Loading...
HomeMy WebLinkAbout20140231 Ver 1_401 Application_20140314Quible Quible & Associates, P.C. ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING SINCE 1959 Roberto Scheller NC Division of Water Quality 943 Washington Square Mall Washington, NC 27889 March 4, 2014 RE: Lot 3, Mid Island Enterprises (Williams Property) Rodanthe, Dare County, North Carolina JD, Nationwide 18 and 401 Certification Mr. Scheller, 2 0 1 4 0 2 3 1 P.O. Drawer 870 Kitty Hawk, NC 27949 Phone: 252-261-3300 Fax: 252-261-1260 web: quible.com F T Enclosed is a Nationwide 18 and 401 Water Quality Certification submission for 0.06 acres of Section 404 wetland impacts associated with a single family residential homesite. The section 404 wetlands line was delineated by myself in January 2014 and field confirmed by Josh Pelletierm, USACE field representative, in February 2014. Enclosed is the following: • $240 Processing fee check • Agent Authorization Statement • Section 404 Delineation • Site Plan • PCN Application • USGS Vicinity Map • Mitigation Acceptance Letter from GDSMB • Stormwater Management Low Density Supplement Please review and process this permit request. If you have any questions or require additional information, please contact me at (252) 261 -3300. Sincerely, Quible & Associates, P.C. �1 w ---- -- Brian Rubino @ ���n�L MAR I 0 2014 WA Quible Quible & Associates, PC ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING SINCE 1959 Josh Pelletier US Army Corps of Engineers 2407 West Fifth Street Washington, NC 27889 February 24, 2014 RE Lot 3, Mid Island Enterprises (Williams Property) Rodanthe, Dare County, North Carolina JD, Nationwide 18 and 401 Certification Mr Pelletier, P O Drawer 870 Krtiy Hawk NC 27949 Phone 252 261 -3300 Fax 252- 261 -1260 Web quble corn Enclosed is a Nationwide 18 and 401 Water Quality Certification submission for 0 06 acres of Section 404 wetland impacts associated with a single family residential homesite The section 404 wetlands line was delineated by myself in January 2014 and confirmed during our on -site meeting in February 2014 The JD request is for three adjoining lots (all owned by the same family) and the Nationwide 18 is for Lot 3 only Enclosed is the following • Agent Authorization Statement • Section 404 Delineation Plat (3 full sized copies and 1 reduced) • Datasheets • Nexus Evaluation Form • Site Plan • PCN Application • USGS Vicinity Map • Mitigation Acceptance Letter from GDSMB Please review and process this permit request If you have any questions or require additional information, please contact me at (252) 261 -3300 Sincerely, Quuiibl ^e rQA' & Associates, P C `-x 1 — Brian Rubino CC Roberto Scheller, DWQ Al .,, _._.�- -�. ✓�- .Q- - r- ve`+.,`-"P-'�- �..e.. ..� Y .tee � 1 v ' 1 I U,IBL`'E WAS.SO.C'IATES � - ••r4•�.. � mss' �. '± KITsT;YPpHi�g.WBK�,'K4-870 yl,. ri a as sir e► w b w° a %252)�26,1'°3300� `°+r ' .� �► d°�'� �' 66 45b 53 DATE , _ w �`-� 'L�em�"� yea.:°'- . �,,, '�°` 'r`"f �: -s+�} ~' -6.ORDER'OF'��.'��"�� .�_�-° �' "�I✓' � ®"�_ �oO UOL °L'ALJ� ~ - +awr - �a - .� ,��s.:�y- ._+�t„�''�, �" ,• °fir r „ � �,"`r' °",' r''�,�'� !°,�° �_' �+�' °�' '�alv''*�,► ^�w �w -<`S" ,�tl i'' ; ■'ip�� "r�'d/y��'�.m.�'4,.�. �1°ex Q!.s� �� TMe. .�- _����°s. m, �` '�' °`- 6�r+'' ., iS�v»1C'�„ °` - _ °' � �9' !rr- vin +p a.°� ®„� �� a+a✓ �`� - - �i-P' `" - u• 0 �.CI�0 2 4' �6'O,u■ :d5 5 3 L`0a4,Z5.,6.8 Lri;, 0 DO 4 A � � -1.�7� '� '- � � i� uJ�w �in�p ��i�►�g. -lam. �.s�zr +9>:'��FS" •`P� }{^IMF �wWdq � �� -TW'F y�r�^ r 4.MS ..�� �R 7TH " �uC_��A.IDd: ib� d�+M.kk6k- +�.��h. `mTw �Jti. Tw" sw.."4n✓�'ax�ia. �• �Vry� � ae167 ' i� var �A�yi .,, _._.�- -�. ✓�- .Q- - r- ve`+.,`-"P-'�- �..e.. ..� Y .tee � 1 v ' 1 I a p t .,, _._.�- -�. ✓�- .Q- - r- ve`+.,`-"P-'�- �..e.. ..� Y .tee � 1 v ' 1 I February 19, 2014 RE Lot 3, Mid Island Enterprises Rodanthe, Dare County, North Carolina As owner of the above referenced property, I authorize Quible & Associates, P C (Quible) and US Army Corps of Engineers to access my property. Quible will act as agent for the purpose of environmental permitting, including USACE and DWQ permits if necessary Authorized Signature Name AlarWrHrarns Date 2 1< W it �►Qvk S AREAS BY CctlRDlNA1E I£INJD Lorinsr/a9rrau ONff LLVIII "RN QM3XJ -91 -4598 DARE L0.MY %N 6JLVldiro OrK 10T A/FA T3T5 XJFf 1)03 KJ Iq.AAD AREA. 3 ;N1150PT /OB3 KJ YE]LNO AFE B9D1 SOFT W, Kl LOrT DARE CL.NIr%M PYIbV'/I-0/A1 DDARECIXNIY� 03a2TiGCtl TK IOi ARFi, I5B96b 50rt (036 Kl CPt.VO APFA 35.5 Jl5¢fT (l5 ACJ I'L11.K® AREA 91]55 SOFT /01l KJ tCT3 DARE LpRIrY PN( CbIP -X 9163U DA ECQMTr RD 03XJ]� - iDTN.lOTAREA ]5033XSFr /DIDKJ lq.VD AREn. 126(B550Fi /D19K) 'EILNO AFE.A @4D SOFT /OJI KJ SBILT RRSRDKEw DB D41 f!5 41 A9 T15 F6 821,W ]6( fK M Pc c k Il6@ PL L Y 66' � ADpITgWV. RffERBYfS. m 19] FIS oS,nDeco Ps. 4B¢ w ]a Rs a] r>e n4 %z 265 RRD .kR,EY DAlE 1!i Al 1U Zfi4 IMS SLRVtY °JBIL/ i0 AM' FKIS IM'LLDiNS B.bIDIN3 SETBACK RB]RIG nLN5, EA:68n5 cOVFNAMS ETL PMT M4Y $ REVEAGf� BY A HLL AAD ALCIrzA1F nRE SEA.B;H IW6 RAT 51Nn3,29J rrZ 11ElLeAMI6IfEYERA�OSL/NES ptr 7W5 RATIS /tlTA9210N1r• Yr4�9 JW.L ftlIBE lF6 £cR RrsLm7Anav sacs uz caw>,-Arr�, DF Rne"e +rr PAMLIGO SOUND U4 649 57l 0545 E L26 3154 4- CGAVCRtTF ` /4 rJ Ai �' t M'FaFENr Kfl ,(y' l,V� Q Fl�ISnnb IRLW %FE RP "'•.Y �' �6 , •" O Fa]SnM6 rRCw emD EIR MIL• iIS ,r r + 4 •� - cKG6At®rolNr ••Ir,1 "•,, ,, " tip /rEnvmAEA,� "� =E s r /Y9 7" w x�a rr+b 404 AM LOASrAL rELAm LIIE(7TPJ y i .. D.w Ayue Je s W W 435gR ! r i DOD Kiss I W L154 D DORtY /G4 INA LIKE MOLE 1 �_ LIRE TARE 09 M Fl 021 LPLOT PART I L SL 1160 / , Da 650 P6 494 $ v 1 _ � " • I _ 1000-2011! At #(- z I , LINE/ LB147N D/RELPLW LIAO LEN6TN TO f✓L� � E 3/1- 0�42R7 YT U 20,5 NOB S5 42 E L15 ?r87 5 T/ OS 45 E _ na 774 P6 205 PART Q° LOT I PA PG L 5L 059 L2 /6A9 N55 // 43 E L/6 3].23 587'549 E ! $JlI 111111 _ m z••= + y VY rEa �d 5p LL .. y Wi J v y . W A4F L D n 13 47D2 5 N 4116 E U7 4240 66r.54 23 E 14 q33 57/NSSE LIB 2:99 H154736E • F L5 2594 5 BT 4B 14 E IN X02 NT 22 56 W SI It Lb 4780 N94 30 27 E LXJ Y 61 526 9 40 W e `• �•, PORrlp4 � SFIORHJIE L7 1587 M34 30 27 E 221 3:62 _ N BI l0 I0 W • S `w A1L4{5 LOT / 645® ON LO W-12 N 69 39 54 W L22 3965 N B3. 4B 23 W / 10/2 A9t /AL PWJT05RAR1Y L9 2882 N /6 33 a w L23 9GOT N 43 92 07' E ct w / LO 2130' NW 37 A W L24 095 NO 4 -3 E /4F T sd b'e ZIM@W4l ET AL Lit L12 694 N15 9 16 W U62 11 E L35 L26 316/ ON 511 50 /I E 5 w W 39 E VICINITY MAP - HA1� 6''11' `• ,,, ``,� \; C A Rp� ••.• Da 706 H 7/ PL OSL 25B /593 a °. i "j3 �i fE55 %Oti !y:• O s a` n U3 /80 N62 -0 12 E L.27 3153 N75 SI 4B E U4 649 57l 0545 E L26 3154 4- CGAVCRtTF ` /4 rJ Ai �' t M'FaFENr Kfl ,(y' l,V� Q Fl�ISnnb IRLW %FE RP "'•.Y �' �6 , •" O Fa]SnM6 rRCw emD EIR MIL• iIS ,r r + 4 •� - cKG6At®rolNr ••Ir,1 "•,, ,, " tip /rEnvmAEA,� "� =E s r /Y9 7" w x�a rr+b 404 AM LOASrAL rELAm LIIE(7TPJ y i .. D.w Ayue Je s W W KF One LFRnWrwrE VORS 0 S .7 FK 666 m9 cLRnRES mar iM5 CLPf t)F nNS ItAr ACG.W ]R.YGL cl5 NE B:VOAeY aF rrE Oa Ib 1RISDlLI1pV LF 5EL11rM 4d Lf /M LlEAN WAtfP ALTAS DFI6l]vNfD BT IN° — VSfRSebl® GW iltl3 DAtE LHl=,5 II[RE 15 A LIM £ IN IIE LAWOR LIR RHISIED I LERPFY ]NAr nb51MR xA5 DRArN Ib.LY"R Mf 9bER.45M17/ fRCM AH Kn1At StRrEY � — .Prv4LAnGe4 mz eErt3mnN5new eF SECncw 4o4.swsaLrlcN n.re.� a6lm taw FDR WADE nnmt3r rr..rrt wsew Ise£ rora FDR o® Re�+.eFJ mar ]1E LeuD.wla lar � A � NJTTD FXCl�D FNE YEARS /f W4 ]N5 DAZE M5 LE16dlINAlidl HtS INDE SIR�'EYfi A� IMILAIFD A5 DRAW! AS DASI®i8F7KH.' LNE; lN4i irE RArNJ cF — Bm.nnb6 ]IeArsasxurE RrEIavAL 54R7FJB? rD rrER6] cLTrPS Lr e4z��es fRC216lON LR rasrnaw. Kce4a5cr a / aAea.KO m4r mrs nw rff]s rEnv4n ee.RFAnav,w4ut acr44Ree+]s c�rrESrArnArmb Lr•rxACncEroR Lam aw.Erbes rN luzn, eAFr1rNA GRAPHIC SCALE rN Icnc SSrE.b' J ]R r Zby- DAr LK&! °W —vk ( IN FFFT ) 1 mrh = 30 (t N mI1B2 F. F A9 -- W Fes+ z r' 4r' w M N � Al n�`1 H O COMMISSbN NO P13063 orsicNm rn TAS wuwn er TAS LlECNm 9Y JHM 55uE GATE 2/19/2014J 435gR ! r i DOD Kiss I W L154 D DORtY /G4 INA W 1 �_ 09 M Fl 021 LPLOT PART I L SL 1160 o I I Da 650 P6 494 PL v 1 _ � " • I _ 1000-2011! At #(- z I , A 601-X5150 eFT Iry 4 492481 SqR 5 TO f✓L� � E 3/1- 0�42R7 YT �'d * W m a .v y e r_ ALDA Y M Da 701 nEnnro w9e+ P 5/gEiW(7- 30-/3) L _ na 774 P6 205 PART Q° LOT I PA PG L 5L 059 + y VY rEa �d 5p LL .. y Wi J v y . W A4F L D n /fie -AY-' br NAP r ?�Ae _ rKYLEMLL /ARS ' L4R= N4rlFAAS KF One LFRnWrwrE VORS 0 S .7 FK 666 m9 cLRnRES mar iM5 CLPf t)F nNS ItAr ACG.W ]R.YGL cl5 NE B:VOAeY aF rrE Oa Ib 1RISDlLI1pV LF 5EL11rM 4d Lf /M LlEAN WAtfP ALTAS DFI6l]vNfD BT IN° — VSfRSebl® GW iltl3 DAtE LHl=,5 II[RE 15 A LIM £ IN IIE LAWOR LIR RHISIED I LERPFY ]NAr nb51MR xA5 DRArN Ib.LY"R Mf 9bER.45M17/ fRCM AH Kn1At StRrEY � — .Prv4LAnGe4 mz eErt3mnN5new eF SECncw 4o4.swsaLrlcN n.re.� a6lm taw FDR WADE nnmt3r rr..rrt wsew Ise£ rora FDR o® Re�+.eFJ mar ]1E LeuD.wla lar � A � NJTTD FXCl�D FNE YEARS /f W4 ]N5 DAZE M5 LE16dlINAlidl HtS INDE SIR�'EYfi A� IMILAIFD A5 DRAW! AS DASI®i8F7KH.' LNE; lN4i irE RArNJ cF — Bm.nnb6 ]IeArsasxurE RrEIavAL 54R7FJB? rD rrER6] cLTrPS Lr e4z��es fRC216lON LR rasrnaw. Kce4a5cr a / aAea.KO m4r mrs nw rff]s rEnv4n ee.RFAnav,w4ut acr44Ree+]s c�rrESrArnArmb Lr•rxACncEroR Lam aw.Erbes rN luzn, eAFr1rNA GRAPHIC SCALE rN Icnc SSrE.b' J ]R r Zby- DAr LK&! °W —vk ( IN FFFT ) 1 mrh = 30 (t N mI1B2 F. F A9 -- W Fes+ z r' 4r' w M N � Al n�`1 H O COMMISSbN NO P13063 orsicNm rn TAS wuwn er TAS LlECNm 9Y JHM 55uE GATE 2/19/2014J 97 . e I E ELrLTzc PL O, Da 650 P6 494 v 1 _ � " • I _ 1000-2011! �� " I , ,iE51 A A 601-X5150 eFT Iry 4 492481 SqR 5 TO f✓L� � E 3/1- 0�42R7 YT VORS 0 S .7 FK 666 m9 cLRnRES mar iM5 CLPf t)F nNS ItAr ACG.W ]R.YGL cl5 NE B:VOAeY aF rrE Oa Ib 1RISDlLI1pV LF 5EL11rM 4d Lf /M LlEAN WAtfP ALTAS DFI6l]vNfD BT IN° — VSfRSebl® GW iltl3 DAtE LHl=,5 II[RE 15 A LIM £ IN IIE LAWOR LIR RHISIED I LERPFY ]NAr nb51MR xA5 DRArN Ib.LY"R Mf 9bER.45M17/ fRCM AH Kn1At StRrEY � — .Prv4LAnGe4 mz eErt3mnN5new eF SECncw 4o4.swsaLrlcN n.re.� a6lm taw FDR WADE nnmt3r rr..rrt wsew Ise£ rora FDR o® Re�+.eFJ mar ]1E LeuD.wla lar � A � NJTTD FXCl�D FNE YEARS /f W4 ]N5 DAZE M5 LE16dlINAlidl HtS INDE SIR�'EYfi A� IMILAIFD A5 DRAW! AS DASI®i8F7KH.' LNE; lN4i irE RArNJ cF — Bm.nnb6 ]IeArsasxurE RrEIavAL 54R7FJB? rD rrER6] cLTrPS Lr e4z��es fRC216lON LR rasrnaw. Kce4a5cr a / aAea.KO m4r mrs nw rff]s rEnv4n ee.RFAnav,w4ut acr44Ree+]s c�rrESrArnArmb Lr•rxACncEroR Lam aw.Erbes rN luzn, eAFr1rNA GRAPHIC SCALE rN Icnc SSrE.b' J ]R r Zby- DAr LK&! °W —vk ( IN FFFT ) 1 mrh = 30 (t N mI1B2 F. F A9 -- W Fes+ z r' 4r' w M N � Al n�`1 H O COMMISSbN NO P13063 orsicNm rn TAS wuwn er TAS LlECNm 9Y JHM 55uE GATE 2/19/2014J W Fes+ z r' 4r' w M N � Al n�`1 H O COMMISSbN NO P13063 orsicNm rn TAS wuwn er TAS LlECNm 9Y JHM 55uE GATE 2/19/2014J a 0\ 2013 \P13085 \DRAWINGS \SURVEY \P13085= FEASEdwg 2/19/2U14 11 19 AM IStokely \ C 1168 ( / w� F ff L, f •yam PAML IGO SOUND r� J \\ w w w l v �o f mete y wheel. r sCt N \ \ \\ w w Cl: ! a N N \\\ � '• w � '� "ed Plne Dr 5HORELINE(7- 30 -13) �)r SI fE L.. ON°d n L n we,ea Bdd Dun. Dr S \ r 5a,e„ Sea Isla Nilla or Lerrolls Rd Cecq Wt1ge d / Yl - w /� (11I w 134° 13'4)1'E � w I \ \ \w SQL` w \ wised L" lgna wa Rer ` N/I u%i W 7702'61e) y \ w �Z7. '� /�• Mmaett wey w g°n Le 1� DOR 15 O. CARD N I See �,ta Dr D.B. 187, PG 668 w V /G /N /TY'MAP - WAVE5 :z LOT 5 a w w w w w LEGEND p - EXI5TING 4'x4" CONCRETE o (PG '15L 1163 wi w w w w w MONUMENT, EGM 0 w w ip w w w w w v O - EXI5TING IRON PIPE, EIP r w I O- CALCULATED POINT ElR ywE7LAND5 w w w w w I w w Iw �v w w w w w w w w rry�- 2,674=SQF,T (006 AC) I w Iw w w p w w w w WETLANDS s FILL 2 1' PROPOSED \ �� f y w w 4' DIA FIBERGLASS 9b' L w N/F N/F LIFT STATION 0' 10 5' ALDA GLORIA M o w L /5A D, MADDREY PROPOSED 84 , w w MADDREY DB 775, PG =82I 3 STORY S F D 2 q'_ 7 '' w DB 761, P& 6/7 i w PART OF LOT I ON' PILES ,y'� > LOT (4 BEDROOMS) l w (PG G, SL 116B w (PG G, SL ll6B �� EA75T1NG' YO PVC F M Y )r0 J 'EA NT I kE- /LAND. w ° \ w 38 7' 6GM' '117R 6970' °20' "l8 "W E/P /NGlNIG NIF (NEW) COPYRIGHT © 2013 Ecrt GAPE HA'TTERA5 } eA o ELEC TR IC I Lp o LIMITS OF FILL (TYP) DB 660, PG 489 I DRAWN BY d �24" FILL REQUIRED c ^ * DD�� iiyssocates ` � 210' I /� ( •r_ G SL. U6B) fi> VIOLATION OF COPYRIGHT LAWS VIOLATION WILL BE SUBJECT TO LEGAL ACTION N I ACTIVE CONVENTIONAL BED 100' _ ' cI ^ I - LINES (7) 0 ®L J SEALED BY A LICENSED PROFESSIONAL THEN THIS PLAN OR PLAT SHALL BE CONSIDERED " PO Drawer 870, Kitty Hawk, NC 27949 Phone '(252) 261 -3300 8 GPD/ T A R DATE PROPOSED ACTIVE 24' FILL REQUIRED Fax (252),261 -1260' 2- 19 - =14 }` 1,200 GALLON 8 HOLE I E -Mali administrator ®quible,com SEPTIC TANK D -sox �j� y)1(TiTT(T S's• 100% REPAIR w (7) 43' LINES ® 3' 0C III (� 0 8 GPD /SF L T A R :fit I w EXI 24' FILL REQUIRED {'1L ' IIIIIIIII+ � IIIIHHI� W Q1 � Imo - '� 63 0' I J PROPOSED I WASTEWATER' EASEMENT e I PROJECT COPYRIGHT © 2013 �.I P113085 QUIBLE & ASSOCIATES, PC ' SINCE 1959 � J 7.7 -OT �jF s 0 „ LI " h F' r II QED I ES' ' L Jj 1�Jiai Iva+ a�a aaa�a.+v THIS DOCUMENT IS THE PROPERTY OF QUIBLE & ASSOCIATES, PC ALL RIGHTS ARE RESERVED REPRODUCTION OF THIS OR iblie {:L ' 1 DRAWN BY d ANY `POSSESSION WITHOUT PRIOR PERMISSION OF c ^ * DD�� iiyssocates ` TA$ QUIBLE & ASSOCIATES P C WILL CONSTITUTE /� ( •r_ G SL. U6B) OG •��• VIOLATION OF COPYRIGHT LAWS VIOLATION WILL BE SUBJECT TO LEGAL ACTION =`ENGINEERING * CONSULTING * PLANNING ENVIRONMENTAL SCIENCES * SURVEYING' CHECKED BY - KINNAKEET TOWNSHIP DARE COUNTY JHM IF THIS PLAN OR PLAT IS NOT SIGNED AND ` NORTH CAROLINA NC License# C -0208 SEALED BY A LICENSED PROFESSIONAL THEN THIS PLAN OR PLAT SHALL BE CONSIDERED " PO Drawer 870, Kitty Hawk, NC 27949 Phone '(252) 261 -3300 ,, 0 40 80 DATE PRELIMINARY AND NOT A CERTIFIED DOCUMENT AND SHALL-NOT BE USED FOR` CONSTRUCTION,I.r Fax (252),261 -1260' 2- 19 - =14 }` RECORDATION' SALES OR LAND CONVEYANCES, I GRAPHICySCALEJN,'FEET 1 " =40" I E -Mali administrator ®quible,com O�0F W ALc9 r O Y Office Use Only Corps action ID no DWQ project no Form Version 1 0 November 2008 Page 1 of 11 PCN Form — Version 1 0 November 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps ®Section 404 Permit El Section 10 Permit 1 b Specify Nationwide Permit (NWP) number 18 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) N 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required9 For the record only for DWQ 401 Certification ❑ Yes N No For the record only for Corps Permit ❑ Yes N No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts9 If so, attach the acceptance letter from mitigation bank or in -lieu fee program N Yes ❑ No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below N Yes ❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC) ❑ Yes N No 2. Project Information 2a Name of project Wdiams Property, Lot 3, Mid ISland Enterprises 2b County Dare 2c Nearest municipality / town Rodanthe 2d Subdivision name 2e NCDOT only, T I P or state project no 3. Owner Information 3a Name on Recorded Deed Brandon Williams 3b Deed Book and Page No DB 1943 / PG 172 3c Responsible Party (for LLC if applicable) N/A 3d Street address 1328 Penrose Ln 3e City, state, zip Chesapeake, VA 23320 3f Telephone no 757 235 3012 3g Fax no 3h Email address Page 1 of 11 PCN Form — Version 1 0 November 2008 Version Section A Applicant Information, continued 4. Applicant Information (if different from owner) 4a Applicant is ® Agent ❑ Other, specify 4b Name 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address 5. Agent/Consultant Information (if applicable) 5a Name Brian Rubino 5b Business name (if applicable) Qwble & Associates, P C 5c Street address P O Drawer 870 5d City, state, zip Kitty Hawk, NC 27949 5e Telephone no (252) 261 -3300 5f Fax no (252) 261 -1260 5g Email address brubino@gwble com Page 2 of 11 PCN Form — November 2008 Version B. Project Information and Prior Project History 1. Property Identification 1 a Property identification no (tax PIN or parcel ID) pin 064820916318 lb Site coordinates (in decimal degrees) 35 57103'N - 75 46920'W 1 c Property size 0 40 acres 2. Surface Waters 2a Name of nearest body of water (stream, river, etc ) to Pamlico Sound proposed project 2b Water Quality Classification of nearest receiving water Sc 2c River basin Pasquotank 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Single Family Residential Nearby properties include single family residential homesites and undeveloped wetlands and uplands 3b List the total estimated acreage of all existing wetlands on the property 0 29 ac 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project The purpose of this wetland impact permit request is for minor wetland fill impacts associated with the fill of 0 06 acres of wooded Section 404 wetlands for a residential homesite 3e Describe the overall project in detail, including the type of equipment to be used Proposed building construction and associated grading will require minor wetland impacts Equipment will include backhoe, dump trucks and compactors 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ❑ No ❑ Unknown project (including all prior phases) in the past? 4b If the Corps made the jurisdictional determination, what type ® Preliminary ❑ Final of determination was made? Agency /Consultant Company US Army Corps of 4c If yes, who delineated the jurisdictional areas? Engineers field confirmation of Lots 1 -3 by J Pelletier on Name (if known) Brian Rubino 2/4 /2014 Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Delineated by Quble in January 2014 and confirmed by USASE in February (JD request submitted at this time) S. Project History 5a Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain Page 3 of 11 PCN Form — Version 1 0 November 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a Which sections were completed below for your project (check all that apply) ® Wetlands ❑ Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of Type of wetland Forested (Corps - 404, 10 Area of impact (acres) Permanent (P) or impact (if known) DWQ — non -404, other) Temporary T shrub - forested ® Corps W1 ®P ❑ T fill 404/ ❑ Yes ® No ® DWQ 006 non - riparian W2 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ 2g. Total wetland impacts 006 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f Stream impact Type of Stream name Perennial (PER) or Average stream width (feet) Impact number - impact intermittent (INT) length Permanent (P) or (linear feet) Temporary (T) S1 ❑ P ❑ T ❑ PER ❑ INT S2 ❑ P ❑ T ❑ PER ❑ INT S3 ❑ P ❑ T ❑ PER ❑ INT S4 ❑P ❑T ❑PER ❑INT S5 ❑P ❑T E:1 PER ❑INT S6 ❑ P ❑ T ❑ PER ❑ INT 3g. Total stream and tributary impacts 3h Comments Page 4 of 11 PCN Form — Version 1 0 November 2008 Version C Proposed Impacts Inventory, continued 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all o en water impacts below 4a 4b 4c 4d 4e Open water Name of impact number waterbody Type of impact Waterbody type Area of impact (acres) — Permanent (if (P) or applicable) Temporary T 01 ❑P 02 ❑P 03 ❑P 04 ❑P M. Total open water impacts 4g Comments Page 5 of 11 PCN Form — November 2008 Version C Proposed Impacts Inventory, continued 5. Pond or Lake Construction If pond or lake construction pro osed, then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5i Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then y ou MUST fill out Section D of this form 6a ❑ Neuse El Tar-Pamlico El Other Project is in which protected basin'? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact (square Zone 2 impact Permanent (P) for impact Stream name mitigation feet) (square feet) or Temporary required9 T " 61 ❑P ❑T El Yes 0 N B2 ❑P ❑T El Yes El No B3 ❑P ❑T El Yes El No 6h Total buffer impacts 61 Comments Page 6 of 11 PCN Form — November 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Fill is designed to be placed in an area that best utilizes the existing uplands on -site The septic system is to be located on Lot 1, meeting all local requirements related to system design and setbacks from wetlands The total area of proposed impacts is limited to the area that is absolutely necessary to accomplish the proposed 4 bedroom house and driveway footprint as shown on the accompanying plan 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Silt fencing to be maintained until disturbed area is stabilized with grass 2 Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ® Yes ❑ No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ® Corps 2c If yes, which mitigation option will be used for this projects ® Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank Great Dismal Swamp Restoration Bank, LLC 3b Credits Purchased (attach receipt and letter) 404e non - riparian Quantity 0 12 ac 3c Comments acceptance letter attached 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature warm, cool, cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 7 of 11 PCN Form — Version 1 0 November 2008 Version D Impact Justification and Mitigation, continued 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone Reason for impact Total impact (square feet) Multiplier Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 Total buffer mitigation required 6c If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6d Comments Page 8 of 11 PCN Form — November 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? ❑ Yes ❑ No 2. Determination if the Project Requires a Stormwater Management Plan 2a Does the project require a Non -404 Jurisdictional General Permit? ❑ Yes ® No 2b Is the project subject to General Certification 3704 or 3705? ❑ Yes ® No 3 Determination of Stormwater Review Jurisdiction 3a Is this project subject to any of the following state - implemented stormwater ® Coastal counties management programs (check all that apply)? ❑ HQW ❑ ORW If so, attach one copy of the approval letter from the DWO and one copy of the ❑ Session Law 2006 -246 approved stormwater management plan ❑ Other 3b In which local government's jurisdiction is this project? Dare County 3c Is this local government certified to implement a state stormwater program? ❑ Yes ® No If so, attach one copy of the approval letter from the local government and one copy of the approved stormwater management plan (or one copy of the approved Stormwater management plan stamped as approved) 4. Information Required for DWQ 401 Unit Stormwater Review 4a What is the overall percent imperviousness according to the most current site Ian? 16 9 % residential 4b Does this project contain any areas that meet the criteria for "high density" per ❑ Yes ® No General Certifications 3704 and 3705? 4c If the site,is over 24% impervious and /or contains high density areas, then provide a brief narrative description of the stormwater management plan 4d Has a completed BMP Supplement Form with all required items been submitted ❑ Yes ® No for each stormwater BMP? Page 9 of 11 PCN Form — Version 1 0 November 2008 Version F. Supplementary Information 1. Environmental Documentation (DWO Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)9 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility A septic treatment system for the subject lot has been designed for Lot 1 to meet Dare County Health Department design and setback requrrments Page 10 of 11 PCN Form — Version 1 0 November 2008 Version F. Supplementary Information, continued 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? E:1 Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Program 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? Mapping data and field investigation, proposed impact area is not within an area of surface waters 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? National Register of Historic Places B. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ® Yes ❑ No 8b If yes, explain how project meets FEMA requirements This type of fill is allowable and home will be elevated above published 100 yr flood elevation 8c What source(s) did you use to make the floodplain determination? NFIP Flood Zone Maps (www ncfloodmaps com) 1�>6 a/) F�—V7' CT 2' 2 `I' 2ory A Q r- Applicant/Agent's Printed Name Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant Date is provided Page 11 of 11 PCN Form — November 2008 Version SCALE 1:24000 0 1000 2000 3000_ 4000 FEET 075.4750000° W 075.4666666° W 075.4583333' W 075.4500000° W 075.4416666' w - 1 •� ,gy ..�W Z l r{!'XQ. a Z CO— n` S � Sel f j11 r ` 4S�It Lq cn `J c North Droan •` +... �� ' i. .! mpgroghd ? . Aunt Phoebes Iterk ' Z Marsh 00 o � '� y .'.lam i N. ` o � LO 51 TE ca. d:; r LO ,'T, -- , J` • ,„ Z W qem a,l.z� a' es I-andin f R z j �• QD o e 7v . D cp LO r• 7a c0 co l c) D vids' _ 1t h! Great- . P Island 1 0 a Z .: Z co ch , M c c7 00 w LO n 6 x 00 m Lf) n - 4"� 5 LO a, • e. idgett •,'I } Island �-t)�y,: 1. p 1 . �' •c .i ,, r O O O { f ; I. ! O LO LO M1 lgctit " - : a LO ti Co ri ht C 2009 WvTopc 075.4750000' W 075.4666666' W 075.4583333' W 075.4500000` W 075.4416666° SCALE 1:24000 0 1000 2000 3000_ 4000 FEET Permit No (to be provided by DEMLR) State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may be photocopied for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H 1002(18) Low density requirements and density factors can be found in Session Law 2008 -211, 15A NCAC 2H 1000, Session Law 2006 -246 and the State of North Carolina Stormwater Best Management Practice Manual Curb and gutter systems are allowed provided they meet the requirements in 15A NCAC 2H 1008(g) I. PROJECT INFORMATION Project Name W 111 t C W) t Pro o erE y 1 Leff 3 M1; A lslae,A t4erp6 to s Contact Person Phone Number ( -i 1 ) 235 -3012 Number of Lots Allowable Built Upon Area (BUA) Per Lot* iye Swmp &awrr Number of Dwelling Units Per Acre" No Sl.,jm 2equreA Low Density Development (check one) ® without curb & gutter ❑ with curb & gutter, outlets to (check one) ❑ Swales ❑ Vegetated Area *If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. BUA shall be shown in units of square feet. * *(Phase II Post - Construction [non -SA] only) II. BUILT UPON AREA Refer to DEMLR's forms and applications website for specific language that must be recorded in the deed restrictions for all subdivided projects (http / /portal ncdenr or-g/web /lr /state - stormwater -forms docs) Complete the following calculation in the space provided below where • SA Site Area - the total project area above Mean High Water • DF Density Factor - the appropriate percent built upon area divided by 100 • RA Road Area - the total impervious surface occupied by roadways • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc • No of Lots - the total number of lots in the subdivision • BUA per Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement • Total allowable lot BUA - the computed allowable built upon area for all lots combined • Total BUA from lot listing - the sum of built upon area allocated for each lot on the list of non - uniform lots Form SW401 -Low Density -Rev 3- 2/10/09 Page 1 of 4 Calculation For uniform lot sizes: S I N 6C-F- Lo T (SA Q541ft2 x DF 0.24) - (RA ft2) - (OA Of ft2) = BUA per Lot =yob ft2 AtloweA (No of Lots ) z9I_ Pro pe so.( For non - uniform lot sizes: a. (SA ft2 x DF ) - (RA ft2) - (OA ft2) =Total allowable lot BUA = ft2 b. Total BUA from lot listing sf b must be < a III. DESIGN INFORMATION Complete the following table If additional space is needed the information should be provided in the same format as Table 1 and attached to this form Rainfall intensity data can be found in Appendix 8 03 of the State of North Carolina Erosion and Sediment Control Planning and Design Manual or at http //hdsc nws noaa gov/hdsc /pfds/ A/D SWALES PROPO1 tO ON — S 1TE Table 1 Swale design information based on the 10 -vear storm Swale No Drainage Area (ac) Impervious Area (ac) Grassed Area (ac) C Q (cfs) Slope M Vallow (fps) Vactual (fps) Flow Depth (ft) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Form SW401 -Low Density -Rev 3- 2/10/09 Page 2 of 4 IV. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the North Carolina Administrative Code Section 15A NCAC 2H 1000, NCDENR BMP Manual (2007), Session Law 2006 -246, and Session Law 2008 -211 Please indicate the page or plan sheet numbers where the supporting documentation can be found An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial below If any item is not met, then justification must be attached. Only complete items n through p for projects with curb outlets Page/Plan Initials Sheet No 9AX2 a t Wo e, +f-C' E�&V-,AS 1AA. Pr-i«_+ Area For projects in the 20 coastal counties Per NCAC 2H 1005, a 50 foot wide vegetative buffer is provided adjacent to surface waters For Redevelopment projects, a 30' wide vegetative buffer adjacent surface waters is provided N & _ b t For HQW or ORW projects outside the 20 coastal counties A 30 foot wide vegetative buffer is provided adjacent to surface waters �1 c t For Phase H Post - Construction projects All built upon area is located at least 30 feet landward of all perennial and intermittent surface waters d Deed restriction language as required on form SWU -101 shall be recorded as a restrictive covenant A copy of the recorded document shall be provided to DWQ within 30 days of platting and prior to the sale of any lots 92L_ e Built upon area calculations are provided for the overall project and all lots f Project conforms to low density requirements within the ORW AEC (if applicable per No SwAL�ES 15A NCAC 2H 1007) _ _ g Side slopes of swales are no steeper than 3 1, or no steeper than 5 1 for curb outlet swales h Longitudinal slope of swales is no greater than 5%, for non -curb outlet projects, calculations for shear stress and velocity are provided if slope is greater than 5% 1 At a minimum, swales are designed to carry the 10 year storm velocity at a non - erosive rate Swales discharging to wetlands are designed to flow into and through the wetlands at a non - erosive velocity (for this flow requirement into wetlands, non - erosive is velocity < 2 ft/s) k Swale detail and permanent vegetation is specified on the plans 1 Swale detail provided on plans, includes grass type(s) for permanent vegetative cover in Swales are located in recorded drainage easements n tt Length of swale or vegetated area is at least 100 feet for each curb outlet o tt The system takes into account the run -off at ultimate built -out potential from all surfaces draining to the system (delineate drainage area for each swale) p tt Curb outlets direct flow to a swale or vegetated area t Projects in the Neuse, Tar - Pamlico, Catawba River basins, and Randleman Lake may require additional buffers. ft Only complete these items for projects with curb outlets. Form SW401 -Low Density -Rev 3- 2/10/09 Page 3 of 4 V. SWALE SYSTEM MAINTENANCE REQUIREMENTS 1. Mowing will be accomplished as needed according to the season Grass height will not exceed six inches at any time, and grass will not be mowed too close to the ground or "scalped ". 2 Swales will be inspected monthly or after every runoff producing rainfall event for sediment build -up, erosion, and trash accumulation 3 Accumulated sediment and trash will be removed as necessary Swales will be reseeded or sodded following sediment removal 4. Eroded areas of the swales will be repaired and reseeded Swales will be revegetated as needed and in a timely manner based on the monthly inspections. Side slopes must be maintained at the permitted slope. 5 Catch basins, curb cuts, velocity reduction devices, and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping 6 Swales will ,not be altered, piped, or filled in without approval from NCDENR Division of Water Quality. I acknowledge and agree by my signature below that I am responsible for the performance of the six maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Punt Name and Title. a Ili ASI.S Address. 2� P �S!✓ l�A �� r tA tSI� � ^; Vii Phone ���" (o(�ep — �Cjlo� Date- Signature Note. The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I, "f. - ll(L 1 - l�xJ��— , a Notary Public for theStat `t e of k L, iV—) CC , , County of i (l1 o hereby certify that Rte' '�� Cl�VY'l5 personally appeared before in this day of �!� and acknowledge the due execution of the forgoing Swale maintenance requirements Witness my, hand and o icial seal, asp Notary srgna�t�,;.rrurrrrrrrrr W� c® O� ra om S `C) r''f nr�r' 71i� i! r W 7 s�f• -'"�' k �Y My commission expires ` da I � \A — Form SW401 -Low Density -Rev 3- 2/10/09 Page 4 of 4 The Great Dismal Swamp RestorationBank, LLC P. O Box 6186 Chesapeake, VA 23323 February 27, 2014 Brian Rubino Quible & Associates, P.C. 8 Juniper Trail P O Drawer 870 Kitty Hawk, NC 27949 RE Brandon Williams Lot Rodanthe, NC Dear Mr Rubino Phone (757) 487 -3441 Fax (757) 487 -8680 The following price quote is given in reply to your request for the purchase of 0 12 wetland mitigation credits (HUC Code 03010205) from The Great Dismal Swamp RestorationBank Timberlake Farm These credits are currently available from our Timberlake mitigation bank. The cost will be Two Thousand, Four Hundred Dollars ($ 2,400 00) This quote will expire on April 30, 2014 You will need to submit to the USCOE the necessary application for said mitigation, and receive USCOE permission to furnish said required credits from our Timberlake bank To complete this transaction, we will require payment in full Once payment is received, the credit sale will be reported to the US Army Corps of Engineers Please provide and /or confirm the following information Corps Project # Waterway Permittee Name Locality of Impact Permit action (i e , IP, NWP -39, enforcement, etc ) Impacts (acres /linear feet) 012 Impacts NWI classification Impacts Hydrologic Unit Code 03010205 Mitigation Bank, Permittee, and Consultant agree not to discuss with any other party the details and /or pricing of this agreement, unless necessary for regulatory matters Information contained herein shall be held in the strictest confidence Thank you for allowing us to quote on this project We look forward to working with you Si cerely, Beverly hate GDSRB A unting CC File Ap. 16 4A MIAMI p f4t."Wflv R =I-