Loading...
HomeMy WebLinkAboutWQ0038005_Regional Office Historical File Pre 2018Pat McCrory Governor North Carolina Department of Environmental Quality September 21, 2015 Mr. Charles P. O'Cain, Development Program Manager Union County 500 N. Main Street, Suite 500 Monroe, NC 28112 Subject: Permit No. WQ0038005 Town Hall at Indian Trail Governmental Center Wastewater Collection System Extension Permit Union County Dear Mr. O'Cain: Donald R. van der Vaart Secretary In accordance with your application received August 26, 2015, we are forwarding herewith Permit No. WQO038005 dated September 21, 2015, to Union County (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T 0403 or any individual system -wide collection system permit issued to the Permittee. it shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 1508 of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: 704--663.1699\,4Fax 704-663-6040 \ Customer Service 1-877-623-6748 Internet: www.ncwateroualityaorg An Equal opportunity \ Affirmative Action Employer - Made in part by recycled paper Union County Permit No. WQ0038005 If you need additional information concerning this matter, please contact Birry Love at (704) 235-2143 or via e-mail at barry.love@ncdenr.gov. Sincerely, Michael Parker, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division ofWater Resources, NCDEQ cc: GregmryHao7ish, P.E. (electronic copy) Regional Office Files Water Resources Central Files PERCS (electronic copy) Page 2 of 8 STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Union County Union County for the construction and operation of approximately 428 linear feet of 8-inch gravity sewer to serve as part of the Town Hall at Indian Trail Governmental Center project, and the discharge of zero gallons per day (interceptor line) of collected domestic wastewater into the Union County existing sewerage system, pursuant to the application received August 26, 2015, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the cified conditions and Ik it ions contained therein. Michael Parker, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0038005 Permit Issued: September 21, 2015 Page 3 of 8 SUPPL�KU����U����U�����/�������Ul7 ����U���� EMENT o.v~o�o^~"�o "�* PERMIT "�"��u~v� `�"vu~u~" Union County iShereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Union County Crooked Creek Wastewater Treatment Plant in accordance with Permit Number NCO069841, Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable,- and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, ZOOU as applicable, unless specifically mentioned herein. Division approval isbased onacceptance ofthe certification provided by North Carolina -licensed Professional Engineer mthe application. It shall be the Perrnittee^s responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS 1. No additional flow shall be made tributary to the subject sewer system until an application for permit modification for ao increase inflow has been submitted to and approved by the Division. 1111. STANDARD CONDITIONS 1. This permit is not transferable. in the event there is a desire for the wastewater collection facilities to change ownership, or there is name change of the Pemnbtee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved, (15AN{]\[02T.8104; G.S 143'215,1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A N[AC ZT; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein, [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. D5A0[A[O2T.O11Oj 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual Page 4 of 8 Pli°1 a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall al, include legal means for inspections of the grease interceptors, enforcement for violators the legal means to control grease entering the system from other public and private s/ sewer systems. 2. For privately owned collection systems, the Grease Control Program shall includ annual distribution of grease education materials to users of the collection permittee or its representative. 3. Grease education materials shall be distributed more often than required' of this Subparagraph if necessary to prevent grease -related sanitary seV 1. Right-of-ways and easements shall be maintained .in the full easemer' equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through three years with exception of the map, which shall be main / 5. The Permittee shall report by telephone to a water res Regional Office, telephone number (704) 663-1699, as/ 24, following the occurrence or first knowledge of the/ Page 5 of 8 a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur, Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143- 215.1C(a1.)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, urge protection, detention time in the wet well, and force main, ability to flush low points in rce mains with a pump cycle, and downstream sewer capacity analysis. If a portable power urce or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage acities and the rotation schedule of the portable power source or pump, include travel mes, shall be provided. Page 6of8 lipPV c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page7of8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERKHITTEE: Union County PERMIT #: WC0038005 PROJECT: Town Hall atIndian Trail Governmental Center ISSUE DATE: September Z1,Z015 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the RoQlnna{ Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Perml1tee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete net of record drawings and design calculations regardless ofwhether partials have been submitted, P[RMnTE'S CERTIFICATION Lthe undersigned agenthvthePemnittee,hcnebystatethatthbp' c1hasbeenconstructedpursuant tothe applicable standards& requirements, the Professional Engineer below has provided applicable design/construction information to the Permhtee, and tbePerrnhtee is prepared to operate & maintain the wastewater collection system permitted herein orportions thereof. Printed Name, Title Signature ENGINEER'S, CERTIFICATION Date |,________ _ dregistered Professional E rinthe State ofNo�hCa:dlnm' having been authorized to mhsenxe U ] periodically, | K vveeNv 2 | full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within swbstaotia| compliance of this permit; lSA NCAC0Zl; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February lZ, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials, North Carolina Professional Engineer's Seal xv/ i8natune&date: _ Final 0Partial (include description CertiGcmbonCPnmmnwn+s/Qua|ifiers if ' ` NC DWR —Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 29115 ~`-- '`^"`''~ °^° '^°'"""` "`` ""°" at r Res G nvironmenta September 7, 2017 Crystal O. Panico, New Development Program. Manager Union County Public Works 500 North Main Street, Suite 400 Monroe, NC 28112 SUBJECT: Final Engineering Certification Acknowledgement Project: Town Hall at Indian Trail Governmental Center Permit No. WQ0038005 Permittee: Union County Public Works County: Union Dear Ms. Panico: ROY'COOPER Governor MICHAEL S. REGAN Secretwiy S. JAY ZIMMERMAN Dirt etor The Division of Water Resource's Mooresville Regional Office received the final engineering certification with record drawings for the subject sewer extension project on September 5, 2017. Enclosed is a certification page for your records. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items of non-compliance. Please be reminded that the Pernuttee is responsible for keeping a copy of the final record drawings for the life of the project. If you have not received such copy from your consultant, please contact them immediately to obtain a copy. Lastly, you are receiving this letter because the Division has you listed as the responsible party. If this permitted system is no longer owned by you or your company, please complete Form PNOCF since the permit is not automatically transferable. Form PNOCF can be downloaded from http://portal,ncdenr.org/web/wq/swp/ps/csfpnoc from the Collection Systems Applications page. Should you have any questions, please do not hesitate to contact me at (704) 235-2143. Sincerely, Barry Love Environmental Specialist cc: Gregory Hash, P.E., (Woolpert, 11341 Cannel Commons Blvd., Suite 300, Charlotte, NC 28226) Central Files MR0 Nothing Compares ,. State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Open Mooresville Regional Office I 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 2 704 663-1699 s FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Union County PERMIT #: WQ0038005 PROJECT: Town Hall at Indian Trail Governmental Center ISSUE DATE: August 22, 2017 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. it should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted, RMI 's CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain e wa,stcwatsr collection system permit rein or portion „tereof. c,1S ©. t a t4co Printed Name, Title ignature:te ENGINEER'S CERTIFICATION I, C,Rizo / 04)2,Ais44 , as a duly registered Professional En sneer in the State of North Carolina, having been authorized to observe periodically, [J weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my knowledge, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal wJ signature & date: Final [1 Partial (include description) Certification Comments,/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-1699 FAX: (704)-633-6040 USE THE TAI3 KEY' TO MOVE FROM FIELD TO FIELD f. OwnerlPeragattee: 1a. Union Count Ful 1 b. lc 1d. 1f. z 1h,. 2,. 2a, 3. 3a. 3b, , HQA, uflttty, etc. on Number: a be completed by DWR) Diaries P. O'Cain, PE, Development Program Manager Signing Official Name and Title (Please review 15A NCAC 2T . i06 (b) for aut or zr The legal entity who will own this system is; 0 Individual ❑ Federal 0 Municipality a u State/County 0 Private Partnership ❑ Corporation ©.' et. 500 North Main Street, Suite 500 Mailing Address NC State 704.296.4244 Telephone Project (Facility) information; Town Hall ait and"saga Trait Gov Brief Project Name (permit will refer to this name) Contact Pef,9n; 2 Charles P. O'Cain, PE Name and Affiliation of 7t 4, 96,4244 Phone Number 2 Pr 704.296 42: Facsimile ne Who Can Answer Questions New 0 Modification ._.._..___ (of an exi n Owner is Public (skp to 2a, If private,, applicant will be: le, Monroe VE NCOEN,RIDOIR City lg. 28112 1j Zip Code ocpin E-mai 2b. Union County County Where e. 0 E- MOORES ' kIE. RE ,. IONAa.. Application n unioncountync., ov Permit No.: 0 Private (go to item 2(a)) 2b. If j, f by a (must choose Retaining Ownership (Le, store, church, single office, etc.) cr 0 Public Utility (Instruction D) Leasing units (lots, townhomes,, c, - skip to Item 8(3) Selling units (lots, townhomes, etc, - go to Item B(2b)) Union Coun Owner of W 4a, Crooked C a Treatment Fa lity WTF 0 Homeowner Assoc./Developer (Instruction E) Treating Wastewater From This Psc 4b. NC046984 Name of WWTF 5a.Union County Owner of Downstream Sewer 6, The origin of this wastewater is (ch ❑ Residential Subdivision Apartments/Condominiums Mobile Home Park ❑ School ❑ Restaurant ❑ Office eiving Sewer Sire fl Force Main eck all that apply): 0. Retail (Stores, shopping centers) institution Hospit ❑ Church ❑ Nursing Home ❑ Other (specify); 7. Volume of wastewater ig be allocated or permitted for this particular project: ll,00 *Do not Include future flows or previously permitted allocations If the permitted flow is zero, indicate why: 0 Pump Station, Outfall or Interceptor Line where flow Flow has already been allocated in Permit No. 0 Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T ,0303 to determine if a permit is required) per WWTF Permit No. W00001160 ..._ �...w. Permit # of Downstream nstruction F) Domestic/Commercial industrial (Attach Description) % Other (Attach Descriot on) gallons per day in subsequent permits that connect to this line i'VI'A 10-14 APPLICATION 4 a: z Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for; the value in Item S(o) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7), Values other than that in 15A NCAC 2T ,0114 (b) and (c) must be supported with actual water or wastewater use? data in accordance with 15A NCAC 2T .0114 (f). Zero with this application (interceptor l.i.ne 1 Q. Summary of Sewer Lines to be Perm tto i (attach additional sheets if necessary) Size (Inches) Length (feet) 428 Summary of Pump Stations w1 associated Force Mains to be Permitted (attach additiona Pump Station Location ID: N/A 'Longitude: Latitude: 2 Design Flow (MGD) Operational Pin GPM QTDH ew Gravity or Add Force Main Gravity (self chosen - as shown on planslmap for reference) Power Reliability Option permanent generator w/ATS; 2 - portable generator w/MTS onal Force Main Size Force Main Len ;Pump Station Locatlon ID: (self chosen as shown on plans/map for reference) 'Longitude: Latitude: Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option permanent generator w/ATS; Force Main Size F rc Main Length; 2 - portable generator w1MTS -h '12, Will the wastewater flow in the proposed sewer lin r pump stations be able to be directed to another treatment facility? !® Yes ® No If Yes, pert'nrt number of 2rhd treatment facility : (RO — if "'yes" to B,12 please contact the Central Office PERCS Unit) 1 Does the sewer system comply with the Minimum Design Criteria for the P (latest version), the Gr vi w r Minimum D i n Criteria (latest version) and If No, cotr document supportin rte and submit the Variance&Altorn or review. Approval of the request ocuments. Yes No ve Delsign Request IVAI required prior to submi of Primp Stations and Force Mains A NCAC Chapter 2T as applicable? application and supporting f the Fast Track Application and FICA 10-14 APPLICATiON Page 5 of 6 14. Have the fallowing permits/certifications been submitted for approval for the system or project to be served? WetlandlStream Crossings - General Permit or 401Certification? El Yes [] No 0, N/A Sedimentation and Erosion Control Plan?Yes D No El NIA Trout Buffer Waiver? © Yes 0 No 3 N/A Stormwater? Q Yes a No © N/A 15. Does this project include any high priority lines (15A NCAC 02T .0402 (21) involve Geri i line iphons, or interference manholes)? These lines will be considered high priority and must be checked once eve r+tr six months Check if Yes: ❑ and provide details: Owner/Permittee"s Certification: (Signature of Signing Official and Project Name) I, Charles P. O'Cain, attest that this application for Town Hall t i i n T it vemrn ntal n has been ,reviewed by me and is accurate and complete to the best of my knowledge. I :understand that if al required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: in accorriance with North Carolina General Statutes 14-215.6A and 143-215.6(3, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10000 as well as civil penalties up to $25,000 per violation. ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXI TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NCAC 02T ,0305 TY`. Professional Engineer's Certification:: (Signature of Design Engineer and Protect Name) 1, Gregory Harnish, attest that this application for Town Hall at the indiar jyjI Governmen. l Center has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge„ I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215,6A and 143-215.6 , any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. Gregory Hamish Professional Engineer Name 2b. Woolpert North Carolina, PLLC Engineering Firm 301 Carmel Cornnrons Blvd, Suite 300 ailing. Address 2d. Charlotte City 2g. 704.526.3052 Telephone Facsimile 2e, NC 2f. 28226. State Zip greg.hamish@woolpert.,com E-mail NC PE Seal, Sirehire 8 date FTA I0-I4 APPLICATION Page 6 of 6 Map data 02015 Goggle 1000 Ft' 1/1 APPROX LOCATION OF SANITARY SEWER CROSSING UN -NAMED TRIBUTARY UNIONWLL CUN-NAMED TRIBUTARY JOINS SOUTH FORK CROOKED CREEK V141 Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-13) Project Applicant Name: Union County Project Name for which flow is being requested: Town Hall at I.T. Gov. Center (Public) More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wasteivater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Crooked Creek b. WWTP Facility Permit 4: NC0069841 All flows are in MGD c. WWTP facility's permitted flow 1.90 d. Estimated obligated flow not yet tributary to the WWTP 0.4417 e. WWTP facility's actual avg. flow 1.20 f. Total flow for this specific request 0.00 g. Total actual and obligated flows to the facility 1.6417 h. Percent of permitted flow used 86.41 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity,* (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** NA * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is t O. Page 1 of3 FTSE 08-13 III. Certification Statement: 1 Charles P. O'Cain certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with Local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. C_ 4eA-LIP 0 i Signing Official Signature c,,, f 0 T Vzi/is aecd 9/tl/I5--- Date Page 2 of% 3 FTSE 08-13 piptv FTSE PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of jr( 3 FTSE 08-13 Division of Water ge Department of Environ tate of North Carolina and Natural Resources Division of Water Resources Watershed Classification Attachment (W SCAS 01-15) Along with this form, submit a color copy of a USGS Topographic Map to identify the project area and waterbodies. Each map or maps must show the location of the sewer system and include location identifiers where the system traverses over or near waterbodies. The map should have location ID's for each different waterbody and corresponding classifications should be recorded. Include the completed form and map portions with the permit application for submittal to the appropriate review agency, A list of the Division's regional offices, their county coverage, and contact information can be obtained from: htto:/ ortal.ncdenr.orieweb/wct/home/ro if unn Name of Waterbody Unnamed tributary to South Fork 4ked Creek. River Waterbody Waterbody Basin Index No. Classification 13-17-20-2 C "unnamed tributary to X", where X is the named waterbody to which the unnamed tributary joins, I certify that as a Registered Professional Engineer in the State of North Carolina that I have diligently followed the Division's instructions for classifying waterbodies and that the above classifications are inclusive of the stated project, complete and correct to the best of my knowledge and belief. PE Seal, Signature and Date 2015 fo \vkhonna Proposed is the cotes Governmental Center in lndi Center will b by the Town. cern, Water and Sat proposed development Town of Indian Trail and WOOLPEPT O F,SlGN I GCOSPAT0*4.IdW VOASTRVC:TURC Town Hall, whi h re resents Trail, NC. Future phases and expansion dependent upon anticipated and observed needs as well as a WOROS time initial phase of the overnment ble funding sons bout prtblic and private) are proposed to serve the gn develop naetat has been closely coordinated with both the n County as the user and the utility provider respectively. The sanitary sewer proposed to se the Town Hall buildi existing rntanholie south of the proposed entrance along Matthews-. The proposed gravity sewer systetaa itneludes both public and prw extension of the sanitary sewer main will extend from under Nt run just outside of an un-named tributary to the South Fork of Cr portion of the extension will be owned and maintained by Union extension of the sanitary sewer main wilt extend from the public m building. The private portion oldie extension will be owned and rna Indian Trail. he connecting to an dian `]rail Road. e mains. The public s-Indian Trail Road and fked Creek. The public nty. The private o serve the Town Hall fined by the Town of 11301 Camel Comm Woolpert, Iris, ras Boulevard„ suite 300 ChArlottrt, NC 282.26 704,525.5284 5'4IDW R UNION COUNTY Pu'-LIC WORKS 500 N. Main Street, Suite 500 Monroe, NC 28112 704/296-4210 Fax 704/296--4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office RFCEIVF 610 East Center Avenue Mooresville, N.C. 28115 Attention: Regarding: Sanitary Sewer to serve Town of Indian Trail -Town Hal! at Government Center TRANSMITTAL WQROS Date: 8/25/15 We are sending you: D Copy of letter 0 Hans Q Prints 0 Shop Drawings Other Copies 1 Date 1 No. 8/21 /15 8/21115 8/21/15 8/21/15 8/6/15 006650 8/14/15 Description Cover Letter Fast Track Application Copy of Fast Track Application Flow Tracking Form 480.00 Check Fee (Application ion e Stream Classification Form These are transmitted as checked below: ® For approval For your use — As requested 0 For review and comments Remarks: Signed: Received by: Date: Central Files: APS SWP 9/21/2015 Permit Number W00038005 Permit Tracking Slip Program Category Status Protect Type Non -discharge Active New Project Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.love Coastal SWRuIe Permitted Flow 0 Facility Version Permit Classification 1.00 Individual Permit Contact Affiliation Facility Name Town Hall at Indian Trail Governmental Center Location Address Owner MajorlMlnor Region Minor Mooresville County Union Facility Contact Affiliation Owner Name Union County Dates/Events Owner Type Government - County Owner Affiliation Cindy Coto 500 N Main St Monroe NC 28112 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 9/21/2015 8/26/2015 9/21/2015 9/21/2015 Regulated Activities Requested /Received Events Institution, other Wastewater collection Outfall Additional information requested Additional information received Waterbody Name Streamlndex Number Current Class 5ubbasin