Loading...
HomeMy WebLinkAbout20180957 Ver 2_USACE Permit_20220112Permittee: Address: U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2017-01430 County: Guilford U.S.G.S. Quad: NC -Greensboro GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION City of Greensboro Attn: Eric Tart P.O. Box 3136 Greensboro, NC 27402 Size (acres) —10 Nearest Town Greensboro Nearest Waterway UT to North Buffalo Creek River Basin Cape Fear USGS HUC 03030002 Coordinates 36.075625 N-79.80108 W Location description: The project area is located along an abandoned Norfolk Southern Railroad corridor between Benjamin Parkway and South Edgewood Street, in Greensboro, Guilford County, North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of dredged or fill material into a total of 2,403 linear feet of streams, and the temporary discharge of dredged or fill material into a total of 1,787 linear feet of streams necessary for construction of the Greensboro Downtown Greenway Phase 4 / A&Y Greenway project, including culvert extensions/construction, stream restoration activities, debris removal, and construction access activities. This permit verification supersedes the previous issued on 8/06/2018. Applicable Law(s): Z Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 27. Aquatic Habitat Restoration, Establishment and Enhancement Activities; NWP 14. Linear Transportation Projects; NWP 3. Maintenance SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your updated application signed and dated 12/17/2021, and the enclosed plans "Wetland and Stream Permit Package" (Sheets 1-24), "College Branch Stream Enhancement", and "EB-6037C". Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact James C. Lastin2er at 919-554-4884 ext. 32 or fames.c.lastinger(a(usace.armv.mil. Corps Regulatory Official: Expiration Date of Verification: 03/18/2022 Date: 1/12/2022 Action ID Number: SAW-2017-01430 County: Guilford Permittee: City of Greensboro, Attn: Eric Tart Project Name: City of Greensboro / Downtown Greenway Phase 4 / Benjamin Parkway to South Edgewood Street / Greensboro / Guilford County / municipal Date Verification Issued: 1/12/2022 Project Manager: James C. Lastinger Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: James C. Lastinger Raleigh Regulatory Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or james.c.lastinger@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date