HomeMy WebLinkAboutNCC220676_ESC Approval Submitted_20220210Planning & Development Department
William Jason Guess
Erosion Control Officer
LETTER OF APPROVAL WITH MODIFICATIONS
February 3, 2022
Mr. Bill Young
506 Bellview Ave.
Daytona Beach, FL 32114
RE: Project Name: CAMPFIRE LODGING -RV EXPANSION SITE
Acres Approved: 1.98 AC
Project 9: ER02021-00102
County: BUNCOMBE
City: WOODFIN
Address: 116 APPALACHIAN VILLAGE ROAD
River Basin: FRENCH BROAD
Stream Classification: C
Submitted By: MR. BILL YOUNG
Date Received by: 1/6/2022
Plan Type: COMMERCIAL
Dear Sir/Madam,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. This approval shall become
null and void if you have not made progress on the site within six months after the date of
approval. A one-time six month extension can be granted for good cause shown upon
receiving a written request from you before the expiration of the approved plan. This letter
of approval is being issued prior to the issuance of the stormwater permit due to
concurrent reviews, but any land disturbing activity associated with this project shall not
begin prior to issuance off all required permits including the stormwater permit and the
land disturbing permit.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under
the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at
Annette.lucas(c�r�,ncdenr.gov or Paul Clark at Paul.clarkkncdenr.gov. If the owner/operator
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. The Land
Disturbing Permit must be posted at the job site. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan
to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
W. Jason Guess
Erosion Control Officer
Enclosures: NPDES NCGO1 Fact Sheet
Cc: Fusco Land Planning & Design PLLC
Planning & Development Department
William Jason Guess
Erosion Control Officer
MODIFICATIONS FOR APPROVAL
Project name: CAMPFIRE LODGING -RV EXPANSION SITE
Project No. ER02021-00102
Location: 116 APPALACHIAN VILLAGE ROAD
Date Approved: FEBRUARY 3, 2022
Person financially responsible: MR. BILL YOUNG
1. Contractor to ensure that any import or export material be from a permitted site.
2. Erosion control measures must be installed in accordance with the approved engineering
plans and maintained at all times. Alternate measures must first be approved with the
engineer of record and regulatory site inspector prior to installation.
3. Clearing limits for grading must be clearly delineated in the field as shown on the
approved engineering plans. Any additional clearing or land disturbing activity that
disturbs the ground surface outside of those limits will constitute a violation of the
County's Ordinance and will be subject to penalties.
4. Any deviations in the original approved construction plans or design changes to land
clearing to the overall site must first be submitted for review to this regulatory office and
approved prior to continuation of construction. Failure to resubmit could result in
possible issuance of stop work orders, holding of any building inspections, or issuance of
certificates of occupancy.