Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0037215_Regional Office Historical File Pre 2018
NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor N4r, Chris Cauthen Gear Investments, EEC 2005 White Birch Trail Weddington, N.C. 28104 Subject: June 27, 201.4 Permit No, WQ0037215 Industrial Alloys Wastewater Collection System Extension Union County Dear Nir. .:autlten: John E. Skvada, 111 Secretary In accordance with your application received. on june 23, 2014, we are forwarding herewith to .Permit No, WQ0037215, dated June 27, 2014, to the Gear Investments, EEC for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded., and shall be subject. to the conditions and limitations as specified therent This cover letter and supplement shall be considered a part of this permit and are therefore incorporated therein by reference. Please pay particular attention to the 'following conditions contained within this permit: Condition BA: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 1.5.A NCAC 2T ,0403 or any individual system -wide collection system permit issued to the Perm Mee. It shall be responsibility. of the Gear Investments, EEC to ensure that the as -constructed project meets the appropriate design criteria and rules, Failure to comply may result in penalties in accordance with North Carolina Genera,' Stature §1.43-2 1„5.6.,A through §1T3-2 I 5,6C, construction of additional or .repla.ceinent wastewater collection fieiIities, andlor referral of the North Carolina-heensed .Professional Engineer to the licensing board, If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following, receipt of this permit, -Fins request must be in the form of a written petition, conforming to Chapter 1.50B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714,, Unless such demands are made, this permit shall be final and binding. Mooresville Regional Office, .610 Easl Center Avenue, MooresvIle, North Carolina 28155 Phone: 704-663-1699\ nte,rnet www nedenr,gov An Equal Opportundy Mccuahve Aclioa Employer - Made mil by ydel pap(f a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, Iine blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water - , • Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 7. Per 15A NCAC 2T.0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supportingdocuments are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles , of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings. should be clear on the plans or on digital media (CD or DVD disk) and are defined 'as the design drawings , that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting pump station design calculations (selected pumps, system curve, operating point, buoyancy calculations, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. • • • • Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. PIease note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. 8. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 9. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June I, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes § 143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. 10. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 11. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 12. The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. FAST TRACK E'G1NF ERN( CERrEFIC:ATIOT Perrnittee: Gear Investments, LLC Project: Industrial Alloys - Union County Complete and suhnnt rhi- form permit i we owing: Permit No. WQ0037215 Issue Date: 6/27/2014 One copy of the project record drawings (plan al prr,rfile s iew and detail drawings of` sewer lines) of the wastewater collection system extension, Final record dravv}ir gs slae uld be clear on the plans or on digital media (CD:) or DVI'a disk) in pdf format, Record drawings should indicate the design and the marked up changes during cc;rnstructiun. Supporting: generator(s) stations permit Changes to the gn calculations torage greater than Pro.; d punrps, system curve, operating pa past three year outage r should he c leaar ly icle ratitied on the record dray Permit modifications are required for any changes resuttin _in tines This pr.( Engineer this certi et shall not be considered complete nor al Certification and all required supporting docutnentatio cation be sent in a manner that provides proof of receipt by th PFPMIT`rF["S C'FR`HF°TCATION h option the l:)i. highly _._....e�.e , the undersigned agent :for the Perrnittee, lea ehy state tha been construe te d pursuant to the applicable standards & rerlttirente nts, the Pro provided applicable desigu!construction information to the Perrnittee, and the Permittee is prepared to operate maintain the wastewater collection system permitted herein or portions thereof: ' portable atty pump d this nded that. Printed Name, Title. L] Partial as a duly registered Professio having be authorized to observe ( periodically, vv{eekly, project for .the Permittee hereby state that,. to the hest of r t ry observation of the construction such that the construction was of this permit; E 5A NC°AC 02,T. the :Division's Gravity Sewer 1996, as applicable, the Division's Minimum Design Criteria for the Fa Force Mains adopted June 1, 2000, as applicable; and other supFro North Carolina Professional Engineer's mature, and date: R Engineer in the State eaf North Carolina, construction of the subject due care and diligence was used in the a be built within substantial compliance Design Criteria, adopted l ebruar, f2, -k Permitting of"Pump Stations and SEND THIS FC RM & SUPPORTING DoCUMENTA"PION Q IRED ATTACHMENTS TO THE FOLLOWING ADDRESS DIVISION OF WATER RESOURCES ti'ATER QUALITY REGIONAL OPERATIONS SECTION MOORESVILLE REGIONAL OFFICE 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE, NC 28115 VR. Use 01*, z 0 Ce 0 CL z 0 H U J O. USE THE TAB KEY TO MOVE FROM FIELD TO FIELD Application Num (to be completed by 1. OwnerlPermittee: la, Gear Investments, LLC Full Legal Name (company, municipality, HOA, utility, etc.) 1b.. ChrisCautherr ` Owner Signing 0ifiutat Name and Title aA (Please review 1 INC ( �" NCAC ,01fi lc, The legal entity who will own this system is: © Individual © Federal EJ Municipality LJ 1d, 2005 White Birch Trail,..v...M_ .. Mailing Address 1f, N.0 ._� State t h. 704 882 m2887 Telephone 2. Project (Face, 2a. Industrial Alloys Brief Project Name (permit will refer to this name 3. Contact Person: 3a, risHope,PE Name and Affiliation of Someon tie 704 882 3153 Facsimile tpformati©n; 3b. 704 219 3602_ Phone Number 1. Project Ej New El Modifi 0 honied signing o e/County El Private Partnership 1 e. Weddington ��m.. �.� � � City clots) Corporation ED Other (specify): 28104 Zip Code___... ccauthen §irtdf E-mail sinc, com 2b, Union County Where Project is Located e Who Can Answer Questions About this Application 3c. chrishepe caroiina.t~r.corn E-mail tion (of an existing permit) If Modifie,ation, Perrnit No.: 2. Owner is [, Public (skip to item B(3)) Private (go to 2a, If private, applicant will be: Retaining Ownership (Lestore, church, single office, etc) or El Leasing units (lots, townhomes, etc. - skip to Item B(3)) EJ Selling units (lots, townhornes, etc. - go to Item B(2b)) 3 Union County Public Works Owner of Wastewater Treatment Fac (— Q Name oCreek WWTP 4a. Twelve� Mile a�ro.a_._�.__......_..�.._ 2 fWWTF CC5a. Union Coun _ 5b.8 °-..... _.� . Z Gravity IL. Owner of Downstream Sewer Receiving Sewer Size EJ Force ain Z 6. The origin of this wastewater is (check all that apply): 2(a)) b.,a, If sold, facilities owned by a (must choose one) El Residential Subdivision [� Apartments/Condominiums Mobile Horne Park El School Eli Restaurant [ Office Volume of wastewater y Public Utility (Instruction D) Homeowner Assoc./Developer (Instruction E) From This Proiec 4b NC0085359 WWTF Permit No, 5c, WQ0032449JDated June Permit # of Downstream Sewer (Instruction E) [� Retail (Stores, shopping centers) [l Institution © Hospital 0 Church Nursing Home E Other (specify): Ira riziAa % Domestic/Commercial 100% Industrial (Attach Description) % Other (Attach Description) ed'orpermitted for this particular project 375 gallons per day "Do not include future {tows or previously permitted allocations If the permitted flow is zero„ indicate why. El Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line El Flow has already been allocated in Permit No. 0 Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T.0303 to determine if a permit is required) 13 APt'I.,ICATION 4of( 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). Factory/Industrial (25 Gallons per employee per shift) Total Employees = 15 (one shift only) (15 emp.) x (25 Gallons) = 375 GPD 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 6" Length (feet) 325' New Gravity or Additional Force Main Gravity W Z ▪ 11. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) O Pump Station Location ID: (self chosen - as shown on plans/map for reference) 0 Longitude: Latitude: z 0 P Design Flow Operational Point Power Reliability Option Q (MGD) GPM @TDH 1 - permanent generator w/ATS; Force Main Size Force Main Length 2 2 - portable generator w/MTS 0 1I Pump Station Location ID: (self chosen - as shown on plans/map for reference) 1-- 2 Longitude: Latitude: re W Design Flow Power Reliability Option 0.., (MGD) Operational Point 1 - permanent generator wJATS; Force Main Size Force Main Length Cli GPM @TDH 2 - portable generator wIMTS 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? ❑ Yes ® No If Yes, permit number of 2nd treatment facility : (RO — if "yes" to B,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum_ Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? Yes ❑ No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 08-13 APPLICATION Page 5 of 6 14. Have the following permits/certifications been submitted for approvat for the system or project to be served? Wetland/Stream Crossings - General Permit or 4OlCert'ification? LJ Yes © No El NIA Sedimentation and Erosion Control Plan? Yes D No 0 N/A Trout Buffer Waiver? EJ Yes ❑ No El N/A Stornawater? . Yes 0 No Q N/A 15, Does this project include any high priority ines ( 5A NCA 02T ,Q4Q2 (2)) involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: [l and provide details. Owner/Perrnittee°s Certification. (Signature raf Signing Official and Project Name) Chris Cauthen attest that .this application for Industrial Alloys been reviewed by me and is accurate and complete to the best of my knowledge, l understand that if all required parts of this application are not completed and that if all required supporting. documentation and attachments ate not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-,2/5 6A and 1437215,6, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,00 per violation. ning Off"dal ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY Z TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NCAC 02T 0305 0 2. Professional Engineers Certification: (Signature of Design Engineer and Project Name) U 1, Chris Hope, PE .attest that this application forIndustrial Alloys _has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other.supporting documentation to the best of my knowledge, 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Miinirnum Design Criteria for Gr'avily Sewers adopted Febniary 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that l have reviewed .this material and have judged it to be consistent with the proposed design. Note. to accordance with NC General Statutes 1.4. 215,6A and 215,6B, any person who knowingly makes any frnavtselrstateme a ent,e nr toexceed on, or certification in anya li,ati r sh ll be guilty a Class 2 gy any p � pp-s' of $10,000 as well as civil penalties/0to y S)flIt per violation, misdemeanor which 2a. Chris Hope, PE Professional Eneer Name 2b. Chris Hope PE Engineering Firm 2c. 2617 Rolling_Hills Drive Mailing Address 2d, Monroe 2e. NC 2f. 28110 City State Zip 2g. 7f14 2�'9.___ -3 r02 2h. 704-S 2� 2 8 . 2i„ hrishopea@7carolina.rr,com Telephone Facsimile E-mail NC PE asdi�, tits FTA.08-I3 APPLJCATIGN Pae 6 of 6 Division of Water Resources State of North Carolina Department of Environment and Natural Resources Division of Water Resources FIow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-13) Project Applicant Name: Union County Project Name for which flow is being requested: Industrial Alloys (Private) More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Twelve Mile WWTP b. WWTP Facility Permit #: NC0085359 All flows are in MGD c. WWTP facility's permitted flow 6.0 d. Estimated obligated flow not yet tributary to the WWTP 1.7643 e. WWTP facility's actual avg. flow 3.44 f. Total flow for this specific request 0.0004 g. Total actual and obligated flows to the facility 5.2047 h. Percent of permitted flow used 86.75 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity,* (Firm / p1), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** Poplin Road 3.16 1.26 0.683 0.2457 0.9287 0.3313 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Page 1 of 6 a FTSE 08-13 ion Statement: I Charles P. t'Cain certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment p➢ant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and. II. plus all attached planning assessment add.endums for which 1 am the responsible party. Signature of this born indicates acceptance of this wastewater flow. Signing Official �` a� >ncature Date'' Page FTSE PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. 1 understand that this does not relieve the collection system owner from complying with G.S. 143-215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of,, FTSE 08-13 R i t. A L L GoMAPS - Union County NC Public Access ,a This map is prepared for the inventory of real property found vrtthin Uniort aunty, NC and is compiled from recorded deeds, piats, and other public records and data. Users of this map are hereby notified that the aforementioned public primary information sources should be consulted fur verification of the information contained on this map. Union County and the mapping companies assurne no legal responsibilities frrr the tn'formation contained on this map. Grid based on the North Carolina State Plane Coordinate System All dimensions in feet North Carolina Secretary of State Page 1 of 1 • Account Login Register Nardi I-2rolII lla Elaine Fmarshals DEPARTMENT OTHE Secretary SECRETARY OF STATE B 2 2 NC273 432:2 (919J' O7-2OO Date: 6/25/2014 Click here to: View Document Filings [ File an Annual Report 1 J', Print a Pre -populated Annual Report Fillable PDF Form 1 Amend A Previous Annual Report i Corporation Names Name Name Type NC GEAR INVESTMENTS, LLC LEGAL Limited Liability Company Information SOS1 D: 1254750 Status: Current -Active Effective Date: 4/16/2012 Citizenship: DOMESTIC State of Inc.: NC Duration: PERPETUAL Annual Report Status: CURRENT Registered Agent Agent Name: Office Address: GARNER, KIMBERLY C. 2005 WHITE BIRCH TRAIL WEDDINGTON NC 28104 Mailing Address: 2005 WHITE BIRCH TRAIL WEDDINGTON NC 28104 Principal Office Office Address: 2005 WHITE BIRCH TRAIL WEDDINGTON NC 28104 Mailing Address: 2005 WHITE BIRCH TRAIL WEDDINGTON NC 28104 Officers/Company Officials Title: MANAGER Name: CHRISTOPHER RYAN CAUTHEN Business Address: 6219 ADELAIDE PLACE WAXHAW NC 28173 Title: MANAGER Name: KIMBERLY CAUTHEN GARNER Business Address: 2005 WHITE BIRCH TRAIL WEDDINGTON NC 28104 This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 3474 http://www.secretary.state.nc.us/corporations/Corp.aspx?PitemId=9979292 6/25/2014 UNION COUNTY DEPARTMENT OF PUBLIC WORKS 500 North Main Street, Suite 500, Monroe, NC 28112 Phone: (704)296-4210 0 Fax: (704)296-4232 June 20, 2014 Mr. Chris Hope Chris L. Hope Engineering Services 2617 Rolling Hills Drive Monroe, N.C. 28110 Re: Sewer Treatment Capacity Private Gravity Sewer to serve Industrial Alloys Dear Mr. Hope: Union County Public Works Department can accept the additional discharge of 375 gallons per day of domestic wastewater from this project for transmission to the Twelve Mile Wastewater Treatment Plant (NPDES permit number NC0085359) for treatment. This allocation is intended to serve the above mentioned project. If you have any questions please don't hesitate to call. Sincerely: Charles P. O'Cain, P.E. Development Program Manager CPO/pwb CHRIS L HOPE, P.E. ENGINEERING SERVICES NARRATIVE: INDUSTRIAL ALLOYS 3013 EATON AVENUE LOT #4 OLD HICKORY BUSINESS PARK PHASE 6 - MAP 4 INDIAN TRAIL, NC 28079 INDUSTRIAL ALLOYS IS AN INDUSTRIAL FACILITY AS MARKED IN SECTION `B NUMBER 6 OF OUR FAST TRACK. APPLICATION (FTA-+08-13 ) THE PRIMARY OPERATION PERFORMED BY THIS BUSINESS IS STEEL FABRICATION. THIS PERMIT IS FOR THE INSTALLATION OF ONE NEW PRIVATE MANHOLE AND 325 LF OF PRIVATE E 6" PVC (SCH 40) SANITARY SEWER PIPE,. THE NEW 6" SANI'T'ARY SEWER WILI GRAVITY FEED TO AN EXISTING PUBLIC MANHOLE DOWNSTREAM THE PERMIT NUMBER FOR TI [E EXISTIG DOWNSTREAM MANHOLE IS:. WQ0032449 (DATED- D- TUNE 12, 200 ) 2 17 Rolling s Drive Monroe, North Carolina 28110 • (704) 882- UNION COUNTY PUBLIC WORKS 500 N. Main Street, Suite 500 Monroe, NC 28112 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue Mooresville, N.C. 28115 Attention: Regarding: Sanitary Sewer to serve Industrial Alloys (Private) We are sending you: Copies Date 6/20/14 6/19/14 6/19/14 1 6/19/14 1 6/20/14 No. Copy of letter Other 6/18/14 1776 Plans Description Sewer Capacity Letter Cover Letter Fast Track Application TRANSMITTAL Date: 6/20/14 Prints Shop Drawings Copy of Fast Track Application Flow Tracking Form $480.00 Check iApplication Fee) These are transmitted as checked below: For approval I I For your use L As requested 1I For review and comments Remarks: Signed: Received by: Date: • Central Files! APS SWP 6/27/2014 Permit Number WQ0037215 Permit Tracking Slip Program Category Status Project Type Non -discharge in review New Project Permit Type Gravity Sewer Extension, Pump Stations, 8 Pressure Sewer Extensions Primary Reviewer michael.parker Coastal SWRule Permitted Flow 375 Facility Version A Permit Classification Individuat Permit Contact Affiliation Facility Name MajorlMinor Region Industrial Alloys Minor Mooresville Location Address County Union Facility Contact Affiliation Owner Owner Name Gear Investments LLC Dates/Events Owner Type Non -Government Owner Affiliation Chris Cauthen 2005 White Birch Trl Wesley Chapel NC 28104 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 6/27/2015 6/24/2014 6/27/2015 6/27/2015 Regulated Activities .Requested /Received Events Industrial/Commercial washwater Additional information received Wastewater collection Outfall Additional Information requested Waterbody Name Streamindex Number Current Class Subbasin EAST TRACK ENGINEERING CERTIFICATION Permittee: Gear Investments, LLC Project: Industrial Alloys — Union County Complete and si br form to the permit issuing regi • One copy c. f the project record drawings (plan & profile views and detail drawings cif leaver litres) cif site vvaste\\ater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) in pdf format. Record drawings should indicate the design and the marked up changes during construction, * Supporting design calculations (selected pumps.. system curve, operating point, available storage if portable generators) or storage greater than lortgust past three year outage reliability option selected) for any pump stations perritted as part of this project d be clearly 'identified on the record drawl madificatirans are required for any changes resulting in non - illations or�minimtim design criteria. Modifications should be submitted Permit No. W00037215 Issue Date: 612712014 ar form, permit, ation. This project shall not be considered complete nor allowed to operate until the Division has re this Engineer's Certification and all required supporting dr>errrnentation. Therefore, it is highly recommended that this certification be sent in a mttrtner that provides proof cif receipt by the Division. of the F etnrittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional F;ngineer below has provided applicable design'construction information to the Permittee, and the Permittee is prepared to operate & aintain the wastewater collection system permitted herein or portions exec f Printed. Name, Title L' \1ITTEE'S CERTIFICATION 0244464 the undersug 144/67 Signature .R'S CERTII- C< TIO Partial as a duly registered Profssicnttl Engineer in the State of North Carolina, axing been author d to observe �periodically, weekly°. full time) the construction of the subject project for the Permittee hereby state that. to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance 1'this permit; ILA NC:AC 02T; the Division's Gravity Sevier Minimum Design Criteria adopted February 12, 996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations argil e Mains aklcted June 1, 2000, as applicable; and other supporting materials. Date al SEND THIS FORM & SUPPORTING DOCLrl 'IENTATION RLQt.,=IRLD ATTACHMENTS TO THE FOLLOWING ADDRESS DIVISION OF WATER RESOURCES WATER Q4.1ALITV R.EGGIONAL OPERATIONS SECTION MOORESVILLE REGIONAL OFFICE 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE, NC 281I5 UNION COUNTY PUBLIC WORKS 500 N. Main Street, Suite 500 Monroe, NC 28112 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue Suite 301 Mooresville, N.C. 28115 Attention: Dee Browder Regarding: Engineer's Ce We are sending you: Copy of letter f�1 Other Copies 1 1 Date 8/28/14 9/3/14 No. 1 These are transm For approval Remarks: Signed: Received by: Description ation for Gear Investments, L.L.0 TRANSMITTAL Date: 9/3/14 Plans —I Prints P Shop Drawings Record Drawings Engineer's Certification for Sewer (Per d as checked below: For your use 0 As requested Li For review and comments Date: