Loading...
HomeMy WebLinkAboutWQ0040094_Regional Office Historical File Pre 2018Water Resources ENVIRONMENTAL QUALITY June 21, 2018 David Burnett, Director of Facilities Union County Public Schools 400 North Church Street Monroe, NC 28112 • Fl lEOOPER Governor M[CHAEL S. REGAN Secretary LINDA CULPEPPER Interim Director Subject: Permit No. WQ0040094 Union County Public Schools Monroe High School Addition • Wastewater Collection System Extension Permit Union County Dear Mr. Burnett: In accordance with your application received June 20, 2018, we are forwarding herewith Permit No. WQ0040094 dated June 21, 2018, to the Union County Public Schools (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover Letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition II.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 1I.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina-Iicensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. State of North Carolina j Environmental Quality 1 Water ResourcesWater Quality Regional Operations Mooresville Regional Ofuce j 610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704 663 1699 CC: u need additional information concerning this matter, please contact Ori uvia. at (704) 235-21.90 or -mail at ori.tuvia' i::ncdenr.gov. Sincerely, -DocuSigned by: 'A'14CC681 AF27425... Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ mpton (P.E.) (E-copy) esville Regional Office Files (Laserliche) er Resources Central Files (Laserfiche) PERCS (Laserfiche) Page 2 of 8 Environmental Quality STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Union County Public Schools Union County for the construction and operation of approximately 133 linear feet of 8-inch gravity sewer, as part of Monroe High School Addition, and the discharge of 0 additional gallons per day of collected wastewater into the City of Monroe existing sewerage system, pursuant to the application received June 20, 2018, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February I2, 1996, as applicable; the Division's Minimum Design Criteria for the Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. r—DocuSigned by: `— A14CC681 AF27425 .. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ By authority of the Environmental Management Commission Permit Number: WQ0040094 Permit Issued: June 21, 2018 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Union County Public Schools is hereby authorized to: Construct, and then operate 1.42OR certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall he treated in the City of Monroe Regional Wastewater Treatment Facility in accordance with Permit Number NC0024333. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer .Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June I. 2000, as applicable; unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I. SPECIAL CONDITIONS 1) No flow in excess of the quantity permitted herein, 0 additional GPD, shall be made tributary to the subject sewer system until an application .for permit modification for an increase in flow has been submitted to and approved by the Division, [15A NCAC 02T.0.304 (b)] II. STANDARD CONDITIONS 1. This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change °tithe Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate, The approval of this request shall be considered on its merits and may or may not be approved. [.5 A NCAC 02T,0 04; 143-215,1(d3)] 'This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 21% the Division's Gravity Sewer Minirnum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1. 2000.. as. applicable; and other supporting materials unless specifically mentioned herein. 115A. NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and ether supporting data. [15A NCAC 02T ,01101 4, The wastewater collection facilities shall be properly maintained and operated at all times. The Perminee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall. he met: [I5A. NCAC 02T .01080)1: Page 4 of 8 a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute § 143-215.1 C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Page 5 of 8 Voice mail messages or faxed information is permissible, but this shall not be considered athe initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division. of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons, reporting any of the above occurrences shall tile a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to he taken to ensure that the problem does not recur. Part If of Form CS-SSO or the most current Division approved form) can also be completed to show that the SSO was beyond control, [G.S. 1,43- 215.1.Cta1)] 6. Construction of the gravity sewers, pump stations, ind force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters ofthe State. [15,A NCAC 02T.0108(b)1 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit s.hall. be submitted with the required supporting documents to the address provided on the form, .A complete certification is one where the form is 'fully executed and the supporting documents are provided as applicable. Any wastewater .flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, .Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall he submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension, Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy at the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump c)cle, and downstream sewer capacity analysis, if a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timettames, shall be provided. ,c. Changes to the project that do not result in non-complia.nce with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary 'Fenn. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of S% or greater, and increases in the numberttype of connections), regulations, or the Minimum Design Criteria,. Requested modifications. Page 6 of 8 or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ I5A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes § 143-2I5.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [l5A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page 7 of 8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: UNION COUNTY PUBLIC SCHOOLS PERMIT #: WQ0040094 PROJECT: MONROE HIGH SCI-100L ADDITION ISSUE DATE: JUNE 21, 2018 This project shall not be considered complete nor allowed to operate in accordance with standard Condition '7 of this permit until the Division has received this Certification and all required supporting documentation, It should be submitted in a manner that documents the Division's receipt. Send the. required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address noted in the page footer. Any wastewater flaw made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up 'until a final ce ification is :received by the Division, A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permit -tee. hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof Printed Name, Title Signature Date ENGINEER'S CERTIFICATION as a duly registered Professional Enc4neer in the State of North Carolina, having beenauthorized to observe (.0 periodically, El weekly, I: j full time) the construction of the project name and location as referenced. above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A. NCAC 02T: the Division of Water Resources' (Division) Gravity. Sewer 1Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's :Minimum Design Criteria for the Fast -Track Permitting of Purnp Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: Final Par ia ude description) Certification'o e Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Mooresville Regional Office Phone: (704) 663-169'9 FAX: (704)-633-6040 Division of Water Resources State of North arolaa of Environmental Quality' vision of Water Resource's 15A NCAC 02T .0300 — FAST TRACK SE R 'STEM EXTENSION APPLICATION FT"A 0 iti SUPPORTING DOCUMENTATION Application Number: Ali itc.t s must be completed or the appl'ieutton Will be returned APPLICANT INFORMATION: —Applicant's name: Union Conn YyPublic Snc� c s (t•c ttt ?. Applicant ty c, Individual Corpt ration ❑ Federal fl Statex`County id l urnett per 1SA NCAC 02T „Q 1(?(,(hi Signature a Title: 'Director 4. Applicant"s tt ailit g address: 400 N CltttrchStt-get City: Monroe State: NC Applicant's contact inlrrtraatic Phone number: (701) 29 -9 Zip: 1 1 2-,_ Address: david.pnp II, PROJECT INFORMATION: Project name: Monroe high Scla< alAdditicru 2_ ApplicationFPrejet taita Proposed If a modification, lfnckw construction but part of a ma 4 County :e project he cxi Union County Perm: WOOO the existing permit n. pality° []' Privately-O+coedPublic Utility E Existing 1 . rrnit/Project ued date: r: \VQOO Approximate Coordinates (Decimal Degrees): Latitude: 34,972' Longitude:-80,526 Parcel ID (if applicable): 09194029 (or P. rc€:l ID to closest duw°nstrearn sew- —) III. CONSULTANT INFORMATION: I. Professional Enganecr: 3Fric. Hampton License Number: Firm: I3GE. Mailing address: 121 W Trade Street, Suite 10 () City: Charlotte State: NC Zip 28202-. Phone number: (980) 220-2222 Address: ehflrnpton' i bgeinc,com IV. WAST.EWAT :EP TREATMENT FACIL..IT% (WW'TF) INFORMATION: I, Facility Name: Ckty of`N/1onroe WW'"I"P Owner Name: City of Monroe NC0024333 RECEIVING DOWNSTREAM SEWER INFOR.MAT'lON (if different than WA Permit Numhcr(s): WQ Cye'twtttsireant (Receivirt System Wide Collection SxsPertNumber' s (ii'applicalt� : \\ QC:S_m .m_ Owner Natne(s): ''C31RO (lONAL (11 f 1GI FORM: FTA 04-16 VI. (;ENt R 1. RI^:Ql 1RF;ylfti'1"S 19 lithe Applicant is a Privately -Own lithe ,Applicant has a Developer of lots to be sold, has a I)tiv Lie ?cr° s ( enth El Yes [JNo N:A an Operational . No ZNIA 3 Origin ofvvastewater: (check all LJ Residential Owned El Residential Leased School / preschool ,'' day car • Food and drink facilities • Businesses ,. offices r` factor'u plyl. [Q Retail (stores, c 0 Retail with food Medical . denta. 0 Church Nursing Horne Nature of vvastevv'ater "t) Domestic omrl ?4. Industrial t S° G. Has a Clow reduction been approved under l 5.,A NCAC .t)I 1f yes, provide a cope' of flow reduction approval Ietter 7, a lied by project: Establishment 'Type (see 02 1'.t)114(1)) Scho I vvitla cafeteria, gym and showers a See b), ldl, tei(1 l a dwelling; proposed unknown non-residential and residential property located south or east .of parats eal student gal d Net been attached'? [] Car \ <a h El] Hotel and/or \.lotels El Swimming Pool /Clubhouse El Swiniming Pool/Filter Backwash Other (Explain in Attachment) (i (iPD (iPD (:jP D GPI) CiPD vasvv°ater oestgr't t°love° rates (t.e., natnttntrtrt thaw per lic access ier1itie 1 aaated near high public use rreas; antic Intracoastal Waterway to he used as vacation rentals as defined h Per I.5.A NCAC (12 F .O1 14( c), design flow ratu s for establishments not itfvntifie determined using available flow data, water using fixtures, occupancy or operat y'astewater generated by project: 0 GPD (per ley v(`r t Ci rI .t}1,I4} Do not includ.e'future doves or previously perntie.aiallocativan t(`pertnifted flow is zero, indicate why: • Pump Station or Gravity sewer where Clow will be permitted in subsequent permits that connect to t • Flow has already been allocated in permit Number- - • R.ehabilitaation or replacement of existing sewer w i'tlt no ne Other (i vplain ): ed in tablet_ A1Cr{.'tt?I.l1L 1shall he trratterns, and other measured data 1)4-16 Page of GRAVITY SE.R DESIGN CRITERIA (If Applicable) 02T .0305 ; M DC ((,;ra I. Sumo ari.zc Section I1 Section I.I perm pes for Lg C;)wersizing lines to meet minimum slope requirement is not allowed and a violation of the Al DC ins information related to design c contains info ' for Pe, lion related to rtaizrir ttn PUMP STATION DESIGN CRITERIA (If Appl'icable)— 02T .0305. M»C (Pump Station s/Force„Alains): COMPLETE TE FOR EACH PUMP STATION, INCLLIDEL) IN THIS PROJECT 1. Purnp station number or name: pp ?.. Approximate Coordinates (Decimal Degrees): t.atrttide: LAtta( 3. Design flow of the pump station: per day I firm capac de: - 4, Operational laoint(s) waf the pumptsl: ...,. canons per minute at feet total dynamic. head $'TDH) Summarize the fbrce main to be permitted (fbr dais Pump Station): Power reliability in accordance ww j J Standby power source or pun Required for all pump stations Must be permanent to facility Or if the pump station has an averag t aily © Portable power source with manual acti 4i305(hlt l )(C"1 or (inches) IJ pith automatic.activaxtion and telemetry - n. average daily flow greater than or equal to 15,000 ,gallon~ per day per day: n, quick -connection re etry - 'I 5,A NCAC 02T l ortahle pumpingutait with plugged emergency pump connection and telemetry - 13,A NCAC 02T .0305(h)(1)(C): It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with th If the portable power source. or pump is dedicated to multiple pump capacities and the rotation ,schedule t f'the portable power source or pump, including, tr. e in the case ofa multiple station power outage. ofall the pump stations' storage be provided .'TA, 04-16 Page 3 of5 I\. SETBACKS & SFP S.R 11'IONS — (02B .0200 & 15A N(`AC 02'1' .0305(f)): Does the project comply with all separations fbund is l 5A NC iC r) ? f" ,0 i 5 ITof _q l 4'r'a Ree Rec 1 5A 'NC AC)7 i.0305(J') dr mains rninirnum separations that tih t#1 l)e provided for sewer systems: Setback d ines {vertical - reclaimed ixrant private or public water supply source, inc nt; otanded reservoirs used as a source o ihwa I benched trenches) ewer ding any wells, Y S-1 waters ofClta #rinkinu water 'S (except WS-1 or 1'raS-V}, B, SA, CDRW, FIQW, tar SB from norm iott) and wetlands (see item 1\.2) ny other stream, lake, ditches ny building foundation oundment, or aground water lowering and surface drainage An ba etttent foap Slope o1`ernb trtktaac trt or cuts ttf 2 feet or more Draina e systems .and inter.¢ for drains Anvsvyisnmin n ols 5,1, VC m\C;° ft .l,. p 0.5(,t con earn classifications can be idcntilicd us tcompliatnce with 021 ,(i3O .tf) or se Does the project comply •ath separation req See the Division's draft separation. refit No variance is required. if the alternative de .�s built documents should reference the location 3. Does the proaject comply with setiaacks found in the rive This would include Trout. Buffered Streams per 4. 17caes the project require caavo:ra individual permits or 41)1 V ate. lrrformation can be obtained Does proj Per l5A. NCAC (12T.01) ( a ,directly= related environmental permits or certifieattott applications are being been applied for, or have been obtained. lssttaartce of"this permit is contingent on issuance of dependent permits Ie elauthor El Yes to Required 24 inches 100 feet ?t) feet 10 feet 10 feet 6 inches separations in 02 i ,031i5(f) cannot he achieved. iv°ision's NC Surfacetl<tf ("1((ssttt a a)) +eh) `this application under a 404 atiuns"' separation) vhere separation cannot he specified is utilized in design and constru as e ffcc:tcd , (r Buffer #'crm des per l 21T.02(12 nles No C�) (additional permits ce sedimentatiorn control plans, stotmtwater management plains, etc.) Does this project include atfy seover coil Per I S Y NC AC 02 0t) (2, "hr lt-prior positioned parallel to stream bank that 1 f yes, in.lttdc an ny tl lean() need '`high -priority'?" ertal sewer, sewer contacting surLIce t undermines or deteriorates the server. Yes \o N/A it details for ¢tech line, including type (aeria in 'al io NiA ed, have siphon. or (High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A N(".• C 02"T.0103(a)(5) or the permi'tee`s individual System -Wide Collection permit. TA 04-t6 re 4 of X, .CATIONS: A. nt, has been reviewed by me a s, subn have know. ;e the tm L7eyignf:rita p Stations and tial ladekage, ine lion tent rr AAC t32"F, tii ?? acrlw S�titie•t, 11ulHl•tty_ttl. design has X Yes NO1 E .- lot accordance with terall Staatutes statement, representation„ ear c:ertiticat[r it -lade tt fine not to exceed 81 ti,t'00, as well as North. C°atr°atIitta Profess has. been res esved atppheaatit nj or is pernut ti all required supporting h s tend con hat if'all kale is ;wr)a i t rai being ra.rura'ia°+3 a t to surface waters or ttPe lattc3 i 1. anttlor criminal pr-aixec,urluPt. 1 sx e wdi alat .cl. 1 also Understand that NOTE -- 1n aCCOrd.MICe with at nett r nits telir` serttaatiwan„ ot" ecrtiticatii;in irr ht4lw at tine; nett eta x a e,i 8l 0,0n1( as ww ell ab t;iw E,1 Nu t Design Criteria for tt + ,Permitl n Qf jasr Stab ns Pt C tier i"i t 4I t1e�t yeraiaat),) tliplia;aable? 3uest applic.ariw brnittat 0 'VA1)C la- la'3)and supporting documents for ek Fitlt llCtt[tk?rt Cr,#i6 r ^t` Ptitl _t ED tirYt r#t . in f r plreaticrn Item red consistent with the inforanatiort s alaplied sn the plans, specie tation to the best of ntv knosw lee. 1 further attest that to d in accordance with the applicable regulations, Gray ), and the Minimum Design Criteria for the rest -:[rack Pet professionals may have developed certain portions of this and seal signifies that 1 have reviewed this material and 43-215,6A and I43-215,613, any person who kno application package shall be gw1t5 of at Class ? riii3 it penalties up to S25,000 per viol 4 a 2 1, g ttuaykr twPt'In doetr e rtt t ded, this applicati 1 understand r and attachments are not y discharge of wastewater liom t,. hate that may include, civil penalties, f Water Resources should a condition jat°kage are not completed and than if Etta owill be returned to uu° as 6A and 143..2.15 611, ;tell person wshta ctwatiw ion package shall be guilts of as Class '' mis to S! ,lllltl per violation art false ich may State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Union County Public Schools Project Name for which flow is being requested: Monroe High School Addition. More than one FTSE may he required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow, 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: City of Monroe WW 1'P b. WWTP Facility Permit #: NC0024333 Allflows ar°+ in MGD c. WWTP facility's permitted flour 1 0.4 d. Estimated obligated flow not yet tributary to the WWTP 54 e. WWTP facility's actual avg. flow f Total flow for this specific request g. Total actual and obligated flows to the facility h, Percent of permitted flow used 6.11 0.00 6.65 63.9% Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (L) (C) (D)=(B+C) (E)=-(A-.a) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm! p, Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** * The Firma Capacity of arty pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pt) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < O. Downstrean Facility Name (Sew Downstream Permit Number: Page 1 of 6 FTSE 04-16 1. Certification Statement: 1 Russell Colbath certify to the best of niy knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and. II plus all. attached planning assessment addendurns for which I am the responsible party. Signature of this form indicates accetatance of this wastewater flow. Signing iI Signature Date Page 2 of 6 FT t4-1(i MONROE HIGH SCHOOL BUILDING EXPANSION SITE TOPO MAP MONROE HIGH SCHOOL ADDITION STREET VIEW MAP Date: 06/ 9/20 8 To: NCDEO — Attention.: Ori Tuvia From: LIGE — Kory Hedrick / Eric Hampton Reference: Monroe High School Addition COVER LE TER RECEIVEDINC DE NRIDWR VVC.„ROS MOORESVILLE REGIONAL. °FRC hem No. Number of Copies Deseriptio.n 1. 1 Fast Track Application (Form: ETA 04-16) Flaw Tracking/Acceptance Form (Form: FES 2 )4-16) 4, 8.5"x 1" Color USG' Topographic Map 6, Street Level Map Site Map Utility.' Plan Application Fee —Check ($48.0,00) The sewer line of interest to be relocated will not be serving additional students, only existing students at Monroe High School. Therefore, there is no addition flow due to the relocation of this sewer line. Please see the attached 'Utility Plan fOr the relocation of this sewer line. BGE Kory Hedrick (980) 500-8931 KhedrickAbgeinc.com Serving, Leading, Solving.'" 121 West- Trade 5treet, SLAe 1030 CI tarlot te North Caroliina 28202 9S0-220-2322