Loading...
HomeMy WebLinkAboutWQ0037222_Regional Office Historical File Pre 2018North Carolina Department of Environment and Natural Resources Division of Water Resources Pat McCrory Governor July 1 2014 Mr. Mike Garbark, PE Union County' Public Works 500 N. Main Street, Suite 500 Monroe, N,C, 28112 Subject: Permit No. WQ0037222 Rays Fork Interceptor Wastewater Collection Syst Union County Dear Ir. Garhark: John E. Skvaria, Ili Secretary in accordance with your application received on June 27, 2014, we are forwarding herevwith to Permit No. WQ0037222, dated July 1, 2014, to the Union County Public Works for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter and supplement shall be considered a part of this permit: and are therefore incorporated therein. by reference. Please pay particular attention to the tollowtt g cronditions contained within this permit: Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 1.5 A NCAC 2T .0403 or any individual system: wide collection systerm permit issued to the Perrnittee. It shall he responsibait)! of the Union County Public Works to ensure that the as -constructed project meets the appropriate design criteria and. rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §14:3-215.6Athrough §I43--215.6C, construction of additional or replacement wastewater collection facilities, andlor referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming. to Chapter 1.5013 of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6.714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are rn.ade, this permit: shall be final and binding. Mooresville Regional tftlue Location: t>1t1 East Center Ave., Suite 301 ticacare vibe, NC 28115 Phone: (7704) 6631699 t Parr: (704) 663-6040 t Customer Service: 1-877-623-6748 nternet: www.ncwaterquaiityiorg An Fnfimd el.,nrvrluieily t AAliemntivn ArAinn r=rnnlnvar VPWQ0037222 untyPublic Works If you need additional information concerning this matter, please contact Michael Parker at (704) 663- 1699 or via e-mail at Michael.Parker@ncdenr.gov. for Thomas A. Reeder Division of Water Resources by Michael Parker Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Cc: Mooresville Regional Office James N. Struve, PE (e-copy) Water Resources Central Files PERCS ATA NCDENR STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Union County Public Works Union County for the construction and operation of approximately 2,280 linear feet of 8-inch gravity sewer, 1,963 linear feet of 12-inch gravity sewer, 7,937 linear feet of 15-inch gravity sewer, 2,120 linear feet of 16-inch gravity sewer to serve the Rays Fork Interceptor and the discharge of 0 gallons per day of collected domestic/commercial wastewater into the City of Monroe WWTP Treatment Facility existing sewerage system, pursuant to the application received June 27, 2014, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. Permit issued this 1st day of July, 2014. for Thomas A. Reeder Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0037222 SUPPLEMENT TO PERMIT COVER SHEET Union County Public Works is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collectedby this system shall be treated in the City of Monroe WWTP Wastewater Treatment Facility (NC0024333) prior to being discharged into the receiving stream. Permitting of this project does not constitute an acceptance of any part of the project that does not me -et 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of 'Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules, Construction and operation is contingent upon compliance with the following Conditions. H. STANDARD CONDITIONS • This permit is not transferable. In the event there is a desire for the wastewater collection .facilities to change ownership, or there is a name change of the Pennittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 1.2, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specificallymentioned. herein. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these 'facilities as required by 15A NCAC 2T .0403.. If an individual permit is not required, the following performance criteria shall be met as provided in 1.5A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.IC. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. J• Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. Noncompliance Notification: The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number 704 663 -1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit 'failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report, Overflows and spills occurring outside normal business hours may also be reported to. the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part 1 of Form. CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence, This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as riot to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. Per 15A NCAC no116, upon. completion of construction and prior to operation of these permitted .facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form, A complete certification. is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall he considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, If the permit is issued to a private entity with an Operational Agreement, then a copy of the. Articles. of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds .office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting ents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (Cl) or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting pump station design calculations (selected pumps, system curve, operating point, buoyancy calculations, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. rrtoCitification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. 8. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 9. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains. adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes § 143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. 10. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 11. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 12. The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. PAST TRACK ENGINEERING CERTIFICATION Permittee: Union County Public Works Project: Rays Fork Interceptor -- Union County Permit No, WQ0037222 Issue Date: 7/1/2014 Complete and submit t.11is form to the permit issuing regional office with the fo owing: One copy of the project record drawings (plan & profile views and detail drawings of sewer lutes) of the wastewater collection system extension. Final record drawings should be clear on the plans ter on digital media (CD or DVD disk) in pdf format, Record drawings should indicate the design and the marked up changes during construction_ Supporting design calculations (selected pumps,. systeon curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pu:tnp stations permitted as part of this project Changes to the project should be clearly ided on the record drawings o Permit modifications are required for any changes resulting in non-cornpliarrce regulations or minimum design criteria. Modifications should be submitted prior t This project shall not be considered complete nor allowed. 'to operate until the D Engineer's Certification and all required supporting documentation. Therefore, it is highly% r this certification be sent in a manner that provides proof of receipt by the Division. n summary formm, with this permit, o certification. `s CERTIFICATION has received this ecommended that , the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable designlconstruction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof, , Title Signature fl Partial as a duly regist T7 Final d Professional fn.gineer in the State of North Carolina, having been authorized to observe (Ij periodically, 1 weekly, J full time) the construction of the subject project for the Perrnittce hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division's (:Gravity Sewer Minimum. Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, '2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS DIVISION OF WATER RESOURCES WATER QUALITY REGIONAL OPERATIONS SECTION MOORESVILLE REGIONAL OFFICE 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE, NC 28115 le, Monroe City g28211 Zip Code E-mail 2b, Union 9- Brief Project Name (permit will refer to this name) County Where Project 'is Located 3. Contact Person: 3a. Mike Garbark, P,E Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 704r296-4239 Phone Number 1. Project is ❑ New 0 Modification (of an existing permit MikeGarbark@co.union,nc.us E-mail odification, Permit No Owner is ►Z4 Public (skip to Item B(3) [] Private (go to Item 2(a)) 2a. If private, applicant will be: ❑ Retaining Ownership (i,e, store, church, single office, etc.) or ❑ Leasing units (lots, townhomes, etc. - skip to item 8(3)) ❑ Selling units (lots, townhornes, etc. - go to item B(2b)) 3. Union County Owner of Wastewater Treatment Facility (WWTF) Treating West 4a. City of Monroe Wastewater Treatment Plant Name of WWTF 5a, Union County 0 0 !JSE THE TAB KEY TO MOVE FROM FIELD TO FIELD Application Number: (to be completed by DWR ©wnerlPermittee: Union County Department of Public Works Full Legal Name (company, municipality, HOA, utitityo etc.) lb. Union County Deailment of Public Works Signing Official Name and Title (Please review 15A NCAC 2T .6106 (b) for authonzed signing officials) lc, The legal entity who will own this system is; ❑ Individual ❑ Federal ❑ Municipality ® State/County ❑ Private Partnership ❑ Corporation 0 Other (speci ld. 500 N. Main Street Mailing Address . North Carolina State 1 h, 704-296-4211 - Telephone 704-296-4237 'CCFacsimile 2. Prolect (Facility) Inforrryation; 2a, Rays Fork Interceptor 2b. If sold, facilities owned by a (must choose one) ❑ Public Utility (instruction D) Homeowner Assoc./Developer (Instruction E) From This Proje 4b. WQ0024333 WWTF Permit No, t5b. 24 Gravity [6c. Wt 0033005 Owner of Downstream Sewer )Receiving Sewer Size i0 Force Main 6, The origin of this wastewater is (check all that apply): Residential Subdivision Apartments/Condominiums 0 Mobile Home Park ❑ School ❑ Restaurant ►1 Office Permit # of Downstream 0 Retail (Stores, shopping centers) Institution 0 Hospital ❑ Church ❑ Nursing Home Other (specify): uction F) 06%© Domestic/Commercial % Industrial (Attach Description) %© Other (Attach Description) 7, Volume of wastewater to be allocated or permitted for this particular project: 0 gallons per day 'Do not include future flows or previously permitted allocations If the permitted' flow is zero, indicate why: Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line rat Flow has already been allocated in Permit No.. WQ 033©05 and WQ0024333 Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T ,0393 to determine if a permit is required) FTA 08-13 APPLICATION Page 4 of 6 z 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T 0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). N/A 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 8-inch 12-inch 15-inch 16-inch Length (feet) New Gravity or Additional Force Main 2,280 Gravity 1,963 Gravity 7,937 Gravity 2,120 Gravity 11. Summary of Pump Stations wl associated Force Mains to be Permitted (attach additional sheets as necessary) © Pump Station Location ID: (self chosen - as shown on plans/map for reference) V N FORMATION 1- Longitude: Latitude: Design Flow Power Reliability Option (MGD) Operational Point 1 - permanent generator w/ATS; Force Main Size GPM @TDH 2 - portable generator w/MTS Force Main Length Pump Station Location ID: (self chosen - as shown on planslmap for reference) Longitude: Latitude: Design Flow Power Reliability Option (MGD) Operational Paint 1 - permanent generator w/ATS; Force Main Size Force Main Length GPM @TDH 2 - portable generator w/MTS 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? Yes No If Yes, permit number of 2nd treatment facility : (RO — if "yes" to 8,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCACChapter2T as applicable? Yes Ei No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 08-13 APPLICATION Page of 6 14, F. ave the following permits/certifications been submitted or approval for the system or project to be served'? Wetland/Stream Crossings - General Permit or 401Certification? Sedimentation and Erosion Control Plan? Trout Buffer Waiver? Stormwater? Yes L] No © NIA Yes D No D N/A © Yes 0 No N/A 0 Yes 0 No N/A 15. Does this project include any high priority lines 5AaNCAC.42T. 4p2 . j involve aerial tines, siphons, or interference manholes')? These lines will be cvneidered 111 #h priority and mus,be checked once every s X months Check if Yes: 0 and provide details: OwnerlPermittee's Certification: (Signature of Signing Official and Project Na !, Michael Garbark, P.E. attest that this application fo'r Rays Fork interceptor has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215,6A and 143 215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties rtp to S25,000 per violation, l a. ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLiCATiON, THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC, REFER TO 15A NCAC 02T ,0315 Z 2, Professional Engineer's Certification' (Signature of Design Engineer and Project Name) 1, James N. Struve, P.E. ,attest that this application for Rays Fork interceptor has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations„ and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations„ Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design, Note: In accordance with NC General Statutes 143-215, 5A and 143721 b,68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10000 as well as civil penalties up to $25,000 per violation. 2a. James N, Struve, PE Professional Engineer Name 2b. Hazen and Sawyer Engineering Firm 2c, 4944 Parkway Plaza Blvd, Suite 375 Mailing Address 2d, Charlotte City 2g.704-357-3150 2h, 704- Telephone Facsi 3 e 2e, NC 2fr 28217 State Zip 2 2i, jstruve@hazenandsawyer,com E-mail FTA 08- 1 3 APPLLLICATION Page 6 of 6 Street Level Map Rays Fork Interceptor PUMP STATION "EAST SIDE" N 457573.13 ft E 1557863.89 ft UNION COUNTY AGRICULTURE CENTER N 450921.98 ft E 1558465.19 ft RAYS FORK INTERCEPTOR PUMP STATION "TRELLIS" N 449283.86 ft E 1560827.09 ft UNION COUNTY ANIMAL SHELTER N 450796.41 ft E 1560698.14 ft RAYS FORK INTERCEPTOR ILL Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-13) Project Applicant Name: Union County Department of Public Works Project Name for which flow is being requested: Rays Fork Interceptor More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Station (Name or Number) Firm Capacity,* MGD (A) Design Average Daily Flow** (Firm / p f), MGD Approx. Current Avg. Daily Flow, MGD (B) (C) Obligated, Not Yet Tributary Daily Flow, MGD East Side #1 2.1 0.71 0.71 0 (D)=(B+C) (E)=(A-D) Total Current Flow Plus Obligated Flow Available Capacity* ** 0.71 1.39 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of 6 FTSE 08-13 'cation. Statement: f Michael Garbark, PE certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections 1 and II plus all attached planning assessment addendu.ms for which l am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Sr"�rtttg Oa aal Signature Date Page 2 of 6 08-13 Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-13) Project Applicant Name: Union County Department of Public Works Project Name for which flow is being requested: Rays Fork Interceptor More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flaw. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: City of Monroe Wastewater Treatment Plant b. WWTP Facility Permit #: WQ0024333 All flows are in MGD c. WWTP facility's permitted flow 10.4 d. Estimated obligated flow not yet tributary to the WWTP 0.991 e. WWTP facility's actual avg. flow 6.77 f. Total flow for this specific request 0 g. Total actual and obligated flows to the facility 7.761 h. Percent of permitted flow used 74.6% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Pump Station (Name or Number) /V/ 7—/ (5 (A) Design Average Daily Firm Flow** Capacity,* (Firm / pf), MGD MGD w7L7 (B) Approx. Current Avg. Daily Flow, MGD (C) Obligated, Not Yet Tributary Daily Flow, MGD (D)=(B+C) (E)=(A-D) Total Current Flow Plus Obligated Flow c -gJ -//i � -?'-d e✓ Available Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (p1) not Less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of 6 FTSE 08-13 III. Certification Statement: I Russ Colbath, PE certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and-1 for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Official Signature Date Page 2 of 6 FTSE 08-13 FORM WSCAS 08-13 WATERSHED CLASS FOR SEWER SYSTEMS CATION ATTACHMENT Location iD Nate of Waterbod Rays Fork Rays Fork Union Yadkin 13w17-36-8-2 Union Yadkin 13-17-36-8-2 Rays Fork Union Yadkin 13-17-36-8-2 Rays Fork Union Yadkin 13-17-36-8-2 Rays Fork Union Yadkin 13-17-36-8-2 C UT to Rays Fork Rays Fork Rays Fork Rays Fork UT to Rays Fork Rays Fork Union Yadkin 13-17-36-8-2 i C Yadkin 13-17-36-8 C Union Yadkin 13w17-36-8 C Union Yadkin 13-17-36-8-2 C Union Yadkin 13-17-36-8-2 C Yadkin 13-17-36-8 13-17-36-8 If unnamed, indicate "unnamed tributary to X", where Xis the named waterbody to which .the unnamed tributary loins. J certify that as a Registered Professional Engineer in the State of North Carolina that 1 have diligently followed the Division's instructions for classifying waterbodies and that the above classifications are inclusive of the stated project, complete and correct to the best of my knowledge and belief: PE Seal, Signature and Date *** END OF FORM WSCAS 08-13 *** Waterbody Classification FORM: WSCAS 08-13 Page 1 of 1 East Side Pump Station am Site S2 earn Site S3 Rays Fork Interceptor am Site S4 Agricultural Center Pump Station Trellis Pump Station SCALE Feet 0 750 1,500 3,000 1 in = 1,500 feet Stream Site S Stream Site S6 Animal Shelter Pump Station Stream Site S 1 O Stream Site S11 Stream Site S6 y lln'ron County '!;,� ',Sheriff's Deparrtment and Jail Facility,' Stream Site S9 Copyri ht: 2 Wetland Site W1 h pc tubed Figure 3 Overall Project Detail Map RAYS FORK INTERCEPTOR Fnvi June 26, 2014 VIA UPS Mr. Michael Parker Water Quality Regional Operations Supervisor NCDENR — Division of Water Resources 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Re: Union County Department of Public Works UCPW Project No. 5E003 Rays Fork Interceptor Fast -Track Application Dear Mr, Parker: EN AND SA ental Engineers & Scientists 494,4 Parkway Plaza Boulevard, Slide 375 ",t'l rlotfe, NC 28217 704 357-3153 hazecad dsawyer, corn On behalf of the Union County Department of Public Works, please find enclosed a Fast -Track permit application for the Rays Fork Interceptor. This project consists of the construction of approximately 14,300 linear feet (LF) of new gravity outfall sewer ranging in size from 8-inches to 16-inches in diameter in Union County west of the Town of Wingate. The proposed gravity sewer will accept flow from three (3) existing pumping stations and convey flow by gravity to the East Side Pump Station. These existing pumping stations presently serve the County Animal Shelter, County Agricultural Center, County Sheriff's Department and Jail Facility, and an existing residential development. The East Side Pump Station pumps flow to the City of Monroe Wastewater Treatment Plant under an existing WWTP permit. This project is being constructed as part of the County's Comprehensive Water and Wastewater Master Plan prepared by others. Enclosed in this submittal are the following items: • Check in the amount of $480 • Signed original plus one copy of the following: o Fast -Track Permit Application (FTA 08-13) o Street Level Map o USGS Topographic Site Map of project area o Flow Tracking Acceptance Forms (FTSE 08-13) o Watershed Classification Attachment (WSCAS 08-13) with map FIAZENMD SA Environmental Engineers & cientists We look forward to your favorable review of this permit application. If you have any questions, please feel free to contact me at 704-940-8913 or by email at avane c .hazenandsawyer.cam. Very Truly Yours, Hazen and Sawyer, P.C. Andrew S Vane, PE Associate Attachm ents cc: M. Garbark, Union County Central Files: APS _ SWP 7I112014 Permit Number ' WQ0037222 Permit Tracking Slip Program Category Status Protect Typo Nen-discharge Active New Project Permit Typo Veralon Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions 1.00 individual Primary Reviewer michael.parker Coastal SWRule Permitted Flow 0 Facility Permit Contact Affiliation Facility Nemo Rays Fork Interceptor Location Address Owner Major!Minor Region Minor Mooresville County Union Facaity Contact Affiliation Owner Name Union County Dates/Events Owner Type Government - County Owner Affiliation Mike Garbark 500 N Main St Monroe NC 29112480 Scheduled °rig Issue App Received Draft dnttiated Issuance 711/2014 6/27/2014 Regulated Activities Office Subdivision Wastewater collection Outfall Public Notice Issue 711/2014 Requested (Received Events Effective 7/112014 Expiration Additional Information requested Additional information received Waterbody Name Streamindex Number Current Class Subbaaln prr . az_ E)1C�1 9101 and SawyernPine SeSchtherro Fne Blvd.., Suitt 25rJ Charlotte, NC 1i3'373 • 704 35'7 � 150 Haz November 2, 7616 Mr, Michael Parker Regional Supervisor Water Quality Regional Operations Section NCDEQ 61.0 East Center Ave, Suite 3011. Mooresville, NC 28115 Re: Permit No, WQ0037222 Union County Rays Fork Interceptor Engineer's Certification Dear Mr. Parker: Please find enclosed the Engineer's Certification for partial activation of the above referenced project. Also included is one set of as -built record drawings and a copy of the Wastewater Collection System Extension letter from your office, If you have any additional information of clarification, please do not hesitate to contact me at (704) 3577-3150 or at ava,ne(hazenandsawyer.com. Very truly yours, RAZZ N AND SAWYER Andrew S. Vane, PE Associate Enclosure cc: M. Caldwell, Union County hazenandsawyer,coni taro .t^ UU the Sl<N9s'1'H1S F1?RC SU':1' : ] STRlE1) ATTACHMENTS TO TT r,(''v ,.c `[F1. * G 1N 'ING AD. x 11A: °'V d11�` AT R RESOt R. REGIONAL O 1 W 1ONS SECTION ?. MOORESVILLE REGIONAL OFFICE 610 EAST' CENTER AVENUE, SUITE 301 MOORE4V1LLE, NC 28115 M � .IvEniNco!l RIDW Ippir FAST TRACK ENGINEERING CERTIFICATION Permitter): Union County Public Works Project: Rays Fork interceptor— Union County Complete and submit this foie to the permit issuing regional office with the foltowiri • 6 "1C4L Permit No. 00037222 issue put. 71112014 One copy of the project record drawings (plan & profile views and detail drawings of sewer lines) of the wastewater collection system extension, Final record drawings should be clear on the plans or on digital media (CD or DVD disk) in pdf format. Record drawings should indicate the design and the marked up changes during construction. • Supporting design calculations (selected pumps, system curve, o generator(s) or storage greater than longest p stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. 'e t o l c do is are re ti , d a i chars s resnitin in non•c lance w' it reEulatiQns or minimum design criteria. Modiffc i ions should be submitted prior to vertlfictitloh, This project shall not be considered complete nor allowed to operate until the Division has received this Engineer's Certification and all required supporting documentation, Tiler fore, it hat* recommended that this certification be scut in a manner that provides proof of receipt fry the Division. g point, available storage if portable three year outage reliability option selected) for any pump PERMITTEE'S CERTIFICATION the undersigned agent for the Permittee, hereby state that this project has en constructed pursuant to the applicable standards & requirements, the Professional Engineer below h provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & intaiti the wastewater collection system permitted herein or portions thereof, nted Name, Tit Partial 1, -s-- ,, %-c, E.„ , ns a duly registered Prolessia teal l ng i having been authorized to observe ( periodically, weekly, full tii project for the Permittee hereby state that, to the best of my ahilitfe,, due cure and observation of the construction such that the construction was observed to be built within. of this permits 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting Force Mains adopted June 1, 2000 as applicable; and other supporting materiels. R"S CERTltt°I `ATM North Carolina Prafeaaional Engineer's Seal) signtttt „,.id date: fl 2 Use Only; this project Is tributary to: to of North Carolina, uction of the subject ae was used in the tantial compliance adopted February 12, of Pump Stations and SEND THIS FOIL & SUPPORTING DOCUMENTATION TH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS DIVISION OF WATER RESOURCES WATER QUALITY REGIONAL OPERATIONS SECTION MOORESVILLE REGIONAL OFFICE 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE, NC 28115 0,2019 To: We Are Sending You: No. n of Water Resources Quality Regional Operations Sect he Regional Office 610 East Center Avenue Suite 301. Mooresville, NC 281.15 To Whom it May Concern Union Countv, NC __ Rays Fork Jntcrcej Date Descrir tron Pnnts Other Sent. By: BP,,:n:^ EGIONAL Remarks: Transmitted: Perrnittee's / Engineer"s Certification We apologize for not sending you the enclosed Perrnittee"s / Engineer's Certification and d Record Drawings for the Union County, NC Rays Fork Interceptor as this project was completed in January 2017, These documents inadvertently "slipped through the cracks s At Your. Request For Your a:to 11.2 For Yo..us P`µyF"7 For Your ,Fpprov i'For Distribution Copies to: Very truly yours, Hazen and Sawyer By: Hazen and Sawyer • 9101 Southern Pine Blvd, Suite 250 • Char➢otte, NC a 73. 704,357.3150 Priv' FAST TRACK ENGINEERING CERTIFICATION Permittee: Union County Public Works Permit No. WQ0037222 Protect: Rays Fork Interceptor — Union County Issue Date, 7/1/2014 Complete and submit this farm to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views and detail drawings of sewer litres) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) in pdf format. Record drawings should indicate the design and the marked up changes during construction. Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written surnrnary fo Pet it modifications._nl re ttired for an ehnrt es resttttin in nnn-c This project shall not be considered complete nor allowed to operate until the Division has received this Engineer's Certification and all required supporting documentation. Therefore, it is highly recommended that this ction be sent in a manner that provides proof of receipt by the Division, PERMITTEE'S CERTIFICATION SIAJ t:' —e the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title a Date ENGINEER'S CERTIFICATION ® Partial having been uuthrarized to obse serve (D periodically, weekly, e subject a dulyre retired Professional Engineer in the State of North , full throe the cotastructiora of the subject project for the Permittee hereby state that, to the best rof my abilities, due cure and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engin Seal, std rime: D"'R Use )rty Flow from thi SEND THIS FORM & SUPPORTING DOCUMENTATION CH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS DIVISION OF WATER RESOURCES WATER QUALITY REGIONAL OPERATIONS SECTION MOORESVILLE REGIONAL OFFICE 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE, NC 28115 oject is tributary to