Loading...
HomeMy WebLinkAbout310286_Compliance Evaluation Inspection_202112213tDivision of Water Resources -.. Facility Nunibet° 0 Division of Soil and Water, Conservatiop . ` 0 Other Agency, . . Type of Visit.- W,01q,ompliance Inspection &Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint &Follow-up,O Referral O Emergency _0 Other 0 Denied Access Date of Visit: Q rr�Te�- M Departure Time: County: Region: Farm Name: ����1 �S ��fse�, Own mail: Owner Name: Phone: Mailing Address: Physical Address: / 2 Facility Contact: �j�f� �'t �y��e Title: Phone: Onsite Representative: S �c,..� � 0�S Integrator: are tor: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design "Current . Design Current' ` Des gn, Cairent Swie Capacity. °Pop, , Wet sultry Capacity Pop. Cattle Capacity_ ":Pop.... . Wean to Finish Other Layers Non -Layers Pullets Turkeys Turkey Poults Dairy Cow Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? [:]Yes 13 No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No [�A ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 5/12/2020 Continued Page 1 of 3 5/12/2020 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment l j) 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No [DNA ❑ NE Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 1 Structure 2 P& Structure 3 Structure 4 Structure 5 Structure 6 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes I No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health orWYes nmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? (not applicable to roofed pits, dry stacks, and/or wet stacks) ❑ Yes [ No ❑ NA ❑ NE 9. Does any part of the waste management system other than the waste structures require ❑ Yes [3/No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes nNo NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes © o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes - to NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? ❑ Yes No „ ❑ NA ❑ NE 17. Does the facility lack adequate acreage for land application? ❑ Yes 0 N ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No 0 NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ElMonthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes - No NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes o ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? �{j''� 6�- ZNo❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes 6ZEj NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ N ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes To ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the 0 Yes []'No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA [3'�NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ [3No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? /�Yye" ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pates as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: — \ Page 3 of 3 Phone: Date: 1 4 5/ 2/2020