HomeMy WebLinkAbout20220216 Ver 1_401 Application_20220204Staff Review
Does this application have all the attachments needed to accept it into the review process?*
Yes No
ID#* Version* 1
20220216
Is this project a public transportation project?* Yes
No
Reviewer List: * Sue Homewood:eads\slhomewood
Select Reviewing Office: * Winston-Salem Regional Office - (336) 776-9800
Submittal Type:* 401 Application
Does this project require a request for payment to be sent?*
Yes
No
How much is owed?* $240.00
$570.00
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: * For the Record Only (Courtesy Copy)
New Project
Modification/New Project with Existing ID
More Information Response
Other Agency Comments
Pre -Application Submittal
Re-Issuance\Renewal Request
Stream or Buffer Appeal
Project Contact Information
Name: Heather LaGamba
Who is submitting the information?
Email Address: hlagamba@pilotenviro.com
Project Information
Project Name: Hanes Lake
Is this a public transportation project?
Yes
No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
Yes No Unknown
County (ies)
Forsyth
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach document
2152.6_Hanes Lake_PCN_2.4.22.pdf 9.56MB
Only pdf or kmz files are accepted.
Describe the attachments or
comments:
PCN for 401 WQC
Sign and Submit
By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
0. 16�11-11 ,
Submittal Date: Is filled in automatically.
Preliminary ORM Data Entry Fields for New Actions
ACTION ID #: SAW- 2020-01465 Begin Date (Date Received): 2.4.22
Prepare file folder ❑✓ Assign Action ID Number in ORM ❑✓
1. Project Name [PCN Form A2a]: Hanes Lake Phase 2 (Lake at Spicewood or Spicewood Dr)
2. Work Type: VPrivate ❑Institutional ❑Government ❑Commercial
3. Project Description / Purpose [PCN Form 133d and 133e]:
4. Property Owner / Applicant [PCN Form A3 or A4]:
5. Agent / Consultant [PNC Form A5 — or ORM Consultant ID Number]:
Pilot Environmental, Inc.
6. Related Action ID Number(s) [PCN Form 135b]:
7. Project Location — Coordinates, Street Address, and/or Location Description [PCN Form B lb]:
36.148183/-80.358331, Spicewood Drive
8. Project Location —Tax Parcel ID [PCN Form Bla]: 5897-75-7469
9. Project Location — County [PCN Form A2b]: Forsyth
10. Project Location — Nearest Municipality or Town [PCN Form A2c]: Winston-Salem
11. Project Information — Nearest Waterbody [PCN Form 132a]: Bill Branch
12. Watershed / 8-Digit Hydrologic Unit Code [PCN Form 132c]: 03040101
Authorization: Section 10 ❑ Section 404 ❑✓
Regulatory Action Type:
❑ Standard Permit
❑✓ Nationwide Permit #
Regional General Permit #
Jurisdictional Determination Request
Section 10 and 404 ❑
❑Pre -Application Request
❑ Unauthorized Activity
❑ Compliance
❑ No Permit Required
Revised 20150602
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre -Construction Notification PCN Form
A. Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the
Corps:
®Section 404 Permit El Section 10 Permit
1 b.
Specify Nationwide Permit (NWP) number: NWP 14 or General Permit (GP) number:
1c.
Has the NWP or GP number been verified by the Corps?
❑ Yes
® No
1d.
Type(s) of approval sought from the DWQ (check all that apply):
N 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
❑ Yes N No
For the record only for Corps Permit:
❑ Yes N No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
N Yes
® No
1g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
❑ Yes
® No
1 h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2.
Project Information
2a.
Name of project:
Spicewood Drive
2b.
County:
Forsyth
2c.
Nearest municipality / town:
Winston Salem
2d.
Subdivision name:
Hanes Lake Phase II (The Lake at Spicewood Phase 1)
2e.
NCDOT only, T.I.P. or state
project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
Clayton Properties Group
3b.
Deed Book and Page No.
003584/00613
3c.
Responsible Party (for LLC if
applicable):
Will Dickerson
3d.
Street address:
221 Jonestown Road
3e.
City, state, zip:
Winston Salem, NC 27104
3f.
Telephone no.:
336.979.4054
3g.
Fax no.:
3h.
Email address:
wdickerson@mungo.com
Page 1 of 13
PCN Form — Version 1.3 December 10, 2008 Version
4.
Applicant Information (if different from owner)
4a.
Applicant is:
❑ Agent ❑ Other, specify:
4b.
Name:
4c.
Business name
(if applicable):
4d.
Street address:
4e.
City, state, zip:
4f.
Telephone no.:
4g.
Fax no.:
4h.
Email address:
5.
Agent/Consultant Information (if applicable)
5a.
Name:
Bradley Luckey
5b.
Business name
(if applicable):
Pilot Environmental, Inc.
5c.
Street address:
PO Box 128
5d.
City, state, zip:
Kernersville, NC 27285
5e.
Telephone no.:
336.708.4997
5f.
Fax no.:
5g.
Email address:
bluckey@pilotenviro.com
Page 2 of 13
PCN Form — Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
5897-75-7469.000
1 b. Site coordinates (in decimal degrees):
Latitude: 36.148183 Longitude: - 80.35833
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size:
186 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
Bill Branch
proposed project:
2b. Water Quality Classification of nearest receiving water:
Class C
2c. River basin:
Yadkin, 03040101
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The site contains Phase I of Hanes Lake subdivision, wooded land, fields and Hanes Lake. The site is located in
rural/residential area of Winston-Salem.
3b. List the total estimated acreage of all existing wetlands on the property:
Wetland=23.83 Ac
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
Streams=4,440 LF. Open Water Lake=27.9 Ac
3d. Explain the purpose of the proposed project:
The purpose of the proposed project is to development the site with Phase II of Hanes Lake, a residential sub -division.
3e. Describe the overall project in detail, including the type of equipment to be used:
The overall project includes the construction of Phase II of Hanes Lake, a 182 lot single family residential subdivision.
The applicant has previously constructed Phase I of the sub -division, an 88 lot single family residential subdivision that
previously permanently impacted 0.07 acres of wetlands in April 2021 (SAW-2020-01465). In order to facilitate the
proposed development and access lots for Phase II of Hanes Lake, it is necessary to have stream and wetland crossings.
To facilitate the development of the site, clearing and grading the site is necessary. Graders, haulers, excavators and
other heavy equipment will be used during grading and construction of the site.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
®Yes ❑ No El Unknown
project (including all prior phases) in the past?
Comments: SAW-2020-01465
4b. If the Corps made the jurisdictional determination, what type
®Preliminary ❑Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas?
Agency/Consultant Company: Pilot Enviromental, Inc.
Name (if known): Michael Brame
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
SAW-2020-01465, 9.1.21
5. Project History
5a. Have permits or certifications been requested or obtained for
® Yes ❑ No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
The applicant constructed Phase I of the Hanes Lake subdivision and permanently impacted 0.07 acres of wetlands
assoicated with the construction of Spicewood Drive. SAW-2020-01465 dated 4.29.21 and NCDWR 401 WQC dated
6.4.2021.
Page 3 of 13
PCN Form — Version 1.3 December 10, 2008 Version
6. Future Project Plans
6a. Is this a phased project? ® Yes ❑ No
6b. If yes, explain.
It may be necessary to obtain permits for future phases, contingent on the economy and subdivision success. The
applicant is aware that impacts will be considered cumulative and that the appropriate permits and mitigation will be
required for future impacts, should they occur.
Page 4 of 13
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
® Wetlands ® Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
Page 5 of 13
PCN Form — Version 1.3 December 10, 2008 Version
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b.
2c.
2d.
2e.
2f.
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non-404, other)
(acres)
Temporary T
W1 ® P ❑ T
Road Fill
Bottomland
® Yes
® Corps
0.248
Hardwood
❑ No
❑ DWQ
W2 ® P ❑ T
Road Fill
Bottomland
® Yes
® Corps
0.120
Hardwood
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g. Total wetland impacts
0.368
2h. Comments: Impact #1-The construction of Cinnamon Hill Drive will permanently impact 0.248 acres of wetlands with
culvert, head/endwalls, rip -rap and clean earthen fill.
Impact #2 - To provide appropriate vehicle and emergency personnel turnaround at the terminus of Cinnamon Hill Drive and to
meet NCDOT safety requirements of a 2:1 side slope adjacent to roads, it is necessary to fill 0.12 acres of wetlands.
Temporary impacts to wetlands are not proposed. Mitigation for wetlands impact is proposed.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non-404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
Culvert &
S1 ® P ® T
Walls/Keyed In
Rip-
Unnamed
® PER
❑ INT
® Corps
❑ DWQ
Variable
91/90/20
rap/Dewatering
S2 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
91/90/20
3i. Comments: Stream Impact 1 will permanently impact 0.008 acres/91 linear feet of stream channel with culvert/wall fill,
permanently impact 0.014 acres/90 linear feet of stream channel with keyed -in rip -rap energy dissipater and temporarily
impact 20 linear feet of stream channel with associated de -watering.
Page 6 of 13
PCN Form — Version 1.3 December 10, 2008 Version
Areas of temporary impact will be restored to similar pre -construction grades, stabilized with matting and native herbaceous
seed mix. Mitigation is not proposed for proposed stream impacts.
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
Open water
impact number —
Permanent (P) or
Temporary T
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody type
4e.
Area of impact (acres)
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts
4g. Comments: Open water impacts are not proposed.
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
Pond ID
number
5b.
Proposed use or purpose
of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments: Ponds are not proposed to be constructed in waters.
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
Page 7 of 13
PCN Form — Version 1.3 December 10, 2008 Version
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar -Pamlico ❑ Other: Yadkin
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b.
6c.
6d.
6e.
6f.
6g.
Buffer impact
number —
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary T
impact
re uired?
B1 ❑P❑T
El Yes
❑ No
B2 ❑P❑T
El Yes
❑ No
B3 ❑P❑T
El Yes
❑ No
6h. Total buffer impacts
6i. Comments: Buffer impacts are not proposed.
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The applicant has designed the proposed residential sub -division to avoid other impact to streams, wetlands and open water
ponds. The applicant designed the road crossing to utilize approximate 10-foot head/end walls and a 2:1 side slope thus
reducing the permanent impact to the stream. Additionally the applicant has designed the terminus of Cinnamon Hill Drive at
a 2:1 side slope, thus reducing the permanent impact to wetlands.
The remaining 23.462 acres of wetlands, 4,219 linear feet of stream channel and 27.9 acres of open water lake are being
avoided.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
The clearing limits will be staked and surveyed in the field. Sediment and erosion control devices and other best management
practices will be utilized during site development activities to prevent down -gradient sedimentation into waters. Temporary
coffer dams will be installed up -gradient of the proposed culvert. During construction, water will be pumped around the
construction footprint. Appropriate stream bank protection will be provided in the channel during construction and all excess
excavated material will be immediately removed from the stream bank/wetland crossing. Upon completion of the culvert
installation, the temporary sand bag coffer dams will be removed and flow will be diverted through the culvert. Following
construction, disturbed banks will be restored to similar pre -construction conditions, matted and seeded/live staked.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
❑ Yes ® No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply):
® DWQ ® Corps
® Mitigation bank
2c. If yes, which mitigation option will be used for this
ElPayment to in -lieu fee program
project?
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: Brushy Mountain Mitigation Bank
3b. Credits Purchased (attach receipt and letter)
Type Wetlands
Quantity 0.74 ac Needed
Page 8 of 13
PCN Form — Version 1.3 December 10, 2008 Version
3c. Comments: The applicant does not propose mitigation for impacts to streams. The applicant proposes to mitigation for
unavoidable permanent wetland impacts at a 2:1 ratio. Based on SOA from Brushy Mountain Mitigation Bank dated 1.28.22
(attached), they have the necessary credits available to satisfy the request of 0.74 acres of wetlands credits.
If the Brushy Mountain Mitigation Bank does not have credits available at the time of permit issuance, then the applicant will
satisfy the request with NCDMS. Other private mitigation banks did not respond to the applicant's request within at least 10
days or does not have available credits.
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non -riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
❑ Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 9 of 13
PCN Form — Version 1.3 December 10, 2008 Version
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
1 a.
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b.
If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
Comments:
2.
Stormwater Management Plan
2a.
What is the overall percent imperviousness of this project?
High Density %
2b.
Does this project require a Stormwater Management Plan?
® Yes ❑ No
2c.
If this project DOES NOT require a Stormwater Management Plan, explain why: The project is high density. A SWMP will
be approved by DEQ or local municipality prior to impacts occuring.
2d.
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
® Certified Local Government
2e.
Who will be responsible for the review of the Stormwater Management Plan?
® DWQ Stormwater Program
❑ DWQ 401 Unit
3.
Certified Local Government Stormwater Review
3a.
In which local government's jurisdiction is this project?
® Phase II
❑ NSW
3b.
Which of the following locally -implemented stormwater management programs
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other:
3c.
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ® No
attached?
4.
DWQ Stormwater Program Review
❑ Coastal counties
❑ HQW
4a.
Which of the following state -implemented stormwater management programs apply
❑ ORW
(check all that apply):
❑ Session Law 2006-246
❑ Other:
4b.
Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ❑ No
5.
DWQ 401 Unit Stormwater Review
5a.
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b.
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 10 of 13
PCN Form — Version 1.3 December 10, 2008 Version
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1a.
Does the project involve an expenditure of public (federal/state/local) funds or the
❑ Yes
® No
use of public (federal/state) land?
1 b.
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c.
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes
® No
letter.)
Comments: A NEPA or SEPA is not required as part of this project.
2.
Violations (DWQ Requirement)
2a.
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑ Yes
® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b.
Is this an after -the -fact permit application?
❑ Yes
® No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3.
Cumulative Impacts (DWQ Requirement)
3a.
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes
® No
additional development, which could impact nearby downstream water quality?
3b.
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
We are not aware of additional development that will result which will impact nearby downstream water
quality.
4.
Sewage Disposal (DWQ Requirement)
4a.
Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
Impacts from wastewater generation are not proposed.
Page 11 of 13
PCN Form — Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
❑ Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ® No
impacts?
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
The IPaC report for the site identifies the following federally protected endangered or threatened species that could be
proximate to the project area: Northern -long eared Bat (NLEB) (T) and Schweinitz's sunflower ( E). The project area
contains an approximate 40 year old hardwood forest. Suitable habitat for Schweinitz's sunflower is not located within the
proposed project area. Therefore, we have made a determinaton of no effect for this species. Percussionary, vibratory or
blasting activties are not proposed. The project area is located greater than 90 miles from known NLEB hibernacula or
summer r000sting trees. Therefore, we have made a determination the proposed project is not likely to adversely affect
NLEB.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Based on our knowledge of the site, the site is not located in or near an area designated as essential fish habitat. Best
management practices and the construction of stormwater ponds will prevent sediment from entering down -gradient
waterbodies which may contain fish..
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
We reviewed the SHPO Map (http://gis.ncdcr.gov/hpoweb/) to identify cultural resources of the site. The map does not
identify listed or eligible for listing properties on or nearby the site. A copy of the map is included as an attachment.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?
® Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: The applicant will obtain floodplain development permit from local
municipality prior to impacts occuring.
8c. What source(s) did you use to make the floodplain determination? FEMA NHFL (Drawing 4, attached)
Digitally signed Bradley Luckey
DIN:Lu: cn=Bradley Luckey, o=Pilot
Bradley
a
Bradley S. Luckey, PWS
Enviromental, Inc., ou,
email=bluckey@pilotenviro.com,
2.4.22
Luckey
Date: 2022.02.04 11:27:55-05'00'
Date
Applicant/Agent's Signature
Applicant/Agent's Printed Name
Page 12 of 13
PCN Form — Version 1.3 December 10, 2008 Version
DocuSign Envelope ID: 791 F4461-4EB7-4CA9-ABB4-OF59FBFFC1 4B
AGENT AUTHORIZATION
This form authorizes PEI to act as our agent in stream/wetland matters including U.S. Army Corps
of Engineers and North Carolina Division of Water Resources field verification and permitting.
Property Address: Spicewood Drive
Applicant Information:
Clayton Properties Group Inc. dba Shugart Homes
Name:
221 Jonestown Road
Address:
Winston-Salem, NC 27104
Telephone Number: 336-979-4054
Fax Number: 336-765-9822
wderrickson@mungo.com
E-mail Address:
DocuSigned by: 1/2 5/2022
Signature:_ pia c,VV1&S"' Date:
FCE4298B6566434...
Image
Basic Info Report
Area of Interest (AOI) Information
Area - 7, 340, 009.57 ft2
Jan 28 2022 9.36.25 Eastern Standard Time
ELF-
_J I 1'1 iclNVll:l
.PMEH8 L
11NVII I ' Ikl; bY!L �r
Yk' i
Address Points
Forsyth County Boundary
Streets
0 Parcels
Parcels - Mailing Labels
Tax Municipal Poiygon
Winston-Salem
201E
Aerial imagery
Red: Band_1
Green: Band 2
Blue: Band 3
1: J,028
D 0.05 4.1 0.2 mi
0 0.1! 0.2
0.4 ism
Parcel Information
# Parcel ID Current Owner Current Owner
1 2
5897-75- CLAYTON
1 7469.000 PROPERTIES
GROUP INC
Official Address Information
Total Assessed Recorded Zoning Area(ft2)
Value ($) Acreage
VALUE 168.69 RS9 7,340,009.57
PENDING
#
Address
2750 SPICEWOOD DR
Zip Code
Use Description
Count
1
27106
Residential Building, Single
Family
Util Addr Point
1
2
2740 SPICEWOOD DR
27106
1
3
2804 SPICEWOOD DR
27106
1
Zoning is as of January 1st. Area calculation is computer generated estimate only, not used in Tax Assessment or Valuation.
For official tax related information, please contact Forsyth County Tax Administration 336-703-2300
z
0
O
xQ
W ¢
U a
0
�Fzd�i z z
ac
tH
Q Y p U m Z¢
��No=mx�o
a ¢d o0
cnac� Jw owe'¢
U yJUJccrw Nc~/Jw�
N
Z
U �Ncnv �nw r
M
-- ♦• 1
g
/I
♦r
I ♦♦
"a
l
Ii
♦ ��o��
�
ao
z
I I
♦ z NG
/
Q
■ tl g ¢ � U
+I �
a o
�A1Iy1,
I
r
I
..
`
jOcen
mil
/
+14Y
��
V ZNpw
z o w
i
w a E
—
N
+
Z
O
Z
O
N
LO
@
Z O
—_
o�
N
N
z
�
�
M
W
i
/ �
Q
LO
w
N N
= m
w o d
■
EE
F.
s �
a
C _ N�
MW
i
o-
s
\10
>
LL.
Z
s
------__----
F—
O O�
w y
lM
lM lM lM — R
O
8
co o
Sip i
■ __ - __
■
■
-_
--
a
E
zi
w V
z z
■
y a�
--
V�
_•■
cn - a
- z
a�
c
c�z
a�
��♦
z¢
00
,.-
in
3
/ CYd I
I
om�
/
/
f
LO
cm /
i C\V i
1
'
/
I
1=
o W
`L-
z
0 0�
CU o w
Q F- z�
z cn
w
z N
o=
0
J
C
W
� a�
c
c
c
U
O
P
�� �
1
F—�100 •�
I �
—•�•-••..
calf
it
I \ � `'■
`�
_
I
J
I
I•
�.__•� --- 0
_C"T
a Lo
z� O
O F E N
Z j
CC CC N
aar
Z c�V
U = m
w¢
a� 2
,v L
� C
a =o
«Z
Y�o
� ma_mo
I..L
O
`L z
�o
O
U 5�
rr z m
p
o ---
- 3s U ' Z
3S3S'3S--
o
v wag _`o czS'2
i
�o g�
z N
CD
z N
O
LLO
1..�
O N
Z U
O
Q
O
[[ N
Q
Z
❑
o
m
z� E
z_`'
z
�0
ao
_
3ozo az
Z OFF ��
o
N
z
0
C/DQ_
`n
`�
�m
W
08,
z�
'-'
�❑
to
u a
W
U
z
¢
N
F-
w
C)
CU
s
w
FOL
L:O
a
z
¢
2
d
y
NLLJ J
0
4
IM
w
W
COD W
v
z
H
W
�
xc
Lu Z
y
¢
zp }
m
2
G w
PEE W
Z
a
Q
J
W
¢ o_
z u
"
�
o
U
ti Q
zCL
o
w
s
,Z
w
Q
Q�
=CL
G
g
¢s
Z0
u
d
F-
N w
O
N
t!
CO
En
2
m E'
�o
a x
O y
�z z
omY¢
_
mom
zz�zZ
Fz¢Fm
N
x
NIW,Z
O
¢
w a
gg a
OC
g
,.
J -3
m
9.
II-
b3= 9 LL&
H'Ryfll
o Y
m
wF
� 5go�"
w
m
cn
z
Ocr
q_'R§�€ gym
a €m
¢m
3m
LU
r
ss3 ZZ
j ro7575r���ygy<,QFQFN{{�3q3�rTio W
a
IN N 0-Aiilmil'
CVz
United States Department of the Interior
FISH AND WILDLIFE SERVICE
Asheville Ecological Services Field Office
160 Zillicoa Street
Asheville, NC 28801-1082
Phone: (828) 258-3939 Fax: (828) 258-5330
http://www.fws.p,ov/nc-es/es/coupiyfr.html
In Reply Refer To:
Project Code: 2022-0003580
Project Name: Hanes Lake Phase 2
February 04, 2022
Subject: List of threatened and endangered species that may occur in your proposed project
location or may be affected by your proposed project
To Whom It May Concern:
The attached species list identifies threatened, endangered, proposed and candidate species, as
well as proposed and final designated critical habitat, that may occur within the boundary of your
proposed project and/or may be affected by your proposed project. Although not required by
section 7, many agencies request species lists to start the informal consultation process and begin
their fulfillment of the requirements under section 7(c) of the Endangered Species Act (Act) of
1973, as amended (16 U.S.C. 1531 et seq.).
This list, along with other helpful resources, is also available on the U.S. Fish and Wildlife
Service (Service) —Asheville Field Office's (AFO) website: https://www.fws.gov/raleigh/species/
cntylist/nc counties.html. The AFO website list includes "species of concern" — species that
could potentially be placed on the federal list of threatened and endangered species in the future.
Also available are:
Design and Construction Recommendations
https://www.fws.gov/asheville/htmis/project review/Recommendations.html
Optimal Survey Times for Federally Listed Plants
https://www.fws.gov/nc-es/plant/plant survey.html
Northern long-eared bat Guidance
https://www.fws.gov/asheville/htmis/project review/NLEB in WNC.html
Predictive Habitat Model for Aquatic Species
https://www.fws.gov/asheville/htmls/Maxent/Maxent.html
New information based on updated surveys, changes in the abundance and distribution of
species, changed habitat conditions, or other factors could require modifications of these lists.
Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act,
02/04/2022
the accuracy of the species lists should be verified after 90 days. This verification can be
completed formally or informally as desired. The Service recommends that verification be
completed by visiting the ECOS-IPaC website or the AFO website (the AFO website dates each
county list with the day of the most recent update/change) at regular intervals during project
planning and implementation for updates to species lists and information. An updated list may
be requested through the ECOS-IPaC system by completing the same process used to receive the
enclosed list or by going to the AFO website.
The purpose of the Act is to provide a means whereby threatened and endangered species and the
ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of
the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to
utilize their authorities to carry out programs for the conservation of threatened and endangered
species and to determine whether projects may affect threatened and endangered species and/or
designated critical habitat.
A Biological Assessment is required for construction projects (or other undertakings having
similar physical impacts) that are major Federal actions significantly affecting the quality of the
human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2)
(c)). For projects other than major construction activities, the Service suggests that a B
Attachment(s):
• Official Species List
• Migratory Birds
• Wetlands
02/04/2022
Official Species List
This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the
requirement for Federal agencies to "request of the Secretary of the Interior information whether
any species which is listed or proposed to be listed may be present in the area of a proposed
action".
This species list is provided by:
Asheville Ecological Services Field Office
160 Zillicoa Street
Asheville, NC 28801-1082
(828) 258-3939
02/04/2022
VA
Project Summary
Project Code: 2022-0003580
Event Code: None
Project Name: Hanes Lake Phase 2
Project Type: Commercial Development
Project Description: Single family residential
Project Location:
Approximate location of the project can be viewed in Google Maps: https:
www. google.com/maps/(a)36.147558149999995,-80.36143539271241,14z
'$. r
k;4 ¢;
PiatlEown ,
s
Q,L M.A T"nch
Counties: Forsyth County, North Carolina
02/04/2022 3
Endangered Species Act Species
There is a total of 4 threatened, endangered, or candidate species on this species list.
Species on this list should be considered in an effects analysis for your project and could include
species that exist in another geographic area. For example, certain fish may appear on the species
list because a project could affect downstream species.
IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA
Fisheriesi, as USFWS does not have the authority to speak on behalf of NOAA and the
Department of Commerce.
See the "Critical habitats" section below for those critical habitats that lie wholly or partially
within your project area under this office's jurisdiction. Please contact the designated FWS office
if you have questions.
1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an
office of the National Oceanic and Atmospheric Administration within the Department of
Commerce.
Mammals
NAME STATUS
Northern Long-eared Bat Myotis septentrionalis Threatened
No critical habitat has been designated for this species.
Species profile: https:Hecos.fws.gov/ecp/species/9045
Reptiles
NAME
STATUS
Bog Turtle Glyptemys muhlenbergii
Similarity of
Population: U.S.A. (GA, NC, SC, TN, VA)
Appearance
No critical habitat has been designated for this species.
(Threatened)
Species profile: https:Hecos.fws.gov/ecp/species/6962
Insects
NAME STATUS
Monarch Butterfly Danaus plexippus Candidate
No critical habitat has been designated for this species.
Species profile: https:Hecos.fws.gov/ecp/species/9743
02/04/2022
4
Flowering Plants
NAME
Schweinitz's Sunflower Helianthus schweinitzii
No critical habitat has been designated for this species.
Species profile: https:Hecos.fws.gov/ecp/species/3849
STATUS
Endangered
Critical habitats
THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S
JURISDICTION.
02/04/2022
Migratory Birds
Certain birds are protected under the Migratory Bird Treaty Act! and the Bald and Golden Eagle
Protection Act2.
Any person or organization who plans or conducts activities that may result in impacts to
migratory birds, eagles, and their habitats should follow appropriate regulations and consider
implementing appropriate conservation measures, as described below.
1. The Migratory Birds Treat. Act of 1918.
2. The Bald and Golden Eagle Protection Act of 1940.
3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)
The birds listed below are birds of particular concern either because they occur on the USFWS
Birds of Conservation Concern (BCC) list or warrant special attention in your project location.
To learn more about the levels of concern for birds on your list and how this list is generated, see
the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that
every bird on this list will be found in your project area. To see exact locations of where birders
and the general public have sighted birds in and around your project area, visit the E-bird data
mapping tool (Tip: enter your location, desired date range and a species on your list). For
projects that occur off the Atlantic Coast, additional maps and models detailing the relative
occurrence and abundance of bird species on your list are available. Links to additional
information about Atlantic Coast birds, and other important information about your migratory
bird list, including how to properly interpret and use your migratory bird report, can be found
below.
For guidance on when to schedule activities or implement avoidance and minimization measures
to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE
SUMMARY at the top of your list to see when these birds are most likely to be present and
breeding in your project area.
1►I_Iuhl
Bald Eagle Haliaeetus leucocephalus
This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention
because of the Eagle Act or for potential susceptibilities in offshore areas from certain types
of development or activities.
https:Hecos.fws.gov/ecp/species/1626
Eastern Whip -poor -will Antrostomus voci ferns
This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA
and Alaska.
BREEDING
SEASON
Breeds Sep 1 to
Jul 31
Breeds May 1
to Aug 20
02/04/2022
2
NAME
BREEDING
SEASON
Prairie Warbler Dendroica discolor Breeds May 1
This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Jul 31
and Alaska.
Red-headed Woodpecker Melanerpes erythrocephalus Breeds May 10
This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Sep 10
and Alaska.
Wood Thrush Hylocichla mustelina Breeds May 10
This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 31
and Alaska.
Probability Of Presence Summary
The graphs below provide our best understanding of when birds of concern are most likely to be
present in your project area. This information can be used to tailor and schedule your project
activities to avoid or minimize impacts to birds. Please make sure you read and understand the
FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting
to interpret this report.
Probability of Presence (■)
Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your
project overlaps during a particular week of the year. (A year is represented as 12 4-week
months.) A taller bar indicates a higher probability of species presence. The survey effort (see
below) can be used to establish a level of confidence in the presence score. One can have higher
confidence in the presence score if the corresponding survey effort is also high.
How is the probability of presence score calculated? The calculation is done in three steps:
1. The probability of presence for each week is calculated as the number of survey events in
the week where the species was detected divided by the total number of survey events for
that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee
was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is
0.25.
2. To properly present the pattern of presence across the year, the relative probability of
presence is calculated. This is the probability of presence divided by the maximum
probability of presence across all weeks. For example, imagine the probability of presence
in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12
(0.25) is the maximum of any week of the year. The relative probability of presence on
week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2.
3. The relative probability of presence calculated in the previous step undergoes a statistical
conversion so that all possible values fall between 0 and 10, inclusive. This is the
probability of presence score.
Breeding Season( )
02/04/2022 3
Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across
its entire range. If there are no yellow bars shown for a bird, it does not breed in your project
area.
Survey Effort (1)
Vertical black lines superimposed on probability of presence bars indicate the number of surveys
performed for that species in the 10km grid cell(s) your project area overlaps. The number of
surveys is expressed as a range, for example, 33 to 64 surveys.
No Data (—)
A week is marked as having no data if there were no survey events for that week.
Survey Timeframe
Surveys from only the last 10 years are used in order to ensure delivery of currently relevant
information. The exception to this is areas off the Atlantic coast, where bird returns are based on
all years of available data, since data in these areas is currently much more sparse.
probability of presence breeding season I survey effort — no data
SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Bald Eagle
Non -BCC Jill 1*WE100+=10 . . . . .d.E.E .M.E. ++++:+
Vulnerable
Eastern Whip -poor -
Will ' 7
will +++i I +++ ++++ +sls ,',++ 1177 o ++++ ++++ ++++ ++++
BCC Rangewide
(CON)Prair* **
BCCie Warbler
++++ ++++ ++++ ++$+ I 11PT +'+t ,+++ ++++ ++++ ++++ ++++
(CON)
Red-headed
Woodpecker ++++ ++++ ++++ ++++ ++++ ++++ ++++ ++++ $+
BCC Rangewide MEN MEMO NONE MEMO
11
(CON)
Wood Thrush
BCC Rangewide ++++ ++++ ++++ +0" "" 1'" pill 1�[s +'+' ,+0+ 1 1 1 1 1 I I
(CON)
Additional information can be found using the following links:
• Birds of Conservation Concern http://www.fws.gov/birds/management/managed-species/
birds-of-conservation-concern.php
• Measures for avoiding and minimizing impacts to birds http://www.fws.gov/birds/
management/project-assessment-tools-and-guidance/
conservation-measures.php
02/04/2022 4
• Nationwide conservation measures for birds http://www.fws.gov/migratoI3Lbirds/pdf/
management/nationwidestandardconservationmeasures. pdf
Migratory Birds FAQ
Tell me more about conservation measures I can implement to avoid or minimize impacts
to migratory birds.
Nationwide Conservation Measures describes measures that can help avoid and minimize
impacts to all birds at any location year round. Implementation of these measures is particularly
important when birds are most likely to occur in the project area. When birds may be breeding in
the area, identifying the locations of any active nests and avoiding their destruction is a very
helpful impact minimization measure. To see when birds are most likely to occur and be breeding
in your project area, view the Probability of Presence Summary. Additional measures or permits
may be advisable depending on the type of activity you are conducting and the type of
infrastructure or bird species present on your project site.
What does IPaC use to generate the migratory birds potentially occurring in my specified
location?
The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern
(BCQ and other species that may warrant special attention in your project location.
The migratory bird list generated for your project is derived from data provided by the Avian
Knowledge Network (AKN). The AKN data is based on a growing collection of survey, banding_,
and citizen science datasets and is queried and filtered to return a list of those birds reported as
occurring in the 10km grid cell(s) which your project intersects, and that have been identified as
warranting special attention because they are a BCC species in that area, an eagle (Eagle Act
requirements may apply), or a species that has a particular vulnerability to offshore activities or
development.
Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your
project area. It is not representative of all birds that may occur in your project area. To get a list
of all birds potentially present in your project area, please visit the AKN Phenology Tool.
What does IPaC use to generate the probability of presence graphs for the migratory birds
potentially occurring in my specified location?
The probability of presence graphs associated with your migratory bird list are based on data
provided by the Avian Knowledge Network (AKN). This data is derived from a growing
collection of survey, banding, and citizen science datasets .
Probability of presence data is continuously being updated as new and better information
becomes available. To learn more about how the probability of presence graphs are produced and
how to interpret them, go the Probability of Presence Summary and then click on the "Tell me
about these graphs" link.
How do I know if a bird is breeding, wintering, migrating or present year-round in my
project area?
To see what part of a particular bird's range your project area falls within (i.e. breeding,
wintering, migrating or year-round), you may refer to the following resources: The Cornell Lab
02/04/2022 5
of Ornithology All About Birds Bird Guide, or (if you are unsuccessful in locating the bird of
interest there), the Cornell Lab of Ornithology Neotropical Birds guide. If a bird on your
migratory bird species list has a breeding season associated with it, if that bird does occur in your
project area, there may be nests present at some point within the timeframe specified. If 'Breeds
elsewhere" is indicated, then the bird likely does not breed in your project area.
What are the levels of concern for migratory birds?
Migratory birds delivered through IPaC fall into the following distinct categories of concern:
1. 'BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern
throughout their range anywhere within the USA (including Hawaii, the Pacific Islands,
Puerto Rico, and the Virgin Islands);
2. 'BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation
Regions (BCRs) in the continental USA; and
3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on
your list either because of the Eagle Act requirements (for eagles) or (for non -eagles)
potential susceptibilities in offshore areas from certain types of development or activities
(e.g. offshore energy development or longline fishing).
Although it is important to try to avoid and minimize impacts to all birds, efforts should be made,
in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC
species of rangewide concern. For more information on conservation measures you can
implement to help avoid and minimize migratory bird impacts and requirements for eagles,
please see the FAQs for these topics.
Details about birds that are potentially affected by offshore projects
For additional details about the relative occurrence and abundance of both individual bird species
and groups of bird species within your project area off the Atlantic Coast, please visit the
Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides
birds that may be helpful to you in your project review. Alternately, you may download the bird
model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical
Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic
Outer Continental Shelf project webpage.
Bird tracking data can also provide additional details about occurrence and habitat use
throughout the year, including migration. Models relying on survey data may not include this
information. For additional information on marine bird tracking data, see the Diving Bird Study
and the nanotag studies or contact Caleb Spiegel or Pam Loring.
What if I have eagles on my list?
If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid
violating the Eagle Act should such impacts occur.
Proper Interpretation and Use of Your Migratory Bird Report
The migratory bird list generated is not a list of all birds in your project area, only a subset of
birds of priority concern. To learn more about how your list is generated, and see options for
identifying what other birds may be in your project area, please see the FAQ "What does IPaC
use to generate the migratory birds potentially occurring in my specified location". Please be
02/04/2022 6
aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that
overlap your project; not your exact project footprint. On the graphs provided, please also look
carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no
data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey
effort is high, then the probability of presence score can be viewed as more dependable. In
contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of
certainty about presence of the species. This list is not perfect; it is simply a starting point for
identifying what birds of concern have the potential to be in your project area, when they might
be there, and if they might be breeding (which means nests might be present). The list helps you
know what to look for to confirm presence, and helps guide you in knowing when to implement
conservation measures to avoid or minimize potential impacts from your project activities,
should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell
me about conservation measures I can implement to avoid or minimize impacts to migratory
birds" at the bottom of your migratory bird trust resources page.
02/04/2022
Wetlands
Impacts to NWI wetlands and other aquatic habitats may be subject to regulation under Section
404 of the Clean Water Act, or other State/Federal statutes.
For more information please contact the Regulatory Program of the local U.S. Army Corps of
Engineers District.
Please note that the NWI data being shown may be out of date. We are currently working to
update our NWI data set. We recommend you verify these results with a site visit to determine
the actual extent of wetlands on site.
FRESHWATER FORESTED/SHRUB WETLAND
• PF01A
• PSS1A
• PF01Ah
RIVERINE
• R5UBH
LAKE
■ T ,11 IBHh
- o r
i �•�+,�•.ays.rcga�mv�wsr.»e.00rrc.ar�.*>aM». y - � G * »opw�¢i.0 x p isn,w onxw �55rc�swra _ -
iile Fen vies f.•aexr 7e HM
ee sr -±t scum• Wvre awe» �sv, i+•�-
C! b�nem-mea�e®_ JMPOMaw-ice ® jy^ 219,4-50� Cn-asm.r_ 7 aisxiJ�MPM- mT, IIQA-SSr,..M,s U n4 � �
Restoration Systems, LLC
1101 Haynes St. Suite 211
Raleigh, North Carolina
Ph: (919) 755-9490
Fx: (919) 755-9492
Statement of Mitigation Credit Availability
Brushy Mountain Mitigation Bank
January 28, 2022
Army Corps of Engineers
Re: Availability of Compensatory Wetland Credits
Applicants: Clayton Properties Group Inc. dba Shugart Homes
Project Location: Spicewood Drive -Yadkin 03040101
This document confirms that 3.08 Wetland Credits (Credits) from the Brushy Mountain
Mitigation Bank (Bank) are currently available and all or a portion may be used, once transferred,
for compensatory mitigation relative to the Spicewood Drive project, and as proposed by Clayton
Properties Group Inc. (Applicant).
The Applicant may ultimately purchase the Credits, if they are available, following Permit issuance.
Should the Applicant purchase the Credits at that time, we will complete and execute the Mitigation
Credit Transfer Certificate (Certificate) within five (5) days of receipt of the full purchase price.
We will additionally provide copies of the completed and executed Certificate to the Applicant, the
Division of Water Resources (DWR) and, if needed, other regulatory agencies. In addition, we will
provide DWR with an updated copy of the Bank's Ledger, reflecting the transaction. Transaction
information in the updated Bank Ledger will include relevant Permit and Applicant information as
well as the number and resource type of the debited Credits.
Should your office have any questions, please contact me at 919.334.9118.
Sincerely,
BARRETT JENKINS
Restoration Systems, LLC
bjenkins@restorationsystems.com
�LCb
Yam. I - r..� .�l •'
x:`w" ..—.�y.�`' - +..i - • - tea: _ - _ . ' $9�
df
�ISr,E 1 G}
} {
/ •'-, -. G �+ 4 �• \. + I� ffry'' +� — ��+-�
`= _ *. LEGEND }
Site Boundary `
rr
Drawing 1 r USGS Topographic Map
USGS Topographic Map I� Hanes Property
Vienna and Rural Hall, ` V= Approximate 186-Acre Tract
NC Quadrangles P10 0T . Winston-Salem, Forsyth County, NC
Scale: 1"-2,000' P1t0t ENVIR0NMENTAL.INC Pilot Project2152.1
Drawing 2
USDA Web Soil Survey
of Forsyth County, NC
Scale: 1" = 700'
PILL ®
P I '. 0 i E N V I A 0 N M E N T A L I N C
4L
Site Boundary
Web Soil Map
Hanes Property
Approximate 186-Acre Tract
Winston-Salem, Forsyth County, NC
Pilot Project 2152.1
R�*
",1'
F
Rr r.
Orn+ _
� l 1
Drawing 3
USFWS NWI
Wetlands Mapper
Scale: 1" = 700'
IF
LEGEND
Site Boundary
Freshwater Emergent
Freshwater Forested/Shrub
V— Estuarine and Marine Deepwater
Estuarine and Marine
Freshwater Pond
Lake
Riverine
Other
NWI Map
Hanes Property
Approximate 186-Acre Tract
Winston-Salem, Forsyth County, NC
Pilot Project 2152.1
i
.:.
MW
L
Drawing 4
National Flood Hazard Layer
From FEMA Web Map Service
Scale: 1" = 700'
P 1 t 0 Y ENVIR ON M E N T A L. I N C
n
FEMA FIRM
Hanes Property
Approximate 186-Acre Tract
Winston-Salem, Forsyth County, NC
Pilot Project 2152.1
7z-
N LL
J
N O
N
410
;r!
m LL
SNP
E
L
L
C
O
N
i
Y
C
0
Q
_
L!
Q+
M
aJW
cn
a
t
U
4-
�°
4'
aJ
C
a
=
U
4
Li
Z
(7
•
LL
J
-0
m
a
0
/ O
f
0 N
N
`
111�
V
W �
u LL n
N J M
O O
p) 0
n
ei LL
o
"
N
Orr! .
jV
0
(n
d
C7
cn
w
0
D
J
U
Z
H
m
2
X
w
cn
2
O
N
DO
O
J
CL
}
m
M
LU
U
D
Z
O
U
Z
O
Q
w
Z
J
w
vi
w
D
Q
LU
LL
W
Q
LU
Z
J
W
M
LL
O
cn
Z
O
Q
U
O
U
Z
-
f6
�
H
O
r-i
U
fV
i
U
Ln
CQ
c Q
Z
N
00
cn
L
U
�O
aJ
O
4 O
E
�
f6
E
a-
_
•X
m
O
O
Q'
�
O
�
Q
N
Ln
LU
E
f6
Ln O ON
N LnL a-11 O
aJ (D
4-1 r I 00
i E O �
cu in
f6
Q�
f6
Ln