HomeMy WebLinkAboutWQ0040253_Regional Office Historical File Pre 2018ROY COOPER,
Gown°,
MICHAEL S. RICAN
ary
LLNDA CULPEPPER
ittrertm Dgector
NORTH CAR INA
Environmental Quolify
August 30, 2018
Numa Robertson, Vice President Corporate Services
Union Electric Membership Corp
1.525 North Rocky River Road
Monroe, NC 28110
Subject: Permit No, WQ0040253
Union Electric Membership Corp
Union Power Cooperative Site Improvements
Wastewater Collection System Extension Permit
Union County
Dear Mr, Robertson:
In accordance with your application received August 24, 20.18, we are forwarding herewith Permit No.
WQ0040253 dated August 30, 2018, to the Union Electric Membership Corp (Permittee) for the
construction and operation upon certification of the subject wastewater collection system extension. This
permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and
limitations as specified therein, This cover letter shall be considered a part of this permit and is therefore
incorporated therein by reference.
Please pay particular attention to the foliowing conditions contained within this permit:
Condition IL t: This permit shall not be automatically transferable; a request must be made and approved.
Condition 1E4: Requires that the wastewater collection facilities be properly operated and maintained in
accordance with 15A NCAC 21 ;0403 or any individual system -wide collection system
permit issued to the Permittee.
It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate
design criteria and rules. Failure to comply may result in penalties in accordance with North. Carolina
General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater
collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing
board.
tate. af ‘,..10rtk", oar,.)5na Erw,r,:,"Irflenta Quality Water Researiales `,A,ateruaft Reglona (eon
klocrTL r301 \i,orth °are saa 2B-115
704 6E3 169z1
Vicinity Map
Union Po r er Cooperative Site improvements
Hereby Bridge
ake Park
ley Chap&
Legend
Property_Limits
Min
S
1 inch = 10,000 feet
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp.,
NRCAN, Esri Japan, MEfl, Esri China (Hong Kong), Esri (ThaHand),
Mapmyindia, C OpenStreetMap contributor; and the GIS User
Community
Stantec Project No.::
June 2018
78440166
FTA 04-16, Item F Site Maps
Union Power Cooperative Site Improvements
Topographical Map
Union Power Cooperative Site Improvements
Stantec Project No.: 178440166
June 2018
FTA 04-16, Item F Site Plan
Union Power Cooperative Site Improvements
MOW
Union Power Coop Site Improver
1 einity Map
egend
Union Electric Membership
NORTH CAROLINA
Department of the Secretary of State
CERTIFICATE OF EXISTENCE
I, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby
certify that
Union Electric Membership Corporation
is a corporation duly created, organized and existing under the laws of the State of
North Carolina, having been incorporated pursuant to the provisions of Chapter 117 of
the North Carolina Session Laws of 1935 by Certificate of Incorporation dated the 22nd
day of February, 1939.
I FURTHER certify that the said corporation is an active North Carolina
corporation, and that the said corporation has not filed a Certificate of Dissolution and
continues to be in existence in this State as of the date of this certificate.
Scan to verity online.
Certification# [02913260-1 Reference# 14657685- Page: 1 of 1
Verify this certificate online at littp // vw.sosnc.goviverification
IN WITNESS WHEREOF, I have hereunto set
my hand and affixed my official seal at the City
of Raleigh, this 12th day of June, 2018.
Secretary of State
North Carolina Secretary of State Search Results Page 1 of 1
•. Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings
Electric .Membership Cooperative
Legal Name
Union Electric. Me. iibership Corporation
Information
Sosld: 0153322
Status: Current -Active
Annual Report Status: Current
Citizenship: Domestic
Date Formed: 2/22/1939
Fiscal Month: December
Registered Agent: Andress, Gregory S.
Addresses
Reg Office Reg Mailing Mailing
1525 N Rocky River Rd PO Box 5014 PO Box 5014
Monroe, NC 28110 Monroe, NC 28111 Monroe, NC 28111
https://www.sosrc.Gov/online_services/searchIBusiness_ Registration_Results 8/27/2018
AlOROS
State of North Carolina
Department o Environmental Quality
Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-1.6)
Entity I equesting; Allocation: Union Electric °Iembersh'ip Corp
Project Name for which flow is being requested: nion Power Coop Site Improverrients
FTS . r7r":v he recprrr> ? ar Ingle project
v, the. proposed sveasre.r<ax a r fe r:•s.
the ;'W7mP i not responsible/Or all pump
I, Con lete this section onI) if you are the owner t f tht
a. WWTP Facility Name: City of Monroe WWTP
b. WW1? Facility I'ertztit : NC 0024333
at
ent plant.
c, 'V./VIP facilit> "s permitted fl
A1Iflows are in MGD
.4
d. Estimated obligated flow not yet tr"ibtttary to the WWII'
e. 'WWTP facility's actual avg, flow
tag flow for this specific request
.8100
ii36
:al actual and obligated flows to the facility 6.,3701.
h. Percent of pemtitted flow used 6 1.3%
Complete this section for each pump station you are responsible: fear along the route of this
proposed wastewater flow.
List pornp stations located between. the project connection point and the W' '`I`P.
(A) (1) (C) (D)- l
Design C)bl igated,
Pump Average Daily ,Approx. Not Yet "fatal Current
Station Firm Flow** Current Avg. Tributary How Plus
(Name or Capacity, * ('Firm I pt), Daily Flew, Daily Flow, Obligated Available
Number) MGD MGD MGD MGD Flow Capacity".
'ha l+lrttt Capacity nt`an putnp station is defined
can be achieved with the tat°est pump taken out of scrvi
** Design Average .Daily Flow is the firm capacity of the pump statinn divided by a peaking
factor (p1) not less than 2..5.
**''` A Planning ,Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < O.
Downstream Facility Name (Sewe
Downstream Permit Number:
of
III. Certification Statctrrcnt.
I Russell C:olhatla ._.__
certify to the best of' y knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treat met t facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstreatn pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment Where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendum for which I a,m the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
wing U icF°tit` Signature
Date
Paget of 6
1- E"SF :04-t6
III. Certification Statement:
I Russell Colbath certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
igning Official Signature Date
Page 2 of 6
P'r i f1Q_1 h
Stantec
July 10, 2018
File: 178440166
Mooresville Regional Office
Water Quality Section
610 E. Center Avenue
Mooresville, NC 28115
STANT"EC CONSULTING SERVICES, INC,
2127 Ayrsley Town Boulevard Suite 300, Charlotte NC 28273
Reference: Union Power Cooperative Site Imp
ve
nts
WCROS
Please find attached the permt submittal package for the above referenced project. This project includes the
construction of a new administration building, vehicle maintenance buildings, and associated structures. The
new vehicle maintenance buildings are not connected to the sewer system and have their own spill
containment facilities, New sewer mains and manholes will collect domestic flows only and discharge to the
City of Monroe's sewer system. Included with this package are the following items:
1. Cover letter.
2. Fast Track Application and Attachments (FTA 04-16).
3, Documentation of registered corporation with NC.
4. Downstream Sewer Flow Tracking/Flow Acceptance Form (FTSE 04-16).
5. Application Fee (Check for $480 payable to NCDEQ),
Please do not hesitate to contact me with any questions about the application or project in general.
Regards,
Robert Bernard PE
Associate
Phone: 980-297-7653
Fax. 704-329-0905
Robert, bernard. stantec. com
Attachment, Application and attachments
CC' Numa Robertson, Union Electric Mbership Corp.
Craig Wall, PARIC