Loading...
HomeMy WebLinkAboutNCC205635_NOT Closeout Documents_20220201Person Addre 1. P1 P 2. V1 3. Is 4. Is 5. Vi 6. Is 8. 10. Repo Date cc: Stormwater Inspection Report No th Carolina D artrrent of Environmental Quality id R ources: Syste Bu lding, 225 reek Street, Suite 714, Fayetteville, NC 28301-51 ( 10 433-3300 Curr berland roject: Ani n,.l Urgent Care River basin: Cape Fear nancia ly responsible: DN M Services Realty, L — Project #: CUMBE-202 Steve Th m is, N lanaging Member COC: NCC205365 219 Barnes Street, ilson,NC 27891 20 ject L cation: NC 24, Cross Creek Lures: No ether i nd soil conditio s: cloudy, worb, ib e sc is Initial inspection: ite cur ently under not ce o violation. No he site in compliance w th S P.C.A. an s? Yes If no, check violations below: lation he site n compliance w th NPDES Per t C 010000 Construction Stormwater requirements? -ribe: sedin entation damagi occurred since I is ins ection? No If Yes, where? (check all that apply ;ree of Jamage: itact n de with (name Title: )ectior report: Sent Re rt Date given/sent: FebruaryOl, 2022 -rectiv, action needed: nmend.. rmane it ground cover st ffici nt to restrAin ei osi has been established. No additional self -monitoring or f-insp, ctions are requirt d. P ject is in co i iplianee and released under the SPCA. Termination of verage under the NPDE General Storm te r Pe mit for Construction Activities (NCGO 1) must be lueste( by the permittee via a Notice of inat n (NOT). The NOT is available at: ps:Hed cs.deq.nc.gov/F rms/NCGOI-TerrlI iratio i. Please note that this correspondence must be uploaded part ol completing the OT I Process. d by: Lori Britt Others present: inspec on: January 25 202 e arriving on site: 1: 30 PM Time leaving site: 1:35 )94 1-030 ,35 Yes ?M Yes