Loading...
HomeMy WebLinkAbout20180067 Ver 1_Staff Report EADS_ebdavis_20220211Mitigation Project Information Upload Initial Review and Submittal ID#* 20180067 Mitigation Project Submittal - 1/27/2022 .................................................................................................. Type of Mitigation Project:* si Stream Wetlands Buffer Nutrient Offset (Select all that apply) Version* 1 Is this a Prospectus,Technical Proposal or New Site?* Yes • No Project Contact Information Contact Name: * Ryan Medric Project Information Existing 20180067 (DWR) ID#: Project Name: Puncheon Fork Project Type: * DMS • Mitigation Bank County: Madison Document Information ................................................................................................................................................................... Mitigation Document Type: * Mitigation Monitoring Report Email Address: * rmedric@res.us Existing 1 Version: (numbers only) All attachments have been uploaded into Laserfiche for your review. Signature Print Name: * Signature: * Ryan Medric W Staff Review Staff Review by EADS\ebdavis Project Location: WaterResources\DWR - Wetlands Program\Non DOT\20180067\Ver 1 Staff Comments File Upload Jpg or pdf only Staff Review Completed Date: 02/11/2022