HomeMy WebLinkAbout20211829 Ver 1_DWR Pre-Filing Meeting Request Form_20220210Contact Name*
Contact Email Address*
Project Owner*
Project Name*
Project County*
Owner Address:
Is this a transportation project?*
Brandon J Phillips
brandon@habitatassessment.com
Charlotte Water
Irwin Creek Tributary to Remount Road Wastewater Improvement Project
Mecklenburg
Street Address
5100 Brookshire Blvd
Address Line 2
Suite 400
City
Charlotte
Postal / Zip Code
28216
Yes - No
Type(s) of approval sought from the DWR:
401 Water Quality Certification - 401 Water Quality Certification -
Regular Express
Individual Permit Modification
Shoreline Stabilization
Does this project have an existing project ID#?*
Yes No
State / Province / Region
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below and include location information.*
As large portions of the city are being rezoned as Transit Oriented
Development (TOD) districts, and many development projects are
planned for the area, the basin is anticipated to continue to see
increased population growth, causing capacity restraints on the
existing sewer system to meet the needs of the growing population in
an urban area. Based on provided GIS mapping and record drawings,
the existing Remount Road Basin consists of 8-inch, 10-inch and 12-
inch vitrified clay pipe (VCP), connecting to existing 36-inch VCP just
North of I-77. All sewer lines are owned and maintained by Charlotte
Water.
The project includes segments of gravity sewer to be replaced in place
within the Remount Basin area, as well as a stretch of proposed sewer
main crossing I-77, through South Side Park. The proposed alignment
consists of over 10,000 If of 12-inch to 30-inch sewer. The
replacement sewer lines will be constructed in NCDOT and CDOT
right-of-way, along W. Tremont Avenue, S. Tryon Street, Brookhill
Road, Dunavant Street, Remus Road and Griffith Street and through
properties owned by Mecklenburg County. The proposed alignment
will tie-in to the existing 54" Irwin Relief Sewer Line located just West
of Irwin Creek.
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401
Certification Rule.
I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting
location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you
can submit an application.
Signature*
Submittal Date 11/10/2021