Loading...
HomeMy WebLinkAbout20220017 Ver 1_More Info Received_202202041 Anderson, Mitchell L From:Charlie Washburn <charlie@marineconstructionllc.com> Sent:Friday, February 4, 2022 2:20 PM To:Anderson, Mitchell L Subject:[External] Heffron Site Plan Attachments:IMG_0005.jpg CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to  Report Spam.    Mitchell,   Here attached is the site plan/ overview drawing for the Heffron Project. If you have any questions please let me know.    Thank you,  Charlie Washburn   ‐‐   Thank You,  Charlie Washburn    Marine Construction LLC  1173 Shiloh Church Rd   Hickory, NC 28601  Cell: (828) 404-2008  Office: (828) 495-3040  12:42 PM Fri Feb 4 9?n54%• ). Riprap/ Class B Stone only placed along 70' of the shoreline. The riprap will be 4'x70'. The sqft disturbance will be 140' below NWL/ Full Pond 111( and 140' below NWL/ Full Pond. dif IV ,E L;ROGERS CRYSTAL H Zone 1 (30')- No trees removed. Construction corridor is 8'x70' (560 sqft total). Zone 2 (20')- No trees removed. Construction corri • or 160 total soft EFFRON BRIAN R; REYSHOCK TAMMY S ROGERS GEORGE L JONES WILM B;JONES ROGER A Construction corridor doesn't require the remove of any trees. The pre -construction topography will be left un-disturbed. Go gle ©2022 Google