HomeMy WebLinkAboutNCS000171_Emails RE Outfalls and Renewal Status_20220204Georgoulias, Bethany
From: Georgoulias, Bethany
Sent: Friday, February 4, 2022 9:31 AM
To: David Kannianen; Young, Brianna A
Subject: RE: [External] Outfall determination questions
Attachments: [External] Outfall determination questions
David,
I'm forwarding your request to our Individual Permits Coordinator, Brianna Young. I am not sure where this permit is on
the renewal schedule, but she can take a look. We are behind on several but working as best we can through our
backlog.
This facility has had a permit quite a while — where has the facility been sampling in the past? Any outfalls without
industrial activity drainage are outside the scope of the permit (so SDO-001 may not be subject to sampling). If there is a
question about potential discharges from the others and best sampling points, it may be best to discuss with a regional
office inspector who can visit the site in person.
Best regards,
Bethany Georgoulias (she/her)
Environmental Engineer
Stormwater Program, Division of Energy, Mineral, and Land Resources
N.C. Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
QF:
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: David Kannianen[mailto:David.Kannianen@Kennametal.com]
Sent: Friday, February 4, 2022 7:13 AM
To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov>
Subject: RE: [External] Outfall determination questions
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Bethany,
I apologize for not supplying that. Our permit number is NCS000171.
Do you know when we will be issued a new permit?
Regards,
David Kannianen
EHS Lead
Henderson
david.kannianen@kennametal.com
T +1 252 430 3367
M +1 317 965 3776
F +1 252 430 3315
Kennametal Inc. 1 139 Warehouse Road I Henderson, NC 27537 1 www.kennametaI.com
THIS COMMUNICATION IS INTENDED FOR THE SOLE USE OF THE PERSON TO WHOM IT IS ADDRESSED AND MAY CONTAIN INFORMATION THAT IS
PRIVILEGED, CONFIDENTIAL AND EXEMPT FROM DISCLOSURE UNDER APPLICABLE LAW. ANY DISSEMINATION, DISTRIBUTION OR DUPLICATION
OF THIS COMMUNICATION BY SOMEONE OTHER THAN THE INTENDED RECIPIENT IS STRICTLY PROHIBITED. IF YOUR RECEIPT OF THIS
COMMUNICATION IS IN ERROR, PLEASE NOTIFY THE SENDER AND DELETE THIS COMMUNICATION.
J J ❑x J Z J ❑x TM] J J J
Select the following link to view theDisclaimerin an alternate language. http://www.kennametal.com/en/about-us/disclaimer.html
From: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Sent: Wednesday, February 2, 2022 3:01 PM
To: David Kannianen<David.Kan nianen@Kennametal.com>
Subject: RE: [External] Outfall determination questions
David, what is the permit number? I'll need to forward this to some other Stormwater staff to help, and I want to make
sure I get you to the right one.
Bethany
Bethany Georgoulias (she/her)
Environmental Engineer
Stormwater Program, Division of Energy, Mineral, and Land Resources
N.C. Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: David Kannianen[mailto:David.Kannianen@Kennametal.com]
Sent: Wednesday, February 2, 2022 2:21 PM
To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Subject: [External] Outfall determination questions
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good Afternoon Bethany,
An observation was made by our new Global Environmental Manager, as we toured our site as to the location of our
outfalls and interpretation of stormwater regulations. They pointed out that the current locations listed on our permit
and in our SPCC/SWPPP plans are not true outfalls as they are not points where storm water leaves our property or the
point where it combines with an "identified" waterway of North Carolina. I'm attaching a Site plan with a couple
notations, to show you what I am talking about.
Outfall 1— Non -industrial — ditch at front of property
Outfalls 2 — 6 Industrial —water flows into surrounding 15 acres in back of facility
There is a small channel or ditch at the rear edge of the property that is dry the majority of the year and only has water
in it in the Fall/Winter/Spring seasons.
So to sum up my question to your department, where do I sample, if I have to at all?
David Kannianen
EHS Manager
Henderson
david.kannianen@kennametal.com
T +1 252 430 3367
M +1 317 965 3776
F +1 252 430 3315
Kennametal Inc. 1 139 Warehouse Road I Henderson, NC 27537 1 www.kennametaI.com
THIS COMMUNICATION IS INTENDED FOR THE SOLE USE OF THE PERSON TO WHOM IT IS ADDRESSED AND MAY CONTAIN INFORMATION THAT IS
PRIVILEGED, CONFIDENTIAL AND EXEMPT FROM DISCLOSURE UNDER APPLICABLE LAW. ANY DISSEMINATION, DISTRIBUTION OR DUPLICATION
OF THIS COMMUNICATION BY SOMEONE OTHER THAN THE INTENDED RECIPIENT IS STRICTLY PROHIBITED. IF YOUR RECEIPT OF THIS
COMMUNICATION IS IN ERROR, PLEASE NOTIFY THE SENDER AND DELETE THIS COMMUNICATION.
LJ J J
Select the following link to view the Disclaimer in an alternate language. http://www.kennametal.com/en/about-us/disclaimer.html
THIS COMMUNICATION IS INTENDED FOR THE SOLE USE OF THE PERSON TO WHOM IT IS ADDRESSED AND MAY CONTAIN INFORMATION THAT IS
PRIVILEGED, CONFIDENTIAL AND EXEMPT FROM DISCLOSURE UNDER APPLICABLE LAW. ANY DISSEMINATION, DISTRIBUTION OR DUPLICATION
OF THIS COMMUNICATION BY SOMEONE OTHER THAN THE INTENDED RECIPIENT IS STRICTLY PROHIBITED. IF YOUR RECEIPT OF THIS
COMMUNICATION IS IN ERROR, PLEASE NOTIFY THE SENDER AND DELETE THIS COMMUNICATION.
..ax,. .,. m� .... ...
Select the following link to view the Disclaimer in an alternate language. http://www.kennametal.com/en/about-us/disclaimer.html
h
` - 4" K
v\ �ai.y. ,l
�o N
o �
m
- " E
Z
O
e
>
o
N
N
y0
m
V ~
�O
ti
D
n
a
F
Ln
BOB SEMENKO
a
o
HENDERSON
�fi-r)-+998
SITE PLAN
I,prucm w K.n ..o s R4VeiYt ra .� rm owoem
�
mw� mn M rimKn. CVJKP a ..r mc�um cme
r�u �S SHOWN
CORPORATE FACILITIES MANAGEMENT
c
Outfall x6
2 Diked Lacgolene ASTs
(under construction)
\' I
Liquid Nitrogen Tank
Oulfoll xS
HVAC /
I
I j —
I
I _ '
g / Outfoll e4
N Main \ I � � —
x 9 �/ Outfall r3
Building —� \ _,A-
- I
j Diked Kerosene, Oils,
Proposed and Ethomeen Storage
/ Storage Rack - _-- — Outfall x2
n I
0
a
r u
Outfalt a1
J Compressed Helium Tank
Grass
j Dumpsler for Crushed
— Drums
I
I
Liquid Argon Tank
Grovel Equipment
Parking Wash Pad Liquid Hydrogen Tanks
Area
Empty Drums and
Powder Drums for
Recycling
Legend
NSOUCaL Ftow Directl�s
u sur oce rmnage pes
El
Grated Storm Drain
— —
Fence Line
fDrainage
Ditch
Figure 1: Site Map Armstrong Geological &
Kennometal Henderson, NC Engineering Services, P.C.
Drawn By: D. Brainard Date: 3/25/97 Approved by: __ _ ____________ Date.