HomeMy WebLinkAboutNCC205635_NOT Closeout Documents_20220201Person
Addre
1. P1
P
2. V1
3. Is
4. Is
5. Vi
6. Is
8.
10.
Repo
Date
cc:
Stormwater Inspection Report
No
th Carolina
D
artrrent
of Environmental Quality
id R
ources: Syste
Bu
lding, 225
reek
Street, Suite 714, Fayetteville, NC 28301-51
(
10
433-3300
Curr
berland
roject: Ani
n,.l
Urgent
Care River basin: Cape Fear
nancia
ly responsible: DN
M Services
Realty,
L
—
Project #: CUMBE-202
Steve Th
m
is, N
lanaging Member COC: NCC205365
219
Barnes Street,
ilson,NC
27891
20
ject L
cation: NC 24,
Cross
Creek
Lures:
No
ether i
nd soil conditio
s:
cloudy, worb,
ib
e sc
is Initial inspection:
ite cur
ently under not
ce o
violation.
No
he site
in compliance w
th S
P.C.A. an
s?
Yes If no, check violations below:
lation
he site
n compliance w
th NPDES
Per
t
C
010000 Construction Stormwater requirements?
-ribe:
sedin
entation damagi
occurred
since I
is
ins
ection? No If Yes, where? (check all that apply
;ree of
Jamage:
itact n
de with (name
Title:
)ectior
report: Sent Re
rt
Date given/sent: FebruaryOl, 2022
-rectiv,
action needed:
nmend..
rmane
it ground cover st
ffici
nt to restrAin
ei
osi
has been established. No additional self -monitoring or
f-insp,
ctions are requirt
d. P
ject is in co
i iplianee
and released under the SPCA. Termination of
verage
under the NPDE
General
Storm
te
r Pe
mit for Construction Activities (NCGO 1) must be
lueste(
by the permittee
via a
Notice of
inat
n (NOT). The NOT is available at:
ps:Hed
cs.deq.nc.gov/F
rms/NCGOI-TerrlI
iratio
i. Please note that this correspondence must be uploaded
part ol
completing the
OT I
Process.
d by:
Lori Britt
Others present:
inspec
on: January 25
202
e arriving
on site: 1: 30 PM Time leaving site: 1:35
)94
1-030
,35
Yes
?M
Yes