Loading...
HomeMy WebLinkAbout20181302 Ver 1_Site Inspection 2.8.22 Sugar Hill U-5818 Non-compliant_20220208Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20181302 NCDOT - SR 1001 Improvements (U-5818) McDowell NCDOT - SR 1001 Improvements (U-5818) NC DOT Division 13 2/8/2022 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Road maintenance/repair/improveme ntsRegion:Asheville Longitude:-82° 02' 08''+35° 38' 47'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspecion was conducted by Kevin Mitchell with the Asheville Regional Office on February 8, 2022. Inspection was in response to a self reported sediment loss on February 4, 2022. Travis Henley and James Hutchinson were present during the inspection. The following are items that need urgent attention: - Station 24+50 LT L - 57 stone needs to be removed from the JS. Check needs maintenance. - Station 24+00 LT L - Check above small unnamed tributary needs maintenance. - Station 479+00 RT Y - Slopes around junction box need cover. Noted in last inspection on January 12. - Station 463+00 - 469+00 LT Y - Groundcover needed on slopes per NPDES requirements. This has been noted in additional inspections dating back to October 22, 2021. - Station 465+00 LT Y - Slope failure. Sediment observed past measures and in stream. Sediment needs to be removed and measures need to be maintained. - Station 467+00 LT Y - Sediment observed in the JS. Measure needs maintenance and sediment needs to be removed from the stream. Please let me know when these items are complete. I will plan a follow up inspection next week. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20181302 2/8/2022 Bryan, Roger D Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Sediment/57 stone was observed at Stations 24+00 LT L, 465+00 LT Y, and 467+00 LT Y . Erosion control measures have not been maintained. Comment: page:2