NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
FIELD SCOPING MEETING WORKSHEET
Return with Comments to Division by:
PROJECT NO.: BP3-R010 FIELD SCOPING MEETING DATE: 2022-1-6 LET DATE: 2025-7-20
DIVISION: 3 LOCATION: On-Site
COUNTY: ONSLOW
ROUTE (US / NC / SR): SR 1109
PROJECT DESCRIPTION: REPLACEMENT OF BRIDGE 71 OVER HARRIS
CREEK AT SR 1109
BRIDGE NO.: 660071
TIER: REGIONAL
FUNCTIONAL CLASSIFICATION: LOCAL, URBAN
MPO / RPO AREA: JACKSONVILLE URBAN AREA MPO
MUNICIPALITY: JACKSONVILLE
ATTENDEES NAME (PRINT) PHONE No E-MAIL
DIVISION CONSTRUCTION
ENGINEER
Anthony Law 910-341-2000 awlaw@ncdot.gov
ASSISTANT DIVISION
CONSTRUCTION ENGINEER
Trevor Carroll 910-341-2000 tkcarroll@ncdot.gov
DIVISION MAINTENANCE
ENGINEER
Keith Eason 910-341-2000 dkeason@ncdot.gov
ASSISTANT DIVISION MAINTENCE
ENGINEER
Caitlin Marks 910-341-2000 cmmarks@ncdot.gov
DIVISION BRIDGE MAINTENANCE
ENGINEER
Bradley Haste 910-467-0520 blhaste@ncdot.gov
AREA CONSTRUCTION ENGINEER David Candela 910-524-4931 dacandela@ncdot.gov
RESIDENT ENGINEER Kirsten Spirakis 910-398-9130 klspirakis@ncdot.gov
DIVISION PROJECT DEVELOPMENT Katie Hite 910-341-2000 kehite@ncdot.gov
DIVISION DESIGN CONSTRUCT
REPRESENTATIVE
David Leonard 910-341-2000 dbleonard@ncdot.gov
DIVISION UTILITY ENGINEER Lonny Sleeper 910-341-2000 lasleeper@ncdot.gov
DIVISION UTILITY COORDINATOR Ben Meyer 910-341-2000
Ext-bcmeyer1@ncdot.gov
DIVISION ENVIRONMENTAL
OFFICER
Mason Herndon 910-341-2000 tmherndon@ncdot.gov
HYDRAULICS UNIT
REPRESENTATIVE
Craig Lee 919-707-6708 cjlee@ncdot.gov
HYDRAULICS UNIT
REPRESENTATIVE
Galen Cail 919-707-6711 gcail@ncdot.gov
GEOTECHNICAL UNIT
REPRESENTATIVE
Dean Argenbright 252-439-2870 dargenbright@ncdot.gov
2
GEOTECHNICAL UNIT
REPRESENTATIVE
James Batts 919-662-3576 jrbatts@ncdot.gov
STRUCTURES MANAGEMENT UNIT
REPRESENTATIVE
Kevin Fischer 919-707-6514 wkfischer@ncdot.gov
STRUCTURES MANAGEMENT UNIT
REPRESENTATIVE
Kristy Alford 919-707-6531 kalford@ncdot.gov
DIVISION RIGHT OF WAY AGENT Eric Ray 910-341-2000 eray@ncdot.gov
LOCATION AND SURVEYS
REPRESENTATIVE
CJ Sawyer 910-341-2280 cjsawyer@ncdot.gov
US ARMY CORPS OF ENGINEERS Brad Shaver 910-251-4611 brad.e.shaver@usace.army.mil
DIVISION OF MARINE FISHERIES Kim Harding 252-264-3901 Kimberlee.harding@ncdenr.gov
DIVISION OF COASTAL
MANAGEMENT
Stephen Lane 252-208-2808 Stephen.Lane@ncdenr.gov
DIVISION OF WATER RESOURCES Hannah Sprinkle 910-796-7306 hannah.sprinkle@ncdenr.gov
DIVISION OF WILDLIFE
RESOURCES
Travis Wilson 919-707-0370 travis.wilson@ncwildlife.org
US FISH & WILDLIFE SERVICES Gary Jordan 919-856-4520 ext.
32
gary_jordan@fws.gov
DIVISION 3 – ASSIATANT
RESIDENT ENGINEER
Daniel Waugh 910-467-0520 Dgwaugh1@ncdot.gov
DIVISION 3 – LOCATION AND
SURVEY
Monica Duval 910-341-2283 mjduval@ncdot.gov
DIVION 3 – DIVISION DESIGN
CONSTRUCT
Brian Harding 910-341-2000 bjharding@ncdot.gov
LJB INC. Scott Cooke 910-726-1839 scooke@ljbinc.com
LJB INC. Rick Coffman 919-594-6738 rcoffman@ljbinc.com
LJB INC. Jon Giles 910-726-1853 jgiles@ljbinc.com
DESIGN CONSULTANT
DESIGN CONSULTANT
DESIGN CONSULTANT
UTILITY CONSULTANT
UTILITY CONSULTANT
UTILITY CONSULTANT
DIVISION (COMPLETED BY DIVISION STAFF AND SENT WITH THE FSM LETTER)
EXISTING FEATURES
FEATURE BRIDGED: HARRIS CREEK
(BRIDGE / CULVERT) LENGTH 86’ DECK WIDTH (OUT TO OUT) 27.333’
3
WATER DEPTH: 2.0’ HEIGHT BED-TO-CROWN: 15.1
PRIOR SURVEY DATE: 01/16/2020 POSTED: SV 19 TTST: 27
STRUCTURE TYPE: CONCRETE DECK ON TIMBER BEAMS
SPAN TYPE: 5 SIMPLE SPANS (17.1-17.25-17.25-17.2-17.1)
HISTORIC HIGH WATER (ELEV. TO THE TOP OF RAIL):
-L- BASE YEAR: 2012
-L- BASE YEAR: 2040
ANNUAL AVERAGE DAILY TRAFFIC: 880
ANNUAL AVERAGE DAILY TRAFFIC: 1760
% TRUCKS/DUALS: 6%
SUFFICIENCY RATING: 31.99
POSTED SPEED LIMIT IN PROJECT VICINITY: 55 MPH
DETOUR: OFF-SITE: YES ON-SITE: NO STAGE CONSTRUCTION: NO
IF DETOUR IS OFF-SITE, PROVIDE DESCRIPTION OF DETOUR ROUTE: SR 1109 (HOLLY SHELTER RD) TO NC
53 (BURGAW HWY) TO SR 1107 (HARRIS CREEK RD) TO SR 1109 (HOLLY SHELTER RD)
APPROXIMATE LENGTH OF DETOUR? 6.9 MILES
IMPROVEMENTS NEEDED TO ROAD ON DETOUR? YES COMMENTS: SF-4903F SR 1109 (HOLLY SHELTER
RD) AT NC 53, REALIGMENT AND LANE CONSTRUCTION.
IMPROVEMENTS NEEDED TO BRIDGES ON DETOUR? NO
ARE BRIDGES ON DETOUR CURRENTLY PROGRAMMED ON TIP? NO COMMENTS:
ARE THERE EMS, SCHOOL, OR BUSINESS ACCESS ISSUES? NO COMMENTS:
ARE THERE ANY RAILROAD CROSSINGS ON DETOUR? NO COMMENTS:
WILL RAILROAD INVOLVEMENT BE REQUIRED? NO
SHOULD WORK ZONE PEDESTRIAN ACCESS BE MAINTAINED DURING CONSTRUCTION? NO REASONS:
EXISTING R/W WIDTH: 60’
IMPACT RATING TO UTILITIES: ----------
POWER TRANSMISSION LINES: DUKE ENERGY AERIAL/UG/BOTH: AERIAL IN CONFLICT: YES
TELEPHONE: CENTURY LINK AERIAL/UG/BOTH: AERIAL IN CONFLICT: YES
CABLE TV: CHARTER AERIAL/UG/BOTH: AERIAL IN CONFLICT: YES
FIBER OPTIC: AERIAL/UG/BOTH: IN CONFLICT:
WATER: ONSLOW WATER & SEWER AUTH. IN CONFLICT: NO, UG & AERIAL ON DOWNSTREAM SIDE
SEWER: ONSLOW WATER & SEWER AUTHORITY IN CONFLICT: --------
NATURAL GAS: PIEDMONT NATURAL GAS IN CONFLICT: --------
OTHER: IN CONFLICT: --------
BASED ON THE PAST HISTORY NEAR THIS PROJECT SITE, WHAT IS THE ESTIMATED TIME REQUIRED TO
COMPLETE UTILITY ADJUSTMENTS MONTHS
WHICH UTILITIES WILL REQUIRE PERMITS FOR RELOCATION?
WHAT TYPE PERMIT?
WHO WILL BE OBTAINING PERMITS FOR UTILITY RELOCATION?
IS THERE ANY FUTURE UTILITY CONSTRUCTION ANTICIPATED IN THE PROJECT AREA?
IS A FEMA BUY-OUT PROPERTY BEING IMPACTED?
EXISTING UTILITY DRAWING ATTACHED?
WILL TEST HOLES BE REQUIRED?
4
HYDRAULICS (COMPLETED BY HYDRAULICS ENGINEER PRIOR TO THE FSM)
WILL THIS PROJECT REQUIRE A FEMA PERMIT? NO
IS THERE UNUSUAL SCOUR POTENTIAL? NO IS PROTECTION NEEDED? USE STANDARD PROTECTION
ARE BANKS STABLE? YES IS PROTECTION NEEDED? USE STANDARD RIP RAP AMOURING
DOES STREAM CARRY APPRECIABLE AMOUNT OF LARGE DEBRIS? NO
WILL THE PLACEMENT OF BENTS IN THE WATER BE ALLOWED? NO COMMENTS:
BRIDGE TO PIPE CANDIDATE? NO COMMENTS:
WILL THIS PROJECT REQUIRE A STATE STORMWATER PERMIT? NO
HOW WILL ROADSIDE DRAINAGE AND / OR TREATMENT OF STORMWATER VIA THE BRIDGE DECK BE
ADDRESSED FOR EACH QUADRANT?
NE QUADRANT: Roadway ditch
SE QUADRANT: Roadway ditch
SW QUADRANT: Roadway ditch and 2GI at bridge
NW QUADRANT: Roadway ditch and 2GI at bridge
GEOTECHNICAL UNIT (COMPLETED BY GEOTECHNICAL UNIT PRIOR TO THE FSM)
EXISTING FOUNDATION REPORTS? NO IF SO, ATTACH.
KNOWN GEOLOGICAL FEATURES IN AREA WHICH MAY AFFECT DESIGN: LIMESTONE
ARE PERMITS NEEDED FOR INVESTIGATIVE WORK AT SITE? UNLIKELY COMMENTS:
ARE THERE ANY HISTORICAL AND / OR VIBRATION SENSITIVE STRUCTURES NEAR BY? NO COMMENTS:
ARE THERE ANY KNOWN LANDFILLS AND / OR GEOENVIRONMENTAL HAZARD SITES AT OR WITHIN CLOSE
PROXIMITY TO THE PROJECT SITE? NO COMMENTS:
DEPTH OF WEATHERED ROCK OR ROCK BELOW STREAMBED? 40-FT (ELVATION 25-FT)
ARE ANY IMPACTS ANTCIPATED TO NATURAL SPRINGS OR ARTESIAN WELLS: NO COMMENTS: BOREHOLES
WILL BE SEALED.
POSSIBLE FOUNDATION TYPE: PILE AND DRILLED SHAFTS – RECOMMENT BENTS BE PLACED A MINIMUM
OF 5 FEET FROM EXISTING BENTS.
ENVIRONMENTAL (COMPLETED BY DEO STAFF PRIOR TO THE FSM)
WETLANDS AT SITE? YES COMMENTS: PJD ISSUED ON THIS SITE APRIL 24, 2017 (SAW-2017-00487) WHICH
REMAINS VALID.
WETLAND MITIGATION? NO RATIO? STREAM MITIGATION? NO RATIO?
KNOWN ENDANGERED SPECIES POPULATIONS IN AREA? COOLEY’S MEADOWRUE, GOLDEN SEDGE,
PONDBERRY, ROUGH-LEAVE LOOSESTRIFE, ATLANTIC AND SHORTNOSE STURGEON, EASTERN BLACK
RAIL, AND NORTHERN LONG-EARED BAT COMMENTS:
BUFFER REQUIREMENTS?
CAMA COUNTY: YES PRIMARY NURSERY AREA: DCM CLAIMING:
MORATORIA: NO IF YES-DURATION
COMMENTS
IS WATER FEATURE CLASSIFIED AS A WILD AND SCENIC RIVER? NO COMMENTS:
5
WHAT IS THE WATER QUALITY CLASSIFICATION FOR THIS PROJECT: C, NSW STREAM ID# 19-17-3
WILL A COAST GUARD PERMIT BE REQUIRED? NO COMMENTS:
IS THE PROJECT SITE IN OR NEAR ANY OF THE FOLLOWING:
NATIONAL FOREST: NO
WILDLIFE REFUGE: NO
STATE, COUNTY, OR LOCAL PARK: NO
AIRPORT: NO
A LAKE FOR RECREATION OR POWER GENERATION: NO
WATER SUPPLY RESERVOIR: NO
NUTRIENT SENSITIVE WATERS: YES
PUBLIC USE BOAT RAMP: NO
CEMETARIES: NO
WILL A FEDERAL ENERGY REGULATORY COMMISSION (FERC) PERMIT BE REQUIRED? NO
IS THIS BRIDGE IN A FEDERAL PROJECT AREA THAT IS SUBJECT TO SECTION 408 PERMISSIONS? NO
IS THE PROJECT AREA KNOWN FOR POTENTIAL INDIAN, COLONIAL, OR OTHER ARCHAEOLOGICAL SITES? NO
KNOWN OR POTENTIAL HISTORIC PROPERTIES IN THE AREA? NO
IS THE BRIDGE STRUCTURE ITSELF, OR ANY PART THEREOF, CONSIDERED HISTORIC? NO
WILL THE PROJECT IMPACT A CHURCH, COMMUNITY CENTER, OR OTHER PUBLIC FACILITY? NO
IS THIS PROJECT ON A STATEWIDE BICYCLE ROUTE OR A LOCAL NON-MARKED BICYCLE ROUTE? NO
ANY CLARIFICATION OR COMMENTS ON ITEMS ABOVE:
NO DECK DRAINAGE DISCHARGE INTO CREEK ALLOWED.
NRTR LETER OF REVISION TO BE ISSUED.
USE STANDARD NOTE FOR LONG EARRED BAT.
CONSTRUCTABILITY AND ACCESS (DISCUSSED AT THE FSM BY DIVISION BRIDGE MANAGER)
METHOD OF ACCESS:
TOP-DOWN: NO
MATERIAL AND EQUIPMENT ACCESS TO SITE: DIRECT ACCESS FROM SR 1109
TRACTOR-TRAILER ACCESS: YES BARGE ACCESS: NO HEAVY EQUIPMENT ACCESS: YES
POSTED ROADS AND POSTED BRIDGES IN VICINITY THAT MAY AFFECT ACCESS? NONE
ARE CONSTRUCTION STAGING AREAS AVAILABLE NEAR SITE? YES
ANY ANTICIPATED AREAS OF TEMPORARY SHORING REQUIRED? NONE
ADDITIONAL COMMENTS:
ROADWAY (COMPLETED BY ROADWAY ENGINEER PRIOR TO FSM)
ALIGNMENT: EXISTING HORIZONTAL: CURVED ALIGNMENT WITH 8% SE
EXISTING VERTICAL: FLAT GRADE APPROX. 0.5%
POSSIBLE DESIGN STANDARDS: NCDOT RDM (11/1/2021) AND ASSHTO GB (2018)
POSSIBLE DESIGN SPEED: 60 MPH
6
POSSIBLE DESIGN EXCEPTIONS: COMMENTS:
APPROXIMATE PROJECT LENGTH: 1100’ NUMBER AND WIDTH OF LANES: 2 LANES @ 11’
SHOULD THIS PROJECT HAVE CURB AND GUTTER OR SHOULDER APPROACHES? SHOULDER APPROACHES
COMMENTS:
TOTAL SHOULDER WIDTH: 4’ PAVED SHOULDER WIDTH: N/A
CLEAR ROADWAY ON STRUCTURE: 24’ CURB-CURB
WILL EXISTING DRIVEWAYS, BUSINESS ACCESS, -Y- LINES OR RAMPS NEED TO BE RELOCATED? NO
COMMENTS:
ARE THERE ADDITIONAL RIGHT OF WAY / PERMANENT EASEMENTS / TEMPORARY EASEMENTS ANTICIPATED
FOR CONSTRUCTION? TCE AND PDE COMMENTS: FOR BRIDGE CONSTRUCTION AND 48” CROSS PIPE
ARE ANY RETAINING WALLS ANTICIPATED? NO
ADDITIONAL COMMENTS: REMOVE ASPHALT DUMPED ALONG NORTHEAST SLOPE. ARMOUR 2:1
SIDESLOPES WITH RIP RAP, USE 3:1 SIDESLOPES WHERE GR IS IN NOT REQUIRED.
ITEMS TO BE DISCUSSED / RESOLVED AT FSM BY ATTENDEES
ALTERNATIVES TO BE STUDIED BY ROADWAY DESIGN (CHECK ALL THAT APPLY)
OFF-SITE DETOUR ON-SITE DETOUR NEW LOCATION
CHECK ONE
TYPE OF ENVIRONMENTAL DOCUMENT (CHECK ONE)
LIBR ATT G
PROGRAMMATIC CATIGORICAL EXCLUSION (PCE)
MINIMUM CRITERIA RULE COMPLIANCE CHECKLIST
THE OPTIMUM LET DATE FOR THIS PROJECT IS:
SURVEY LIMITS: 55 MPH
POSSIBLE SUPERSTRUCTURE:
TYPE: CONCRETE DECK ON PRESTRESSED CONCRETE GIRDERS.
NUMBER OF SPANS: TWO OR THREE
LENGTH OF SPANS: TWO SPAN 30-65
(FT), THREE SPAN 30-45-30 (FT)
TOTAL PROPOSED LENGTH: 95 TO
105 (FT)
TOTAL PROPOSED WIDTH: 33’ OUT-OUT (FT)
BRIDGE SKEW: 90 DEGREES
ROW BY:
PERMITS:
METHOD OF CLEARING:
SALVAGEABLE MATERIALS: NO
REMOVAL OF REMENANT ABUTMENTS / PIERS: YES
DECK OVERLAY TYPE ASPHALT
7
ADDITIONAL COMMENTS:
APPROACH SLAB ON SKEW OR PERPENDICULAR: PERPENDICULAR
SHOULD PILES BE NON-CORROSIVE MATERIAL: YES
WILL TEST HOLES BE REQUIRED? YES