Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20220017 Ver 1_More Info Received_20220204
1 Anderson, Mitchell L From:Charlie Washburn <charlie@marineconstructionllc.com> Sent:Friday, February 4, 2022 2:20 PM To:Anderson, Mitchell L Subject:[External] Heffron Site Plan Attachments:IMG_0005.jpg CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Mitchell, Here attached is the site plan/ overview drawing for the Heffron Project. If you have any questions please let me know. Thank you, Charlie Washburn ‐‐ Thank You, Charlie Washburn Marine Construction LLC 1173 Shiloh Church Rd Hickory, NC 28601 Cell: (828) 404-2008 Office: (828) 495-3040 12:42 PM Fri Feb 4 9?n54%• ). Riprap/ Class B Stone only placed along 70' of the shoreline. The riprap will be 4'x70'. The sqft disturbance will be 140' below NWL/ Full Pond 111( and 140' below NWL/ Full Pond. dif IV ,E L;ROGERS CRYSTAL H Zone 1 (30')- No trees removed. Construction corridor is 8'x70' (560 sqft total). Zone 2 (20')- No trees removed. Construction corri • or 160 total soft EFFRON BRIAN R; REYSHOCK TAMMY S ROGERS GEORGE L JONES WILM B;JONES ROGER A Construction corridor doesn't require the remove of any trees. The pre -construction topography will be left un-disturbed. Go gle ©2022 Google