Loading...
HomeMy WebLinkAboutNC0062413_Wasteload Allocation_19920609NPDES DOCUMENT SCANNING COVER SHEET NPDES Permit: NC0062413 Linville Ridge Country Club WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Compliance Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: June 9, 1992 '1`liis document is printed on reuse paper - igaiore any content on the reYerse side State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27604 James G. Martin, Govemor George T. Everett, Ph.D. William W. Cobey, Jr., Secretary Director June 9, 1992 Mr. Gary Johnston Linville Ridge Development Company PO Box 704 Linville, NC 28646 SUBJECT: NPDES Permit Number NC0062413 Linville Ridge Development Avery County Dear Mr. Johnston; On January 10, 1992, James B. Cranford, PE with CRW, PC submitted for you a modification request for the subject permit. The proposed modification constitutes a major modification. The proper protocol for such a change entails a formal application with supporting documentation (such as the 1/10/920 CRW submittal) and $400 processing fee. Since you will be relocating your discharge to a positive -flow stream, it is probable that you will have Tess stringent limitations than the 5/2 (BOD/NH3) currently assigned effective 7/1/93. I will retain the aforementioned submittal for 60 days in anticipation of receipt of the requested additional information. After sixty days, I will return it as incomplete. If y,ou have any questions on this matter, you can reach me at 919/733-5083. Yours truly, Jul �hanklin, Environmentalnmental Engineer col5ies TSB - Jackie Nowell ARO - Paul White Permit File - Coleen Sullins Pollution Prevention Pays P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer ��-- 41--- O. /S"m,. arcs y as/3 12" po 6. 5:e5' vi 7 c 6/.1; S.79 A - O, o. 3 7 S C1 / 11(Z- 6 L 3 09 z. = 6 . / 7 ,�� a. 7s / 7Q- C571 = v/9 z. a 76 c..6 sf s Z( /D - (6, A)(437s } z D, 6S6 c6 ti v. oG°c cs-6 w.7 /ts (a, iS (0, )r a D Ts—c„6. ^' a, oa'.af F- �_ 312.. 6). /.s' ( u, 7S- _ 6. // tA o, ism, , linville ridge development AMMONIA 7Q10: 0.0600 NH3 Effl. Conc: AL (1/1.8 mg/1) : Upstream NH3 Conc.: Design Flow: Predicted NH3 Downstream: NH3 Limit: 9.9000 1000.00 220.0000 0.0150 2923.42 2.923423 3012.903 3.012903 AMMONIA 7Q10: 0.0800 NH3 Effl. Conc: 9.9000 AL (1/1.8 mg/1) : Upstream NH3 Conc.: Design Flow: Predicted NH3 Downstream: NH3 Limit: 1800.00 220.0000 0.0150 2399.76 2.399757 7236.559 7.236559 ANALYSIS cfs mg/1 ug/1 ug/1 MGD ug/1 mg/1 ug/1 mg/1 ANALYSIS (WINTER) cfs mg/1 ug/1 ug/1 MGD ug/1 mg/1 ug/1 mg/1 linville ridge development CHLORINE 7Q10: CL2 Effl. Conc: AL (17/19 ug/1) : Upstream CL2 Conc.: Design Flow: Predicted CL2 Downstream: CL2 Limit: 0.0600 9.9000 17.0000 0.0000 0.0150 2764.86 2.764864 60.87096 0.060870 ANALYSIS cfs mg/1 ug/1 ug/1 MGD ug/1 mg/1 ug/1 mg/1 t SUMMER MODEL RESULTS Discharger : LINVILLE RIDGE DEVELOPMENT Receiving Stream : UT WF LINVILLE RIVER The End D.O. is 8.05 mg/l. The End CBOD is 9.93 mg/1. The End NBOD is 3.40 mg/1. WLA WLA WLA DO Min CBOD NBOD DO Waste Flow (mg/1) Milepoint Reach # (mg/1) (mg/1) (mg/1) (mgd) Segment 1 7.04 0.00 1 Reach 1 45.00 13.50 6.00 0.01500 1 *** MODEL SUMMARY DATA *** Discharger : LINVILLE RIDGE DEVELOPMENTSubbasin : 030830 Receiving Stream : UT WF LINVILLE RIVER Stream Class: C TROUT Summer 7Q10 : 0.06 Winter 7Q10 : 0.08 Design Temperature: 25.0 ILENGTHI SLOPE' VELOCITY 1 DEPTHI Kd 1 Kd I Ka 1 Ka I KN 1 1 mile I ft/mil fps 1 ft 'design' @204 'design' @201/2 Idesignl 1 1 1 1 1 1 1 1 1 Segment 1 1 1.001450.001 0.162 1 0.19 1 0.91 1 0.72 155.75 1 50.001 0.73 I Reach i 1 1 I 1 1 I 1 1 1 1 Flow I CBOD 1 NBOD 1 D.O. 1 1 cfs I mg/1 1 mg/1 1 mg/1 I Segment 1 Reach 1 Waste 1 0.023 1 45.000 1 13.500 1 6.000 Headwaters) 0.060 1 2.000 1 1.000 1 7.440 Tributary 1 0.000 1 2.000 1 1.000 I 7.440 * Runoff I 0.000 I 2.000 1 1.000 I 7.440 * Runoff flow is in cfs/mile P SUMMER I Seg VI Reach # I Seg Mi I D.O. I CBOD I NBOD I Flow I 1 1 0.00 7.04 14.01 4.49 0.08 1 1 0.10 7.86 13.54 4.37 0.08 1 1 0.20 7.97 13.08 4.25 0.08 1 1 0.30 7.99 12.64 4.13 0.08 1 1 0.40 8.00 12.21 4.02 0.08 1 1 0.50 8.01 11.79 3.91 0.08 1 1 0.60 8.02 11.40 3.80 0.08 1 1 0.70 8.03 11.01 3.70 0.08 1 1 0.80 8.04 10.64 3.60 0.08 1 1 0.90 8.04 10.28 3.50 0.08 1 1 1.00 8.05 9.93 3.40 0.08 I Seg # I Reach # I Seg Mi 1 D.O. I CBOD I NBOD I Flow I DIVISION OF ENVIRONMENTAL MANAGEMENT March 4, 1992 MEMORANDUM TO: Dale Overcash THRU: Ruth Swanek pc -Dos Carla Sanderson FROM: Jacquelyn Nowell�(a SUBJECT: Estimated 7Q10 Flowdat Proposed Discharge Site Linville Ridge Development Co. NPDES Permit No. NC0062413 Avery County The Technical Support Branch has reviewed the letter from the project engineer of the subject facility and has the following comments. Our review of the drainage area of the proposed discharge site (Area 2 on the map) was slightly smaller at 0.15 square miles compared to their measurement of 0.16 square miles. Our estimate of the 7Q10 flow at that site is also 0.06 cfs, using runoff yields from the USGS station downstream. Assuming that the drainage area measurements are accurate, these estimates seem to indicate that there is enough flow in this segment of the UT West Fork Linville River. A preliminary Level B model was run at the proposed site for the Linville Development facility at a design capacity of 0.015 MGD. Using a headwater flow of 0.06 cfs, model results indicate the following effluent limits will protect water quality. Summer Winter BOD5 (mg/1) 30 30 NH3-N (mg/1) 3 7 DO (mg/1) nr nr TSS (mg/1) 30 30 Fecal (/100m1) 200 200 Res. Chlorine (ug/1) 28 28 pH (SU) 6-9 6-9 It should be noted that these limits are preliminary and final limits will be assigned when a formal permit application is requested. If there are any additional questions concerning this matter, please contact me. cc: Forrest Westall WLA File Sue- J. CRAIG CRANSTON. I'.E. THOMAS H. ROBERT.SON. P.E. ELDRIDGE A. WHITEHURST, JR.. P.E. Cranston, Robertson & Whitehurst, P.C. ENGINEERS PLANNERS SURVEYORS 016 /QL. OLD ENGINE COMPANY NO. 1 POST OFFICE BOX 2546 �'.j L�J( 452 ELLIS STREET AUGUSTA. GEORGIA 30903 TELEPHONE (404) 722.1588. TELECOPIER (404) 722-8379 January 10, 1992 State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management 512 North Salisbury Street Raleigh, North Carolina 27611 ATTN: Mr. Dale Overcash, P.E. 149:77!FilltD )+N 2 3 1992 Subject: NPDES Permit No. NC0062413 Linville Ridge Development Co. USGS Data and 7Q10 Min. Flow Calculations Our File No.: 90-268 Gentlemen: JOHN T. ATTAWAY C. WAYNE COX JAMES B. CRANFORD. JR. P.E. VAUGHN L MAXWELL, III P. FRANK PURNELL WAYNE SWANN. LS. ANDREW R. WIGGERS ail • i On April 3, 1991, our firm submitted an engineering report evaluating non -discharge alternatives for Linville Ridge Development Co. in accordance with Part III, Item D of the NPDES Permit. The report recommended adding a tertiary filter at the treatment plant and piping the effluent to a discharge point in the stream that is greater than or equal to positive 7Q10 minimum flow. This minimum 7Q10 flow rate has been defined by Ms. Carolyn McKaskill of your organization as 0.05 cfs. It is our understanding that since no design calculations were submitted with the engineering report documenting the proposed discharge point location as indicated on Figure 2, the State requested 7Q10 discharge points from the U.S.G.S. We understand that the U.S.G.S. provided two 7Q10 sites labeled as sites 1 and 2. Site 1 is the closest to our proposed discharge location. The site data indicates that the 7Q10 minimum flow at this location is approximately 0.09 cfs. This site is located some 1750 linear feet from our proposed location which suggests that the project cost will almost double. The 7Q10 flow at our proposed discharge location is 0.06 cfs which is in line with the State requirements. We respectfully request that you approve our proposed discharge point location. Division of Environmental Management January 10, 1992 Page 2 Attached are the design calculations qualifying our proposed discharge point location. The design calculations include the determination of the 7Q10 flow rates at the Linville Ridge property line and at the proposed discharge point location as indicated on Figure 2 in the engineering report. Also, the 30Q2 flow is analyzed on Sheet 3 of 11 in the calculations. Sheet 11 of 11 is a topographic map of the area and was previously submitted to the State as Figure 1 in the engineering report. This map indicates the areas used for the analysis and the proposed discharge point location. We have also marked the sites suggested by your organization for your convenience. We trust that the design calculations and documentation is complete for your organizational review. However, should you have any additional questions or comments regarding any aspect of the Engineering Report or the documentation provided herewith, please contact us at your earliest convenience. Sincerely, CRANSTON, ROBERTSON & WHITEHURST, P.C. mes B. Cranf g6rd , ., P.E. oject Engineer PROJECT TITLE: Cranston, Robertson & Whitehurst, P.C. ENGINEERS PLANNERS L� Jl LLG �1�v T T1-- T P Lam► - A ATE A‘`n v ES WORK DESCRIPTION: 70 10 K 1 N F �O�J biGIEgtAk,-)E 7Q 10 T Pol-rr E �15L1-iALb6 Ptorsg_T 0 SURVEYORS rJOB # 90 - zG PAGE % OF COMP. • L CHECKED: ` r '� / / PAGES DATE: /-30^9/ DATE:_,_, l�sL���C�f✓ : Pfe0sp = . (0. A c ,= 3,3 85R---> 0 . s 6.5. Q v Ph. b&tnE Y C_ Ae64 CO = 9 B. 8 Pfc,= 0. 1(osM Ae6A ©= 1/9.2 A-c.= o, 195m Aet4 10k So.7 5. 9 1 s tA 7Qlo Fog. Z.1 ,7A- SAT // oic // (PRoa).6.6z 3/ 056 S SEA SMT 5 0` 1L 7e�,u »- 7 Q /o �-'o�e A�`4s lam, C� --tee C C0,0 Q7,_3 7Qt01-3 70)04 7Q 1 o 1_3 2. 1 3,3840,16+0d, 5.9) 7Q10f_3= 1.33c'Fs ,L7TE, AA, JE 7Q icD 7Q10Z_3 74101-3 A L P13. A f- A 3 7R ( 0z_3 0,I(0+0, 1� 1,33 3.38+-o. u. + 0, )9 R1E PofLrj L 1 PROJECT TITLE: WORK DESCRIPTION: Cranston, Robertson & Whitehurst, P.C. ENGINEERS PLANNERS SURVEYORS JOB # 0 -Ze8 D. 12 cis PAGE OF / 1 PAGES COMP. --, 1X- - DATE: / 1 50-9/ CHECKED: 4 DATE - `9.2 bsT6-R_)--e 7p 10 t. No, 10 6e66,-.1 (7 co oz) � - e6F. 1'1 L:ve_s Z. 7 6t (0z 761 i 01-3 0.1(p 0�) (a, 3) 3.13 • • O. Co c:Cs I 0, 0 5 c__`_s (e). D. 05 c f lis }4t r ►-tv x-.1 r Fe. 7 Q 1 O ��� CAgoLf J R c ►L� w -&(_, l■..a,11.'11t PROJECT TITLE: Cranston, Robertson Sc Whitehurst, P.C. ENGINEERS PLANNERS SURVEYORS JOB # 0-?log ,--rr A ppves WORK DESCRIPTION: 30 Q Z F LO PAGE 3 OF PAGES COMP. -� C- DATE: / 30 -9 CHECKED: A DATE: -beregLA 1 N 3� 2. E I-) 67 po - t 5C, w A E ( = a Q Z o _ 4.3 cfs F,EA- 3,54 5o. R.\ 30 Q Z, 3oQ Z�}- 4E0- _ 30 Q Z 5 �? 3ts'- 30 2 . ( -7 cis 1 so ?<3ocz1 3o Q 2_3 " 0,33 Z. V7 3. S`f �. Z5 o,o c`Fs oK