Loading...
HomeMy WebLinkAbout20171291 Ver 1_Staff Report EADS_ebdavis_20220211Mitigation Project Information Upload Initial Review and Submittal ID# * 20171291 Mitigation Project Submittal - 2/3/2022 Type of Mitigation Project: * si Stream Wetlands Buffer Nutrient Offset (Select all that apply) Version* 1 Is this a Prospectus,Technical Proposal or New Site?* Yes • No Project Contact Information Contact Name: * Ryan Medric Project Information Existing 20171291 (DWR) ID#: Project Name: Gideon Project Type:* DMS Mitigation Bank County: Surry Document Information Mitigation Document Type: * Mitigation Monitoring Report Email Address: * rmedric@res.us Existing 1 Version: (numbers only) All attachments have been uploaded into Laserfiche for your review. Signature Print Name: * Signature: * Ryan Medric Of Staff Review Staff Review by EADS\ebdavis Project Location: WaterResources\DWR - Wetlands Program\Non DOT\20171291\Ver 1 Staff Comments File Upload Jpg or pdf only Staff Review Completed Date: 02/11/2022