Loading...
HomeMy WebLinkAbout20220172 Ver 1_Shoreline Stabilization_20220201 02 6 - c9 a 72._ h,a STAT E ✓J��?'l ROY COOPER al s -, D% frill Governor lob"» 2 k MICHAEL S.REGAN r ,_,,,,p,, a Secretary 4.rg`p+u+"'0°. S.DANIEL SMITH NORTH CAROLINA State of North Carolina Director Environmental Quality Department of Environment Quality Division of Water Resources 15A NCAC 02H.0500—Water Quality Certification,Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application(including attachments)and the application fee should be sent to: If sending via US Postal Service If sending via delivery service(UPS, FedEx, etc.) Paul Wojoski Paul Wojoski DWR—401& Buffer Permitting Branch DWR—401& Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre-Filing Meeting Request Form as we will not be able to accept your application without this important first step.The Pre-Filing Meeting Request Form is used in accordance with 40 C.F.R.Section 121.4(a)which states"At least 30 days prior to submitting a certification request,the project proponent shall request a pre-filing meeting with the certifying agency." In accordance with 40 C.F.R.Section 121.5(b)(7), and(c)(5), all certification requests must include documentation that a pre-filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentation of Pre-Filing Meeting Request to this application. Date of Pre-filing Meeting Request: / / (required) DWR ID# Version (if applicable) -,(_, ' vIv 4 L a A. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Reber-'-n MQr,•kriejo5 Mailing Address: 1O1- We5fi c(fi' 5fru4- un11- 656 Lkarlo fte , NG a-8 lop- Telephone Number: 70N -S30- 5 70 8 Fax Number: E-mail Address: Y Maz.ctric5os ®3"a;'I ( urn V+ D E�^- North Carolina Department of Environmental Quality I Division of Water Resources ([[[�,�//���� 512 North Salisbury Street 11617 Mail Service Center ! Raleigh,North Carolina 27699-1617 D.p.m:.M oli';,, ontel OunN� /`° 919.707.9000 2. Agent/Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/dots/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: vr.t lin ycar1- Company Affiliation: L-c ke Norma,., D-cd1;r5 Pcrn�H- ng Mailing Address: 1%1414 (Ses ( V'c u.tr one. sti-ck , Pt 25 Loci Telephone Number: 704-401--3240 Fax Number: E-mail Address: Vaugkh 19 91- f��rtick;l . B. Project Information f 15A NCAC 02H .0502(a)&(b)] 1. Attach a vicinity map(i.e.street map)clearly showing the location of the property with respect to local landmarks such as towns,rivers,and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls,docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/Normal Water Level elevations,and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/buffer proposed to be stabilized. (Include a scale of some sort-a yard stick,shovel handle,etc.) 4. Location of the property(where work is to be conducted) County: C Nearest Town: [jeviver Lake/river/ocean adjacent to property: LaKc. W orr,4/ Property size(acres): I.Aq Subdivision name or site address(include phase/lot number): 76'(( 131ac4 welder (d. Dentrer, NC 26037 Directions to site-please include road names and numbers, landmarks,etc.: Pro*, µsr 150 'Turn yr h c''44bSI,nf b- ut5e- -k h.rn riyh-r woaa i 1d-cptideAre L.n,� f-kc., trhr,tku(e ego eittu(wd Latitude(in decimal degrees) 35,55 loci Longitude(decimal degrees) ' 10.qR 6 9'7 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped,etc.): uhct velope�l 6. Describe proposed work(include discussion as to how hardening of shoreline has been avoided,or why it is necessary): Dreagzva5 Glrvund ex.W clod( FORM:SSGP 09-2020 Page 2 of 5 7. Will work be conducted from land? n From water? Wi 8. Total amount of impacts below the normal pool lake level/Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls,etc.) in square feet: 2544- 4o depi+, anund dock welt) a 100r4- 250 Chwpel going out Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level/Normal Water Level and 50 feet land-ward Permanent impacts(including back fill, excavation, rip rap, retaining walls,etc.) in square feet: Temporary impacts(temporary clearing,construction corridor)in square feet: 10. Please describe the vegetation above the normal pool lake level/Normal Water Level and 50 feet landward to be impacted (number of trees,for instance): Voocled 11. Signature By signing below, I, as the project proponent,certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time 7 l/j /.<<> � Z j wri r/A ent's Signature' [15A NCAC 02H .0502(f)] Date 'Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls,docks,etc. e. Location of any excavation or dredging below the Full Pond/Normal Water Level elevation FORM:SSGP 09-2020 Page 3 of 5 tr uo E {- 'I Full Pond/ MIN i MN Mill — Shoreline - - - - - - - Lake - - - `I (A1(t Fo1IPontt1 N6rnrai VltaterLevvI} ( ` Normal Water Level Plan View 1N SIN 10 S, Full Pond/ Normal Water Level -thoreirne 2 h.x 150 h. additional clearing • if necessary E Plan View Lake (A[ Full Pond/ No mal Wales Level) Existing Dock /30hx 7k ♦ A�' �� Riprap n 03 1 AMPL 3 hx 150h Below full pond/ NW'. 4hx150h abc, a full pond/ N\0'L E FORM: SSGP 09-2020 Page 4 of 5 ', Lake ; a; (A�Full Pond/Normal Water Level) i � c _ ' C f._ �T 13 C Side ViewCL D LL 3 ft below full pond water level 4 ft above full pond water level 2 ft.additional clearing I I I 'if necessary •• Existing bank ',�. ',,► 10 ft.bank height eV' O�ea OQ Side Vi FORM:SSGP 09-2020 Page 5 of 5 CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: Ro o'(A-0 Ma is(P egos p feokSi nq County: C a4-a,4 a tt JJ Owner J.0SE g: t' 221 E LTvS Print ture Contractor/agent: VawJlin 1?-4 y Csr I— - 4wj.� Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule.Site specific work should be provided in the application. [15A NCAC 02H.0506 and 15A NCAC 02B.0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer(within 30 ft of the full pond elevation), unless approved.Exception,those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed.[15A NCAC 02B.0243(6)] Benching and grading in the buffer is not allowed.Excessive disturbance of ground cover.[15A NCAC 02B.0243 (6)] Beaches,impervious patios,impervious walkways,etc.are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks.[15A NCAC 02B.0243(4)and(6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described.The approved access corridor shall be restored.Staging,spoil,construction material must be outside the buffer. [15A NCAC 02H.0502 and 15A NCAC 02B.0243(4),(6),(8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non-erosive velocities to the lake.[15A NCAC 02B.0243(5),(6)] Acknowledgement of Notification I, Z. M A121 ,hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer,not specifically stated in the application and approved by the Division of Water Resources(DWR),is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plan(s)and specification(s),and other supporting materials. Signature(owner): Date: j I /l ei/7v 2 Duke Enerev Excavation Permit Application Form FOR DUKE ENERGI USE ONLY Duke File No. Application Fee S Security Deposit S Check# Date Recv'd Initials Date of Duke Energy Lake Services,applicant and/or contractor on-site inspections Date .1f r(21 Initials Lit7) Date Final Protection/Avoidance Area Markings Field-Verified Initials Approved to Start Work By*: Date_ (Print) (Sign) Date Completion Required- Date of Any Approved Extension , initials Date Passed Closeout Inspection* Initials Any Stop Work Orders or SM(i Violations*?(check one) ❑Yes ONo (if Yes,explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated Initials *Forward copy of approved application(all pages,plus any attachments that Duke Energy changed)back to applicant with Approval Letter and highlight any changes.File copies of Approval and Close-out Checklists and any Stop Work Orders with application. Part t. Applicant Information(Please Print) Name Ptoberla /4azaffe3o5 Telephone 10'4 -S sd ' S706 Email address: 3Et.Maya r.^e.Sos D9r+et:,Con Lake Address Mailing Address/if different) 76 k6 /3lae.4( .older rat, q0 - West `{r'' Sircee4- Leo-656 Denver , Nc no3 1 U•ro(lo+F,, plc -c3O�- Contractor Company LQKL Ntreewa Preol3;13 Contractor Contact Person lictqu( r.✓lyersrV Telephone 161-t.o2 -) 560 Contractor Email Address: VD u3k t I Q92..@yrt itt I.Con LAKE LOT INFORMATION Lake NorMar County Ci ii bq City Newer State MC- Tax Map No. Subdivision Lot/Section No. 2. Lot Size t•4q Acres Duke Energy Page 4 of 13 RECEIVED re% 11,12"y Excavation Program FFH DEQ-WATER RESOURCES 401 &BUFFER PERMITTING Duke Enerev Excavation Permit Application Form Are there any Co-Applicants*?(check one) ❑Yes IKAo (If Yes, include names. street' addresses or lot numbers.pier numbers,phone numbers. and email addresses in Part V— Additional Information) * Co-Applicants exist when the proposed work is being done under a single application,will be performed by a single contractor as one continuous project.and is done to benefit multiple owners/lease holders of Project-front properties within a single development. There can be no more than 4 co-applicants in addition to the lead applicant on any application. Do not continue the application until an on-site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE:Initialling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. i Date of on-site inspection i Initials(Duke Energy) ( ci> (applicant/contractor) VC Duke Energy Page 5 of 1 3 re v 10'1 2019 Excavation Program Duke Energy Excavation Permit Application Form Part II. Description of Project A. Basic Information 1. Type of excavation:(check one) l'New excavation 0 Maintenance excavation 2. Purpose of excavation:(check one) l°1Boat Access Channel ❑Water Intake Channel 0 Wastewater Discharge Channel ❑Other(specify'): I 3. Lake user category:(check one) Private ❑Residential Marina ❑Commercial Marina ❑Public ❑Other(specify): 4. Max.Excavation Area Dimensions(ft): Length 110 Width 25 Depth f 2•zs (Note:include additional area dimensions if necessary so response to#5 below equals max.area dimensions in#4) 5. Volume of Excavated Material(TOTAL for the project): 90417 Cubic yards 6. Type of material removed(applicant determines by field sample ifpractical): 0 WI, 0,4 n re4:c th; 7. Excavation Site area: 0,07 5 Acre(s) Disposal Site area: 0.075 Acrc (s) 8. Total Disturbed Area(including equipment staging area): 0,15 Acre(s) 9. Does the project meet the requirements of the applicable General Pennit?(check one) L6Yes ONo 10. Do you claim title to the disposal area?(check one) ©Yes ONo 1 1. Do you claim title to the equipment staging area?(check one) Yes ONo 12. Are there any water-treatm9nt facilities within 50 feet of the proposed excavation area? (check one) ❑Yes 11Mo (If Yes,sped/v): 13. How will the excavated material be entrapped and the erosion controlled?(e.g.see attached erosion control plan and disposal area design): Maherwl "411 be_ GJtcay.+td ,^G%, et 105 rePrA, e,cLgvlda/ 4 bony.. Duke Energy Page 6 of 13 rev 11/22/21 Excavation Program Duke Enemy Excavation Permit Application Form 14. Type(s)of excavation equipment to be used: ( .rgey t ¶e„dei 4Soe15, 1 omi reach a-xeavafar 15. Will waters or wetlands be y.rossed in transporting equipment to or from the site? (check one) ❑Yes No (If yes,explain) 16.Will return water re-enter the reservoir?(Check one) ❑Yes 19No ON/A (If Yes,specify point(s)of re-entry and show on Excavation Area Drawing) 17. Is there an existing facility(e.g.pier)that access is being maintained to by conducting the excavation? MYes ❑No (If Yes,provide the existing permit number. If No,include a scaled drawing of the proposed facility). Permit# (1317 18. Total planned duration of the work(Include first equipment mobilization,excavation through final miti ation measures complete): START d h y / 2O - FINISH Ja II / 3-4 -2- (Month) (Year) (Month) (Year) Duke Energy Page 7 of 13 rev 11/22/21 Excavation Program Duke Enerev Excavation Permit Application Form Part II.(Continued) B. Protection/Avoidance Area Description Complete the following table including all land areas within and immediately adjoining the disturbed area: Protection/Avoidance Areas Auorox Identification Method(*) Avoid(A)or Mitigate(MI (check all that apply) Acre Field ID Work Area Dwe.ID_ u a. Marshland,swamp,ponds,beneficial aquatic vegetation or other potential wetlands IV ft (circle all that apply) b. Buffer Zones(specify width&source of requirement) NA c. Environmental Areas as identified by tiA Duke Energy d. Natural Areas as identified by Duke Energy NA e. Historic properties(specify) AA f'1 f. Rare or threatened species(specify) N14 g. Buried gas,water,sewer, -r A communications or electric lines(circle) Iv Duke Energy Page 8 of 13 rev I I:22n021 Excavation Program Duke EnerEv Excavation Permit Application Form Protection/Avoidance Areas Approx Identification Method(*i Avoid(A)or Mitieate(MI (check all that apply) Acre Field ID Work Area Dwe.ID h. Impact Minimization Zones as identified by Duke Energy i. Other areas requiring specific avoidance,protection or mitigation(specify) * For`Field ID"column,specify entity or person that performed the identification and how it was physically marked(e.g.Duke Energy(John Doe)/Pink and purple-dotted tape,Corps of Eng.(John Smith)/yellow flagging). For"Work Area Dwg ID"column, show the symbol that is used on the drawings to identify the protection/avoidance area. ** List and attach mitigation plans Duke Energy Page 9 of 13 rev 11/22/2021 Excavation Program Duke Energy Excavation Permit Application Form C. Applicant's Signatures Comments: • Applicant Name(print) A s c-- I L py 1 A Lsa%1-1 L-G.c S Applicant Signature* t Date I Z/cj /_1 c L Co-Applicant Name(print) Co-Applicant Signature* Date Co-Applicant Name(print) Co-Applicant Signature* Date Co-Applicant Name(print) Co-Applicant Signature* Date Co-Applicant Name(print) Co-Applicant Signature* Date *Per my signature,the information provided in this application is correct to the best of my knowledge. Duke Energy Page 10 of 13 rev 11/22/2021 Excavation Program 01010 OF NOHIH CAHOUNA NOS' TYOR�AwR MINOR SUBDIVISION I. AMER.A IM9_T15__OCR TINT DOS YAP WAS DRAWN B/YE A '1R°PEMY ENV BE SMELT TO RECORDED DR UMW- r ERON AN ACTUAL SURVEr MADE UNDER Nr SUPETMSIOS.DEED l\ • UMW- CORDED RIGHTS 0 WAY OR EASEMENTS N01 Oe5[Nr20. FOR -- DESCRIPTOR RECORDED W BODR ui8 L.p /9/S• PROP0ATY IS SS OTHERS O.0010 TEAR R000 ElE- D°"`""54° NOTED). H. MERCER DA VI S •ND NOS OR°SOS 07TO 0 rs 55 01 TO Sf NOTED). 1 Nom / .PAGE=.BO._G .PAGE =. �: 2000'CO'M PA.. (MESS mKRwSE NOTED). vn TNT THE RATIO OF PRECISION AS ELCNATED BY WTrUDCS ARO •AIL IRIS IWRT COIBECT TO COLA.NOM DEPN0UB 6 I: O.(5 '(THAT THE Boumoms NOT Sumer m \ APPRDNNO rl<s PUT CATAWBA 00710 006 NOT R MOUNTAIN CREEK TWSP CATAWBA COUNTY,N.C. ME SNOW AS Rim N LACES xOTTEo TROY wrOlimnoN FoLWO N or Non •0A\RNIIEE TIE SIrtMRITY Or A SEPTIC TARN M 'NE ' a SCALE I•••40' JULY 26.2006 I . RD FOR ANY LOT ypr"' IN DOOM_ _ .PACE__ ):Dm THIS NM rs RONNIE DEDMON SURVEYORS.P.A. PREPARED n ACCORDANCE WITH G.S. JQ AS HANDED 0 1,Ae y E \ \�T10E ARCS ws TMSAImoERI EASEMENT A T ALL LOT uN6 RONNIE DEDMON,PLS 91222 IN NY NND 4O SGE TES TNr_Za 00 a ',r5 _TL�E� e5-rel ME LOCATED w THE 6-N CPoIMK AREA WATERSHED. CHUCK PoOVEY PLS 9762 �e e a 24133 ROBERT DEMON.PLS //9899 PE. •TFOS PROPERTY 6 CURRENTLY ICAO R-0 RESIOENTIN_ PH2LIP HARRIS, PLS /s IBA •I FURTHER CERIRY THAT TIE SNRVEY CREMES A 0BONISON =�4' TOTAL ACREAGE Or LARD FEWC OMOED.3.)JB AC.H- 4897 NC HIGHWAY/I6 NORTH .0 MT.THE AREA OP A COURID OR NUncrr1DV THAT ;•6. \ 'i ANMUH a P.O. BOX 494.DENVER,N.C. 28037 rnOrE.IBAR.uln* pGAAATEs PARCELS Of UAW, �'� .•.: —_\ (704)483-4908 CUT AA'(:1.4 \ awa A McOx or P Put ma Et Prot ,aA dP i'--�'Y _ REn,,,,,,RNIn-llu,aRRI PwE is, •T` niIERC(WRE�CR DAMS MAIER RIrORWrIEITA: Au SNP Q l \\ 12120 HENDERSON HILL RD Ar t A(A I -=,; o H.®. 1 5� CONTACT:PCRVPS ANDU501 704-572-7503 i( REREBT CERTIFY THAT,AY PIE ARE)THE OWNER 0r TIC ,•11. - - 'O,•PA \q \ THE SIIBMA REGULATOR JWISOCMIN OF CAIAW0E COUDESCRIBED HEREON.MR.PROPERTY IS NTT. AO, THAT I(WE)HEREBY FREELY ADOPT THIS PEN Or SUBDN60N MO DEDICA.'i{••. • - :•'�.l W'It. \4 STREETS,NJ.DS.WALKS,PARKS.OPEN SP TO PUBUC USE ALL AREAS SHORN ACE. EASEMENTS. NTS PLAT AS WYWY DM 0 TIW MA a M U.. 03017 w1NI - A \ EXCEPT TIOSC SPECIFCAALY WOICAIW AS PERMIT,AND TWAT I WW<la IR�T M \ I (EE)WILL NNNTALN ALL SUCH AREAS UNTIL THE OTHER 0' C /J_,.1_ ' ''���''�, DEOGTON IS ACCEPTED BY THE APPROPRIATE PUBLIC AUTHORITY. t*D4 J,y~<yl,e3 iv.h. .• - .\ `? \ ALL PROPERTY SHOWN ON THIS PET AS DEDICATED FOR A PUftJC �i N.wWA" / SE SHALL BE DEEMED TO BE OSOCATED FOR Mr OTHER PUBLIC co�WN USE AUTHORZED BY LAW WEN SUCH OTHER USE IS APPRO•ED BY STATECON:Or CATA GROIMA --- .\ 7�p d f b 6 1-� 'Y ,�.�t, - ..C'OjSMY OF C,ATAWBA (jpp�� \ O / D(IE u EAR/EIA44 11701 RErEW 0110 IN — - ' rooGN MO Ko.g.o.s. C_^= W t 1.754 ACRES +- 54 ir. B SAEIBPI BO2 I/A t..-... __ \ a H N.N IA �\ DATE OWNER RN.FM. I'.\y - +e '`A.6 l MrElt's�6n2L.oy� __ 'S f\ N°R0,--.0.... ARIA COUNTY 17. 1- !'\ \ I,A NUNN POSJEi pg TIE cagTY STATE MORCSAAD 4)11/. \- -_L. �o id '\• 41) '•,\ CERTIFY NEE TARO ACNNOFAm00Eo �CUTION Of TIC r0FGOMG \ \ea (,�r ` \ wRUTAFNr.aRPTNEss AquE�AND ARO orEr OR SEAL `3 ; ___ - _. _ W /I' �'p ` \ wcaAnsaN DOMES 6_2•3•_keit0 ;''MOAN). p�r�de /" k : # _ `N� /� g '� ! ee1 NC' -No...,pue0c,?y ‘G. P G�f LI 1,, \ \ � LA g O \ I Corm BRRXp DINRrWR \ `b P,pJy4.i5 © \ 1 .Z \ $/E ; LI s iS 111 r Al.,- . '�i a. 1.985 ACRES +- ° \ II`� S NSA' )J] `e \ • 1Z'I \ t! S�1}Q'' pY"E Il a4.,\ u 0 o+ qq \ r dr • '. • I; y SS 1 'x] `F\ •i4"0 !\\ I f 5 BBAB'SJ'EA Y $ �e i , I. 67.2T c 10 S t 7e \ \ "T. "aar�y { . 1 A ArN{ P 1 Gy ,D I-W 1�' W w;9'',t E \ 0 R W _ 32AW Pe as J \\\ 70 £ \ I E N \ lo m wm . I M EA1T W .1' •r I.0.:9' VMS 1 CP"• n ITCj 11:W .7p' R Jx `� \��pTA,;;O- MAB r 1 EF *Woo' J.41 u< N L23 ToByIApA• u.r \ _ __ \ 127 S T E 7. - - -- _— _ \ BLACKWELDER RD 60. R/W • 60 0 40 eo 120 \ GRAPHIC SCALE - FEET \ rH{guAN'L.OW6/P.HARR(5 pNBuo0+.CRD FILED COW IN on Asp Q:f,2016 at 01 A900 pm erase e Tag tows (MC) rat#13178 DOWM HICIIsIrPeiceR, arrerofoeeae Mt03365 erg 06484649 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $300.00 Parcel Identifier No. Verified by County on the_day of ,20_ By: .{ Mail/Box to: 'l Sw ss-bent," Thin imtrumeet was prepared by: The Jonas Law Finn,PLLC,2279 North Highway 16,Denver,NC 28037 Brief description for the Index: LOT Tract 2, Minor S/div H.Mercer Davis(64/54) THIS DEED made this 3rd day of August ,2Ci 6 by and between GRANTOR GRANTEE James M Hirst,Jr.and wife, Jose Roberto Mazariegos and spouse, Kim W.Hirst Edgar Rolando Castro 160 Whitney Blvd,Unit 66 Lake Lure,NC 28746 4564 Sawgrass Ct Denver,NC 28037 Enter in appropriate block for each Grantor and Grantee: name,mailing address,and,if appropriate,character of entity,e.g. corporation or partnership. The designation Grantor and Grantee as used herein shall include said pasties,their heirs,slace:mo n,and assigns,and shall include singular, plural,masculine,feminine or neuter as required by context. WITNESSETR,that theGraneor,fora valuable consideration paid by the Grantee,the receipt of which is hereby acknowledged,has and by these presents does grant,bargain,sell and convey unto the Grantee in fee simple,all that certain lot,parcel of land or condominium unit situated in the City of Mountain Creek Township, Catawba County, North Carolina and more particularly described as follows: BEING all and the full contents fo Tract#2 containing 1.985 acres as shown on plat and survey entitled"Minor Subdivision for H. Mayer Davis"dated July 26,2006,prepared by Ronnie Dedmon Surveyors and recorded in Plat Book 64 at Page 54,Catawba County Registry. The property hereinabove described was acquired by Grantor by instrument recorded in Book 3219 page 1750 , All or a portion of the property herein conveyed_includes or 21 does not include die primary residence of a Grantor. A map showing the above described property is recorded in Plat Book 64 page 54 . Pepe ld2 NC Ear AUOCi*ImFOIDtNO,301976.Revised 01977,2002.2013 This standard tom bes boo approved by. Primed by Aprsmeec wit she NC Ear AasocWioa—1981 North Carob=Bar Auocia6m—NC Bar Form No.3 TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appuitenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Gnome,that Grantor is seized of the premises in fee simple,has the right to convey the same in fee simple,that title is marketable and flee and dear of all encumbrances,and that Grantor will warrant end defend the title against the lawful claims of all persons whomsoever,other than the following exceptions: VALID AND ENFORCEABLE EASEMENTS,RESTRICTIONS,RESERVATIONS,RIGHTS OF WAY AND OTHER CONDITIONS THAT MAY APPEAR IN THE RECORD CHAIN OF TITLE. �� IN WITNESS WHEREOF,the Grantor has duly executed the foregoing as of the day and year first above written. (SEAL) (Entity Name) r/fype Name y J By: . %{ ,,ff�__ --`` 1.i. J-f111� (SEALI Print/Type Name&Title: Name: Kim W Furst By: (SEAL) Prut/Type Name&Title: Print/Type Name: By: (SEAL) Print/lype Name&Title: Print/Type Name: State of kBlfth('tufauna -County or City of I,the undersigned Notary Public of the County or to of and State aforesaid,certify that James M Hint.Jr.and wife,Kim W.Hirst paeon ily appeared before methb day and admow thedue i ttoan foregoing i for the.., , . T-..^ • Witness my hand and Notarial stamp or seal this 5'^day of Iyter , ll My Commission Expires: 9 ,r;:1,, ' 1 fib itmIn r I ''.,oa � Public (Affix Seal) BUG f Notety'sPrimedor •-• State of -County or Ci 11`4• tr I,the undersigned Notary Public of the County or City of and State aforesaid,certify that persooally appeared before me this day and acknowledged the due execution of the foregoing imtnmwnt for the purposes therein expressed. Witness my hand and Notarial stamp or seal this_day of 20. My Commission Expires: Notary Public (Affix Seal) Notary's Printed or Typed Name State of -County or City of I,the undersigned Notary Public of the County or City of and State aforesaid,certify that personally came before me this day and acknowledged that _he is the of a North Carolina or corporation/limited liability company/general parmetship/limited partnership(strike through the inapplicable),and that by authority duly given and as the act of such entity,__he signed the foregoing instrument in its name on its behalf as its act and deed. Witness my hand and Notarial stamp or seal,this_day of ,20 . My Commission Expires: Notary Public (Affix Seal) Notary's Printed or Typed Name Page 2 of 2 NC bar Assodadoa Liam No.3 01976.Remhed 01977,2002,2013 Thu studied form has teen approved by: Printed by Ayee®t with the NC Bye Association-1981 Nash Carolina Bar Aaaariattan-NC Bar Rum No.3 12/12/21,1:08 PM 7646 Blackwelder Rd-Google Maps Go gle Maps 7646 Blackwelder Rd V Go gle o° Map data©2021 100 ft i J 7646 Blackwelder Rd 00000 Directions Save Nearby Send to your Share phone Lao- 35. S51ob O 7646 Blackwelder Rd, Denver, NC 28037 l,0.15 -$0 9q G$7 H223+R7 Denver, North Carolina https://www.google.com/maps/place/7646+Blackwelder+Rd,+Denver,+NC+28037/@35.5518808,-80.9973811,18z/data=14m513m411 s0x8856b2998ea... 1/1 I ', f r r ,,4? ,, ' ill I 4 't .'4'1 *-4,',0s, •.' 1 lc a� V r le j ' l6'f` li,ji (t4 � `1 %,�.. • 1 ,, ii, ! " y y<ii+11 i. 11}I N`'''� "' " h !i h �t�ik,fatN r ti/f � jir `t vF'{ i h 1 „Y ,.L 9'�1y{�. t,t +I,ur�Y�1, , ,, ;, 7,6, h�u/! [ /�`A„tj -,f}(.. A AlTt3t,k- `, R,t .,. ifi1 1y� 4 "�. }t �3 ' Sr i` '`, r iM',,, Y -art ivv ,Ir, ll,ladl T. D , 11 ,.„ F F-, �Y b ^�' ,,, 1 (,. S Q-rr'. 4 1Y1 4t 1 . y F y1, '� "�� • y� A t ,t4A �,�d�7�1"!,,,..1. ) 'ii: t� 1 � /',ire+ r .-1 , i A,;,-) t'''41[,�;'�i'`'i%4 ,j rv.l illlT?'"7,i 1" , t J�v ' 1,� tY l' "1 4� ll n t '.>• A Is . 4411,. 3y, �"�a i ,y� o�7 y� 4 !r ,1.`t hwy �- r•' [Y .•". +1r + ' r 7 IiI"' R7 !It p i J ,� .4 Gti f ' ,,ite 1 �R. 4 fitx �,7+T..o 1,.. I `` + 4s a , Itil tip r r ' hi.�t ++4' 7. firN P + 1 ik'l gbh ,''y4.2 %Ut * r ��wr, '� Y �w ryi i‘itee 4 • ' t . 7 4' ��,,S [.1 tin 4 . e • .'b'ha d , s K LF f I ir5� i!,(1� 4 f1,4r""it + , I• I I I Ili SS ' .,,,,A.,',y Dl�� �h h � I , A • 3 , d+l• F#S{ rr�}fl'!'F I I t� I I I + 4'I. 17� , ' iu , ; I I Y 1 'v F ; I CH k , t , A yti,'� j� ,�i +�� k -eft r Ya''kr4r � M }%hi"F"r 4� 1a1. / �,Ii i) " V Si x1V�,' 'til �r r '� '1 '1r;.i�'. _ . 91 f"-T n+�C a. I' ICJ , ,I ik;. 3 ♦birr . s� \'1 h 11 I ��'1 y ' 1 ''/' `'b�� + r �. nn+�a S~`'�+'+YrF'` 4 l Au 1,� O .4 �+''��jy�.'t 7 t y Jf ` I ', 5 / ,,i 7y,� ,J76� +Yr O a + i �y ilITi ` :'11 t r r': ^1 , e lli -TOX . 1 , ' , / 1 .ggppA 1 � .Pr`? .4 Excavation Project User's Agreement Letter (Please fill in the blanks.Please Print) Date (1'C'l02-1 TO: Duke Energy c/o Lake Services-EC 12Q 526 S.Church Street Charlotte,NC 28202 RE: Excavation For(Subdivision and Lot#'s or Other Project Name) 74N C 13kat welch/ !d, Denver, !Kt- zpso37 (Lake/County/City) Korean / Cafo.4k / Denver (Applicant's full name) Rober4o Aaz0.rre3o5 hereby agrees to comply with all recommendations, requirements and/or conditions of Duke Energy, General Permit(s) (if applicable)and other federal,state and local agency requirements pertaining to the application to excavate for the purpose of a 5 4- ctCCt55 in addition, I/we have read and agree to comply with Duke Energy's current Shoreline Management Plan(SMP) or other applicable guidelines, much of which is repeated herein,and understand that written authorization must be obtained from Duke Energy prior to beginning any activity within the Federal Energy Regulatory Commission(FERC)project boundary or on Duke Energy property associated with a reservoir, collectively referred to as Project Boundary. The excavation will be completed as described in the approved application and within eighteen(18) months from the date of written approval by Duke Energy,unless specifically noted otherwise in the application or unless Uwe obtain approval for a single,time extension(maximum of one year) in writing from Duke Energy.1/we understand that if the SMP or other applicable guidelines or rules change during any extension period, I/we will be expected to comply with the new requirements to the maximum extent practicable.I/we also recognize that failure to complete the excavation within this build-out period will require the filing of a new application within the then- current SMP or other applicable guidelines and the new application must include any applicable fees and security deposits. I/we attest to be the owner(s)or lease holder(s)of the land immediately adjoining the Project Boundary where the excavation activity is to take place,or if not the owner or lease holder,I/we have included proof of title to the property and written authorization from the owner(s)or lease holder(s)to carry out the proposal within the Project Boundary adjacent to their land. I/we attest to be the owner(s)or lease holder(s)of the land that will be used for equipment staging and disposal of excavated material or if not the owner or lease holder,1/we have included proof of title to the property and written authorization from the owner(s)or lease holder(s)to carry out the work on their land. Duke Enery, Page 1 Re,1'6'2020 • Uwe agree to develop any required mitigation plans and to complete any required mitigation activities at my/our own expense within the specified time frames. Uwe recognize that the excavation work is not considered complete and deposits will not be refunded until the mitigation requirements(if any)have been satisfactorily fulfilled. I/we agree to notify Duke Energy by phone when the excavation is initiated and to ensure that during the excavation period,Uwe will post Duke Energy's approval letter in a clear waterproof bag at the job site and visible from the water's edge. I/we agree to notify Duke Energy in writing when the excavation is completed(including any required mitigation measures)and that the excavation was completed per the approved application,so a close-out inspection can be performed. Uwe recognize security deposits will not be refunded if any violations of the SMP,other applicable guidelines,or this user's agreement occur. I/we understand there will be no change in hydro project operations as a result of the excavation and/or utilization of the excavated area. I/we agree to maintain the work area in a safe condition and to fully indemnify and save Duke Energy harmless from any and all claims,liability,loss or damage that may arise from this excavation project. I/we understand that this user's agreement does not,in any way,constitute the transfer of any rights in real property and that my/our use and enjoyment of FERC project and Duke Energy lands and waters shall not hinder the general public's lawful use and enjoyment of the same. Sincerely, s r' ._-I C Sc l L . M A Z, ;LI c etcS - Applicant's Name(Print) plicant's Signature Co-Applicant's Name(Print) Co-Applicant's Signature Co-Applicant's Name(Print) Co-Applicant's Signature Co-Applicant's Name(Print) Co-Applicant's Signature Co-Applicant's Name(Print) Co-Applicant's Signature Dukc em g, Page 4 Rev:4/6/2020