Loading...
HomeMy WebLinkAbout20211714 Ver 1_More Info Received_202202034:03 PM Thu Feb 3 Place Riprap/ Class B Stone along the shoreline excluding the beach natural area. The riprap will be placed 4'x 235'. The sgft disturbance will be 470' below NWL/ Full Pond and 470' above NWL/ Full Pond. r Natural beach area to not be disturbed by equipment or riprap. Zone 2 (20')- We plan to remove 5 trees due to being dead or damaged from prior falling trees. The cnnstr j .tinn corridor is 8'x 0' (160 sgft). Zone 1 (30'� Remove the necessary trees for the construction corridor/ access path. The corridor will be 8'x 235' (1,880sgft total). The corridor will be left with the pre -construction topography. Work area will hp lined with silt fence and seeded once complete. 7 S_Q19%1P C_ Q� V v s�P IN _O Go gle ©2022 Google