HomeMy WebLinkAboutNC0000396_Fact Sheet_20220209DEQ/DWR
FACT SHEET
NPDES No. NC0000396, Duke Energy Progress, LLC
Asheville Steam Electric Plant
Facility Information
Applicant/Facility Name:
Duke Energy Progress, Inc./ Asheville Steam Electric Plant
Applicant Address:
200 CP&T Drive, Arden, NC 28704
Facility Address:
(same)
Permitted Flow
Not applicable
Type of Waste:
100 % Industrial
Facility/Permit Status:
Major Modification
County:
Buncombe
Miscellaneous
Receiving Stream:
French Broad River
(001); UT to French
Broad River (101);
Lake Julian (002)
Regional Office:
ARO
Stream Classification:
B (French Broad River
and UT to French
Broad River)
C (Lake Julian)
Quad
F8NE
303(d) Listed?:
No
Permit Writer:
Sergei Chernikov, Ph.D.
Subbasin:
040302 (French
Broad)
Date:
February 25, 2019
Drainage Area (mi2):
655 (French Broad
River discharge, 001)
________________________
Summer 7Q10 (cfs)
Winter 7Q10 (cfs)
306
409 winter
30Q2 (cfs):
631
Average Flow (cfs):
1769
IWC (%):
Est., 1.75%
(Based on a flow of
3.52 MGD)
Primary SIC Code:
4911
SUMMARY
This is a Major Modification of the NPDES wastewater permit for Asheville Steam Electric
Plant (Asheville Plant). The Asheville Plant is a former coal fired steam electric generating plant (2
Units; 2 internal combustion turbines). The facility was converted to a Combined Cycle Plant powered
by natural gas. The new plant began power production and the coal-fired units were shut -down in
January 2020. The new plant consists of 2 combined cycle power blocks with a summer/winter net
electrical generation capacity of 250MW/280 MW per block (500 MW/560 MW total), the plant
employs cooling towers.
Page 1 of 12
NPDES PERMIT FACT SHEET NPDES No. NC0000396
This facility is subject to EPA effluent guideline limits per 40 CFR 423 - Steam Electric Power
Generating Point Source Category. The facility is located in the Mountain area of the state; the
applicable state water quality temperature standard is 29°C (84.2 F).
The Major Modification is proposed to incorporate changes necessary to complete the excavation of
the 1964 basin. In order to finalize the closure of the 1964 basin the facility will install underdrains to
collect the groundwater within the footprint of this basin. The flow from underdrains will be
discharged through the existing Outfall 101. In addition, Outfall 101 will discharge storm water from
1964 basin footprint and construction storm water. Therefore, description of Outfall 101 in the permit
will be modified. The rest of the permit remains unchanged.
The site has 1 new ash pond (built in 1982), 1 old ash pond (built in 1964) and a cooling pond (Lake
Julian). The facility has excavated all ash from the 1982 pond, the ash is currently being removed from
the 1964 pond. The state law requires all the ash to be removed by August 1, 2022. Lake Julian is a
320-acre waterbody constructed in 1963 by CP&T (original owner of the facility) to serve as a cooling
water source, it is classified as "waters of the State". Discharge from Lake Julian to the French Broad
River is extremely rare and any occurrence would be during periods of heavy rainfall. These discharges
are routed through a spillway.
The facility has installed a new Reverse Osmosis (RO) system in 2010, it will be used in conjunction
with alum coagulation/filtration to provide water for various plant processes. The reject stream from
the RO unit is sent to the ash pond.
The EPA's contractor conducted a review of the stability of the ash pond dams at the site in 2010.
The contractor determined that the embankment and spillway systems appeared to be structurally
sound for both dams (old and new ash ponds). However, the contractor recommended that some
studies be conducted on the 1964 dam, including a slope stability analysis. After conducting these
studies, Progress Energy (owner of the facility at the time) decided to make the enhancements to the
1964 dam. In order to accommodate these enhancements, the facility had to move the existing Outfall
001 approximately 3,000 ft. downstream. Permission for this relocation was granted by DWQ on May
13, 2011. All the enhancements to the 1964 dam were completed in 2012.
Outfall 001.
Outfall 001 discharges directly to the French Broad River. The ash pond/rim ditch receives ash
transport water, coal pile runoff, storm water runoff, various low volume wastes (such as boiler
blowdown, cooling tower blowdown, Heat Return Steam Generator (HRSG) blowdown, oil water
separator wastewater, backwash from the water treatment processes, ash hopper seal water, plant
drains), air preheater cleaning water and chemical metal cleaning wastewater discharged from Internal
Outfall 004 (potentially). It also might contain some storm water and groundwater seepage from an
old ash pond. Historically, this flow has been allowed to evaporate and/or infiltrate. The
enhancements to the old pond that were completed in 2011 require that this water level be managed
and maintained below a certain elevation. Therefore, it may be necessary to periodically pump water
from the old ash pond to the combined, relocated settling basin and Outfall 001.
Page 2 of 12
NPDES PERMIT FACT SHEET NPDES No. NC0000396
Outfall 002.
Once through non -contact cooling water system. This waste stream is discharged directly to Lake
Julian via Outfall 002. After the coal-fired facility is demolished, the cooling water discharges to Lake
Julian will discontinue. However, the make-up water for the new plant cooling towers will be pumped
from Lake Julian.
Outfall 101.
1964 pond toe drains (combined outfall for 3 toe drains). This outfall discharges to an Unnamed
Tributary (UT) to French Broad River. Following excavation of the 1964 ash basin, Outfall 101 flows
will consist of flows from existing toe drains, groundwater removed via underdrains installed in the
footprint of the 1964 ash basin and storm water runoff.
Internal Outfall 001C.
This Outfall will discharge to the secondary settling basin. It contains cooling tower blowdown and
HRSG blowdown.
Internal Outfall 001D.
This Outfall will discharge to the secondary settling basin. It contains storm water discharges from
containment areas around fuel oil storage tanks, transformers, and other plant equipment. This storm
water/wastewater is treated in the oil water separator prior to the discharge through Internal Outfall.
TOE DRAINS- OuirALL 101.
The facility identified 3 unpermitted toe drains from the 1964 ash settling basin, wastewaters from the
toe drains are collected in the same structure and discharged through a single pipe. The location of
Outfall 101 is identified below and depicted on the map attached to the permit.
Table 1.
Discharge Coordinates and Assigned Outfall Numbers
Seep ID
Latitude
Longitude
Outfall number
64 EO-01, 64 EO-02,
and 64 EO-03
35.468
-82.549
Outfall 101
ASH POND DAMS
Seepage through earthen dams is common and is an expected consequence of impounding water with
an earthen embankment. Even the tightest, best -compacted clays cannot prevent some water from
seeping through them. Seepage is not necessarily an indication that a dam has structural problems, but
should be kept in check through various engineering controls and regularly monitored for changes in
quantity or quality which, over time, may result in dam failure.
REASONABLE POTENTIALANALYSIS(RPA)- OUTFALL 001
The Division conducted EPA -recommended analyses to determine the reasonable potential for
toxicants to be discharged at levels exceeding water quality standards/EPA criteria by this facility. For
the purposes of the RPA, the background concentrations for all parameters were assumed to be below
detection levels. The RPA uses 95% probability level and 95% confidence basis in accordance with
the EPA Guidance entitled "Technical Support Document for Water Quality -based Toxics Control."
The RPA included evaluation of dissolved metals' standards, utilizing a default hardness value of 25
mg/L CaCO3 for hardness -dependent metals. The RPA spreadsheets are attached to this Fact Sheet.
Page 3 of 12
NPDES PERMIT FACT SHEET NPDES No. NC0000396
The interstitial concentration data was supplemented with data for a combined cycle plant discharges
since both types of wastewater will be discharged simultaneously for several years before the removal
of ash is completed. The calculations included: As, Be, Cd, Chlorides, Total Phenols, Cr, Cu, CN, Pb,
Mo, Ni, Se, Ag, Zn, Al, Sb, and Tl (please see attached). The renewal application listed 3.52 MGD as
a current flow. The discharge data on the EPA Form 2C was used for the RPA, it was supplemented
by the analysis of the free standing water in the ash pond. The analysis indicates no reasonable
potential to violate the surface water quality standards or EPA criteria.
The proposed permit requires that EPA methods 200.7 or 200.8 (or the most current versions) shall
be used for analyses of all metals except for total mercury.
MERCURY EVALUATION
The State of North Carolina has a state-wide mercury impairment. The TMDL has been developed
to address this issue in 2012. The TMDL included the implementation strategy, both documents were
approved by EPA in 2012.
The mercury evaluation was conducted in accordance with the Permitting Guidelines for Statewide
Mercury TMDL.
Year
2008
2009
2010
2011
2012
Annual average
concentration (ng/L)
53.3
24.1
17.6
21.1
11.4
Maximum sampling
result (ng/L)
173
56.4
83.2
49.2
43.3
The Water Quality -based allowable mercury effluent discharge concentration for this facility is 680.6
ng/L. All annual average mercury concentrations are below allowable. However, there are values that
exceed 'IBEL of 47.0 ng/L. Based on the Permitting Guidelines for Statewide Mercury TMDL, the
'1'BEL limit of 47.0 ng/L will be added to the permit.
CWA SECTION 316(a) TEMPERATURE VARIANCE AND FISH TISSUE MONITORING—
OUTFALL 001, OUTFALL 002
There is a current Section 316(a) thermal variance for Lake Julian pending renewal. The facility
conducts biological monitoring of Lake Julian to meet the requirements of the Section 316(a) CWA.
The Water Sciences Section (WSS) of the DWR reviewed the biological monitoring report that was
submitted to the DWQ in 2010. The WSS determined that "the fisheries community in Lake Julian
currently meets the balanced and indigenous population (BIP) definition of Section 316(a) of the Clean
Water Act". The WSS also imposed the additional monitoring requirements for the future BIP studies.
Lake Julian has been monitored since 1973. Monitoring encompasses water quality, water chemistry,
phytoplankton, zooplankton, benthic macroinvertebrates, and fish. Prior to 2001 the monitoring was
conducted annually; currently it is conducted triennially.
The 2007-2008 Monitoring Report also investigated fish tissue. Fish tissue of bass and channel catfish
collected from Lake Julian were analyzed for As, Cd, Cu, Hg, and Se. All trace element concentrations
Page 4 of 12
NPDES PERMIT FACT SHEET NPDES No. NC0000396
in fish tissue were below detection level with an exception of Se. However, all Se values were well
below the NC consumption advisory threshold of 50 µg/g dry weight.
In addition to Lake Julian, the facility conducts fish tissue sampling at 3 stations in French Broad River
to determine potential impacts of the discharge. The latest fish tissue report was submitted to WSS in
2012. The WSS concluded: "2012 data demonstrates that there were no selenium issues noted at any
of the three stations on the French Broad River and all selenium levels remain well below the North
Carolina Department of Health and Human Services (NCDHHS) fish consumption advisory criteria
of 10 ppm". The WSS also concluded: "In terms of mercury, a total of 91 total fish were collected
from the three stations. From this total, seven individuals (8%) exceeded the 0.4 ppm NCDHHS
mercury advisory criteria."
The WSS also reviewed that fish tissue data for 2014 and 2016. The WSS stated: "The review of the
2014 data demonstrates that there were no selenium issues noted at any of the three stations on the
French Broad River and all selenium levels remain well below the North Carolina DHHS fish
consumption advisory criteria of 10 mg/kg. For 2014, as was the case in previous years, there were
exceedances of 0.4 mg/kg mercury criteria measured at all three monitoring locations (upstream,
adjacent to the discharge and below the discharge). However, based on the Duke Energy data
presented in the 2014 NPDES report (and past reports), we agree that these levels are not attributable
to the discharge from the Asheville plant." The 2016 review states that "there have been no changes
in Mercury and Selenium levels since the FGD system went operational".
Changes after Conversion
After conversion of the facility to the Combined Cycle power generation discharges of the cooling
water to Lake Julian will cease. Cooling tower blowdown will be routed to Outfall 001 that discharges
to French Broad River. The facility conducted CORMIX modeling of the thermal discharge and
determined that the state temperature standard will be met 40.5 meters downstream of the outfall and
the width of the thermal plume will be no wider than 7.5 meters. This Mixing Zone will be added to
the permit and 2 instream compliance points will be established to demonstrate that the state
temperature standard is not contravened. The size of the mixing zone is relatively small and does not
prevent a free passage of fish in the receiving stream, the stream width at the point of discharge is
approximately 67 meters.
INSTREAM MONITORING— OUTFALL 001, OUIFALL 002
The 2007-2008 Environmental Monitoring Report for Lake Julian concludes that — "Except for
copper, all mean trace element mean concentrations surface waters remained below their respective
reporting limits during 2007. All measured copper concentrations were relatively low and less than the
North Carolina water quality standard". The same report provides data for Copper, Selenium, and
Arsenic that were measured in two locations at Lake Julian, and in the French Broad River below the
discharge from ash pond. The vast majority of samples were below detection level, the remaining
samples were well below water quality standards. The only exception is one Se measurement in French
Broad River (5.1 ug/L) that slightly exceeded the water quality standard of 5.0 µg/L.
The update to the permit renewal application submitted in 2014 provided instream sampling data for
Oil & Grease, COD, Chlorides, Fluoride, Sulfate, Mercury, Aluminum, Barium, Boron, Calcium,
Hardness, Iron, Magnesium, Manganese, Zinc, Antimony, Arsenic, Cadmium, Chromium, Copper,
Page 5 of 12
NPDES PERMIT FACT SHEET NPDES No. NC0000396
Lead, Molybdenum, Nickel, Selenium, Thallium, TDS, TSS, pH, Temperature, Specific Conductance,
and Turbidity. The upstream monitoring station was located 5,500 ft. upstream of Outfall 001 and
the downstream monitoring station was located 2,900 ft. downstream of the Outfall 001.
The following parameters were below detection level at both monitoring stations: Oil & Grease, COD,
Fluoride, Mercury, Boron, Antimony, Arsenic, Cadmium, Chromium, Copper, Lead, Molybdenum,
Nickel, Selenium, and Thallium. The rest of the parameters did not indicate a significant difference
between the upstream and the downstream monitoring locations except for Specific Conductance.
The proposed permit will require monthly monitoring for total arsenic, total selenium, total mercury,
total chromium, dissolved lead, dissolved cadmium, dissolved copper, dissolved zinc, total bromide,
total hardness (as CaCO3), temperature, turbidity, and total dissolved solids (TDS).
CWA SECTION 316(b)
The permittee shall comply with the Cooling Water Intake Structure Rule per 40 CFR 125.95. The
permittee shall submit all the materials required by the 316(b) Rule 180 days before the planned
commencement of cooling water withdrawals for the operation of the new unit.
Changes after Conversion
The combined cycle plant is defined as a "new unit" at an existing facility per 40 CFR 125.92(u). To
meet the requirement of the 316(b) Section of the Clean Water Act the new unit will be equipped with
closed -cycle recirculating mechanical draft cooling towers. The make-up water will be pumped from
Lake Julian with design maximum withdrawal of 5.2 MGD and through -screen velocity of 0.049
feet/second.
Duke Energy submitted information demonstrating that the new unit meet BTA standards for
entrainment and impingement in accordance with 40 CFR 125.94(e).
TOXICITY TESTING-0uTFAu. 001
Current Requirement: Outfall 001 — Chronic P/F @ 1.8% using Ceriodaphnia Dubia
Recommended Requirement: Outfall 001 — Chronic P/F @ 1.8% using Ceriodaphnia Dubia.
This facility has passed all toxicity tests during the previous permit cycle, please see attached.
For the purposes of the permitting, the long term average flow was used in conjunction with the 7Q10
summer flow to calculate the percent effluent concentrations to be used for WET tests for each
facility.
COMPLIANCE SUMMARY
During the last 5 years, the facility had no violations of the permit limits, please see attached.
PERMIT LIMITS DEVELOPMENT
• The temperature limits (Outfall 002 and 2 instream locations for Outfall 001) are based on the
North Carolina water quality standards (15A NCAC 2B .0200) and 316(a) Thermal Variance.
• The Total Residual Chlorine Limit and Time of Chlorine Addition Limit (Outfall 002) were
established in accordance with the 40 CFR 423.
Page 6 of 12
NPDES PERMIT FACT SHEET NPDES No. NC0000396
• The limits for Oil and Grease and Total Suspended Solids (Outfall 001, Internal Outfall 001A,
Internal Outfall 001B, Internal Outfall 001C, Internal Outfall 001D, and Outfall 101) were
established in accordance with the 40 CFR 423.
• The pH limits (Outfall 001, Outfall 002, and Outfall 101) in the permit are based on the North
Carolina water quality standards (15A NCAC 2B .0200).
• The turbidity limit in the permit (Outfall 001) is based on the North Carolina water quality
standards (15A NCAC 2B .0200).
• The mercury limit in the permit (Outfall 001) is based on the North Carolina water quality
standards (15A NCAC 2B .0200) and implementation strategy for Statewide Mercury TMDL.
• The Technology Based Effluent Limits for Total Arsenic, Total Mercury, Total Selenium, and
Nitrate/nitrite as N (Outfall 005) are based on the requirements of 40 CFR 423.
• The Whole Effluent Toxicity limit (Outfall 001) is based on the requirements of 15A NCAC
2B .0500.
• The limits for Total Copper and Total Iron (Outfall 004) were established in accordance with
the 40 CFR 423.
• The limits for Chlorides, Total Nickel, Total Selenium, and Total Zinc in the permit (Outfall
101) are based on the North Carolina water quality standards (15A NCAC 2B .0200).
PROPOSED CHANGES
• The description of Outfall 101 was amended as follows: Following excavation of the 1964 ash
basin, Outfall 101 flows will consist of flows from existing toe drains, groundwater removed via
underdrains installed in the footprint of the 1964 ash basin and storm water runoff.
PROPOSED SCHEDULE
Draft Permit to Public Notice:
Permit Scheduled to Issue:
December 14, 2021 (est.)
February 14, 2021 (est.)
STATE CONTACT
If you have any questions on any of the above information or on the attached permit, please
contact Sergei Chernikov at (919) 707-3606 or sergei.chernikov@a,ncdenr.gov.
Page 7 of 12
NPDES PERMIT FACT SHEET
NPDES No. NC0000396
NPDES Implementation of Instream Dissolved Metals Standards — Freshwater Standards
The NC 2007-2015 Water Quality Standard (WQS) Triennial Review was approved by the NC
Environmental Management Commission (EMC) on November 13, 2014. The US EPA subsequently
approved the WQS revisions on April 6, 2016, with some exceptions. Therefore, metal limits in draft
permits out to public notice after April 6, 2016 must be calculated to protect the new standards - as
approved.
Table 1. NC Dissolved Metals Water Quality Standards/Aquatic Life Protection
Parameter
Acute FW, µg/1
(Dissolved)
Chronic FW,
µg/1
(Dissolved)
Acute SW, µg/1
(Dissolved)
Chronic SW,
µg/1
(Dissolved)
Arsenic
340
150
69
36
Beryllium
65
6.5
Cadmium
Calculation
Calculation
40
8.8
Chromium III
Calculation
Calculation
Chromium VI
16
11
1100
50
Copper
Calculation
Calculation
4.8
3.1
Lead
Calculation
Calculation
210
8.1
Nickel
Calculation
Calculation
74
8.2
Silver
Calculation
0.06
1.9
0.1
Zinc
Calculation
Calculation
90
81
Table 1 Notes:
1. FW= Freshwater, SW= Saltwater
2. Calculation = Hardness dependent standard
3. Only the aquatic life standards listed above are expressed in dissolved form. Aquatic life
standards for Mercury and selenium are still expressed as Total Recoverable Metals due to
bioaccumulative concerns (as are all human health standards for all metals). It is still necessary
to evaluate total recoverable aquatic life and human health standards listed in 15A NCAC
2B.0200 (e.g., arsenic at 10 µg/1 for human health protection; cyanide at 5 µg/L and fluoride
at 1.8 mg/L for aquatic life protection).
Table 2. Dissolved Freshwater Standards for Hardness -Dependent Metals
The Water Effects Ratio (WER) is equal to one unless determined otherwise under
15A NCAC 02B .0211 Subparagraph (11) (d)
Metal
NC Dissolved Standard, µg/1
Cadmium, Acute
WER* {1.136672-[In hardness](0.041838)} • e^{0.9151 [In hardness] -
3.1485}
Cadmium, Acute
waters
Trout
WER* {1.136672- [ln hardness](0.041838)} • e^{0.9151[ln hardness] -
3.62361
Page 8 of 12
NPDES PERMIT FACT SHEET
NPDES No. NC0000396
Cadmium, Chronic
WER* {1.101672-[In hardness](0.041838)} • e^{0.7998[ln hardness] -
4.4451 }
Chromium III, Acute
WER*0.316 • e^{0.8190[ln hardness]+3.7256}
Chromium III, Chronic
WER*0.860 • e^{0.8190[ln hardness]+0.6848}
Copper, Acute
WER*0.960 • e^{0.9422[ln hardness]-1.700}
Copper, Chronic
WER*0.960 • e^{0.8545[In hardness]-1.702}
Lead, Acute
WER* {1.46203- [In hardness] (0.145712) } •
1.460}
e^ {1.273 [In hardness] -
Lead, Chronic
WER* {1.46203- [In hardness] (0.145712) } •
4.705 }
e^ {1.273 [In hardness] -
Nickel, Acute
WER*0.998 • e^{0.8460[ln hardness]+2.255}
Nickel, Chronic
WER*0.997 • e^{0.8460[ln hardness]+0.0584}
Silver, Acute
WER*0.85 • e^{1.72[ln hardness]-6.59}
Silver, Chronic
Not applicable
Zinc, Acute
WER*0.978 • e^{0.8473[ln hardness]+0.884}
Zinc, Chronic
WER*0.986 • e^{0.8473[ln hardness]+0.884}
General Information on the Reasonable Potential Analysis (RPA)
The RPA process itself did not change as the result of the new metals standards. However, application
of the dissolved and hardness -dependent standards requires additional consideration in order to
establish the numeric standard for each metal of concern of each individual discharge.
The hardness -based standards require some knowledge of the effluent and instream (upstream)
hardness and so must be calculated case -by -case for each discharge.
Metals limits must be expressed as `total recoverable' metals in accordance with 40 CFR 122.45(c).
The discharge -specific standards must be converted to the equivalent total values for use in the RPA
calculations. We will generally rely on default translator values developed for each metal (more on that
below), but it is also possible to consider case -specific translators developed in accordance with
established methodology.
RPA Permitting Guidance/WQBELs for Hardness -Dependent Metals - Freshwater
The RPA is designed to predict the maximum likely effluent concentrations for each metal of concern,
based on recent effluent data, and calculate the allowable effluent concentrations, based on applicable
standards and the critical low -flow values for the receiving stream.
Page 9 of 12
NPDES PERMIT FACT SHEET NPDES No. NC0000396
If the maximum predicted value is greater than the maximum allowed value (chronic or acute), the
discharge has reasonable potential to exceed the standard, which warrants a permit limit in most cases.
If monitoring for a particular pollutant indicates that the pollutant is not present (i.e. consistently
below detection level), then the Division may remove the monitoring requirement in the reissued
permit.
1. To perform a RPA on the Freshwater hardness -dependent metals the Permit Writer compiles
the following information:
• Critical low flow of the receiving stream, 7Q10 (the spreadsheet automatically
calculates the 1Q10 using the formula 1Q10 = 0.843 (s7Q10, cfs) 0.993
• Effluent hardness and upstream hardness, site -specific data is preferred
• Permitted flow
• Receiving stream classification
2. In order to establish the numeric standard for each hardness -dependent metal of concern and
for each individual discharge, the Permit Writer must first determine what effluent and
instream (upstream) hardness values to use in the equations.
The permit writer reviews DMR's, Effluent Pollutant Scans, and Toxicity Test results for any
hardness data and contacts the Permittee to see if any additional data is available for instream
hardness values, upstream of the discharge.
If no hardness data is available, the permit writer may choose to do an initial evaluation using
a default hardness of 25 mg/L (CaCO3 or (Ca + Mg)). Minimum and maximum limits on the
hardness value used for water quality calculations are 25 mg/L and 400 mg/L, respectively.
If the use of a default hardness value results in a hardness -dependent metal showing reasonable
potential, the permit writer contacts the Permittee and requests 5 site -specific effluent and
upstream hardness samples over a period of one week. The RPA is rerun using the new data.
The overall hardness value used in the water quality calculations is calculated as follows:
Combined Hardness (chronic)
_ (Permitted Flow, cfs *Avg. Effluent Hardness, mg/L) + (s7Q10, cfs *Avg. Upstream Hardness,
m L
(Permitted Flow, cfs + s7Q10, cfs)
The Combined Hardness for acute is the same but the calculation uses the 1Q10 flow.
3. The permit writer converts the numeric standard for each metal of concern to a total
recoverable metal, using the EPA Default Partition Coefficients (DPCs) or site -specific
translators, if any have been developed using federally approved methodology.
Page 10 of 12
NPDES PERMIT FACT SHEET
NPDES No. NC0000396
EPA default partition coefficients or the "Fraction Dissolved" converts the
value for dissolved metal at laboratory conditions to total recoverable metal
at in -stream ambient conditions. This factor is calculated using the linear
partition coefficients found in The Metals Translator: Guidance for
Calculating a Total Recoverable Permit Limit from a Dissolved Criterion
(EPA 823-B-96-007, June 1996) and the equation:
Cdiss =
Ctotal
1
1 + { [Kpo] [SS'''] [10-6] }
Where:
ss = in -stream suspended solids concentration [mg/1], minimum of 10 mg/L
used, and
Kpo and a = constants that express the equilibrium relationship between
dissolved and adsorbed forms of metals. A list of constants used for each
hardness -dependent metal can also be found in the RPA program under a
sheet labeled DPCs.
4. The numeric standard for each metal of concern is divided by the default partition coefficient
(or site -specific translator) to obtain a Total Recoverable Metal at ambient conditions.
In some cases, where an EPA default partition coefficient translator does not exist (ie. silver),
the dissolved numeric standard for each metal of concern is divided by the EPA conversion
factor to obtain a Total Recoverable Metal at ambient conditions. This method presumes that
the metal is dissolved to the same extent as it was during EPA's criteria development for
metals. For more information on conversion factors see the June, 1996 EPA Translator
Guidance Document.
5. The RPA spreadsheet uses a mass balance equation to determine the total allowable
concentration (permit limits) for each pollutant using the following equation:
Ca = (s7Q10 + Qw) (Cwqs) — (s7Q10) (Cb)
Qw
Where: Ca = allowable effluent concentration (µg/L or mg/L)
Cwqs = NC Water Quality Standard or federal criteria (µg/L or mg/L)
Cb = background concentration: assume zero for all toxicants except NH3* (µg/L or
mg/L)
Qw = permitted effluent flow (cfs, match s7Q10)
s7Q10 = summer low flow used to protect aquatic life from chronic toxicity and human
health through the consumption of water, fish, and shellfish from noncarcinogens (cfs)
* Discussions are on -going with EPA on how best to address background
concentrations
Flows other than s7Q10 may be incorporated as applicable:
Page 11 of 12
NPDES PERMIT FACT SHEET NPDES No. NC0000396
1Q10 = used in the equation to protect aquatic life from acute toxicity
QA = used in the equation to protect human health through the consumption of
water, fish, and shellfish from carcinogens
30Q2 = used in the equation to protect aesthetic quality
6. The permit writer enters the most recent 2-3 years of effluent data for each pollutant of
concern. Data entered must have been taken within four and one-half years prior to the date
of the permit application (40 CFR 122.21). The RPA spreadsheet estimates the 95th percentile
upper concentration of each pollutant. The Predicted Max concentrations are compared to
the Total allowable concentrations to determine if a permit limit is necessary. If the predicted
max exceeds the acute or chronic Total allowable concentrations, the discharge is considered
to show reasonable potential to violate the water quality standard, and a permit limit (Total
allowable concentration) is included in the permit in accordance with the U.S. EPA
Technical Support Document for Water Quality -Based Toxics Control published in
1991.
7. When appropriate, permit writers develop facility specific compliance schedules in accordance
with the EPA Headquarters Memo dated May 10, 2007 from James Hanlon to Alexis Strauss
on 40 CFR 122.47 Compliance Schedule Requirements.
8. The Total Chromium NC WQS was removed and replaced with trivalent chromium and
hexavalent chromium Water Quality Standards. As a cost savings measure, total chromium
data results may be used as a conservative surrogate in cases where there are no analytical
results based on chromium III or VI. In these cases, the projected maximum concentration
(95th %) for total chromium will be compared against water quality standards for chromium
III and chromium VI.
9. Effluent hardness sampling and instream hardness sampling, upstream of the discharge, are
inserted into all permits with facilities monitoring for hardness -dependent metals to ensure
the accuracy of the permit limits and to build a more robust hardness dataset.
10. Hardness and flow values used in the Reasonable Potential Analysis for this permit included:
Parameter
Value
Comments (Data Source)
Average Effluent Hardness (mg/L)
[Total as, CaCO3 or (Ca+Mg)]
25.0
Default value
Average Upstream Hardness
(mg/L)
[Total as, CaCO3 or (Ca+Mg)]
25.0
Default value
7Q10 summer (cfs)
0
Lake or Tidal
1Q10 (cfs)
0
Lake or Tidal
Permitted Flow (MGD)
2.1
For dewatering
Page 12 of 12