Loading...
HomeMy WebLinkAbout20220179 Ver 1_Shoreline Stabilization_20220207 is) duo � ROY COOPER Governor '1 1/43\ .: MICHAEL S.REGAN Secretary S.DANIEL SMITH NORTH CAROLINA State of North Carolina Director Environmental Quality Department of Environment Quality Division of Water Resources 15A NCAC 02H.0500—Water Quality Certification,Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.) Paul Wojoski Paul Wojoski DWR—401 & Buffer Permitting Branch DWR—401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre-Filing Meeting Request Form as we will not be able to accept your application without this important first step.The Pre-Filing Meeting Request Form is used in accordance with 40 C.F.R.Section 121.4(a) which states "At least 30 days prior to submitting a certification request,the project proponent shall request a pre-filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre-filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre-Filing Meeting Request to this application. RECEIVED Date of Pre-filing Meeting Request: -/ '- /(7)C -2-"(required) FEB - 7 7m2 DWR ID# Version (if applicable) DEO-WATER RESOURCES 401 &BUFFER PERMITTING A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: John Chyriwski Mailing Address: _ 1148 Riverwood Drive Salisbury, NC 28146 Telephone Number: 516-661-5311 Fax Number: E-mail Address: IanekracPaol.com c North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 919.707.9000 2. Agent/Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/dots/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: B. Project Information [15A NCAC O2H .0502(a) &(b)] 1. Attach a vicinity map (i.e. street map)clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/buffer proposed to be stabilized. (Include a scale of some sort-a yard stick,shovel handle, etc.) 4. Location of the property(where work is to be conducted) County: Rowan Nearest Town: Salisbury Lake/river/ocean adjacent to property: High Rock Lake Property size (acres): 2.12 acres Subdivision name or site address(include phase/lot number): Rowan Tax PID 502 043, on Right side Bringle Ferry Road first parcel across bridge past Tamarac Marina Directions to site- please include road names and numbers, landmarks,etc.: 1-85 to Innes St. exit, east on Innes St., L on Stokes Ferry Rd., L on Providence Church Rd., R on Bringle Ferry Rd., first parcel across bridge past Tamarac Marina. Latitude (in decimal degrees) 35.36.2703 Longitude (decimal degrees) 80.18.1946 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Undeveloped lake front parcel FORM:SSGP 09-2020 Page 2 of 6 6. Describe proposed work(include discussion as to how hardening of shoreline has been avoided,or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? [ From water? Li 8. Total amount of impacts below the normal pool lake level/Normal Water Level Permanent impacts(including all excavation,backfill,rip rap,retaining walls,etc.)in square feet: 530 sg.It. Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake level/Normal Water Level and 50 feet land-ward Permanent impacts(including back fill. excavation,rip rap,retaining walls,etc.)in square feet: 1460 so.ft_ Temporary impacts(temporary clearing,construction corridor)in square feet: 1325 sq.ft. 10. Please describe the vegetation above the normal pool lake level/Normal Water Level and 50 feet landward to be impacted(number of trees,tor instance): 6 to 8 trees will be removed to install the oropoced shoreline stabilirat on 11. Signature By signing below,1,as the project proponent,certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate,and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time ' Ctw#Fier/Agent's Signatifre' 115A NCAC 02H.0502(fl) Date 'Agent's signature is valid only if on authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. location of rip rap or fill to be placed above the Full Pond/Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elevation FORM:SSGP 09-2020 Page 3 of 6 d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/Normal Water Level) Full Pond/ Normal Water Level Shoreline Plan View Lake (At Full Pond/Normal Water level) Existing Dock o-.;n aftx150ft Below full pond/NWI- Full Pond/Normal Water Level —1hOrellal�n2 ®av - - _ 4ft also ft Riprap Above full pond/NWL 2 ft.a 150 ft. additional clearing if neCe552ry EKAM PE Plan View FORM:SSGP 09-2020 Page 4 of 6 D T V ' T i7 \ 5 z r, vN o ro CD o °7 � O o CD • r fD rn Full Pond/ Normal Water Level I Shoreline v CD U) 0 3 ft.below fullpond water level 4 ft.above full pond water level 2 ft.additional clearing *if necessary I I 1 1 I Existing bank 41Nor 41/ ep- / � a lO ft.bank height ,,� '67 i �O 1 ff. m p L , __,.. „F.- .. ,, A , , i ..% ..., Side Vi FORM:SSGP 09-2020 Page 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: John Chyriwski Bringle Ferry Road, Rowan County Tax Parcel 502 043 STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 265 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1—Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope = (265') x (1') x (2) = 530 sq.ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2—Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 65 LF of Shoreline = 2.ft. Above Normal Pool Estimate 200 LF of Shoreline = 3 ft.Above Normal Pool Area of Impact = Length x Height x Slope = ( 65' x 2' x 2) + ( 200' x 3' x 2) t 260, + 1200 = 1460 sq.ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 265' x 5 ft. = 1325 sq.ft. Total Area of Impact Above Normal Pool Level = 2785 sq.ft. '---"") /e�� sN. i• -. . 7<CAP,N6NINNti .44' • J 11Prto J', N "0'RY. q4<. k V. ' ./ -; ,..--" ' ). . --'----.--....„...X . w, -it, J h r i 1N10 \ttC Uagt w\l (.., . ' COd 4 ,; (,6 �` `� Ct EA 7 502 043 , i. • 4\_- E P 41 Toct4F -Tcze5 tr ei, N Pi / gM2 ir SCALE 1"= 50' f i / 5O2 IO2 I I j CHYRIWSKI SITE MAP VEGETATION AND EROSION :),/ CONTROL FABRIC �/ — EXISTING GRADE //j 3 •:�1/�- ` .P.. I 4• i Varies CLASS 2 RIP RAP • :e*_ i 2 to 3 ft. 1L-b;t• t 2 q.: EROSION CONTROL FABRIC— S ► Assume .�f� • 1 ft. 004. /��/�/�\��\� LAKE BOTTOM TYPICAL CONDITIONS • 36" TO 72" ERODED CUT • WAVE EXPOSURE FOR: JOHN CHYRIWSKI LOCATION: 1148 RIVERWOOD DRIVE RESERVOIR: HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. — BADIN, NORTH CAROLINA DRAWING TITLE: DETAIL in MODERATE RIP RAP STABILIZATION 3 a a tof 04;*2 r 7rl4 -T. r+ y TM r'- I `' )--• .r i, �. . ` ` i • t ' , + .Y 'ram • . 1.., i i, �'" ,- •, t -,'t 1, tw it 4� - . y ,, w fr y� r._ k r'y`t >` -xi. irt .fir ' ' �:�. �.. 1 , ' f Lt .."`"* . -r.► .' -.A., '"fit' _ . 4 = �. , _.. J., , • tr:: ice ` '-+ �� ? ..f ;: 1.4 y: . i +. r 01164 ) a ( fi\ /', tom. r :` I7111111.- - .? ,.‘ #'; _ a .!6'N"°Y F. ':y,a`"�.yiC' � p R r"a- .gar. .,; r". -drgr .47.401*..• r` let r, <� • r• "t ' •*.„, j# Zf �c ^ - 4 $ 4 / ` . . _ . r OM. !1.j..iJr 3 E +v r "tit , ' ' i . !r 4 1 - f s ryi. ;t * y ,1.'. • r.,..lit, . • - ic iiito Jiro , . , v,i_ 4- r!! - • , !�'• Y rr{_ .7..,}' - "f'✓ "' „reb* .fir .. R tam 1 �, ...-.. % r i. _ ,may. -rr. ••'"� .a' • � 4A' aA.i • t _ y bed.: • YTT Jr .i',,,e ' P 1 " ,4. +i A, •a''�, 4;4 -•? IW►. ....t.',...,, r e jr,joep..s. ,r., —..._._,....4_, ,...,,,._. ,,,. .. . _„. P - q:. :lir .. • 1,,,- __...g,.•... ..r-,.4»...,6din. - . sa - - . ti •� IL qr• �• - Kl .. - tli x�y`} A • ` vY4:,a-rI i ' ti y 9QL-f x itir �r fr 00,, ( ,y k 4 -es � • 4F t • � : t:, - ...4&,... i. • O': , diiisew n *R '- AL , f r 1 �i TTT "}.""AAA ,` �,• �• • ' N N. 1, , •/ /, I". ,• `Is.. • 3 .*' F .:4- ,,,. .. . • ...-,„;_,P. - ior, ,, • ,,. .1. ..,•, .....4._,__'-. 4 • i p r} 1 ...y,1 '"1 :- '•• T .. 00•1d ',y t s f Y. {{ :` / ti s _ t 'dF �:.w''.F ��J'. �.. .t- • -, .' • .Rr.°i4 „K. `4 "L.iF• _w`r..iW` ...i-:::::4%.-0*„.:.:1:21.7- i .. r• ,zr. � yy y _ .• � k. • . ti . • • s, - _ e4-7 ��RR,,,: eC 0x A s� tea. ,♦? e sv a P - v. 400:- : 1.:., ..:111:ay....... " ? . i i'^ a+" ac % F y. am 'r4 r � ' "" • -M, * •' '.y ! "� - T i R . .I �n • !r dF ( ''its' - r' '1_ "t. . ' . • '1' .,-" ;i' Its.m. 2 • " , t/ . , ' :' '„ jr ., 's: k•4 . a. b ate. . .-T. 9 a r r �y e� V .. �i - •� - y{. r _,}'.M"r. tx y �f `"` i, � ' \ y 4.. , , ,.. ., , . 0 . .. , , r_ ....• , _ . 1 • , i . . . ......s. ._ . ..... . , ,., , .. ,...).„.. ,,• o ,,, , •o„, o.s...... , ,,, . . .._ „ .,,,,,,„ . . ..3,....,. _ , ,„ . . ,,..„ . . ... • .... ...„.• ....... _ . . - \Nio:i „ „iw,. ..Ati.,,...„..... ,,.....;.... .,.,.. .,..,.. . . A.-:-.-aoc. , . _ , .. • .....,..i e 0 , ..,,. ... ir ,*,.. ,,i.• 44-411* - . -40, • „:400,, -....:- ....... mow[ < \r- '. � , • 4 • Karen Baldwin From: laserfiche@ncdenr.gov Sent: Wednesday, February 02, 2022 9:33 AM To: Karen Baldwin Subject: Pre-Filing Meeting Request Acknowledgement- High Rock Reservoir Attachments: DWR Pre-Filing Meeting Request Form.pdf [This email originated OUTSIDE of Eagle Creek. Exercise caution. DO NOT open attachments or click links from unknown senders or unexpected email.] The North Carolina Division of Water Resources has received the Pre-Filing Meeting Request Form for High Rock Reservoir that you submitted on 2/2/2022. Attached is a copy of your request. All certification requests (applications) must include documentation that a pre-filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. The Division can not accept an application for your project earlier than 30 days from this pre-filing meeting request. Applications that do not meet this 30-day requirement will be returned. Please save this email/attachment; it must be submitted with your application to document that this requirement has been met. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. 1 DWR Pre-Filing Meeting Request Form NORTH CAROLINA FnvlrwowudQuota, Contact Name* Karen Baldwin Agent for John Chyriwski Contact Email Address* karen.baldwin@eaglecreekre.com Project Owner* Eagle Creek Renewable Energy Project Name* High Rock Reservoir Project County* Rowan Owner Address:* Street Address 1148 Riverwood Drive Address Line 2 City State/Province/Region Salisbury North Carolina Postal/Zip Code Country 28146 United States Is this a transportation project?* Yes v No Type(s)of approval sought from the DWR: 401 Water Quality Certification- 401 Water Quality Certification- Regular Express Individual Permit Modification Shoreline Stabilization Does this project have an existing project ID#?* Yes No Do you know the name of the staff member you would like to request a meeting with? NA Please give a brief project description below and include location information.* Standard Shoreline Stabilization in accordance with Cube Yadkin's Shoreline Management Plan By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your projects thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an application. Signature* Submittal Date 2/2/2022 ' 2/2/22,9:33 AM Submission Completed 32 ?y�l f, e_ —;ling Meeting Request Form =.„;:• NCR I N CARO_INA Environmental Quality Contact Name* Karen Baldwin Agent for John Chyriwski Contact Email Address* karen.baldwin@eaglecreekre.com Project Owner* Eagle Creek Renewable Energy Project Name* High Rock Reservoir Project County* Rowan Owner Address:* Street Address 1148 Riverwood Drive Address Line 2 City State I Province/Region Salisbury North Carolina Postal/Zip Code Country 28146 United States Is this a transportation project?* Yes No Type(s)of approval sought from the DWR: 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Does this project have an existing project ID#?* Yes No Do you know the name of the staff member you would like to request a meeting with? NA Please give a brief project description below and include location information.* Standard Shoreline Stabilization in accordance with Cube Yadkin's Shoreline Management Plan By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. https://edocs.deq.nc.gov/Forms/Form/Submit 1/2 2/2/22,9:33 AM Submission Completed • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an application. Signature* te' te o- Submittal Date 2/2/2022 https://edocs.deq.nc.gov/Forms/Form/Submit 2/2 2/2/22,9:45 AM Tamarac Marina-Google Maps Go:.:gle Maps Tamarac Marina 5'P Tamarac M a Lakeview Family Restaurant ,roe ceenton Rd North Carolina Wildlife "r04n,3 , Boat Access Ramp k4/2 erg 4)p, St Matthews Qri Lutheran Church ng�e,c 2142 Pop_ Gog1e,, 2140 Map data©2022 500 ft https://www.google.com/maps/place/Tamarac+Marina/@35.6066857,-80.2999311,16z/data=!4m5!3m4!1 s0x885388cd17bf1 c1 d:0x1 b22179f1 c9c40!8m... 1/1