Loading...
HomeMy WebLinkAboutWQ0034043_Regional Office Historical File Pre 2018ATA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary May 27, 2009 Mr. Carl Weber, Town Administrator Town of Marshville 201 West Main Street Marshville, NC 28103 Subject: Permit No. W00034043 First Baptist Church of Marshville Wastewater Collection System Extension Union County, North Carolina Dear Mr. Weber, In accordance with your application received on May 11, 2009, we are forwarding herewith Permit No. WQ0034043 dated May 27, 2009, to the Town of Marshville for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted for the construction and operation of approximately 765 linear feet of 8-inch gravity sewer and the discharge of 900 gallons per day of domestic wastewater into the Town of Marshville and Anson County existing sewerage systems in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Mooresville Regional Office Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-16991 Fax: (704) 663-6040 1 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality_ora No ahCarolina 7Vatura/lj Fast Track Engineering Certification Permit No, W00034043 May 27, 2009 OwnerANQCS WQCsivvwrp PE Carl Weber, Town Admin, Vance Gulledge, Dir Jeff McCluskey Town of Marshville Anson County MC2 Engineering, Inc, 201 West Main Street 907 N. Washington St, 2110 Glen Craig Dr., Ste 400 Marshville, NC 28103 Wadesboro, NC 28170 Charlotte, NC 28262 Alt .WWTP Alt. WQCS Russell Colbath Mark Garbark City of Monroe Union County 2401 Walkup Ave, 400 N. Church St. Monroe, NC 28111 Monroe, NC 28111 Complete and submit this form to the permit issuing regional office with the following' • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form, Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineers Certification and .all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION 0 Partial 0 Final as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (0 periodically, 0 weekly. 0 full time) the construction of First Baptist Church of Marshville, a Union County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit, 15A NCAC 2T, the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable, the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking ail partial certifications up until a final certification is received, Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Owner/Permittee: a. Town of Marshville Full Legal Name (company, municipality, HOA, utility, etc. arl Webber — Town Administrator Application Number: (to be completed by DWQ) Signing Official Name and Title (Please review 15A NCAC 2T .6106 (b) fo The legal entity who will own this system is: 0 Individual D Federal Municipality 0 a 1 d. 201 West Main Street Mailing Address NC Z State 1 h. (7fl4) 624-2515 Telephone authorized signing officialsl) ate/County 0 Private Partnership 0 le. Marsliville Facsimile 2. Project (Facility) Information: 2aGrravity SS to serve rve First Beptist Church of Marshville . Brief Project Name (permit wilt refer to this name) 3. Contact Person: 3a. Jeff McCluskey - Project Civil Engineer Name and Affiliation of Someone Who Can Answ 3b, (704) 510-9797 Phone Number Project is New 0 M 2. Owner is 2a. If private, applicant will be: Retaining Ownership (i.e. store, church, single office, etc.) or 0 Leasing units (lots, townhomes, etc. - skip to item B(3)) El Selling units (lots, townhomes, etc, - go to Item B(2b)) Anson County City g. 28103 0 ation 0 Other (specify): Zip Code marshvilletownhall @alit E-mail 2b, Union an existing permit) County Where Projec et s Located s About this Application 3c. Jeff @ tnc2eng.corn__ E-mail dification, Permit No.: Public (skip to Item B(3)) 0 Private (go to Item 2(a)) 2b. If sold, facilities owned 6 y a (must choose an 0 Public Utility (Instruction C) 0 Homeowner Assoc./Developer (Instruction D) Owner of Wastewater Treatment Facility (WWTF) Treating Waste 4a. AnsonCounty WWTP Name of Town of Owner of Downstrea The origin of this wastewa fib, f3" Gravity r rReceiving Sewer Size 0 Force Main (check all that apply): Residential Subdivision 0 Apartments/Condominiums 0 Mobile Home Park 0 School [ Restaurant 0 Office er From This Project 4b. 0041408 WWTF Permit No. Unknown Permit # of Downstream Sewer (Instruction E El Retail (Stores, shopping centers) C ➢ institution fospital Church [j Nursing Home 0 Other (specify):__ Volume of wastewater to be allocated or permitted for this particularproject: *Do not include future flows or previously permitted allocations If the permitted flow is zero, indicate why: 0 Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line 0 Row has already been allocated in Permit No. 0 Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to deterrnine if a permit is required) 00 % Domestic/Commercial Industrial (attach s description) (RO: contact your Regional Office I Pretreatment staff) % Other (specity): 990 gallons per day PTA I.2/07__v. • 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item 8(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). 300 seats x 3 gpd per seat = 900 gpd 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) New Gravity or Additional Force Main 8" 764.94 G 0 11. Summary of Pump Stations wl associated Force Mains to be Permitted (attach additional sheets as necessary) W D Pump Station Location !D (self chosen - as shown on plans/map for reference) Z 1 Z 0 Design Flow (MGD) Operational GPM @TDH Point , Power Reliability Option 1 - permanent generator w/ATS; I Force Main Size 2 - portable generator w/MTS I I Force Main Length U i Z' 0 QPump Station Location ID (self chosen - as shown on plans/map for reference) CC 0 Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option 1 - permanent generator w/ATS; 2 - portable generator wIMTS Force Main Size Force Main Length Z •, H n M Pump Station Location ID (self chosen - as shown on plans/map for reference) a CO Design Flow Operational Point j Power Reliability Option (MGD) i 1 - permanent generator w/ATS; GPM @TDH GPM 2 - portable generator w/MTS l_---f--- Force Main Size Force Main Length I I 12. �I Will Yes the • wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? No If Yes, permit number of 2nd treatment facility Anson (Primary)-0041408 & Monroe (Secondary)-024333 i(RO — if "yes" to 6,12 please contact the Central Office PERCS Unit) 13. l <i Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? 1 Yes ■ No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 12/07_ver2 14. Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401Certification? 0 Yes El No N/A. Sedimentation and Erosion Control Plan? [] Yes EJ No N/A Stormwater? © Yes ©No N/A Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)] involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes; a and provide details Owner/Permittee's Certification: (Signature of Signing Official and Project Name) 1, Cart Webber _. attest that this application for Gravity SS to Serve First Baptist Church of Marshville_ has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215,6A and 143-215,6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well a.,civil-penalfies-up to $25,000 per violation. - Signing Official Signature ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRiOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PR©XIMITY1 co TO OTHER UTILITIES, DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 z Date Professional Engineer's Certification: (Signature of Design Engineer and Project Name) 1, .Jeffrey D, McCluskey ,, attest that this application for Gravity. SS to Serve First Baptist Church of Marshville has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria; for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215,66, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25000 per violation. 2a. Jeffrey D. McCluskey, PE Professional Engineer Name 2b. Mc2 Engineering, lnc Engineering Firm 2c. 2l l0 Ben Craig Dr., Suite 400 Mailing Address 2d. Charlotte City 2g. 704.510.9797 2h, 704.510.9787 Telephone Facsimile NC 2f. 28262 State Zip 2i—Jeff@mc2eng.com E-mail NC PE Seal, Signature Date Al2/07 ver2 «HHm are responsible %l 0 160 (this Department Eo P [ Complete A m W Wt R "Rte. la, WW1]; Facility WTI) !be & ¢aimatedAG; l Aownot yet tbmyyt theWw TR m WWII) lac' Total flow for i +1 Complete this s 1�« proposed witstewatcr11 w. E500 _V m mm r & q m4(,m! ao gi it sewer overflow & *Aver treatment plant ander norle Abk State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name anion County Public Works Project 'Name for which flow is being requested: New construction — First Baptist Church Marshville, NC Nfore than one FTSE-10/07 May he required for a single project he If1417? is not responsih/efr all pump Stations along the route qf the proposed wastewater I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Citv of Monroe b. WWTP Facility Permit 4: NCO24333 All flows are in MGD 10.40 c. WWTP facility's permitted flow d. Estimated obligated. flow not yet tributary to the WWII' e, WWTP facility's actual avgflow f. Total flow for this specific request g. Total actual and obligated flows to the facility h.. Percent of permitted flow used 0.637 6.408 0.0009 7.0459 67.74°A II. Complete this section for each pump station you are Tsponsible for along the route of this proposed wastewater flow. List putnp stations located between the project connection point and the WWTP Pump Station Name A.pprox. Capacity, MGD A.pprox. Current Avg. (Firm/Design) Daily Flow, NIGD **NOTE: City of Monroe Certification is for WWFP only.** 111, Certification Statement: 1, Russell Coibath.. certify that, to the hest of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated alone.: the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures Using the best available data, This certification applies to those items listed above in Sections I and II for which I am th- -es:poit>ible party, Signature of this - :icates acceptance of this wastewater flow., t,'F; ';•`s S{:�i A'w :Tel .�. ,.+r' '„i ,�rj.yy ti tri r. ari :• r pit �t.f� s . , �'�....:l. ' . r r. State of North Carolina Department of Environment and Natural Resources Division of Water Quality Flow TrackinWAcceptance for Sewer Extension Permit Applications (FTSE —10/07) Project Applicant Name: Union County Public Works Project Name for which flow is being requested: New Construction — First Baptist Church, Marshville More than one FTSE-10/07 may he required fir a single project if the owner ofthe WWTP is not responsible fir all pump stations; along the route of the proposed wastewater 3w. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: BY CITY OF M.ONROE FTSE 10/07 SUBMITTED SEPERATELY b. WWTP Facility Permit #: c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h... Percent of permitted flow used All flows are in MGD .0009 11. Complete this section for each pump station you are responsible 'for along the route of this proposed wastewater flow. List pump stations located between the project connection paint and the WWTP Pump Station Name East Side Pump Station No. 1 East Side Pump Station No.2 Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD 2.59 1.28 1..76 1.05 East. Side Purnp Station No.3 1.28 .78 111. Certification Statement: I, Sc c 77-r , certify that, to the best of my knowledge, the addition of the volume of wastewater to bd permitted in this project has been evaluated along he route tothe receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden. any downstream pump station en route to the receivi treatment plant under non-nal circumstances. This analysis has been performed in accordance with local established policies. and procedures using the best available data. This certification applies to those items listed above in Sections 1 and 11 for which lam the responsible party. Signature of this form indicates acceptanee,of this wastewater flow. < / /Sining • / / Official Signatat;e;;/ Date Send To mr r I3ack T asp « Change to 2«7Print 5e Show Grid Line km S of Marsh * fl,North Carolina United States E » ,t4UQ\ , 2 - � Image cou sy 2004 Microsoft Corporation „ e J % Geolog cac l S rvcy Terms of U Change m amom m 1993 Privacy Statement GoMAPS - Union County NC Public Access This map rs prepared for the inventory of rear property found withrn Unron Coun aforementioned public; pnmary rnformatroc sources shouid Ne c.irr,s0,1 for ve piled from recorded deeds, p4a public records and data ,tamed on this map Union County and the mappsng companie atton contained on this map God based on the North Carefi ne Slate Plane Coordrnale System ABr dimenyons to feet ENGINEERING Transmittal Mc2 Engineering, Inc. 2110 Ben Craig Dr., Ste. 400 Charlotte, NC 28262 Phone 704.510.9797 Fax 704.510.9787 Jeff @Mc2eng.com To: NCDENR - DWQ 610 E Center Ave, Ste 301 Mooresville, NC 28115 Attention:: Dee Browder (704) 663-1699 For Your In forniation As 'Requested For Your Approval For Your Review Project: Town of Marshville SS Extension 4/15/09 04/30/09 Fast -Track App. Gravity Sewers (Form FTA 12/07 ver2 $480.00 Application Fee 4/24/09 2 4/16/09 4/15/09 Flow acceptance from Anson County Flow acceptance from City of Monroe Flow acceptance from Union County USGS Quad Sheet Street level view of project area Comments: Please let roe know additional if any ainformation is needed. CC: Ch of 1Mai"shvi le\Coiresponderice1Transn Q-SS-(3 a- 18- 09.doc: Permit Number WQ0034043 Central Files: APS_ SWP 05/27/09 Permit Tracking Slip Program Category Status Project Type Non -discharge Active New Project Permit Type Fast Track Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer 1.00 Individual Extensions Primary Reviewer Permit Contact Affiliation dee.browder Coastal SW Rule Permitted Flow 900 Facility Facility Name Major/Minor Region Gravity SS to serve First Baptist Church of Minor Mooresville Marshville Location Address Owner County Union Facility Contact Affiliation Owner Name Owner Type Town of Marshville Government - Municipal Dates/Events Owner Affiliation Larry B. Smith Jr. 201 W Main St Marshville NC 28103 Orig Issue App Received Draft Initiated 05/27/09 05/08/09 Regulated Activities Church Wastewater collection Outfall NULL Scheduled Issuance Public Notice Issue 05/27/09 R- : r-s ed/Receiv Effective 05/27/09 Even s Expiration Additional information requested Additional information received Waterbody Name Stream Index Number Current Class Subbasin