Loading...
HomeMy WebLinkAboutWQ0039793_Regional Office Historical File Pre 2018Water Resources CN VFRONMEN r'L OUAUTY February 12, 2018 Crystal Panico, New Development Program Manager Union County Public Works 500 N. Main Street, Suite 400 Monroe, NC 28112 Dear Ms. Panico: LE ROY COOPER Governor MICHAEL S. REGAN Secretory LINDA CULPEPPER Interim Director Subject: Permit No. WQ0039793 Union County Public Works Ardmore at Price Wastewater Collection System Extension Permit Union County In accordance with your application received February 7, 2018, we are forwarding herewith Permit No. WQ0039793 dated February 12, 2018 to the Union County Public Works (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through § 143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. State of North Carolina I Environmental Quality j Water Resources I Water Quality Regional Operations Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 704 663 1699 If you need additional information concerning this natter, please contact Ori Tuvia at (704) 2 5-2190 or via e-mail at ori.tuviavia nedenr, roar. by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: Kevin Herring (P.E.) (E-copy) Mooresville Regional Office Files Water Resources Central Files PERCS (E-copy) Page 2 of 8 Environmental Quality STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENTAL QUALITY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Union County Public Works Union County for the construction and operation of approximately 578 linear feet of 8-inch gravity sewer to serve Ardmore at Price Development, and the discharge of 0 additional (50,070 gallons per day permitted through permit WQ0039794) gallons per day of collected wastewater into the Union County Public Works existing existing sewerage system, pursuant to the application received February 7, 2018, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. jL-by W. Corey Basinger, Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ By authority of the Environmental Management Commission Permit Number: WQ0039793 Permit Issued: February 12, 2018 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Union County Public Works is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Twelve Mile Creek Regional Wastewater Treatment Facility in accordance with Permit Number NC0085359. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division. approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS 1) No flow in excess of the quantity permitted herein, 0 additional (50,070 gallons per day permitted through petrriit WQ0039794) GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.0304 (b)] STANDARD CONDITIONS This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 1.5A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] This permit shall be effective only with respect to the nature and volume ofwastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Perrnittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: Page 4 of 8 a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six months and inspections documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute § 143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Page 5 of 8 Voice mail inessages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300, Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part 1 of Form CS-SSO (or the most current Division approved form.) within five days following first knowledge of the occurrence. 'This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [O.S. 5.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [ 15.a. NCAC 02-f.O1108(h)] Upon completion t f. construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit. shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided. as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an. Operational Agreement, then a copy of the Articles of Incorporation,Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall inelude the following: a. One copy of the project constrrret:iorr record drawings (plan &. profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should he clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis, if a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall he provided. Changes to the pro ect that do not result in non compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of l Ct14i© or greater, increased. flow, pump station design capacity design increases of 5% or greater, and increases in the nurberltype ofconnections), regulations, or the Minimum Design Criteria. Requested modifications Page 6 of 8 or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000, as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes § 143-215.6A through § 143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -Licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. (15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page 7of8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: UNION COUNTY PUBLIC WORKS PERMIT #: WQ0039793 PROJECT: ART)MORE AT PRICE ISSUE DATE: FEBRUARY 12, 2018 This project shall not be considered complete nor allowed to operate in accordance with standard Condition. 7 of this permit until the :Division has received this Certification and all required supporting documentation, It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional. Supervisor, Water Quality Regional Operations Section at the address noted in the page Rioter. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee t :7 appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up tttzt1 a final certification is received by the Division. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERT FTC: THIN I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable designiconstruction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, 'I"itle Signature. Date ENGINEER'S CERTIFICATION 1, , as a duly registered Professional En itzeer iri the State of North Carolina, having been authorized to observe ('{— perioddlcally°, rveeklyr, full timrre) the construction of the project name and location as referenced above for the above Per m ttee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 1 SA NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Min'imunr Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum. Design Criteria for the Fast -Track: Permitting of Pump Stations and Force Mains adopted. June 1, 2000, as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w'sign.ature & date: Final 0 Pa is tide description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 2t1115 ',Anne Pc,,itlp r7Painnal rlffirP Phnr,P. (7rial F,F1.1F44 FAY' anal-F3"1.,Ffl4fl Resources State of North Carolina Department of Environmental Quality Division of Water Resources I5A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSi1ON APPLICATION ETA 04-16 & SUPPORTING DOCUMENTATION Application Number: a itta e �mpteted by Dv( All items must be completed or the application will. be returned APPLICANT INFORMATION: I. Applicant's name: Union. County (company, municipality, „OA, utility, etc.) Applicant type: individual © Corporation © General ,Partnership ® ,Privately -Owned Public Utility © Federal ® State./County © Municipal [l Other 3. Signature authority's .name: Crystal O. Panico PE per 1 A N4( AC t)' i tllt3f k� "Title: Nev Development .Program Manager 4. Applicant's mailing address: 500 N Main St. Suite 400 City: Mott~ ,p State: NC Zip: 28112- 5, Appplicant's contact information: Phone number: (704)'296-4239 Etrtail Address: cr tstal.tttnettnioncountyne.gety_ _ Ii, PROJECT INFORMATION: I.. Project name: Ardmore at Price 2. Application/Project status: Proposed (New Permit) ©Existing Perni t/Project If a modification, provide the existing permit number: WQOO and issued date: If new construction but part of a master plan, provide the existing permit number: WQOO__ 3. County where project is located: Union 4. Approximate Coordinates (Decimal Degrees)' Latitude: 34.9283`` Longitude:-80.7455' 5. Parcel ID (if applicable): 0510,020 (or Parcel ID to closest downstream sewer) CONSULTANT INFORMATION: I . Professional Engineer: Barrett liwri License Number: 39469 Firm: Hazen Engineering PA Mailing address: 3859 Battleground Ave City: Greensboro Phone number: (336) 86-3350 State: NC Email Address Zip:27410.- __.... Shaw iehaeen g IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: I. Facility Name: Twelve Mile Creek WWTI? Owner Name: County Permit Number: NC008535'9 V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQN/A '; stern Wide (ol1e tionSystem Owner Name(s): Union County Downstream (Receiving) Sewer Size: 8 inch ,lwt pplR� t) C i WQCS_ FORM: I I"A 04-16 Page I of 5 VI. GENERAL REQUIREMENTS 1, If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached.? 0 Yes 0No 2. If the Applicant . is a Developer of lots to be sold, has a Deve1gper's (..Vg.Tational -greemen't (FORM: 1„.WV) been attached? Ej Yes No N./A 3. If the Applicantis a ilonie/Prvertv Owners' .Association has an Qaclaiona1 Agree rnenI j‘ FORM: HO..!:\,) been attached? 0 Yes 0No N/A 4. Origin of wastewater: (check all that apply): O Residential Owned Z Residential Leased 0 School ./ preschool day care O Food and drink facilities O Businesses / offices / factories 0 Retail (stores, centers, malls) 0 Retail with food preparationlservice Ej Medical / dental / veterinary facilities El Church El Nursing Horne 5, Nature of wastewater , 100 % Domestic/Commercial % Commercial % :Industrial (Sce54-NNc,A ( sj2j-Lokiczoi) *Is there a Pretreatment Program in effect? Ej Car Wash 0 Hotel and/or Motels 0 Swimming Pool /Clubhouse 0 Swimming Pool/Filter Backwash 0 Other (Explain in Attachment) Yes ElNo 6. Has a flow reduction been approved under 15.A N( .,AC 02T .0 1 40)? Ej Yes. Z No ves,, provide a come of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02' . Daily Design Flow No. of Units Flow Total GPD GPD 0 GPD See I 5A CAC 02'1 01 14,022,Actidelti iiiitd1(2), for caveats to wastewater design flow rates (i,e,, minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas, and residential property located south or east of the Atlantic Intracoastal Waterway to. be used as vacation rentals as defined in G,S. 42A-44, Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table ;15"..AN(LAc 0?J-1QU .11 sh.all be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. iVC 'Wastewater generated by project: 44/4;c5 GPD (per I 5A NC.AC OA- .0114) Do not include future flows or previously perrnitted allocations If permitted 'flow is zero, indicate why: Pump Station or Gravity Sewer where flow will be -permitted in subsequent permits that connect to this line El Flow has already been allocated in Permit Number: O Rehabilitation or replacement of existing sewer with no new flow expected. 0 Other (Explain): FORM: ETA 04-16 Page 2 of 5 -;ra Tv VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 021 1. Summarize gravity sewer to be permitted: Si- (inches) Length (feet) Section 11 & Ill ofthe MDC for Permitting of Gravity Sewers contains information related to design criteria • Section 1.11 contains information related to minimum slopes for gravity sewer(s) • Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC Vilt PUMP STATION DESIGN CRITERIA (If .Applicable) " .0305 & (hi . !Fore Minj: COMPLETEFOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1, Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3, Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the purnp(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size(in .hes) Length (feet) Material 6, Power reliability in accordance with 15,,ANCAC()2"0105(b)a): 0 Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0.305(100 )(B), • Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day. • Must be permanent to facility, Or if the pump station has an average daily flow less than 15,000 gallons per day: 0 Portable power source with manual activation, quick -connection receptacle and telemetry - 1.5A NCAC 02T .0305(h)(1)(C) Or [11 Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1-,XCI: :).%,•' It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreem.ent) and is compatible with the station. • If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timefrarnes, shall be provided in the case of a multiple station power outage. FORM: FrA 04-15 Page 3 of 5 # • 4 IX. SETBACKS & SEPARATIONS— (026..0200 & I5.A NCAC 02T .0305(6): 1. Does the project comply with all separations found in J5A:NCAC9211LE0501 15A NCAC 02T.0305(D_contains minimum separations that shall be provided for se . Setback Parameter* Separation Required ..orm sewers and other utilities. not listed below (vertical) 24 inches a er rnains vertical -water over sewer including in benched trenches) 18 inches rizontal) I 0 feet Reclaimedwater lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class 1 or Class 11 impounded reservoirs used. as a source of drinking water Waters classified WS (except WS-I or WS-V), B, SA, OR.W, HOW, or SB from normal h water (or tide elevation) and wetlands (see itern.IX.2) '*Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches An building foundatio.n Anbasement lope of embankment or cuts of 2 feet or more vertical height, Drainagestems and interceptor drains ols nal rade (verticat)___ IlE1 Yes D No JA NCI& (J2T4J3).iNg) contains alternatives where separations in 02 11.0305(i) cannot be achieved. • **Stream classifications can be identified using the Division's NC Surface Water ClussjOexions webilavx • If noncompliance with 021L(130s(J),or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) Eli Yes E No N/A. 'yes See the Division's draft separation requirements for situations where separation cannot be meet :-#.4 No variance is required if the alternative design criteria specified is utilized in design and construction • As built documents should reference the location of areas effected 3, Does the project comply with setbacks found in the river basin rules per 15A.,,IcAc:(gp92p0? El Yes El No N/A • 'This would include Trout Buffered Streams per 15A_NCAf_2„1.3,0:2(12 4. Does the project require coverage/authorization under a 404 Nationwide or individual permits or 401 Water Quality Certifications? Information can be obtained from the 401 & Buffer Pcrariittiug.Buuleli Ej. Yes 5. Does project comply with wac joi (additional permits/certifications)? Yes El No Per f5A NCAC 021,0 05,Loifij, directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6, Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NC.1NC 0219401 "high -priority sewer" :means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. El Yes No DNA • if yes, include an attachment. with details for each line, including type (aerial line, size, inaterial, and location), High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 041-16 Page 4 of 5 CERTIFICATIONS: I, Does the submitted system comply with 1.5A NCAC 02T, the NI in im fiesitm Criteria for the Permitting al Purnp Stations and Force iMain‘qitinest version), and the Gravity Sewer Minimum Desito Critethi (lates( version) as a.pplicable'? Yes Ej No if No, complete and submit the Variancel.Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of .the Fast Track Application and supporting documents. 7, Professional Engineer's Certi essional Engineer's name from Application Item IIL. I .) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge, further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain. 'portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE --In accordance with General Statutes 143-215,6A and 143-215.6B, any person who knowingly makes any false statement, representation., or certification in any application package shall be guilty of a Class 2 .misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. , \ACA North Carolina Professional Engineer's seal, signature, and date: fl /VG I 3, Applicant's Certification per I5A NCAC 02T .0106(b): 1, _ax_y5T-4 AANActek attest that this application for (Signature Aifilioriry's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater front this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, ancUor criminal prosecution, 1 will make no claim against the Division of Water Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will he returned to me as incomplete. NOTE — In accordance with General Statutes 143,-2.15.6A and 113:215,613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, Signature: Date: FORM: VITA 04-16 Page 5 of 5 *_._014WittE WIMIXV ettML Googly: Earth 2017 CiioNle egen >.Grc oad o `House y J ©re,Sadd ry . Feature 1 Medical Group Of Wax r ' l ehael Ryan Realty Reigning. ats, Dogs Sauthsiders` Stewart's Village Gallery axhaw Animal Hospiital ... axhaw City Hall. 400 ft State of North Carolina Department of Environmental Quality Division of Water Resources Flow Trackingi,Acceptance for Sewer Extension Applications (FrsE 04-16) Entity Requesting Allocation: Union County Project Name for Which flow is being requested: Ardmore at Price (Public) More than one FTSE may he requfred r o project Or the owner of the (174177) is not responsible fOr ail jump stations along the route qf the co-oposed vvastewater flow, I. Complete this section onlyi 1youare the owner of the wastewater treatment plant, a. WWTP Facility Name: Twelve Mile Creek WWTP b. ww-FP 'Facility Permit #: NC0085359 Allflows are ifl MGD c. WWII) facility's permitted. now 6.0 * Does not include 3N,IGD diversion to 6 Mile d. Estimated obligated. flow not yet tributary to the WWTP 1.8630 c. Nkr\VT.1) facility's actual avg, flow I, Total flow for this specific request g. 'Total actual and obligated .flows to the .facility h. Percent ofpermitted flow used 3.71 0,000 5,5730 92.8S 11. Complete this section for each pump stalk) proposed wastewater flow. Y 0 LI arc responsible for along the route of this 1„.ist. pump stations located between the project conneer:..tpoint e 'W\NITT: (A) (B) (( ) (I))-(B+C) (E)=-(A-U) :Design Obligated, Pump Average Daily .Approx„ Not Yet Total C u rr e n t station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pi), Daily Flow, Daily Flow, Obligated Available Number) MGT) M(i") tvIGD MC D Flow Capacity*** N/A * The Firm. Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (p1) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station Located between the project connection point and the WWTP where the Available Capacity is <tL .Downstream ,Facility Name Sewer): Twelve Mile Creek. WWII' Downstream Permit Number: N/A. Page 1 of 6 VISE 04-16 III. Certification Statement: I Crystal O. Panico certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements 'identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. 61..:1-A2 1A511,3- Sig al Signature Date Page 2 of 6 FTSE 04-16 PLANNING ASSESSMENT ADDENDUM (PAA) Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is < 0. Pump Station (Name or Number): Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily FIow (C) accounts for % and MGD of the Available Capacity (E) in Pump Station ; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143- 215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Page 3 of 6 FTSE 04-16 • Instructions for Flow Tracking/Acceptance form (FTSE) and Planning Assessment Addendum (PAA) Section I a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e + f] h. Percent of permitted flow used: Equals [(g / c)*100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a proposed flow expansion of 0.015 MGD. The first Form FTSE submitted after January 15, 2008 may have numbers like this: c. = 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f. = 0.015 MGD g. = 3.215 MGD h. = 53.6% The next Form FTSE may be updated like this with a proposed flow expansion of 0.102 MGD: c. = 6.0 MGD d. = 0.515 MGD e. = 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. = 55.8% Each subsequent FTSE form will be updated in the same manner. Page 4 of 6 FTSE 04-16 , Section II List the pump station name or number and approximate pump station firm capacity, approximate design average daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow for this project with other obligated flows that have been approved for the pump station but are not yet.tributary (C). Firm capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the Minimum Design Criteria. Design Average Daily FIow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than 2.5. If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station if the system has future specific plans related to capacity that should be considered in the permitting process. (A) (B) Design Firm Average Pump Station Capacity Daily Flow (Name or Number) MGD (Firm 1 pf) Kaw Creek PS Valley Road PS 0.800 0.320 Approx. Current Avg. Daily Flow, MGD 0.252 1.895 0.758 0.472 (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity* 0.080 0.332 -0.012 0.135 0.607 0.151 Page 5 of 6 FTSE 04-16 Planning Assessment Addendum Instructions Submit a planning assessment addendum for each pump station listed in Section II where available capacity is<0. A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating the flows from the proposed sewer extension project. If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control the rate of flow to prevent sanitary sewer overflows. The planning assessment may identify a funded project currently in design or construction, or a planned project in the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the certainty of successful timely project completion for any expansion, flow management diversion or infiltration and inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance compliance. For example: Given that: a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the committed flow in Pump Station Kaw Creek; and that b. The rate of activation of this obligated, not yet tributary capacity is currently approximately 0.01 MGD per year; and that c. A funded capital project that will provide the required planned capacity, namely is in design or under construction with planned completion in ; and/or d. The following applies: The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to add 0.100 MGD to the firm capacity of the pump station by October 2015. Inclusion of this proposed capital project as a condition of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority for funding and construction to be implemented ahead of the activation of obligated, not yet tributary flows in amounts that exceed the firm pump station capacities identified in Section II above. Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. Page 6 of 6 FTSE 04-16 1tNEERING, PA Building Code Enforcement 500 N Main Street Room 47 Monroe, NC 28112 704-296.421 0 3859 Battleground Ave, Suite 300 Phone: (336) 286-3350 Greensboro, NC 27410 RE: Ardmore at Price Union County Submission Public Sewer Permit Cover Letter tshaw@ha,gen-engrcom January g, 2018 TF The purpose of this cover letter is to outline the contents of this Public Sewer Permit application package as well as to provide of a summary of the project to which is pertains, This Ardmore at Price development is a 245 unit multifamily complex which will require an estimated peak flow of 40,475 GPD for utility consumption. The project will be comprised of both private and public sewer, both of which will be gravity sewer, In terms of public sewer, this project will be comprised of 453 LF of 8" PVC and 125 LF of 8" DIP. Within this submittal package you will find the following items: 1) $480 check for the Public Sewer Permit 2) One completed DWR Fast Track Sewer System Extension application 3) One 8.5" x 11" USGS Topo Map 4)One street level map (aerial) 5) How Tracking Form Thank you, Tim Shaw, EIT Hagen Engineering, PA 434-566-8037 • Union County Union County Public Works 500 North Main Street Suite 400 Monroe, NC 28112 T. 704-296-42 1 Q www.unloncountync.gov Transmittal To: Attention:, NC Department of Environmental Quality Division of Water Resources - Mooresville Regional Office 610 East Center Avenue Mooresville„ N.C. 26115 Regarding: Sanitary Sewer to serve Ardmore al Price (Public) We are sending you: Copies Copy of letter Plans Date; February 2, 2018 Prints Shop Drawings Date No, Description 11918 1/25'18 1125f18 These are transmitted an For approval Remarks: Signed: Receives by: Cover Letter Fast Track Application Copy of Fast Track Application USGS lop° Map Street Level Map jHow Tray king Forni 156 480,01 Check (Application Fee) ecked below: For your rise Other As requested l`: i For review and comment Peter W. Brown Date: Central Files: APS SWP 2/9/2018 Permit Number WQ0039793 Permit Tracking Slip Program Category Status Project Type Non -discharge In review New Project Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer ori.tuvia Coastal SWRuie Permitted Flow 0 Facility Version A Permit Classification Individual Permit Contact Affiliation Facility Name Major/Minor Region Ardmore at Price Minor Mooresville Location Address County Union Facility Contact Affiliation Owner Owner Name Union County Dates/Events Owner Type Government - County Owner Affiliation Cindy Coto 500 N Main St Monroe NC 28112 Orig Issue App Received 2/12/2018 2/7/2018 Draft Initiated Scheduled Issuance Public Notice Issue Effective 2/12/2018 2/12/2018 Regulated Activities Requested /Received Events Apartment complex Condominium Wastewater collection Outfall Expiration Additional information requested 218/18 Additional information received 2/9/18 Waterbody Name Streamlndex Number Current Class Subbasin