Loading...
HomeMy WebLinkAbout20211829 Ver 1_DWR Pre-Filing Meeting Request Form_20220210Contact Name* Contact Email Address* Project Owner* Project Name* Project County* Owner Address: Is this a transportation project?* Brandon J Phillips brandon@habitatassessment.com Charlotte Water Irwin Creek Tributary to Remount Road Wastewater Improvement Project Mecklenburg Street Address 5100 Brookshire Blvd Address Line 2 Suite 400 City Charlotte Postal / Zip Code 28216 Yes - No Type(s) of approval sought from the DWR: 401 Water Quality Certification - 401 Water Quality Certification - Regular Express Individual Permit Modification Shoreline Stabilization Does this project have an existing project ID#?* Yes No State / Province / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below and include location information.* As large portions of the city are being rezoned as Transit Oriented Development (TOD) districts, and many development projects are planned for the area, the basin is anticipated to continue to see increased population growth, causing capacity restraints on the existing sewer system to meet the needs of the growing population in an urban area. Based on provided GIS mapping and record drawings, the existing Remount Road Basin consists of 8-inch, 10-inch and 12- inch vitrified clay pipe (VCP), connecting to existing 36-inch VCP just North of I-77. All sewer lines are owned and maintained by Charlotte Water. The project includes segments of gravity sewer to be replaced in place within the Remount Basin area, as well as a stretch of proposed sewer main crossing I-77, through South Side Park. The proposed alignment consists of over 10,000 If of 12-inch to 30-inch sewer. The replacement sewer lines will be constructed in NCDOT and CDOT right-of-way, along W. Tremont Avenue, S. Tryon Street, Brookhill Road, Dunavant Street, Remus Road and Griffith Street and through properties owned by Mecklenburg County. The proposed alignment will tie-in to the existing 54" Irwin Relief Sewer Line located just West of Irwin Creek. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature* Submittal Date 11/10/2021