Loading...
HomeMy WebLinkAbout20220184 Ver 1_ePCN Application_20220128fr.,f DW R mrlsloa of ware. Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 6, 2021 Ver 4.2 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS # Assigned* 20220184 Is a payment required for this project? No payment required Fee received Fee needed - send electronic notification Select Project Reviewer* Sue Homewood:eads\slhomewood Information for Initial Review 1a. Name of project: COURTESY COPY Stokes County Water Improvement Project la. Who is the Primary Contact?* Mark Lacy 1 b. Primary Contact Email: mark@lkcengineering.com Date Submitted 1 /28/2022 Nearest Body of Water Dan River Basin Roanoke Water Classification WS-V Site Coordinates Latitude: 36.385279 A. Processing Information County (or Counties) where the project is located: Stokes Is this a NCDMS Project Yes No Longitude: -80.188658 Is this project a public transportation project?* Yes No 1a. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Version#* 1 Reviewing Office* Winston-Salem Regional Office - (336) 776- 9800 1c. Primary Contact Phone:* (910)420-1437 Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 58 - Utility Line Activities for Water and Other Substances (frequently used) le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Stokes County 2b. Deed book and page no.: ROW for NC 8 and 89 Highway South and County Home Road 2c. Contact Person: Stuart Easter 2d.Address Street Address 1014 Main Street Address Line 2 City Danbury Postal / Zip Code 27016 2e. Telephone Number: (336)593-2415 2g. Email Address: seaster@co.stokes.nc.us 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region North Carolina Country USA 2f. Fax Number: Yes No Yes No U 3. Applicant Information (if different from owner) 3a. Name: Mark Lacy, P.E. 3b. Business Name: LKC Engineering 3c.Address Street Address 140 Aqua Shed Court Address Line 2 City Aberdeen Postal / Zip Code 28315 3d. Telephone Number: (910)639-3811 3f. Email Address:" mark@lkcengineering.com 4. Agent/Consultant (if applicable) 4a. Name: Michelle Measday 4b. Business Name: ECS Southeast LLP 4c.Address Street Address 5260 Greens Dairy Road Address Line 2 City Raleigh Postal / Zip Code 27616 4d. Telephone Number: (919)441-2437 4f. Email Address:" mmeasday@ecslimited.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Danbury 2. Project Identification 2a. Property Identification Number: Roadway ROW 2c. Project Address Street Address NC Highway 8 and 89 and County Line Road Address Line 2 City Danbury Postal / Zip Code 27016 3. Surface Waters State / Province / Region North Carolina Country USA 3e. Fax Number State / Province / Region North Carolina Country USA 4e. Fax Number 2b. Property size: 58 State / Province / Region North Carolina Country USA 3a. Name of the nearest body of water to proposed project: Dan River 3b. Water Resources Classification of nearest receiving water:* WS-V 3c. What river basin(s) is your project located in?* Roanoke 3d. Please provide the 12-digit HUC in which the project is located. 030101030109 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The PSA is located within roadway right-of-way for NC 8 Highway South, Dodgetown Road and County Home Road as shown on the attached figures included with this assessment. In addition to the water line installation, there are additional features associated with the project, including a water tank, development well, and pressure reducing valve areas. The project is located within Meadows and Danbury in Stokes County. The PSA includes the roadway, roadway right-of-way, mowed turf, and wooded lands. Based on the United States Geological Survey (USGS) Topographic Map, unnamed tributaries to Flat Shoals Creek, Flat Shoals Creek, an unnamed tributary to Dan River and Mill Creek. The PSA consists predominantly of roadway, maintained right-of-way, and wooded lands. The majority of the right-of-way is mowed turf to the tree line. Steep sections along the right-of- way that are unable to be mowed consist of Virginia creeper (Parthenocissus quinquefolia), poison ivy (Toxicodendron radicans), Japanese honeysuckle (Lonicera japonica), and violet (Viola, spp.). Forested areas along the right-of-way include yellow poplar (Liriodendron tulipifera), oaks (Quercus alba, Quercus rubra, Quercus stellate), hickory (Carya spp.) and cherry (Prunus serotina, Prunus virginiana) and pines (Pinus spp.) with an open understory of the mature species mixed with ironwood (Carpinus caroliniana), flowering dogwood (Corpus florida) mountain laurel (Kalmia latifolia) and rhododendron (Rhododendron maximum). 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.002 4g. List the total estimated linear feet of all existing streams on the property: 820 4h. Explain the purpose of the proposed project: The proposed project entails improvements to an existing well, installation of a new storage tank, new pressure reducing station, a new booster pump station and approximately 25,500 linear feet of water main. The proposed work is located in close proximity to tributaries to the Dan River. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: The 25,500-LF of water main proposed for installation within the right-of-way for NC Highway 8 and 89 requires crossing of six tributaries. No permanent impacts are proposed with the installation of the water main. See below for details of each tributary. Tributary 1 is an unnamed tributary of Flat Shoals Creek that carries stream flow under County Home Road near NC Highway 8 and 89. The channel flows under County Home Road by way of an arch culvert. An open cut is proposed to the streambed for installation of the water main. The disturbance is temporary and will be backfilled to existing elevations with native material. Backfill in the stream channel shall be material that shall not readily erode. Refer to Sheet W-1.8 for details regarding the stream crossing. Tributary 2 is an unnamed tributary to Flat Shoals Creek. No disturbance is proposed to this tributary. The proposed water main will be installed above the culvert. Tributary 3 is Flat Shoals Creek. Flat Shoals Creek is conveyed under NC Highway 8 and 89 through a double box culvert. An open cut is proposed to the streambed for installation of the water main. The disturbance is temporary and will be backfilled to existing elevations with native material. Backfill in the stream channel shall be material that shall not readily erode. Refer to Sheet W-1.7 for details regarding the stream crossing. Tributary 4 is an unnamed tributary to Flat Shoals Creek. The tributary is conveyed under NC Highway 8 and 89 through an 18-inch reinforced concrete pipe (RCP). No disturbance is proposed to this tributary. The water main installation is proposed below the existing RCP using a Jack and Bore Method of installation. Tributary 5 is an unnamed tributary to Flat Shoals Creek. The tributary is conveyed under NC Highway 8 and 89 through double box culvert. No disturbance is proposed to this tributary. The water main is proposed above the existing culvert. Tributary 6 is Mill Creek and drains into the Dan River. Mill Creek is conveyed under NC Highway 8 and 89 through double box culvert. No disturbance is proposed to this tributary. The water main is proposed above the existing culvert. Project related impacts include 15-LF (559-SF) of temporary impacts to Tributary 1 and 15-LF (304-SF) of temporary impacts to Tributary 3 for installation of the water main. All construction related impacts will be restored upon construction completion to pre -disturbance elevations and replanted with a native seed mix. A hydrologic connection will be maintained during construction of the water main and following construction 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes Comments: No 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Unknown Name (if known): Michelle Measday Agency/Consultant Company: ECS Southeast LLP Other: 6. Future Project Plans 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 3. Stream Impacts ❑ S7 3a. Reason for impact (?) water line installation 3b.lmpact type* Temporary 3c. Type of impact* Excavation 3d. S. name* -] UNT Flat Shoals Creek 3e. Stream Type* ?) Perennial 3f. Type of Jurisdiction* Corps 3g. S. width* 20 Average (feet) 3h. Impact length* 15 pinear feet) S2 water line installation :7ht::] Excavation UNT Flat Shoals Creek Perennial:::] CorpP Average (feet) Qinear feet) 3i. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 0 31. Total stream and ditch impacts: 30 3j. Comments E. Impact Justification and Mitigation 1. Avoidance and Minimization 3i. Total temporary stream impacts: 30 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The potential alignment routes of this water main were limited due to topography, water line depth, streams, and manhole locations. The water main was located as perpendicular to the tributaries as feasibly possible to minimize stream disturbance. Jack and bore method is being utilized to minimize stream impacts and avoids an open cut of Tributary 4. The water main will be installed above the culvert at Tributaries 2, 5 and 6 avoiding impacts to those streams. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Jack and bore method is being utilized to minimize stream impacts and avoids an open cut of Tributary 4. The water main will be installed above the culvert at Tributaries 2, 5 and 6 avoiding impacts to those streams. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Temporary impacts are proposed. No permanent impacts are associated with this project. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No u If no, explain why: Project area tributaries are not subject to riparian buffers. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phasell NSW USMP Water Supply Please identify which local government stormwater program you are using. Danbury/Stokes County Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. The project is an improvement project, not an expansion project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC and a response letter from USFWS concurring a "no effect" determination. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? * Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NOAA Essential Fish Habitat Mapper. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NC HPO GIB imagery and letter of concurrence from the NC HPO 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b. If yes, explain how project meets FEMA requirements: Impacts are temporary. Impacted areas will be restored to pre -disturbance elevation. No fill will be introduced into the flood hazard area. 8c. What source(s) did you use to make the floodplain determination?* FEMA FIRM Map Service GIS viewer. Miscellaneous u Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document ORM Form Stokes-Meadows.pdf 595.86KB Signed Agent Authorization.pdf 830.95KB WOUS Figure.pdf 1.65MB Permit Impact Locations.pdf 1.65MB Stokes County Stream Crossing Plan Sheets - Revised.pdf 1.73MB USFWS Response Letter.pdf 324.21KB NHP Response Letter 2021-May-19.pdf 1.54MB SHPO Response Letter.pdf 151.22KB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Michelle Measday Signature Michelle I(7e6sdT U Date 1 /28/2022