Loading...
HomeMy WebLinkAboutGW1-2022-01548_Well Construction - GW1_20220120 WELL CONSTRUCTION RECORD(GA-1) For Internal Use Only: I.Well Contra for Information:�j t" �� 14.WATER ZONES - F1tOD{ TO DESCRIPTION Well C ntractor Name ^ {t, .7 it. - G ft. / G. NC Well Contractor Cert//ification Number .0 ER ASING for multi-case ells OR L R II a livable FROM To DIAA TfI1C1CNE/ssss MATERIAL alpZli (b 7 j ft. -7 1° Comp ny Name 16,INNER CASING OR TUBIlVG eotherma]closed-100 2.Well Construction Permit#: / �f � �uCl�S � EOM TO DIAMETER THICKNESS MATERIAL in. List all applicable well construction permits(i.e.UIC,Counly,State,Variance,etc.) ft. fL ft. ft iIL 3.Well Use(check well use): 17.SCREEN rClAgricultural ater Supply Well: FR011f TO DIAMETER SLOT 512E Tx,c//ICNEss MATERIAL ❑Municipal/Public l°',,�fL � It ZGeothermal Well Supply) Residential Water Supply(Single) ft ft in ❑Industrial/Commercial /❑Residential Water Supply(shared) 18.GROUT 01ni ation ❑Wells>100,000 GPD FROM To FATERIAL EMPLACEMENT nt on&AMOUIYI ft. fL Non-Water Supply Well: ❑Monitoring ❑Recovery ft. fL Injection Well: ft. ft ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK a livable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM To MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑StormwaterDrainage ft ft L> n / ❑Experimental Technology ❑Subsidence Control ft. fL ❑Geothermal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if neces FROM TO DESCRIM.. cobs,Ludness,soiVrock e, 'n size,etc ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) fL fL 4.Date Well(s)Completed: 4L_7jL Well ID# ft ft. ft. —ft. 7 5a��ep Locatyon: ft. rr ft. f4 Facility/Owner Name f Facility ID#(if applisabtc _ 0 e i's l) t rc rr 1 ft, f4 Physical A4ddress,City and Zip � 21.REMiARKS ounty Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one lat/long is sufficient) 22 ertifica' n• / I ure of Certified I Contractor ate 6.Is(are)the well(s): [ ermanent or ❑Temporary / 8y signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well ❑Yes orj�10 (/ 15A NCAC 02C.0100 or 1 SA NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,Jil!out!mown well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back of lhisform. 23.Site diagram or additional well details: You may use the back of this page to provide additional well construction info S.For cti on,o only I G or Closed-Loop Geothermal Wells having the same (add'See Over'in Remarks Box).You may also attach additional pages if necessary. construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells drilled: / D t 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: �� K (ft') Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths if different(example-3(200'and 2 1003 24a. For All Wells: Original form to Division of Water Resources (DWR), 10.Static water level below top of casing: (ft•) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 If water level is above caring,use"+" L //� 24b.For Injection Wells:Copy to DWR,Underground Injection Control(IUC) 11.Borehole diameter: (ln) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: /�1 till /�t%1 �p G� 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing;over 100,000 GPD:Copy to DWR,CCPCUA / Permit Program,1611 MSC,Raleigh,NC 27699-1611 13a.Yield(gpm) r /� Method of test: