a. Name:
Lindsey Brown
3b. Business Name:
Longfellow Real Estate Partners, LLC
3c. Address
Street Address
300 Morris St
Address Line 2
Ste 280
City
Durham
Postal / Zip Code
27701
3d. Telephone Number:
(919)2294702
3f. Email Address:"
(brown@lfrep.com
4. Agent/Consultant (if applicable)
State / Province / Region
MA
Country
us
2f. Fax Number:
State / Province / Region
MA
Country
us
2f. Fax Number:
State / Province / Region
NC
Country
us
3e. Fax Number:
4a. Name:
Jennifer Burdette
4b. Business Name:
Natural Resource Consultants
4c.Address
Street Address
10212 Creedmoor Rd
Address Line 2
City
Raleigh
Postal / Zip Code
27615
4d. Telephone Number:
(919)422-3605
4f. Email Address:*
burdefte@nrconsultnc.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Morrisville
2. Project Identification
2a. Property Identification Number:
0746844500,0746848536,0746849444,
0746940414,0746941532,0746942571 &
0746944430
2c. Project Address
Street Address
0 & 514 Watkins Road
Address Line 2
City
Morrisville
Postal / Zip Code
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Crabtree Creek
3b. Water Resources Classification of nearest receiving water:
B; NSW
3c. What river basin(s) is your project located in?*
Neuse
3d. Please provide the 12-digit HUC in which the project is located.
030202010801
4. Project Description and History
Stale / Province / Region
NC
Country
us
4e. Fax Number:
2b. Property size:
21
State / Province / Region
NC
Country
US
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Pines occupy most of the site, with a few patches of hardwood forest along drainage ways. Two former homesites are in the northeast corner of the site. Figure 1 depicts the location of the
project area on the US Geological Survey (USGS) Cary, NC 7.5-minute quadrangle topographic map. Figure 2B shows the location of the project area on the Wake County Soil Survey
Map. Figure 3 depicts the subject project area on an aerial photograph of the general area. Land use in the project's vicinity consists of commercial office space, industrial uses, and
apartment complexes.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
0.01
4g. List the total estimated linear feet of all existing streams on the property:
0
4h. Explain the purpose of the proposed project:
The project aims to provide a mixed -use research laboratory center to serve the Morrisville area.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
The proposed project involves the construction of a mixed -use research laboratory center. Retail and restaurant space will serve research laboratory employees. One single -story and four
5-story buildings, two 5-story parking garages, associated public and private roadway access, open space areas, bike parking, sidewalks, and a walking path are proposed.
Mass grading of the site will impact one isolated wetland and a linear, jurisdictional wetland. Heavy equipment typical for road construction, utility installation, and grading will be used to
construct the proposed project, such as track hoes, bulldozers, dump trucks, and graders.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2021-00374 & SAW-2020-01406
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Jennifer Burdette
Agency/Consultant Company: NRC (formerly McAdams)
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
While at McAdams in January and April 2021, Jennifer Burdette delineated the western and easternmost lots of the project, respectively. Soil & Environmental Consultants delineated the
middle portion of the project area in late 2020. AJDs were issued for all but the easternmost parcel under the NWPR. An updated AJD/PJD request was submitted to the USACE under
separate cover. The Jurisdictional Determination Map is attached (Figure 4).
The Town of Morrisville completed stream determinations for the project with one appeal to DWR (#20210921). There are no streams or riparian buffers on the project site.
6. Future Project Plans
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
2. Wetland Impacts
W1
2a1 Reason (?)
Fill - mass grading
2b. Impact type* (?)
P
2c. Type of W.
Headwater Forest
2d. W. name*
W1
2e. Forested* �12f.
Yes
Type of Jurisdicition"
DWR
2g. Impact
area
0.110
(acres)
F771
Fill - mass grading
P
Headwater Forest
W2
Yes
Both
0.012
(acres)
2g. Total Temporary Wetland Impact
0.000
2g. Total Wetland Impact
0.122
2g. Total Permanent Wetland Impact
0.122
21. Comments:
Wetland W1 is a nonjurisdictional, isolated wetland. The proposed 0.110-acre permanent impact is covered under State General Permit NJGP100000
and does not require written approval but is listed in the application for clarity.
E. Impact Justification and Mitigation u
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The applicant requested a delineation of surface waters and wetlands prior to designing the site plan to avoid and minimize impacts to these resources.
The size and configuration of the wetland situated within the project area make avoidance impractical.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
A Sediment and Erosion Control Plan for the project will be developed and approved by the Town of Morrisville. The project will also comply with the
supplementary NPDES Construction Stormwater Permit (NCG010000).
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Jurisdictional wetland impacts total 0.012 acre and are below the 0.10-acre threshold for mitigation.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
What type of SCM are you providing?
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Other SCM that removes minimum 30 % nitrogen
Proposed project will not create concentrated stormwater flow through the buffer
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? *
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
Yes No
N/A - project disturbs < 1 acre
2d. Which of the following stormwater management program(s) apply:
Local Government State
Local Government Stormwater Programs
Phase II NSW USMP Water Supply
Please identify which local government stormwater program you are using.
Town of Morrisville
Comments:
The stormwater management plan consists of green infrastructure and two underground vaults with stormfilter cartridges. The green infrastructure (GSI) includes bioswales, pervious
pavement, rainwater harvesting, and tree wells. The Town of Morrisville will review and approve the plan.
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/statellocal) funds or the use of public (federallstate) land?*
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
Yes No
3b. If you answered "no," provide a short narrative description.
The proposed project is a mixed -use research laboratory center in a highly developed area. It is not anticipated to result in additional development.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
Yes No N/A
4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a
treatment plant, list the capacity available at that plant.
Wastewater generated by the development will be sent to the Town of Morrisville sanitary sewer system. The Town will review the project to ensure
sufficient treatment capacity is available.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Raleigh
5d. Is another Federal agency involved?*
Yes No
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
Unknown
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
McAdams submitted a protected species assessment to USFWS on May 21, 2021. No comments were received from USFWS. The self -certify letter and
species conclusion table are attached.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat? *
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
The NOAA Essential Fish Habitat (EFH) Mapper (http://www.habitat.noaa.gov/protection/efh/efhmapper/) was accessed on February 8, 2022.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
In a letter dated July 12, 2021, SHPO requested consultation with the Office of State Archaeology. Ms. April Norton, USACE approved a proposed permit
area by email dated October 14, 2021. A report of an archaeological survey of the permit area was sent to SHPO for review. The attached SHPO letter
dated December 17, 2021 indicates no additional work is recommended for the surveyed permit area.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
Yes No
8c. What source(s) did you use to make the floodplain determination?*
FIRM Map Number 3720074600J, effective 5/2/2006
Miscellaneous
U
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
Watkins PCN Attachments 2022-02-10_Optimized.pdf 3.98MB
File must be PDF or KMZ
Comments
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
I intend to electronically sign and submit the PCN form.
Full Name:
Jennifer Burdette
Signature
ff-t-hz,
Date
2/10/2022