HomeMy WebLinkAboutNCC220669_ESC Approval Submitted_20220211srA7Z
ROY COOPER
y M m
Governor.
ELIZABETH S. BISER
` y
Secretary
„n*
BRIAN WRENN
NORTH CAROLINA
Director
Environmental Quality
February 3, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Dew Sharpe, LLC
Attention: Cranford A. Jones, Manager
3705-A W. Market St.
Greensboro, NC 27403
RE: Project Name: Dew Sharpe Road: Off -site borrow area
Acres Approved: 4
Project ID: GUILF-2022-022
County: Guilford
City: Gibsonville
Address: Dew Sharpe Rd.
River Basin: Cape Fear
Stream Classification: WS-V ; NSW - Jordan Lake Watershed
Submitted By: Borum, Wade and Associates, P.A.
Date Received by LQS: February 1, 2022
Plan Type: New -Express
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this Letter of Approval with Modifications.
The Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction General Permit. After the form is reviewed and found to be complete, you will receive
a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future, the new responsible party must obtain a new COC.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
•��/� Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27103
nGv„CANEnn n o.wmm,em - ,�mnioWm 336.776.9800
Letter of Approval with Modifications
Dew Sharpe, LLC
February 3, 2022
Page 2 of 3
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition, it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely,
Digitally signed by Zachary Lentz
Zachary Lentz Date: 2022.02.03 15:09:22-05'00'
Zachary Lentz, PE
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
cc: James McGinley, PE of Borum, Wade and Associates, P.A. (via e-mail)
WSRO file
Letter of Approval with Modifications
Dew Sharpe, LLC
February 3, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Dew Sharpe Road: Off -site borrow area
Project ID: GUILF-2022-022
County: Guilford
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. A pre -construction meeting with staff from this office is required prior to land -disturbing
activity. It is recommended that the meeting occur just before the commencement of
excavation and/or grading since the excavation or grading must be completed within one
year. If it is anticipated that the excavation or grading will not be completed within one year,
a mining permit is required prior to land disturbance.
[15A NCAC 413, G.S. 113A-57(3), G.S. 74, Article 7]
2. This approval is for erosion and sediment control and associated construction stormwater
associated with the borrow pit only. It is the duty of the Financially Responsible Party to
assure that land -disturbing activity is conducted in compliance with other applicable
regulations, including, but not limited to, the Mining Act of 1971. Please note that removing
materials beyond the landfill property requires a mining permit.
[15A NCAC 413, G.S. 113A-57(3), G.S. 74, Article 7]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities