Loading...
HomeMy WebLinkAboutWQ0038261_Regional Office Historical File Pre 2018N/oterResourres Fw,WpwMo*,(. Qv^ury February 5,I016 ' Ms. Crystal Panico New Development Program Manager Union County Public Works 500N. Main Street, 6oite40O Monroe, N[28l1I Dear Ms. Panioo: PAlMCCR0BY DONALDD.VAN DER V&A8T ' S.JAY ZlMME&M&N , Subject: Permit No. VVC%l0382G1 Union County Public Works MSA Swim Center Wastewater Collection System Extension Permit Union County In accordance with your application received January Zg, 2016, we are forwarding herewith Permit No. WQ0038261 dated February 5, 2016, to Union County Public Works (Permittee) for the construction and operation upon certification of the subject wastewater collection system ex1ension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified theoein. This cover letter ohgU be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: [ondition||.l: This permit shall not be automatically transferable; a request must be made and approvco. Condition 11.4. Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued t0the Pe,rnittee. M shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to com/lymay result inpenalties \oaccordance with North Carolina General Statute8143-215.6A through §143-2%�6C,construction of additional orreplacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office ofAdministrative Hearings, 6714Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall befinal and binding. State "/ North cma""|Environmental V"ali*|Water n"souroe*|Water Quality Regional or=mti"rt,5 Mooresville Regional offimmoEast c"nt"Avenue, Suite m1|mvm~-sv.ne,North nar"linuzv115 r0w663/*ry |fyou need additional information concerning this matter, please contact Barry Love at (704)235-214] or via e-mail at barry.love@ncdenr.gov. bvVV.Corey Basinger, Regional8upen/isor Water Quality Regional Operations Section Mooresville Regional Office Division ofWater Resources, NCDE{l cc Brian [LSmith, P.E.(e-coov) Regional Office Files Water Resources Central Files Page 2 of 8 Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Union County Public Works Union County for the construction and operation of approximately 202 linear feet of 8-inch gravity sewer, to serve a 13,500 square foot swim center as part of the MSA Swim Center project, and the discharge of 6,750 gallons per day of collected domestic wastewater into the Union County Public Works existing sewerage system, pursuant to the application received January 29, 2016, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12,1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0038261 Permit Issued: February 5, 2016 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Union County Public 'Shereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected bvthis system shall be treated in the Charlotte Water McAlpine Creek Wastewater Treatment Plant in accordance with Permit Number NCO024970. Permitting of this project does not constitute anacce�ptance ofany part ofthe project that does not meet ISA N[A[3T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12,1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1,2Q0Q asapplicable, unless specifically mentioned herein, Division approval is based Onacceptance ofthe certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. |. SPECIAL CONDITIONS . No flow in excess of the quantity permitted herein, 6,750 gallons per day, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted toand approved bvthe Division. [1SA0CACOJT.O384/b8 2. This permit shall become voidable unless the agreement between Union County Public Works and Charlotte Water for the collection and final treatment of wastewater is in full force and effect. (15A ° 11.STANDARD CONDITIONS 1. This permit is not transferable, In the event there is a desire for the wastewater collection facilities to change ownership, or theme is a name change of the Pennhtee, a fQmna| permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials asmay beappropriate, The approval nfthis request shall beconsidered onits merits and may ormay not beapproved. [1SANC4CO2T.UIU4;G.S143'Z15.l<d]\] This permit sbeU become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T| the Division's Gravity Sewer Minimum Design Criteria adopted Februaryl2, 1995, msapplicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. (15A NCAC 02T.0110] . This permit shall beeffective only with respect tothe nature and volume of wastes described iothe application and other supporting data. [15A NCAC 02T 0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Page 4 of 8 operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) - of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (I) of this Rule fora minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24, following the occurrence or first knowledge of the occurrence of either of the following: Page 5 of 8 a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any 550 and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part 1 of Form. CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control, [G.S. 143-215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. one copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. Page 6 of 8 c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria, Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of theconstruction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which may be required by the Division or any other Federal, State, of Local government agencies. [G.S.143- 215.1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PGRNQIT7EE: PERMIT #: PROJECT: ISSUE DATE: Union County Public Works VV[10038261 M3ASwim Center ` This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered o violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permbtee is responsible for tracking all partial certifications up umd| a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless ofwhether partials have been submitted. pEeMnTEE"SCcRTMCAT|QN |, the undersigned agent for the PenniDee' hereby state that this project has been constructed pursuant 10the applicable standards 8'requirements, the Professional Engineer below has provided applicable design/construction information to the Pernmittee, and the Pe,mUtee in prepared to operate & maintain the wastewater collection system permitted herein orportions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION |, , as duly registered Professional � in the State ofNorth Carolina, h/��b�na�����obe���� �/[|�7w���F� full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 164 NCACO2T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12° 1996,asapplicable; the Division's Minimum Design Criteria for the Fast -Track Permitting ofPump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Sea|e/signature &date: rlFi`a| ——ParUm|(imcludedescription) Certification Comments/Qualifiers if : stat=vavorth Carolina |s°~""me"ta]Quality | Water nq°==`|Water Quality Regional onm=aow MooTesville n°Lo" moffi=/womstc"mer^°en"e,auit°3o,|w"°esvine,w"rlhcar""mzu/o USE THE TAB KEY TO MOVE FROM FIELD TO FIELD Owner/Permittee: a. Union County Full Legal Name (company, municipality, HOA, utility, etc.', lb. Crystal Panico, New Development Program Manager Signing Official Name and Title (Please review 15A NCAC 2T ,0106 (b) for authorized signing officials) 1 c. The legal entity who will own this system is: EJ Individual 0 Federal 0 Municipality ® State/County 0 Private Partnership ID Corpor2lbi Application Number: (to be completed by DWR) O 1 d. 500 North Main Street, Suite 400 LL Mailing Address 1 f. NC Z State O 1 h, (704) 296-4239 Telephone 2. Proie+y; (Facjlity) Inf 2a. MSA Swim Center Brief Project Name (permi Contact Person: Crystal Panico, PE Name and A 3b. (704) 296-4239 Phone Number (704) 296-4232 Facsimile ormation: fer to this name) Monroe City 1g. 28112 Zip Code crystal.pan union E-mail 2b. Union County County Where Proje s Located n Answer Questions About this Application 3c. crystal.panico@unioncountync.gov E-mail Project is New I Modification (of an existing permit) if if Modicr : icatron, Permit No.: Owner is l Public (skip to Item B(3)) ❑ Private (go to Item 2(a)) 2a. If private, applicant will be: Retaining Ownership (Le. store, church, single office, etc.) o �] Leasing units (lots, townhomes, etc. - skip to item B(3)) 0 Selling units (lots, townhomes, etc. - go to item B(2b)) 2b. If sold, facilities owned by a (must choose one) El Public Utility (Instruction D) © Homeowner Assoc./Developer (instruction E) O 3. Charlotte Water Owner of Wastewater Treatment Facility WWTF Tre ting Wastewater From This Project 4a. McAlpine Creek WWTP Name of WWTF 5a. Union County Sb. 8" ar Gravity Owner of Downstream Sewer Receiving Sewer Size °* Force Main 6, The origin of this wastewater is (check all that apply): © Residential Subdivision © Apartments/Condominiums © Mobile Home Park 0 School 0 Restaurant © Office 4b. NC0024970 WWTF Permit No. WQ0020517 Permit # of Down O Retail (Stores, shopping centers) © Institution 0 Hospital 0 Church © Nursing Home Other (specify): Fitness Center 100 % Domestic/Commercial n F) Industrial (Attach Description) % Other (Attach Description) Volume of wastewater to be allocated or permitted tor this particular project: 6,750 gallons per day *Do not include future flows or previously permitted allocations If the permitted flow is zero, indicate why: 0 Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit No. © Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine it a permit is required) FTA 10-14 APPLICATION Page 4 of 6 0 z 0 Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T Q114 for; the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7), Values other than that in 15A NCAC 2T ,0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f), 50 gal/100 sf x 13,500 sf = 6,750 gpd 10, Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 8 Length (feet) 202 New Gravity or Addit�run Force Main New gravity Pump Stations wl associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID: (self chosen - as shown on plans/map for reference) Longitude: Latitude: Design Flow Operational Point Power Reliability Option (MGD) GPM ITDH 1 - permanent generator wWATS; Force Main Size Force Main Length 2 - portable generator w/MTS Pump Station Location ID: (self chosen - as shown on plans/map for reference) Longitude: Latitude: y _ Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option - permanent generator wIATS; Force Main Size Force Main Length 2 - portable generator wIMTS 12. r''iil the wastewater flo in the proposed sewer lines or pump stations be able to be directed to another treatment facility? [] Yes ® No If Yes, permit number of 2nd treatment facility : (RO — if "yes" to 8,12 please contact the Central Office PERCS Unit) 13, Does the sewer system comply with the Minimum De i n Criteria for the Permitting of Pump Station and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? Yes [] No If No, complete and submit the Variance Alternative Design Request VADC 10-14) application and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. ETA 10-14 AP'Pt,ICAT1ON Page 5 of 6 14, Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings General Permit or 401 Certification? ❑ Yes ❑ No ❑ N/A Yes ❑No ❑NIA ❑Yes ❑No El N/A Z Yes ❑ No ❑ NIA Sedimentation and Erosion Control Plan? Trout Buffer Waiver? Stormwater? 15. Does this project include any high priority lines (15ANCAC „02T ,0402 (2)) involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: ❑ and provide details: OwnerlPermittee''s Certification: (Signature of Signing Official and Project Narrre) 1, Crystal Panico, attest that this application for MSA Swim Center has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete, Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Sign Signature ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY CI) TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NCAC 02T .0305 Z 2. Professional Engineer's Certification. (Signature of Design Engineer and Project Name) 1, Brian Smith, attest that this application for MSA Swim Center has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A, and 143-215 6B any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a, Brian D. Smith, P.E. Professional Engineer Name 2b. Urban Design Partners, LLC, Engineering Firm 2c, 1318 Central Avenue, Suite E6 Mailing Address Charlotte City NC 2f. 28205 Zip State 2g. (704) 334-3 03 2h, (704) 334-3305 2i. trr an urbandesi ppartners.com Telephone Facsimile E-m NC PE Seat, Signature & ©ate FTA 10-14 APPLICATION Page 6 of 6 January 20, 2016 Address Points Parcel Hooks Parcel Easements Parcels Highways Roads MSA S Center 1:4,278 0 0.035 0.07 0.14 mi L..J, r- ' �J 0 0.05 0.1 0.2 km Sauroost Far„ HERE, DeLarne, LISGS, Interrnap, Incrmrne.ai P Cmrq.,. NRCAN, Esui Japan, METI. EsO China (Hung Kxj'i, Eon. (Thailand(, Mapnylndua, l Op'nSramiMap contrbutors, and the GIS UUmr Community U.S. DEPARTMENT OF THE INTERIOR U.S. GEOLOGICAL SURVEY CATAWBA NE QUADRANGLE SOUTH CAROLINA-NORTH CAROLINA 7.5-MINUTE SERIES 3E77 3E77 470 000 FEET (NC} UTIA GRID ARO 2011 DECLINATUOIH AT CE USGS e Iw a changing world sTIC NORTH Of SHEET SCALE 1 0,5 WOO 500 t 0.5 CONTOUR INTERVAL 10 FEET NORTH AMERICAN VERTICAL DATUM Of t4aa Thii map was produced to Lonfernl with the No adnN C'.euspactli Ptampare US T0I Proeh, 1Stamford, ZOE t. A malodour Me aas«,toted oath chit product Is &oft version D. Alb ROAD CLASSIFICATION Luca! Connector !Local Road 1(I 0 State Route 24 040 OME2 0 t-.rm MILES FEET 6601E ?000 The National Mep I USTopo Produced by the United Staten Geologkkol Surrey Narth Ausertran t1;airtlrrt or 1983 1MA'tl7931 WNW Cra.vanta,'.. 33110m or 1984 e"b4'Tm584D. Protection ucn t C131 retnr Wan u0Oversst Traraveree Mercator, Zono 175 10 ONE font ticks: moll: Coca ina Caordiaate. Satter, of 1983, Md1'GC Co.t "P0 Cam1S1^s01R Sy&tern of 19E3 thts map la rad a kola! document - Rpurec,0anea may he g0nerattacf for tint wrap snake. private toots wham 9Orarnf'rutnrnt rean"va€saps may not he «hcastwa_ Canaan permtnloro berate entering private Iauuis. tkademorapAt ....................Rack,: at Contours ......................,.., Natlt1r0t01 Rourtdarie::............ Multioto sources: see 0' WEDDINCTON, NC -SC 2013 111011 tAMK111 LOCATION Vol Rtdd R,[h'k Hitt Fos[ MG 7. i QIADRANCE ES r Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-13) Project Applicant Name: Union County Project Name for which flow is being requested: MSA Swim Center More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek b. WWTP Facility Permit #: NC0024970 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 0.0068 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity,* (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** N/A * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Page 1 ofA3 FTSE 08-13 Certi ation Statement: I William Grant certify to the best of my knowledge that the addition of the volume of wastewater to be pertrtitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of thitrrn indicates acceptance of this wastewater flow. -Ffr 0 n ? 6' Date FTSE PLANNING ASSESSMENT ADDENDUM (FAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of%3 FTSE 08-13 CHARLOTTE W .TER December 14, 2015 Mr. Peter Brown Union County Public Works 500 N Main St Suite 400 Monroe, NC 28112 SUBJECT: SEWER FLOW ACCEPTANCE MSA SWIM CENTER UNION COUNTY PID# 06-201-007 CLTWATER TRACKING# 20151367 A flow acceptance study of the subject site has been completed and the following has been determined, Charlotte Water (CLTWater) agrees to accept the gravity sewage flow of 6,750 gallons per day (13,500 ft' swim center x 50 gpd/100 ft') from this project for transmission to the McAlpine Creek Wastewater Treatment Plant; NPDES permit number NC0024970, for treatment. This acceptance of flow is based upon the existing capacity of the designated publicly owned treatments works. Please see the attached NC DENR FTSE form. Due to the involvement of other agencies and continuing growth of the sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved. Connection to the CLT1Nater and sewer system isaccepfed on a first come, first served basis. The applicant should understand that this letter is not authorization to construct private water or sewer systems, as the appropriate local or State permits are required prior to construction. he the appropriate authorization to construct permits are not obtained and construction has not started within one ft) year of issuance of this flow acceptance study this approval shall be rescinded and a new flow acceptance study must be made. If you have any questions, you may contact me at (704) 432-5801. Sincerely, Barbara Gross Engineering Assistant Charlotte Water 5100 Brookshire 6ivrt, Charlotte, NC 28216 charlottewater.org d y Charlotte itaz,di; i sr i \Vtw=.r, it ti -.411111111111111.1111111111111 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-1.3) Project Applicant Name. Unzan County Public Work Project Nance for which flow is being requestedtsA More than one VISE may he required for a single project if the ow stations along the route of the proposed wastewater flow. iP is not responsible for all pump 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine c k, Irwin Creek, Sugar Creek WWTP b. WW1P Facility Permit f: NC002497ii NC0024945, NCO24937 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e, WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility' h, Percent of permitted flow used All flows are in MGD 99.Q .1 59D 6.7,5©8 76. 7 Il. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project c©rmecti Pump Station (Name or Number) Six Firm Capacity,* MGD * The Firm Capacity ot'un y pump station is defined as the p n eclfl can be achieved with the largest pump taken out of service. owt factor (pf) not less than 2.5. ** Design Average Daily Flow is the firm capacity of the pump statio n divided by , ***A Planning Assessment Addendum shall be attached for each Pump station between the project connection point and the WWTP where the Available Gap ?age 1 ef 6 (A) Design Average Daily Flow** (Firm / pO', IktGD point and the W VTP: (B) (C) (D)=(fl+C Obligated, ) ()T(AD) Approx. Not Yet Current Avg. TTotal CPruent Tributary Flow Plus Daily Flow, Daily Flow, MGD obligated Available MGD Flow Capacity*** 0 177 4 597 III. Certification Statement: I &t 1 Wt 9 11 certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with Ioca1 established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature oft 's form indicates acceptance of this wastewater flow. Signing Of 'al SVI/ 0( ignature Date Page 2 of 6 FTSE 08-13 MSA SWIM CENTER FAST TRACK APPLICATION COVER LETTER PROJECT No. 15-O35 PREPARED BY: URBAN DESIGN PARTNE!* SS 1318-E6 CENTRAL, AVENUE CHARLOTTE, NORTH CAROL,INA 28205 (704) 334-3303 MSA SWIM CENTER FAST TRACK APPLICATION COVER LETTER PROJECT No. 15-035 APPLICANT Mecklenburg Swim Association Peter Perers 3928 Pemberton Drive Charlotte, NC 28210 704-620-2439 ENGINEER Urban Design Partners Brian D. Smith, P.E. 1318-E6 Central Avenue Charlotte, NC 28205 704-334-3303 704-334-3305 (fax) PROJECT LOCATION The 2.0-acre site is located along Tom Short Road in Union County, NC, roughly 580 linear feet southwest of the intersection of Rea Road (SR 1316) and Tom Short Road (SR 3628). PROJECT DESCRIPTION Mecklenburg Swim Association is constructing a 13,500 square foot swim center. The building will be served by public sewer Iines that connect to an existing public sewer main in the adjacent neighborhood, Hunter Oaks Subdivision. The sanitary sewer design for this project includes the installation of 202-linear feet of 8- inch PVC and two proposed manholes. The estimated wastewater flow was calculated using an average daily flow of 50 gallons per day per 100 square feet of building. The estimated wastewater flow is 6,750 gallons per day. UNION COUNTY PUBLIC WORKS 500 N, Main Street, Suite 500 Monroe, NC 28112 704/296421 d Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue Mooresville, N,C, 28115 Attention: Regarding: Sanitary Sewer to serve MSA Swim Center We are sending you: Copies Date TRANSMITTAL Date: 1/26/16 C Copy of letter C Plans Prints 0 Shop Drawings Other No, Description 1 1/26/16 1 1/26/16 1 11/9/15 1 12/14/15 1 12/10/15 1 1 `21/16 5017 Cover Letter Fast Track Application Copy of Fast Track Application UCPW Flow Tracking Form CMU Acceptance Flow Letter CMU Tracking Form $480,00 Check (Application Fee These are transmitted as checked below: Z For approval For your use Q As requested 0 For review and comments Remarks: Signed: Received by: Date: Central Files: APS SNP 2/5/2016 Permit Number WQ0038261 Permit Tracking Slip Program Category Status Protect Type Non -discharge Active New Project Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.Iove Coastal SWRuIe Permitted Flow 6,750 Facility Version PermitCfassification 1.00 Individual Permit Contact Affiliation Facility Name Major/Minor Region MSA Swim Center Minor Mooresville Location Address County Union Facility Contact Affiliation Owner Owner Name Owner Type Union County Government - County Owner Affiliation Cindy Coto Dates/Events 500 N Main St Monroe NC 28112 Orig Issue 2/5/2016 Scheduled App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 1/29/2016 2/512016 2/5/2016 Regulated Activities Requested !Received Events Wastewater collection Additional Information requested Additional information received Outfall Waterbody Name Streamindex Number Current Class Subbasin PAT MCCRORY Governor DONALD R. VAN DER VAART .Secrel#y S. JAY ZIMMERMAN Water Resources Director ENVIRONMENTAL QUALITY As built check list (reference 2T .0300) Reviewed By: Barry Love Review Date: 10/10/2016 Project Name: MSA Swum Center WQ#: WQ0038261 County: Union 1) As -built has been signed, sealed, and dated by an N.C. PE ® Yes ❑ No 2) Adequate information related to sewer lines : Note that per the 2T and MDC, there is a minimum 8" for public gravity or minimum 6" for private gravity, Three (3) feet minimum cover shall be provided for all sewers unless ferrous material pipe is specified. Manholes shall be installed: at the end of each line, at all changes in grade, size, or alignment, at all intersections, and at distances not greater than 425 feet, minimum diameter of manholes shall be 4 feet (48 inches). ® Yes n No n N/A 3) Adequate information related to pump stations: Ensure power reliability option is selected (15A NCAC 02T.0305(h)). ❑ Yes ❑ No ® N/A 4) Is Project design is in accordance with (see section B.13 of FTA 12-12) 15A NCAC 02T Gravity Sewer Minimum Design Criteria (latest version), Minimum Design Criteria for Permitting of Pump Stations and Force Mains (latest version). ® Yes n No n N/A If no, a variance approval is required per the requirements of 15A NCAC 02T.0105(b) ❑ Applicant must submit TWO copies of the plans, specifications, and calculations ❑ Contact the Central Office to discuss the variance request to determine a course of action. The central office will review the variance request, and if approvable, specific language regarding the variance will be forwarded to the Regional Office reviewer to incorporate into the permit. A copy of the variance letter (or email correspondence) should be kept with the application file. 5) Project contains high priority lines (15A NCAC 02T .0402(2)) ❑ Yes ® No If Yes, insure that the permit contains the necessary condition related to high priority lines 15A NCAC 02T.0403 (a)(5) 6) Is the Sewer As -built length within 10% of the fast track applied Length? (I Original Length of pipe — As built length I / Original length) < 10%. ® Yes ❑ No If no application need to be modified State of North Carolina I Environatental Quality I Water Resources I Water Quality Regional Operations Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704 663 1699 PAT MCCRORY DONALD R. VAN DER VAART sectetamy S. JAY ZIMMERMAN rare. ror October 10, 2016 Ms. Crystal Panico, New Development Program Manager Union County Public Works 500 N. Main Street, Suite 400 Monroe, NC 28112 SUBJECT: Final Engineering Certification Acknowledgement Project: MSA Swim Center Permit No. WQ0038261 Permittee: Union County Public Works County: Union Dear Ms. Panico: The Division of Water Resource's Mooresville Regional Office received the final engineering certification with record drawings for the subject sewer extension project on September 29, 2016. Enclosed is a certification page for your records. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items of non-compliance. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received such copy from your consultant, please contact them immediately to obtain a copy. lastly, you are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you or your company, please complete Form PNOCF since the permit is not automatically transferable. Form PNOCF can be downloaded from http://portal ncdenr.org/web/wq/swp/ps/cs/pnoc from the Collection Systems Applications page. Should you have any questions, please do not hesitate to contact me at (704) 235-2143. Sincerely, Barry Love Environmental Specialist cc: Mr. Brian Smith, P.E., (Urban Design Partners, 1318 Central Ave., Suite E6, Charlotte, NC 28205) Central Files MRO State of North Carolina 1 Environmental Quality 1 Water Resources 610 E. Center Avenue, Suite 301, Mooresville NC 28115 Phone. 7&4663-1699 \ Internet: www.ncdenr.gov 117 ' FAST TRACK SEWER ENGINEERING CERTiFtCAT 1ON PERMITTEE: Union County Public Works PERMIT ##: WQ0038261 PROJECT: MSA Swim Center ISSUE DATE: February 5, 2016 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shah be a comptete set of record drawings and design calculations regardless of whether partials have been submitted. P RMITTEEtS CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Crystal Panic°, Development Program Manager Printed Name, Title ( ,, " Signa`ture oat"e ENGINEERS CERTIFICATION Brian Smith as a duly registered Professional En ineer in the State of North Carolina, having been authorized to observe (j periodically, ® weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996,.as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: 0 Final 0 Partial (Include de al Certification Comments/t ualiflers (attach If necessary): slily 1 Water Resources l Water ter Avenue, Suite 301 1 Moores 704 663 1699 Iity Regional Operations , North Carolina 28115 UNION COUNTY PUBLIC WORKS 500 N. Main Street, Suite 500 Monroe, NC 28112 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue Mooresville, N.C. 28115 Attention: Regarding: Sanitary We are sending you: Copies Date 1 9/22/16 1 ewer to serve MSA Swim Center TRANSMITTAL fl Copy of letter Z Plans D Prints 5< Other No, Description MSA Swim Center Final Asbuilts MSA Swim Center Fast Track Certification Date: 9/27/16 L Shop Drawings These are transmitted as checked below: 1 For approval [IJ For your use As requested Remarks: Thanks and take care, Signed: For review and comments Received by: Date: ..:. '•f 4 Di.vlslon of Water Iltesokircel State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-13) Project Applicant Name: Union County Public Works Project Name for which flow is being requested: MSA Swim Center More than one FISE may be required for a single project if the owner of the WIFTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP FaciIityName: McAlpine Creek, Irwin Creek, Sugar Creek WWTP b. WWTP Facility Permit #: NC0024970, NC0024945, NC0024937 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. TotaI flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 99.0 A 990 67.508 0.00675 75.105 76.9% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Station (Name or Number) Six Mile Firm Capacity,* MGD 14.90 (A) Design Average Daily Flow** (Firm / pf), MGD (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Approx. Not Yet Total Current Current Avg. Tributary Flow Plus Daily Flow, Daily Flow, Obligated Available MGD MGD Flow Capacity*** 5.96 4.419 0.177 4.597 1.362 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of 6 FTSE 08-13 III. Certification Statement: 619 n certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and IT plus all attached planning assessment addendums for which I am the responsible party. Signature of t 's form indicates acceptance of this wastewater flow. 6 Signing Of al Signature Page 2 of 6 7/', Date FTSE 08-I3