HomeMy WebLinkAboutNCG080614_DMR_20220103Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCGO80000
Date submitted 1/3/22
CERTIFICATE OF COVERAGE NO. NCG08 0 6 1 4 SAMPLE COLLECTICN YEAR 2021
FACILITY NAME Rex Oil Company SAMPLE PERIOD ❑ lan-June ❑X July -Dec
COUNTY Davidson or ❑ Monthly' (month)
PERSON COLLECTING SAMPLES Ben Robinson RECENMISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY Merltech, Inc. Lab Cert. q 165 JAN 1 N C(l?�, ❑Zero -flow ❑Water Supply ❑SA
Comments on sample collection or analysis: ;♦:KfKqL FILES [X]Other Class C
vvR SECTION PLEASE REMEMBER TO SIGN ON THE REVERSE a
Did this facility perform Vehicle Maintenance Activities using more than S5 gallons of new motor oil per month? _yes Z-no
(if yes, report your analytical results in the table immediately below)
Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable)
❑ No discharge this period'
Outfall
No.
Date
Sample Collected,
mo/dd/yr
00530
00400
00556
Total Suspended
Solids, mg/L
pH,
Standard units
Non -Polar Oil and Grease/TPH EPA
Method 1664 (SGT-HEM), mg/L
New Motor Oil Usage,
Annual average gal/mo
Benchmark
50 or 100 see permit
Within 6.0 — 9.0
15
Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (If applicable)
Outfall
No.
Date
Sample Collected,
mo/dd/yr
00556
00530
00400
Non -Polar Oil and Grease/TPH EPA Method
1664 (SGT-HEM), mg/L
Total Suspended Solids,
mg/L
pH,
Standard units
Permit Limit
-
15
50 or 100 see permit
6.0 — 9.0
SDO-1
12-18-21
<5
15
7.67
For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
SWU-250 last revised April 11, 2013
Page I of2
STORM EVENT CHARACTERISTICS:
Date 12/18/21(first event sampled)
Total Event Precipitation (inches):
Date (list each additional event sampled this reporting period, and rainfall amount)
Total Event Precipitation (inches):
Note: If you report a sample value in excess I the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS: i
• A BENCHMARK EXCEEDANCE TRIGGERS Tif R 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAM5 PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO
REGIONAL OFFICE CONTACT NAME: '
Mail an original and one copy of this DMR including all "No Dischar e" re orts within 30 days of receipt of the lab results for at end of monitorina period in
the case of "No Discharae" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document'and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
that qualified personnel properly gather and evalui to the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that
there are significant penalties for submitting false i formation, including the possibility of fines and imprisonment for knowing violations.
1 /3/22
(Signature of Permittee)
Additional copies of this form may be downlo
(Date)
led at: http://Portal.ncd6,nr.org/web/wq/ws/su/npdessw#tab-4
l
SWU-250
last revised April 11, 2013
Page 2 of 2