Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0033247_Regional Office Historical File Pre 2018
Pr" 4trA NCDENR Nort'i Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E, Dee Freeman Governor Director Secretary Union County Public Works Mr, Mike Garbark.„ P.E,, Assistant .Di.rec 500 N. Main Street, Suite 500 Monroe, North Carolina. 281. L. Dear Mr, Garbark: March 2, 2012 of Public Works Subject: Permit No. WQ0033247 (Modification) Fairhaven Phase 11 Wastewater Collection System Extension Union County, North Carolina In accordance with your application received on February 2 , 2012, we are forwarding herewith Permit No.WQ0033247, dated March 2, 2012.to Union County Public Works for the construction and operation of the subject wastewater collection system extension. This permit shall he effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shag be considered a part of this permit and is therefore incorporated therein by reference, Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 211 .0403 or any individual system -wide collection syste.rn permit issued to the .Perraittee Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 1.5A -NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Purnp Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design. criteria. and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215,6A through §143-215.6C, construction of additional or replacement wastewater collection 'facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Onc North Carolina Mooresville Regional Office 613 East Center Ave„ Suite .:301 Nfoore.sk NC 28115 Internet iswormcmviaterquaCity,org Customer SCINiCC: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer -50% Recyclediln Post Consumer Paper Phone (70,4) 663-1699 Fax' (704) 663-6040 Mr, f3aihark Page 2 March 02, 2012 In accordance with the provisions of r icle 21 of Chapter 143, (Jeneral Statutes of North Carolina as amended, and other appiiall. Lavas, Mules, and Regulations, permission is hereby granted to Union County Public Works for the construction rind operation of approximately 6,256 linear feet of 8-inch gravity sewer and the discharge of 50,445 gallons per day of collected domestic wastewater (previous permit was issued on July 29, 2008 for approximately 6,256 linear feet and the discharge of 4,275 gallons per day) into Twelve Mile Creek existing sewerage system, pursuant to the application received on February 21, 2012, and in conformity with. 15.h NCAC 2T, the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. Assessing subsequent impacts to the downstream collection system and treatment facility is the complete responsibility of Union County Public Works. Union County Public Works must utilize whatever tracking tools necessary for planning additions of sewer flow in order to maintain compliance with the WVYTP permitted limits and the WQCS00054 perrnit requirements. The sewage and'wastewater collected by° this tern shall be treated in t"welv!°c Mile Creek Was tcwater Treatment plant WW" P (NPI)ES No NCt)085359) pri receiving stream.. to being discharged into the It any parts, requirements, or limitations contained in this perr:nit are unacceptable, you have the right to request an adjudicatury hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with. the Office of Administrative hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714, Unless such demands are made, this permit shall be final and hinding, If you need additional information concerning this matt:cr, please contact Samar Bou-Ghazale at (704) 663-1699. les Wakild, RE. cc: Mooresville Regional Office, Collection System. Permit File Surface Water Protection Central Files PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT (MODIFICATION) This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 1 This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. Per 15A NCAC 2T .0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. A copy of the construction record drawings shall be maintained on file by the Permitt of the wastewater collection facilities, 0 he life Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable;. the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 20O0 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10, The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 28 .0200 and 15A NCAC 2H .0500 Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 2" day of March, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for`Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0033247 (Modification) 3 Fast Track Engineering Certification Permit No. W00033247 (Modification) March 2, 2012 Owner/WWrPIWQCS Union County Public Works FairHaven Phase II 500 N. Main St., Suite 500 Monroe, NC 28112 Bryan Metzler PE Merrick & Company 1001 Morehead Square Drive Suite 530 Charlotte, NC 28203 Complete and submit this form to the permit issuing regional office with the following: One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permi modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria, This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division,. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEERS CERTIFICATION Partial El Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ([ periodically, 0 weekly, El full time) the construction of FairHaven Phase II, a Union County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable.. the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions, cc Q Z z 0 USE THE TAB KEY TO MOVE FROM FIEL Owner/Permittee: la. Union County Public Works Full Legal Name (company, municipality, HOA, utility, etc., 1b. Mike Garbark, PE, Assistant Director Application Number: (la be completed by DWQ) Signing Official Name and Title (Please review 15A NCAC 2T ,6106 (b) for authorized signing officials!) 1 c. The legal entity who will own this system is: 0 Individual 0 Federal 0 Municipality 0 Staf `County El Private Partnership 0 id. 500 North Main Street, Suite 500 Mailing Address NC_ State 1 hm 704-296-4239 Telephone 2. Project (Each! 2a, FairHaven Phase Brief Project Name (permit will refer to this name) 3. Contact Person: 3a. Mike Qarbark, PE - Union County Public Works 11, 7 04-296-4232 w Facsimile......— ation: Name and Affiliation of Someone Who Can Answer Que 3b. 704-296-4239 Phone Number 1. Project is 0 New I', Modification 2. Owner is 0 Public (skip to Item 2a. ry It private, applicant will be 0 Retaining Ownership (i.e. store, church, single office, etc.) or Leasing units (lots, townhomes, etc. - skip to Item B(3)) 0 Selling units (lots, townhomes, etc, - go to Item B(2b)) 3. Union County Public Works Owner of Wastewater Treatment Fa illy (WWTF) Tr an existing permi le, Monroe City lg. 28112 Zip Code mike:garba E-mail 1?.pn County Where Project is Located ons About this Application 3c. mikegarbark@co.union.nc.us E-mail edification, Permit No Wt t1033247 4a. Twelve Mile Creek Name of WWTF �� Private (go to Item 2(a)) 2b, old, facilities owned by a (must choose one) 0 Public Utility (Instruction C) 0 Homeowner Assoc./Developer (instruction D) ating Wastewater From This Project 4b. NC0085359 Owner of Downstream Sewer fib. Gravity Union County Receiving Sewer Size ?� Force Main 0 6. The origin of this wastewater is (check all that apply): z 2 w CO 7. 0 Residential Subdivision Apartments/Condominiums 0 Mobile Home Park 0 School O Restaurant Q' Office WWTF Permit No. 278 0 Retail (Stores, shopping centers) O Institution 0 Hospital 0 Church O Nursing Home © Other (specify). of Downstream Sewer (Instruction E.. 4 Domestic/Commercia % Industrial (attach description.) (RO: contact your Regional Office Pretreatment staff) %/a Other (specify): Volume of wastewater to be allocated or permitted for this particular project: 46,170 gallons per day *Do not include future flows or previously permitted allocations If the permitted flow is zero, indicate why: O Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit No. 0 Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) 7 W M Pump Station Location ID Z z 0 Pr ovide a the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item 8(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). z 1- Design Flow (MGD) 9 162 lots * 285 GPD = 46,170 GPD 46,170 GPD (modified permit) + 4,275 (original permit) = 50,445 GPD for this Phase 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) New Gravity or Additional Force Main 1. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) (self chosen - as shown on plans/map for reference) Operational Point Power Reliability Option GPM @TDH 1 - permanent generator w/ATS; Force Main Size } Force Main Length 2 - portable generator w/MTS Pump Station Location ID Design Flow (MGD) Operational Point GPM @TDH 2 ix Pump Station Location ID w Design Flow (MGD) (self chosen - as shown on plans/map for reference) Power Reliability Option- ` � ___-�--- --- - �--------- _ 1 - permanent generator w/ATS; Force Main Size Force Main Length 2 - portable generator w/MTS (self chosen - as shown on plans/map for reference) Operational Point Power Reliability Option GPM @TDH 1 - permanent generator w/ATS; I Force Main Size 2 - portable generator w/MTS r Force Main Length 12. Will the wastewater flow in the proposed sewer lines or pumpstations be able to be directed to another treatment p p tr atment facility? ❑ Yes ® No if Yes, permit number of 2nd treatment facility (RO - if "yes" to 8,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? ® Yes ❑ No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA12/07 2a. Bryan Metzler, PE ry Professional Engineer Name 2b. Merrick & Company_^_ Engineering Firm 2c. 1 001 Morehead Sic mare Drive Suite 5 Mailing Address 14. Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401 Certification? S Yes No ❑ N/A Sedimentation and Erosion Control Plan? El Yes LJ No © N/A Yes No El N/A Storrnwater? 15, Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)] involve aerial Vines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: LJ and provide details .......... ................. Owner/Permittee's Certification: (Signature of Signing Official and Project Name) I, _ Mike Garbark, PE _ , attest that this application for FairHayen Phase 11 has been reviewed by me and is accurate and complete to the best of my knowledge, I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215,6A and 143-215,68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 a well as civil penalties up to $25,000 per violation. Signing Official Signature ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY TO OTHER UTILITIES, DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 z 0 F- 2, Professional Engineer's Certification: (Signature of Design Engineer and Project Name) 1, Bryan C Metzler, PE�,. , attest that this application for FairHavon Phase 1f has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: in accordance with NC General Statutes 143-215,6A and 143-215,6B, any person who knowingly. makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 14 A 2d. Charlotte 2e. NC 21, 28203 City State_...- Zip g. 0882 2i. bryan.metzlermerrick.com 2 704-529-65t?0 _ 2'h. 7a4-522- .�_. Telephone Facsimile E-mail NC PE Seal, Signature & Date FTA f `i07 116 4 Matthews; NC'; Scale: 1" = 0 150Mi 241Mt 792Ft, 1 Md = 5. 67" , Department of Enviro State of North Carolina nt and Natural Resources Division of Water Quality Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 10/07) project Applicant Name: Project Name for which flo I1ore than one FTSE- f 0/0s7 Union Co being requested: Fairhaven Phan II iVlodification).,_ pump stations along the route e proposed wastewater P is not resl ottsfl le for ald 1.. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility b. WWTP Facility at Twel -k NC0085359 c. WW1 P f°aeility s permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow t. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 6.0000 1.5749 3.56 0.0462 5.1811 86.35 11. Complete this section for each pump station you are responsible for along the t-r ute ofthis proposed wastewater flow. List pump stations located between the project connection point ttnd the W VTP Pump Station Name Poplin_Road. Approx., Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD Mcl<:inro & Greed/3.16 69 Certification Statement: ,!like C arhark ccrtii\E that, to the best. of"ttty knowledge, the addition of the volume; of vater to be permitted. in this project has been evaluated along the route to the receiving wastewater treatrn.ent facility and that the flow from this prcwject: is not anticipated to cause any capacity related. sanitary sewer overflows or overburden any do nstream pump station en route to the receiving treatment plant under normal. circumstances. This analysis has been performed in accordance with local established. policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 11 for which 1 and the responsible party. Signature of this form indicates acceptance of this wastewater flow. Signing Official k. t nature Date UNION COUNTY PUBLIC WORKS 500 N. Main Street, Suite 500 Monroe, NC 28112 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue Mooresville, INC. 28115 Attention: Regarding: Sanitary Sewer to serve Fairhaven, Phase II We are sending you: Copy of letter ® Other Description TRANSMITTAL Date: 2/16/'I2 Plans [ Prints [1 Shop Drawings Non -Discharge Permit Application Copy of Non -Discharge Permit Application Flow Tracking Form 80.00 Check (Application Fee earn Classification Form These are transmitted as checked below: For approval LI For your use D As requested 1 For review and comments Remarks: Signed: Received by: Date: Permit Number WQ0033247 Central Files: APS SWP 03/02/12 Permit Tracking Slip Program Category Status Non -discharge Active Project Type Major modification Permit Type Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer 1.10 Individual Extensions Primary Reviewer Permit Contact Affiliation samar.bou-ghazale Coastal SW Rule Permitted Flow 50445 Facility Facility Name Major/Minor Region Fair Haven Phase II Minor Mooresville Location Address Owner County Mecklenburg Facility Contact Affiliation Owner Name Owner Type Union County Public Works Government - County Owner Affiliation Mark Eugene Tye Dates/Events 500 N Church St Ste 500 Monroe NC 281124730 Orig Issue App Received Draft Initiated 07/29/08 02/21/12 Scheduled Issuance Public Notice Issue Effective 03/02/12 03/02/12 Regulated Activities Re•uested/Received Events Subdivision Additional information requested Wastewater collection Additional information received Outfall NULL Expiration Waterbody Name Stream index Number Current Class Subbasin Fast Track Engineering Certification Permit No. WQ0033247 (Modification) March 2, 2012 OwnerANWTPANQCS Union County Public Works FairHaven Phase II 500 N. Main Si, Suite 500 Monroe, NC 28112 Bryan Metzler PE Merrick & Company 1001 Morehead Square Drive Suite 530 Charlotte, NC 28203 Complete and submit this form to the permit issuing regional office with the following: One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in nen-conipliance with this permit regulations or minimum design criteria, This project shall not be considered complete nor allowed to operate until this Engineers Certification and all required supporting documentation have been received by the Division, Therefore, It is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. Certification iniudes: ' Phase 2 Map 1 (Lots:517-544) ENGINEERS CERTIFICATION (MH 1-3, 27-22) Farhat El Final 1, Bryan C. Metz.li,,,r as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ( periodically, [1 weekly, full time) the construction of FairHaven Phase II, a Union County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials, North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION -WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 6 0 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received: Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineers Certification shall be considered a violation of the permit and shall subject the Perrnittee to appropriate enforcement actions, Fast Track Engineering Certification Permit No. WQ0033247 (Modification) March 2, 2012 OwneriWVVVTPlWQCS Cryan Metzler PE Union County Public Works Merrick & Company FairHaven Phase II 1001 Morehead Square Drive Suite 530 500 N. Main St., Suite 500 Charlotte, NC 28203 Monroe, NC 28112 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations • rmitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any charfg_es,resultinq in noncom Matt e with this permit, regulations or minimpm design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division, Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division, ENGINEER'S CERTIFICATION Q Partial [x] Final 1, Ma i cus King P . E ., as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (D periodically, El weekly, Ei full time) the construction of FairHaven Phase iq, a Union County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. Fast TrackEnpineering Certification Permit No. WQ0033247 (Modification) March 2, 2012 OwnerMANTWWQCS Union County Public Works FairHaven Phase It 500 N. Main St., Suite 500 Monroe, NC 28112 Bryan Metzler PE Merrick & Company 1 1 Morehead Square Drive Suite 530 Charlotte, NC 28203 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations rmitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form, aerreit moclifica ion e r Liked for an ch resulting in ruan-cempliance with, this ermit r ions or. djjumsn criteria. This project shall not be consideredcomplete nor allowed to operate until this Engineer's Certification and WI required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of recelpt by the Division. Certification inludes: ' (Lots:369-377, 475-516) ENGINEERS CERTIFICATION (MH 3-6, 23-28) EJPartiat Ei Final l, Marcus King, P E as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (N periodically, El weekly, El full time) the construction of FairHaven Phase II, a Union County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 16A NCAC 2T; the Division 9f Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineers seal, signature, and date: SEAL „. 034443 CUS qe,,Irmoi% SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions.