HomeMy WebLinkAbout20070721 Ver 2_More Info Received_20220120 (2)NORTH FORK RESERVOIR DREDGING PLAN HENDERSON COUNTY, NORTH CAROLINA USACE ACTION ID: SAW-2020-01908 CITY OF HENDERSONVILLE CONTRACT #: 19010 PROJECT DIRECTORY SPONSOR CITY OF HENDERSONVILL Hnderscivr1Iee Water jSewer Adam Utilities (828) asteurer@hvinc.gov Steurer, 233-3207 Engineer PE ENGINEER JENNINGS ENVIRONMENTAL PLLC Greg President (919) greg@jenningsenv.com Jennings, 600-4790 PhD, PE Jennings Environmental ENV. PERMITTING CLEARWATER ENVIRONMENTAL INC. An CLear\AJaer Clement Senior (919) clement@cwenv.com Scientist 698-9800 Riddle EnviroScience Company SHEET INDEX COVER SHEET 4.0 DREDGING OPERATIONS PLAN SPECIFICATIONS 4.1 EXISTING SITE CONDITIONS 5.0 DREDGING OPERATIONS PLAN 6.1-6.4 HAUL ROUTE DISPOSAL SITE - HENDERSONVILLE'.\ATER PLANT IDREDGE SITE - N FORK RESERVOIR U-II "ph. 0 5 1 2 Miles NORTH I I I I I I I I 42 rix: . ..t 8.5 MILE HAUL ROUTE MIS' :11 r.tin5,ii 3nUP4s IllsP II,ir Mu : -_?E. Armin, IJ , Irrterna ,r.I#kCRE.MEfi1T P, * f2Can, E5ri Japan, METI, E5ri' �i •_ _•n Kc yr. E=si i.C!2 . arI 17raiI ntlj, t yCC, its OpariStreetMageantribtrter5. erdt#heGISU - Cernmr rlty �,.. ° PRELIMINARY DRAWING NOT RELEASED FOR CONSTRUCTION JANUARY 19, 2022 z 0 C7 z t7 0 w 0 0 uJ V I w w J J NORTH FORK M COVER SHEET PRELIMINARY DRAWING REVISIONS: CoH: 01/28/2021 DWR: 01/19/2022 DATE: 01/19/2022 PLOT SIZE: 24" x 36" AS NOTED H.D.: NAD83 (SCSP) V.D.: NAVD88 JE PID: 8102 4.0 DREDGING OPERATIONS GENERAL NOTES 1. THE PURPOSE OF THIS WORK IS TO REMOVE ACCUMULATED SEDIMENT IN N. FORK RESERVOIR DEPOSITED BY BIG CREEK AND FLETCHER CREEK TO MEET AND MAINTAIN WATER SUPPLY DEMANDS FOR THE CITY OF HENDERSONVILLE. UP TO 7,500 CY OF SEDIMENT MAY BE DREDGED FROM THE RESERVOIR. 2. THIS WORK IS AUTHORIZED BY PERMITS FROM USFS, USACE, NCDWR AND NC DEMLR. ALL GENERAL AND SPECIAL PERMIT CONDITIONS SHALL BE FOLLOWED FOR THE DURATION OF THE DREDGING OPERATIONS. 3. DURING PROJECT IMPLEMENTATION, EROSION CONTROL MEASURES SHALL BE IMPLEMENTED TO REDUCE SEDIMENTATION INTO BIG CREEK, FLETCHER CREEK, N. FORK RESERVOIR AND N. FORK MILLS RIVER. EFFORTS SHALL BE MADE TO LIMIT AND EXPEDITE EQUIPMENT TIME SPENT WORKING IN THE RESERVOIR. WHEN POSSIBLE, WORK WILL OCCUR FROM THE TEMPORARY ACCESS RAMPS. 4. CONSTRUCTION WORK WITHIN THE RESERVOIR SHALL OCCUR BETWEEN APRIL 16 AND OCTOBER 14. A TROUT BUFFER DISTURBANCE MORATORIUM IS IN EFFECT FROM OCTOBER 15 TO APRIL 15 FOR FLETCHER CREEK, BIG CREEK, N. FORK RESERVOIR AND N. FORK MILLS RIVER. 5. CONTRACTOR SHALL CONTACT NORTH CAROLINA WILDLIFE RESOURCE COMMISSION AT LEAST TWO (2) WEEKS PRIOR TO MOBILIZATION AND CONSTRUCTION ACTIVITIES TO SCHEDULE A PRE -CONSTRUCTION MEETING WITH NCWRC, THE CONTRACTOR AND THE ENGINEER. 6. SENSITIVE AQUATIC SPECIES MAY BE LOCATED WITHIN THE PROJECT AREA. NCWRC AND NCFS WILL PERFORM A SURVEY TO DETERMINE IF RELOCATION OF SENSITIVE AQUATIC ORGANISMS IS NECESSARY. 7. ALL TREES, UTILITIES AND OTHER SITE FEATURES WILL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 8. EQUIPMENT SHALL BE WELL -MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. 9. FUELING SHALL BE PERFORMED IN THE DESIGNATED STAGING AREA AT LEAST 100 FEET AWAY FROM SURFACE WATERS. 10. CONSTRUCTION SCHEDULING AND STAGING SHALL BE TIMED TO EFFICIENTLY COMPLETE THE WORK AND MINIMIZE THE AMOUNT OF TIME SPENT WORKING IN THE RESERVOIR. 11. TO THE EXTENT POSSIBLE, DREDGING OPERATIONS SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW 12. DREDGING OPERATIONS SHALL NOT OCCUR IN THE RESERVOIR DURING WET WEATHER OR STORMFLOWS. 13. AN APPROPRIATELY SIZED LONG REACH EXCAVATOR SHALL BE UTILIZED TO PREVENT EXCESSIVE TRACKING AND SEDIMENT DISTURBANCE WITHIN THE RESERVOIR. 14. ALL DREDGED SEDIMENT SHALL BE HAULED TO AND DISPOSED OF IN THE DESIGNATED AREA AT THE CITY OF HENDERSONVILLE WATER TREATMENT PLANT AS SHOWN ON SHEET 2.3. 15. ANY TURBID WATER GENERATED IN THE RESERVOIR DURING DREDGING OPERATIONS CAN BE PUMPED INTO THE WATER INTAKE FOR TREATMENT AT THE CITY OF HENDERSONVILLE WATER TREATMENT PLANT. 16. SITE ACCESS AND STAGING A. ACCESS TO THE N. FORK RESERVOIR SHALL OCCUR VIA WASHE CREEK ROAD (FS 5000) AND HENDERSONVILLE RESERVOIR ROAD. B. A DESIGNATED STAGING AREA SHALL BE ESTABLISHED OFF OF THE EXISTING GRAVEL ROAD NEAR THE RESERVOIR AS SHOWN IN THE DRAWINGS. C. CONSTRUCTION ROUTES WITHIN THE LOD SHALL UTILIZE EXISTING GRAVEL ROADS, ACCESS RAMPS AND OCCUR OUTSIDE THE 25' TROUT BUFFER TO THE MAXIMUM EXTENT PRACTICAL. ALL ROCK USED FOR TEMPORARY ACCESS RAMPS SHALL BE REMOVED FROM THE RESERVOIR AND WORK AREA. 17. SILT FENCE AND EROSION CONTROL WATTLES A. PRIOR TO ANY DREDGING AND HAULING, SILT FENCE AND EROSION CONTROL WATTLES SHALL BE INSTALLED AS SHOWN IN THE DRAWINGS. AT THE END OF THE PROJECT, WHEN ALL DISTURBED AREAS HAVE BEEN STABILIZED, ALL SILT FENCE AND WATTLES SHALLE BE REMOVED. MATERIAL SPECIFICATIONS, INSTALLATION PROCEDURES, AND MAINTENANCE SHALL CONFORM TO SECTION 6.62 OF THE NORTH CAROLINA SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 18. TEMPORARY DIVERSION CHANNELS A. SANDBAGS, BERMS, LINED CHANNELS OR OTHER DIVERSION STRUCTURES SHALL BE USED TO AVOID EXCAVATION AND DREDGING IN FLOWING WATER. B. ALL MATERIALS USED FOR FLOW DIVERSIONS SHOULD BE REMOVED FROM THE RESERVOIR AFTER COMPLETING THE WORK. C. ALL DIVERSION CHANNELS SHALL BE LINED. 19. TRUCK HAULING SEQUENCE A. TRUCKS SHALL BE USED TO HAUL DREDGED MATERIAL FROM N. FORK RESERVOIR TO THE HENDERSONVILLE WATER TREATMENT PLANT. THE TYPE, SIZE AND CAPACITY OF THE TRUCKS SHALL BE SIZED TO EFFICIENTLY HAUL DREDGE MATERIAL AND SHALL MEET ALL USFS, LOCAL, STATE AND FEDERAL ROAD AND BRIDGE CROSSING LOAD LIMITS. B. TRUCKS SHALL USE THE EXISTING GRAVEL TURN OUTS AND STAGING AREA TO TURN AROUND AND WAIT FOR LOADING. C. ALL TRUCKS SHALL TRANSIT TO AND FROM N. FORK RESERVOIR AS A CONVOY WITH ADEQUATE SAFETY PRECAUTIONS. D. TRUCKS SHALL NOT BE OVERLOADED. 20. MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES A. ALL EROSION CONTROL AND SEDIMENTATION MEASURES WILL BE INSPECTED DAILY AND AFTER SIGNIFICANT RAIN EVENTS BY THE ON SITE ENGINEER AND THE CONTRACTOR. THE CONTRACTOR WILL ASSURE THAT ALL INSTALLATIONS ARE FUNCTIONING PROPERLY AT THE END OF EACH WORK DAY. INSPECTION REQUIREMENTS, AS DESCRIBED IN NC DEMLR'S CONSTRUCTION GENERAL PERMIT NUMBER NCG01000, WILL BE FOLLOWED. B. SITE, SEASONAL OR CLIMATE CONDITIONS MAY REQUIRE INSTALLATION OF ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES. 21. ONCE THE WORK AREA IS STABILIZED, ALL NON -BIODEGRADABLE EROSION CONTROL MEASURES WILL BE REMOVED AND PROPERLY DISPOSED OF BY THE CONTRACTOR. DREDGING OPERATIONS SEQUENCE OBTAIN EROSION AND SEDIMENTATION CONTROL PLAN APPROVAL AND ALL OTHER APPLICABLE PERMITS. 2. NOTIFY INSPECTOR FROM DEMLR ASHEVILLE REGIONAL OFFICE PRIOR TO DISTURBANCE. 3. POST CERTIFICATE OF APPROVAL FOR LAND DISTURBANCE AT SITE. 4. INSTALL RAIN GAUGE AND PREPARE SELF INSPECTION AND REPORTING FORMS AS DESCRIBED ABOVE. 5. FLAG THE WORK LIMITS AND STAKE OUT THE EXTENTS AND ELEVATIONS OF THE PROJECT. 6. LOCATE ALL UNDERGROUND UTILITIES WITHIN THE WORKSITE. 7. HOLD PRE -CONSTRUCTION MEETING PRIOR TO STARTING CONSTRUCTION. 8. INSTALL CONSTRUCTION ENTRANCES, SILT FENCE AND STREAM CROSSING PER THE ATTACHED PLAN SHEETS AND DETAILS. 9. INSPECT EROSION AND SEDIMENTATION CONTROL PRACTICES DAILY AND AFTER SIGNIFICANT RAINFALL EVENTS. MAKE NEEDED REPAIRS IMMEDIATELY. 10. ANY AREA DISTURBED WITHIN 25 FEET FROM THE TOP OF THE STREAM BANK SHALL BE PROVIDED WITH TEMPORARY GROUND COVER SPECIFIED IN THE VEGETATION PLAN WITHIN 10 CALENDAR DAYS, UNLESS SUPERSEDED BY THE CONDITIONS OF GENERAL STORMWATER PERMIT NCG 010000. 11. DEWATERING N. FORK RESERVOIR A. PRIOR TO STARTING DREDGING OPERATIONS, THE WATER SURFACE ELEVATION OF THE RESERVOIR SHALL BE LOWERED BY TEMPORARY SIPHONS OR PUMPS TO AN ELEVATION THAT WILL ALLOW THE SEDIMENT THAT WILL BE EXCAVATED TO DEWATER AND DRY OUT. THE WATER ELEVATION CAN BE LOWERED BELOW THE WTP INTAKE ELEVATION (2039') TO DEWATER SEDIMENTS TO BE REMOVED IN THE VICINITY OF THE DAM AND BOTTOM DRAIN. TEMPORARY ROCK SILT CHECKS AND TURBIDITY CURTAINS SHALL BE INSTALLED TO PREVENT TURBID WATER FROM DISCHARGING DOWNSTREAM B. THE RESERVOIR BYBASS VALVE SHALL REMAIN CLOSED FOR THE DURATION OF THE DEWATERING AND DREDGING OPERATIONS. C. THE LOWERED WATER SURFACE ELEVATION SHALL BE MAINTAINED FOR A SUFFICIENT PERIOD OF TIME TO ALLOW THE SEDIMENT THAT WILL BE EXCAVATED TO DEWATER AND DRY OUT. ONCE THE SEDIMENT HAS BEEN SUFFICIENTLY DEWATERED DREDGING OPERATIONS MAY BEGIN. D. A FLOATING TURBIDITY CURTAIN SHALL BE INSTALLED AROUND THE SIPHON INTAKES FOR THE DURATION OF THE DREDGING OPERATIONS. E. THE MINIMUM DOWNSTREAM FLOW OF 8 CFS SHALL BE MAINTAINED THROUGH ALL PHASES OF THE PROJECT (E.G., DEWATERING, DREDGING, RESERVOIR REFILLING). 12. PHASE 1 DREDGE OPERATIONS A. PHASE 1 OF THE DREDGING WORK WILL EXCAVATE AND REMOVE SEDIMENT FROM THE BIG CREEK SIDE OF THE RESERVOIR. B. A TEMPORARY ACCESS RAMP TO THE WORK AREA SHALL BE CONSTRUCTED TO MOBILIZE EQUIPMENT AND LOAD TRUCKS. A TEMPORY CROSSING SHALL BE ESTABLISHED ACROSS FLETCHER CREEK AS SHOWN IN THE DRAWINGS AND DETAILS. EXISTING WOODEN FENCE SHALL BE REMOVED DURING DREDGING AND REINSTALLED ONCE THE PROJECT IS COMPLETE. C. DURING ACTIVE DREDGING OPERATIONS, FLOW FROM BIG CREEK SHALL BE DIVERTED AROUND THE WORK AREA USING A LINED TEMPORARY CHANNEL TO PREVENT STREAM FLOW FROM ENTRAINING SEDIMENT AND INCREASING THE TURBIDITY AT THE SIPHON INTAKES. ANY TURBID WATER GENERATED IN THE RESERVOIR SHALL BE ALLOWED TO SETTLE OUT IN THE RESERVOIR OR GET PUMPED OR DIVERTED TO THE WTP INTAKE FOR TREATMENT. TURBID WATER SHALL NOT BE BYPASSED TO THE DOWNSTREAM REACH. D. AFTER THE CITY AND THE ENGINEER HAVE APPROVED THE COMPLETED PHASE 1 DREDGING OPERATIONS ON BIG CREEK, THE ACCESS RAMP, DIVERSION CHANNEL AND FLETCHER CREEK CROSSING SHALL BE REMOVED. 13. PHASE 2 DREDGE OPERATIONS A. PHASE 2 OF THE DREDGING WORK WILL EXCAVATE AND REMOVE SEDIMENT FROM THE FLETCHER CREEK SIDE OF THE RESERVOIR. B. A PORTION OF THE TEMPORARY ACCESS RAMP USED FOR PHASE 1, SHALL REMAIN IN PLACE DURING PHASE 2 TO MOBILIZE EQUIMPENT AND LOAD TRUCKS. C. DURING ACTIVE DREDGING OPERATIONS, FLOW FROM FLETCHER CREEK SHALL BE DIVERTED AROUND THE WORK AREA USING A LINED TEMPORARY CHANNEL TO PREVENT STREAM FLOW FROM ENTRAINING SEDIMENT AND INCREASING THE TURBIDITY AT THE SIPHON INTAKES. ANY TURBID WATER GENERATED IN THE RESORVOIR SHALL BE ALLOWED TO SETTLE OUT IN THE RESERVOIR OR GET PUMPED OR DIVERTED TO THE WTP INTAKE FOR TREATMENT. TURBID WATER SHALL NOT BE BYPASSED TO THE DOWNSTREAM REACH. D. AFTER THE CITY AND THE ENGINEER HAVE APPROVED THE COMPLETED PHASE 2 DREDGING OPERATIONS ON FLETCHER CREEK, THE ACCESS RAMP, DIVERSION CHANNEL, ROCK SILT CHECKS, SIPHONS AND TURBIDITY CURTAINS SHALL BE REMOVED FROM THE RESERVOIR. 14. DISPOSAL OPERATIONS AT CITY OF HENDERSONVILLE WATER TREATMENT PLANT A. ALL DREDGED SEDIMENT SHALL BE DISPOSED OF IN THE DESIGNATED AREA AT THE CITY OF HENDERSONVILLE WATER TREATMENT PLANT. B. ALL TRUCK TRAFFIC SHALL ENTER THE SITE THROUGH THE SERVICE GATE OFF HAYWOOD ROAD / SR 191. C. A CONSTRUCTION ENTRANCE SHALL BE INSTALLED AT THE ENTRANCE TO THE SERVICE YARD. D. SILT FENCE SHALL BE INSTALLED ALONG THE LIMITS OF DISTURBANCE. E. PLACE ALL DREDGED MATERIAL IN THE DISPOSAL AREA TO THE LINES, GRADES AND ELEVATIONS SHOWN IN THE DRAWINGS. F. AFTER THE CITY AND ENGINEER HAVE APPROVED OF THE DISPOSAL WORK, STABILIZE THE AREA WITH TEMPORARY SEED, PERMANENT SEED AND STRAW MULCH. 15. NOTIFY INSPECTOR FROM DEMLR REGIONAL OFFICE AFTER FINAL STABILIZATION TO TERMINATE THE PERMIT. NORTH FORK M DREDGING OPERATIONS PLAN NOTES AND SPECIFICATIONS PRELIMINARY DRAWING REVISIONS: CoH: 01/28/2021 DWR: 01/19/2022 DATE: 01/19/2022 PLOT SIZE: 24" x 36" AS NOTED H.D.: NAD83 (SCSP) V.D.: NAVD88 JE PID: 8102 4.1 0 40 80 Feet SCALE: 1" = 40' 49/ W3 0.046 AC / • / Tcy \ h� T � \� LI \\\ r / >:j1/\()Afic)(11-/C/5177711))// /'', 1' \\\` �p) \ \\NA \ ) 00 ll \\\)1 l\ !\ 0 :\\:°\ \\ `\ \\\ 'I2///j�� \\\II // fry //�_ 1) > 7 1 �GEOFRESERVOIR//�i/%� /�//// WSE ELV. = 2,449.2j� r / /� �" ��7�// // / //� / ,00 / r // f / =2/// i �//4— // ,N.FORK �/ RESERVOIR -_,/ / 0.579 AC �� J 1 / / j� / - ' \ r — __ -- — _ - ///// .ii ��� /C N., n -. N\ f — /- - ���J �2�.o%r/ ,J� I L �/ — �i r / r' / EXISTING CONDITIONS FEATURES 2450 TB ♦ EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR STREAM CENTERLINE STREAM TOP OF BANK TOP OF EMBANKMENT SLOPE 25' TROUT BUFFER EXISTING GRAVEL ROAD EXISTING WETLAND N. FORK RESERVOIR EXISTING SIGNIFICANT TREE TEMPORARY BENCHMARK (TBM) // 4, 4, 111 \ \ 1 IS \ / / N / / / //\ / / i i / / - i / /\_ k, ....2,-il.:*"__ ..-/ "...-___-- — W2 0.039 AC r co 1"1//z///ily//1///y1'/‘'7(s'z'////////7 WATERFALL INV. ELV. = 2,453.9' WSE ELV. @ BASE = 2,449.4' rn FENCE LIN TBM #12 TBM #11 TBM #4 7 / • W4 0.007 AC Tk / T" /\(\' ( -N260.-::,Z__:_ill_em—B°B_TAT\ 10KM:9:FT TBM #7 12" POP 12" MAP 18" DIP 15" DIP PORK _ MILLS RIVER N. INV. ELV. = 2,445.9' 14" OAK TBM #9 -GRAVEL ROAD TB 26,50 -0-NjTBM TBM #8 26" POP. 8" BCH -re:_w(1„,1„.opoF :1-13J ( GRAVEL ROAD u) • E sa) op 0 NORTH FORK M (f) LL1 LLI EXISTING SITE CONDITIONS - N. FORK RESERVOIR PRELIMINARY DRAWING CoH: 01/28/2021 DWR: 01/19/2022 DATE: 01/19/2022 1" = 40' H.D.: NAD83 (SCSP) V.D.: NAVD88 JE PID: 8102 5.0 0 40 80 Feet SCALE: 1" = 40' / V�FTcy, �c iQ ��\� - 2Aj� O` % 25' TROUT BUFFER L '\\ —,_ L \ \ • \ 2A6o \1 1 // / / so 1 I REMOVE EXISTING WOODEN FENCE AND 15" POPLAR TREE FOR ACCESS TEMPORARY STREAM CROSSING. FOUR (4) 48" HDPE CULVERTS TURBIDITY CURTAIN SHALL BE USED AROUND SIPHON OR PUMP INTAKES PHASE 1 DREDGING AREA TEMPORARY OPEN WATER IMPACT 0.338 AC W3 PERMANENT IMPACT 0.036AC-f e/ Ge 43<c • F/r \ (p \ 1 l I\11lI / j Its 1) 7 // /// / EDGE OF RESERVOIR , //7 z / j/d WSE ELV. = 2,449.2' /i/// „-/ -�s - Loj, J�� ci fist • J a?� /��� \�i••••••0••:•1•€��P 40000000000,0/40 Oste.:10.60000;;;;15;q i‘.:: t.:: ID' - Q� ir ,,.......,s. ` i 1p�40 0,�- � ue, rLODr J-- • /▪ �� PWE4RMANENT IMPACT�—%_- _ - 0.002 AC WATERFALL INV. ELV. = 2,453.9' WSE ELV. @ BASE = 2,449.4' r 1- J //// / // /// //;op / 7 O° "9" /y LIMITS OF DISTURBANCE (LOD) = 1.22 AC //i/ co( ////ii - // TB t Jl/7 12�- DREDGING OPERATIONS PLAN FEATURES - 2450 - EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR STREAM CENTERLINE STREAM TOP OF BANK TOP OF EMBANKMENT SLOPE 25' TROUT BUFFER EXISTING GRAVEL ROAD EXISTING WETLAND TB EXISTING SIGNIFICANT TREE • TEMPORARY BENCHMARK (TBM) LOD WAT SF LIMITS OF DISTURBANCE EROSION CONTROL WATTLES SILT FENCE PUMP OR SIPHON SYSTEM ■ ■ CULVERT / / / \ \ \ TRUCK LOADING RAMP DREDGING AREA STAGING AREA DIVERSION CHANNEL ROCK SILT CHECK LIMITS OF DISTURBANCE (LOD) = 1.22 AC EROSION CONTROL WATTLES ,/ -'/\, l / .-2470 n AT — -TB ) TEMPORARY PUMP OR SIPHON . �- ORK IVjI SYSTEM WITH ROCK SILT CHECK (SEE DETAIL SHEET 3.4) TO DEWATER RESERVOIR DURING - DREDGING OPERATIONS _—.2440—" — \ 2450 BIG CREEK TEMPORARY DIVERSION CHANNEL DURING PHASE 1 DREDGING OPERATIONS. � ry N.F LLS RIVER 17'Q( WA T 7 l� 1� ice- �\ Z-- — n --� ��f�r \ r _ o TB 25' TROUT BUFFER 2450 _ LOD WAT / — — TB TB TB GRAVEL ROAD A h; 10-) 4E' c .2 sa) op CD cn 0 NORTH FORK M (f) LLI LLI 1 DREDGING OPERATIONS PLAN - N. FORK RESERVOIR PRELIMINARY DRAWING CoH: 01/28/2021 DWR: 01/19/2022 DATE: 01/19/2022 1" = 40' H.D.: NAD83 (SCSP) V.D.: NAVD88 JE PID: 8102 6.1 TB- 0 40 80 Feet SCALE: 1" = 40' �� h \� \ \ h \\\ 25' TROUT BUFFER W2 PERMANENT WETLAND IMPACT 0.031 AC PHASE 2 DREDGING AREA TEMPORARY OPEN WATER IMPACT 0.28 AC FLETCHER CREEK TEMPORARY DIVERSION CHANNEL - DURING PHASE 2 DREDGING OPERATIONS. TURBIDITY CURTAIN SHALL BE USED AROUND SIPHON OR PUMP INTAKES —/ //// / _/ ' �7// _ -- — ///// �/// / �� J ���//�/ �N,-� Te t� 1\-\ \ )460 \� �\L !L`\\ Te \\ \ �S 2A6r o (— Il // (IrK ./// ,±/; EDGE OF RESERVOIR /// fir- WSE 1 // - �_ � � 2� b"" ..-- J \� �. - / / N. \ \—�/ / I \ \---` ��./T8,-s \ / I CP ELV. = 2,449.2' / / / J/ /// oI l0 �rj7 ri /, Te _ .-- / / /// _ _ e�0 ,// / % Loj I/ / /\ I N \ \ / DREDGING OPERATIONS PLAN FEATURES - 2450 - EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR STREAM CENTERLINE STREAM TOP OF BANK TOP OF EMBANKMENT SLOPE 25' TROUT BUFFER EXISTING GRAVEL ROAD EXISTING WETLAND TB EXISTING SIGNIFICANT TREE • TEMPORARY BENCHMARK (TBM) LOD WAT SF _ _ 7 / _ / / / ///\ // \\\��O l\ /mil �����— //////� ///// O �'�� LIMITS OF DISTURBANCE (LOD) = 1.22 AC / co ( /%/ WATERFALL INV. ELV. = 2,453.9' WSE ELV. @ BASE = 2,449.4' �l\ \ ti!\\ / r —J //////i LIMITS OF DISTURBANCE EROSION CONTROL WATTLES SILT FENCE PUMP OR SIPHON SYSTEM ■ ■ CULVERT / / / \ \ \ TRUCK LOADING RAMP DREDGING AREA STAGING AREA DIVERSION CHANNEL ROCK SILT CHECK -- -DREDGING OPERATIONS 25' TROUT BUFFER W1 PERMANENT WETLAND IMPACT 0.007 AC —2460 ACCESS RAMP LIMITS OF DISTURBANCE (LOD) = 1.22 AC EROSION CONTROL WATTLES y //\,V I ( 2470 WAT WAT ice- \\ —�-TB )� N. WAT LOD 71- -- vVAT \\\ SILT FENCE DOWNSLOPE TR /// -- —/~ GRAVEL ROAD 71Y, \ ,/>-y z / -- SYSTEMRARY WITH PUMP ROCKOSILTI CHECK vKK MILLS RIVER �_ iC�� / �� r _ j/�\"C� _ z/ ice— J�c� DEWATER RESERVOIR DURING o ,r��\ � �� �_ // / 1 (SEE DETAIL SHEET 2.4) TO TB TB TB 0 u) 0") C (1) • E sa) LIJ op 0 NORTH FORK M (f) LLI LLI 1 DREDGING OPERATIONS PLAN - N. FORK RESERVOIR LLJ PRELIMINARY DRAWING CoH: 01/28/2021 DWR: 01/19/2022 DATE: 01/19/2022 1" = 40' H.D.: NAD83 (SCSP) V.D.: NAVD88 JE PID: 8102 6.2 DREDGING OPERATIONS PLAN FEATURES - 2450 - EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR FILL LIMITS TOP OF EMBANKMENT SLOPE EXISTING GRAVEL ROAD 2450 LOD SF EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR LIMITS OF DISTURBANCE (LOD) SILT FENCE CONSTRUCTION ENTRANCE INE Ina men I Mg TEMPORARY SILT FENCE AROUND PERIMETER OF WORK AREA LIMITS OF DISTURBANCE (LOD) = 1.57 AC HENDERSONVILLE CITY OF PIN: 9631942484 12.35 AC Il �� CONSTRUCTION ENTRANCE TO HAYWOOD ROAD / NC 191 0 1 1 40 Ii gF 2 0 •4tv ‘• fib 7 J'cP00i•• -a '— LOD LOD o/ `�F � SF — o N - a N LOUKAS, CHRISTOS G; LOUKAS, VIVIAN PIN: 9631944652 0.41 AC 80 Feet NM SCALE: 1" = 40' / 1 1 i TOP OF FILL EMBANKMENT ELV. - 2,097.0' 1 EXISTING GRAVEL PAD FILL LIMITS STORAG E SHEDS ANN ins LOD 2095 SF — MLRC LLC PIN: 9631849822 7.58 AC LOD SF 2090 FILL AREA SURFACE AREA = 0.75 AC VOLUME = 7,500 CY N U 0 I I I I LOD SF 1 I I I 0 0 0 IMO I 0 0 N �oq (.0 iso SF / OD , •`�� •' HARVEY, KEVIN J; HARVEY, DENISE D PIN: 9631944772 0.30 AC • • • r- cnO- m01 Cr) 0- -no co r1 01 l I �0o I0 , HAMILL, JOSH; HAMILL, STEPHANIE PIN: 9631944881 0.30 AC I LIMITS OF DISTURBANCE (LOD) = 1.57 AC FILL LIMITS TEMPORARY SILT FENCE AROUND PERIMETER OF WORK AREA 1 1 1 1 1 1 1 1 SHOEMAKER, DAVID PIN: 9631944991 0.34 AC 1 1 1 1 1 1 1 1 1 1 1 1 1 z z r— V 0 w 0 0 LL w Nw w LL J J NORTH FORK M Lu J J_ z 0 ce Lu Lu z 0 z 0 0 0 rz_n 0 Lu PRELIMINARY DRAWING REVISIONS: CoH: 01/28/2021 DWR: 01/19/2022 DATE: 01/19/2022 PLOT SIZE: 24" x 36" 1" = 40' H.D.: NAD83 (SCSP) V.D.: NAVD88 JE PID: 8102 6.3 TOP OF DAM INV. ELV. = 2,449.2' WTP INTAKE INV. ELV. = 2,439.0' (APPROX.) • • • • • • • • • • • • • • • • TEMPORARY PUMP OR • SIPHON �• • • • 15" DIP WITH GATE VALVE • INV. ELV. = 2,432.5'� • • N. FORK MILLS RIVER • • 4 4 4 MMMM 4MM a J 4 a 9 a J 4 4 4 4 4 4 4 44 J 4 4 4 a 4 44 J 4 a 4 J 4 4 a 4 4 44 4 4 4 4 4 a 4 4 4 4 4 44 • a J 4 4 4 4 4 a 4 4 J 4 a BOTTOM DRAIN BURIED zy— TO WTP N. FORK RESERVOIR WATER SURFACE TOP OF SEDIMENT NEAR INTAKE ELV. = 2,447.0' IDREDGE RESERVOIR TO ELV. = 2,432.0' CONTRACTOR SHALL NOT DREDGE ANY IN -SITU MATERIALS BELOW ACCUMULATED SEDIMENT DEWATERING PLAN NOTES 1. PRIOR TO STARTING DREDGING OPERATIONS, THE WATER SURFACE ELEVATION OF THE RESERVOIR SHALL BE LOWERED SUCH THAT THE BOTTOM OF THE RESERVOIR IS NEARLY DRY WITH ONLY A SMALL RESIDUAL POOL OF WATER. THE RESERVOIR WATER SURFACE ELEVATION SHALL NOT BE LOWERED MORE THAT 1 FOOT PER DAY SUCH THAT DISCHARGE FROM THE SIPHON DOES NOT CAUSE EROSION TO CHANNELS DOWNSTREAM. 2. INSTALL TEMPORARY ROCK SILT CHECKS WITH STILLING BASINS AS SHOWN IN THE DRAWINGS. THE LOWERED WATER SURFACE ELEVATION SHALL BE MAINTAINED FOR A SUFFICIENT PERIOD OF TIME TO ALLOW THE SEDIMENT THAT WILL BE EXCAVATED TO DEWATER AND DRY OUT. ONCE THE SEDIMENT HAS BEEN SUFFICIENTLY DEWATERED DREDGING OPERATIONS MAY BEGIN. DEWATERING PLAN DETAIL ROCK SILT CHECK FOR INLET PROTECTION WASHED #57 FILTER STONE NCDOT CLASS B RIPRAP WASHED #57 FILTER STONE NCDOT CLASS B RIPRAP ROCK SILT CHECK FOR INTAKE PROTECTION DETAILED PLAN NOT TO SCALE SETTLING BASIN DETAILED SECTION A - A' NOT TO SCALE EXISTING EMBANKMENT SETTLING BASIN EXISTING EMBANKMENT ROCK SILT CHECK SPECIFICATIONS 1. ALL ROCK SILT CHECK INSTALLATION WORK SHALL TAKE PLACE DURING DRY WORKING CONDITIONS. THE CONTRACTOR SHALL MINIMIZE THE EXPORT OF SEDIMENT TO ADJACENT SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE. 2. INSTALL THE ROCK SILT CHECK AND ARMORED OUTFALL, ELEVATIONS AND GRADES IN THE DRAWINGS AND DETAILS. 3. NON -WOVEN 8 OZ FILTER FABRIC SHALL BE USED BENEATH ALL RIPRAP INSTALLATIONS. 4. EROSION CONTROL BLANKET SHALL BE USED ON ALL EXCAVATED AND BACKFILLED EMBANKMENT AREAS. ROCK SILT CHECK DETAIL NORTH FORK M DREDGING OPERATIONS PLAN DETAILS PRELIMINARY DRAWING REVISIONS: CoH: 01/28/2021 DWR: 01/19/2022 DATE: 01/19/2022 PLOT SIZE: 24" x 36" 1" = 40' H.D.: NAD83 (SCSP) V.D.: NAVD88 JE PID: 8102 6.4