Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0031775_Regional Office Historical File Pre 2018 (2)
7ist .w�Mrrrwwrw+e NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Division of Water Quality Charles Wakild, P, E. Director November 13, 2012 Union County Public Works Mr. Mike Garbark, P.E., Capital Improvement Program Manager 500 N. Main Street, Suite 500 Monroe, -North. Carolina 281 1.2 Dear Mr, Garbark: Dee Freeman Secretary Subject: Permit No.WQ0031775 (MOD Ill JCATION) Millbridge Phase 2A Wastewater Collection System Extension Union County, North Carolina In accordance with your application received on November 8, 2012, we are forwarding herewith Permit -No. WQ003 1775, dated November 12012 to Union County Public Works fir the construction and operation of the subject wastewater collection system extension, This permit shall be effective from the date of issuance until rescinded, shall void Permit No. WQ0031775 issued May 30, 2007, and shall be subject to the conditions and limitations as specific therein, This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference, This modification is for the construction of approximately 5,R71 linear feet of 8--inch sewer line and the discharge of 11,400 GPD. Please pay particular attention to Permit Condition 3 which. requires that the wastewater collection, facilities be properly operated and maintained in accordance with.15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Per ittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 21' 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design. Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute § 143-215,6A through § 143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensi . hCarolina hoard. ._w atura!!f Mooresville Regional Office 610 East Ave., suite 301 Mooresville, NC 28115 nt net; www.ncmwaterquality.org Customer Sersmce- I-877-623-6748 An Equal Opportunity/Affirmative .Action Employer - 50% Recycied 10% Poal Consumer Paper Rhone: (704) 663-i699 tax: (704) 663-6040 Mr, t arbark Page 2 .,November,13 2:212 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended,. and other applicable Laws, Rules, and Regulations, permission is hereby granted to Union County Public Works for the construction and operation of approximately 5,871 linear feet of 8-inchgravity sewer, and the discharge of 11,400 gallons per day of collected domestic wastewater into the Union County and Charlotte -Mecklenburg Utility Department existing sewerage system, pursuant to the application received on November 8, 2012,. and in conformity with 15A NC2-'\,C 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. Assessing subsequent impacts to the downstream collection system and treatment facility is the complete responsibility of Union County Public Works. Union County Public Works must utilize whatever tracking tools necessary for planning additions of sewer flow in order to maintain compliance with the WWTP permitted limits and the WQCS00054 permit requirements. Assessing subsequent impacts to the downstream collection system and treatment facility is the complete responsibility of Charlotte -Mecklenburg Utility Department (CMU). CMU must utilize whatever tracking tools necessary for planning additions of sewer flow in order to maintain compliance with the WWTP permitted limits and the WQCS0000I permit requirements. The sewage and wastewatercollected by this system shall be treated in the Charlotte- Mecklenburg.Utility Department WWTP (McAlpine Creek NPDES No.NC0024970) prior to discharged into the receiving stream, If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right: to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of .Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional inforrn.ation concerning this matter, please contact Samar Bou-Ghazale at (704) 663-1699. Sincerely, for Charles Wakild, P.E. cc: Mooresville Regional Office, Collection System Permit File Surface Water Protection Central Files PERCS ND14TFi CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT (MODIFICATION) This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. if an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (Le. 365 days per year). Pump ,stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 1 4. This permit shall not be transferable. In the e-vent there Is a`desire for the wastewater'collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved, Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6 Per 15A NCAC 2T .0116, upon completion of construction arid prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable, 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8, Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T, the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable, and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities, 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B ,0200, erosion and sedimentation control requirements in 15A NCAC Ch, 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B ,0200 and 15A NCAC 2H .0500. 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a, Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility Voice mail messages or faxed information is permissible, but_ shall not be considered as the ws initial verbal report. Overfloandspills occurring outside normal business hours May also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 13th day of November, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0031775 (MODIFICATION) 3 Fast Track Engineering Certification Permit No. WQ003177,5 (MODIFICATION) Noven-lber 13, 2U12 OwnerNVW1PNVQCS Union County Public Works MilIbridge-Phase 2A 500 N. Main St, Suite 500 Monroe, NC 28112 Chris CapeIlini, PE Land Design 223 North Graham Street Charlotte, NC 28202 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified, on the record drawings or in written summary form Permit modifications are required for any changes resulting in nora-com hence with this permit, regulations or minimum design criteria This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEERS CERTIFICATION El Partial El Final as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (El periodically, El weekly, []full time) the construction of Millbridge Phase 2A, a Union County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials, North Carolina Professional Engineers seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineers Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. E THE TAB KEY TO Owner/ 'erns ittee: Union County Public Works tl' OVE FRO D TO FIELD! Full Legal Name (company, municipality, HOA, utility, etc.) Garbark, P.E., Capita Signing Official Name and Title (Please review 15A NCAC 2T .010 Application Number: (to be completed by DWG) lc. The legal entity who will own this system is: 0 Individual 0 Federal 0 Municipality ! Sta Q ld, 500 North Main Street, Suite 500 U. Mailing Address 2 1 f, North Carolina ©State 704--29 -4239 0 1 h, Telephone Facsimile 2. Project (Facility) Info ation: 2a, Millbridge Phase 2A Brief Project Name (permit will refer to this n 3. Contact Person: 3a. i ovement Program Manager r authorized signing officialsl) County 0 Private Partnership 0 Corporation 3b 704-296-4232 Mike. Garbark, P.E. le Monroe City 1 g. 28112_ Zip Code ba E- ail 2b. Union Name and Affiliation of Someone Who Can Answer Questions About Phone Number Project is 0 New Owner is 296-4239 3c County here Project is Located ation ark@co.union.nc..us E-mail Modification (of an existing permit) If Modification, Permit No.: WOO Public (skip to Item B(3)) 2a. If private, applicant will be: 0 Private (go to item 2(a)) 2b. If sold, facili 0 Retaining Ownership (i.e. store, church, single office, etc.) or 0 Leasing units (lots, townhomes, etc. - skip to item B(3)) 0 Selling units (lots, townhomes, etc. - go to Item B(2b)) es owned by a (must choose one 0 Public Utility (Instruction C) 0 Homeowner Assoc./Developer (Instruction D) Charlotte -Mecklenburg Utility Department (CMU) Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a. McAlpine Creek WTP Name of WWTF CMU Owner of Downstream i5b 36 inch; Gravity ewer ?Receiving Sewer Size 0 Force Main The origin of this wastewater is (check all that apply): Residential Subdivision 0 Apartments/Condominiums © Mobile Home Park O School ❑ Restaurant ❑ Office 4b. NC0024970 WWTF Permit No. W00010438 Permit # of Downstream Sewer (instruction E) 0 Retail (Stores, shopping centers) 0 Institution 0 Hospital 0 Church Q Nursing Home ❑ Other (specify) % Domestic/Commercial % Industrial (attach. description.) (RO: contact your Regional Office Pretreatment staff) % Other (specify): 7. Volume of wastewater to be allocated or permitted for this particular project : 2,,490 gallons per day *Do not 'include future flows or previously permitted allocations 8. If the permitted flow is zero, indicate why: Ei Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line 0 Flow has already been allocated in Permit No. O Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T ,0303 to determine if a permit is required) PTA I • B. PERMIT INFORMATION (CONTINUED) rovide the wastewater the value in Item Item B(7). Values data in accordance 60 lots x 190 gpd 11,400 gpd (modified flow calculations used B(7) AND/OR the design flow in determining the permitted flow in accordance with 15A NCAC 2T .0114 for for line or pump station sizing if a reduced or zero flow is being requested in 2T .0114 (b) and (c) must be supported with actual water or wastewater use M. permit)=(-32,490) gpd net change for this phase other than that in 15A NCAC with 15A NCAC 2T .0114 = 11,400 gpd total for this phase permit)-43,890 gpd (previous 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) // - New Gravity or Additional Force Main 8" 14,530 LF (Previous Permit)-8,569 LF (Modified Permit) J5,871 LF New Gravity 11. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option 1 - permanent generator w/ATS; 2 - portable generator wIMTS Force Main Size Force Main Length • Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option 1 - permanent generator w/ATS; • 2 - portable generator wlMTS Force Main Size Force Main Length Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow (MGD) Operational Point GPM @TDH Power Reliability Option 1 - permanent generator w/ATS; 2 - portable generator wIMTS Force Main Size Force Main Length 12. Will the wastewater flow in the proposed sewer If Yes, permit number of 2nd treatment please contact the Central lines or pump stations be able to be directed to another facility treatment facility? IN Yes ►i No (RO — if "yes" to B,12 Office PERCS Unit) 13. Does the sewer Mains (latest version), applicable? system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION ® Yes • No .FTA 12/07 otlowing permits/ceai:ifications been submitted for approval for the system or project to be served? etland/Stream Crossings - General Permit or 4O1 Certification? Sedimentation and Erosion Control Plan? Stormwater? El Yes D No ©N/A Yes Ej No N/A ® Yes ©No D N/A 15. Does this project include any high priority lines, (see 15A NCAC 02T .0402 (2)1 involve aerial lines, siphons, or interieren manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: El and provide details 1 a. Owner/Perrnittee's Certification: (Signature of Signing Official and Project Name) ike Garbark attest that this application for Millbrrdge Phase 2A has been reviewed by me and is accurate and best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete.. Note: In accordance with North Carolina General Statutes 143-215.,6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation, Signing Official Sigrt'ture Date ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION, THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY TO OTHER. UTILITIES, DESIGN CALCULATIONS. ETC, REFER TO 15A NCAC 02T .0305 2. Professional Engineer's Certification: (Signature of design Engineer and Project Name) 1, Chris Capetlini, attest that this application for Millbridge Phase 2A has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design, Note: In accordance with NC General Statutes 143-215.6A and 143-215,68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a. Chris Capellini Professional Engineer Name 2b, LandDesign Engineering Firm Vic. 223 North Graham Street Ivfailing Address 2d. Charlotte City 2e. NC 2f. 2 202 State Zip 'i q landde i .eom .. 2g. 704-333-0325 2h. 2�. ccapellin Telephone Facsimile E-mail Signatuo1e & Date FTA 1 "2/07 Milibri dge Phase 2A Sewer U SG S Map Proposed Suer Existing Sewer Phase 2A State of North Carolina Department: of Environment and Natural Resources Division of Water Quality Flo w Tracking/Acceptance for Sewer Extension Permit Applications (I TS E —f 0107) Pro ect Applicant. Name: Project Name for which flow is being requested: Alillbridge, Phase 2A �f t >dwt r a single project he proposed wasteti `tt r flaw. r-is°ible for I. Complete this section only if you are the c caner of the wastewater treat:rnent plant. a. WWTP Facility, Name: 1'eAl : irre Crecy b. WWTP hacilit ° Permit a. NC0024970 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used. All flows are in MGD -0.032.5 II. Complete this section for each pump station you are responsible for, along the route of this proposed wastewater flow. List pump stations located between the project connec.ttc n point and the WWTP Pump Station Narne tillbridtYe Approx R.I). _ apaci 4GI) n11D)esign) .7 Approx. Current Avg. Daily Flow, MGD 0.04 ion Statement: Garbark , certify` that, to the best of my knowledge, the addition of the volume of" wastewaterto be permitted in this prc ect has been evaluated along the route to the r treatment facility and that the flow ficnt this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, This analysis has been performed in accordance with local established policies and procedures using the best available data, This certification applies to those items listed above in Sections I and II for which I am the responsible party°. Signature of this Corm indicates acceptance of this wastewater flow. Date CE'tRLOT 7 CHARLOTTE-MECKLENBURG UTILITY DEPARTMENT OCtober 10, 2012 Mr, Peter Brown Union County Public Warks 500 N Main Street Suite 500 Monroe, NC 28112 SUBJECT: SEWER FLOW ACCEPTANCE MILLBRIOGE PHASE 2A MODIFICATION OF WQ0031775 UNION COUNTY TAX PARCEL# 05-165-001 C-MU TRACKING# 600-12-627 A flow acceptance study of the subject site has been completed and the following has been determined: Charlotte -Mecklenburg Utility Department agrees to accept the net gravity sewage flow of 11,400 gallons per day (60 lots x 190 gpd/Cot). The original permit for 43,890 gallons per day [231 lots x 190 gpollot] minus 32,490 gallons per day [171 lots x 190 gpdflot] from this project for transmission to the McAlpine Creek Wastewater Treatment Plant; NPDES permit number NC0024970, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatments works, Please see attached FTSE form, Due to the involvement of other agencies and continuing growth of the sewer system, the ability to provide service for future projects cannot be guaranteed nor reserved, Connection to the Charlotte - Mecklenburg Utility Department system is accepted on a first come, first served basis, The applicant should understand that this letter is not authorization to construct private water or sewer systems, as the appropriate local or State permits are required prior to construction, if -the appropriate authorization to construct perm tsarse not obtained and construction has of started within one (1) year of issuance of this flow acceptance Letter, this flow acceptance ap royal shall be _rescinded and a new flow acceptance study must be made, If you have any questions, you may contact me at (704) 432-5801. Sincerely, Barbara Gross Engineering Assistant Installation & Development Services CHARLOTTE-MECKLENURG UTILITY DEPARTMENT Engineering Division • Installation & Development Services www.cmutil ities.cogi 700 North Tryon Street Charlotte, NC 28202 Ph: 7041432-5801 Fax: 704)432-5804 State of North Carolina Department of Environment and Natural Resources Division of Water Quality' Flo w° "T rael inglAeceptance for Sewer Extension Permit Applications (FTS _ 10,07) Project Applicant Name: Pt Project Name for which flow is being requested: _ ty;l..tl.., More than one S -l0/07 uraxv be retia 'rerd„far cr szr z proi'ect /HOHp stations along the route of the pr P i not respon. I. Complete this section only ifyou are the owner :r t ft,he way; a. WWFP Facility Name: b,WWTP Lac Permit c. WW I'P faeilitygs permitted flow d. Estimated obligated flow not yet tributary to tl e.. WWTP facility's actual a gig, flow f. `fotal flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 5 Tl I' t plant. WWTP AlI flows are in MOD 66.8 G . 0114 ' 74.197 TI. Conple' this section for each pump station you are respon.sihle for along the route of this proposed wastewater floe List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGI) Approx,. Current .Avg, (FirmiDesign) Daily 1 l.ow MC.il) certr y that, t�"r the hest t f` my knowledge, the add' volume of w`astewattr to be perrtlitterl in this project has been evaluated along the route to th' wastewater treat.ntent facility and that the Clow from this project is not anticipated to cause any capacity° related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. "this analysis has been performed in accordance with local established policies and procedures using the best available data. "1 h.is certification applies to those items listed above in Sections 1 and II for which 1 am the responsible party. Signature of this form irtshe.ltes acceptance e of this wad s°°ater Low. Signing 0/Ik ial Signature plpir, FORM WS°CAS-03/2012 WATERSHED CLASSIFICATION ATTACHMENT FOR SEWER SYSTEMS Apant Name Union County Public Works I�rofessiorral Engineer Name Chris Capellini cName Prole,.,.t _..�,�__�.�_... MiIibridge Phase 2A En andDesign Firm N cation River rbody Stream ID Name of Waterbody' County Basin Index No. Tw el�re Mile Creek Union Catawba 1 "i 1 8 If unnamed, 'indicate 'unnamed tributary to X", where X is the named waterbody to which the unna ed tributary ions, l certify that as a Registered Professional Engineer in the State of North Carolina that l have diligently followed the Division's instructions for classifying waterbodies and that the above classifications are inclusive of the stated project, complete and correct to the best of my knowledge and belief. PE Seal, Signature and Date *** END ()F FORM WSCAS-tI/Zti12 *** Waterbody Clsasification FORM: WSCAS-03/2O12 Page 1 of 1 Phase 2A Sewer U SG S Map Pr ►p s dS wi Existing Sewer Phase 2A UNION COUNTY PUBLIC WORKS 500 N. Main Street, Suite 500 Monroe, NC 28112 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue Mooresville, N,C. 28115 Attention: TRANSMITTAL Date: 1 6 Regarding: Sanitary Sewer to serve Millbridge, Phase 2A-Modification (Resubmittal) We are sending you: Ei Copy of letter 0 Plans 0 Prints 0 Shop Drawings Other Copies Date T No, Description Non -Discharge Permit Application Copy of Non -Discharge Permit Application 9/28/12 UCPW Flow Tracking Form 10/10/12 CMU Acceptance Flow Letter 10/4/12 CMU Flow Tracking Form 1 9/26/12 11821 480,00 Check (Application Fee) 1 9/26/12 1 Stream Classification Form These are transmitted as checked below: 2 For approva 0 For your use 0 As requested [1 For review and comments Remarks: This is a resubmittal of the above mentioned project, The application that was signed is now signed by an authorized representative (see attached NCDENR letter). The check that is listed above was sent with the previous submittal, Signed: Received by: Date: ATA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Chuck Wakild, P.E. Dee Freeman • Govemor Director Secretary aPb 1, 5/, 2012 x34D M . t'? I ck;Y1 c _ Gov YY1 wm r oE. NC. au l r Subject: Fast Track Applation Return +1 Project Name: 11+�a c �,l.1rLi Po County, North Car ma Dear Mr./lip The Division of Water Quality, Mooresville Regional Office received your Fast Track sewer application on 10100-11a During an initial review of your application, your application was determined to be incomplete. Therefore, your application is being returned. (Please include a copy of this letter with your resubmittal). For a listing of the correct forms and instructions please visit: http://portal.ncdenr.org/web/wq/swp/ps/cs/apps. Please complete/correct the following deficiencies: ❑ Application submitted on wrong or outdated forms. Form(s): ❑ Corporation is not listed with the State of North Carolina. ❑ Application was submitted without a processing fee or with an incorrect processing fee. ❑ Application did not contain a FIow Tracking Form (FTSE 10/07). ❑ Application did not contain the Developer's/Homeowner's Operational Agreement. ❑ Application did not contain the correct number of copies. ❑ Application failed to include project map. Application (line A.1b) was not signed by an authorized representative in accordance with 15A N AC 2T A106(b). (see http:/lportal.ncdenr.org/web/wq/swp/pstes/regdesign) Following submission of a complete application, the Mooresville Regional Office will begin a technical review of your application. If your application is technically deficient additional information may be required or the package may be returned again. Mooresville Regional Office Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-1699 %Fax: (704) 663-60401 Customer Service: 1-877-623-6748 Internet http:llportal.ncdenr.orglwebhwq One NorthCarolina Naturally An Equal opportunity 1 Affirmative Action Employer— 56% Recycled/10% Post Consumer paper Sincerely, Robert B. Krebs Supervisor, Mooresville Regional Office Enclosure: Fast Track Sewer Extension Application cc: RO File Central Files: APS SWP` 11/13/12 -- - Permit -Number- - lQO!31775 -Permit-Tracking Slip Program Category Status Project Type Non -discharge Active Major modification Permit Type Fast Track Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer samar.bou-ghazale Coastal SW Rule Permitted Flow 11400 Facility Facility Name Millbridge - Phase 2A Location Address Owner Version 1.20 Permit Classification individual Permit Contact Affiliation Major/Minor Region Minor Mooresville County Union Facility Contact Affiliation Owner Name Owner Type Union County Public Works Government - County Dates/Events Owner Affiliation Mark Eugene Tye 500 N Church St Ste 500 Monroe NC 281124730 Orig Issue App Received 05/30/07 10/30/12 Draft Initiated Scheduled Issuance Public Notice Issue Effective Expiration 11/13/12 11/13/12 Regulated Activities Requested/Received Events Subdivision ' Wastewater collection Outfal! NULL Additional information received Additional information requested Additional information received Additional information requested Additional information received 10/30/12 11/08/12 Waterbody Name Stream Index Number Current Class Subbasin Fast Track Engineerinq Ce Permit No.. W00031775 Modification ,June 7, 2012 Owner/WOGS Mr. Mike Garbark Union County Public Works 500 North Main Street, Suite 00 Monroe, NC 28112 ication WOCS/WWTP Steve Miller CMU 5100 Brookshire Blvd. Charlotte, NC 28216 PE Chris Capellini LandDesign, Inc, 223 North Graham Stre Charlotte, NC 28202 Complete and submit ttiis form to the permit issuing region& office with the following; One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resultinq_ia non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have n received by the Division. Therefore, it is highly recomended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION Partial 0 Final I, Chris Capellini, as d ly registered Professional Engineer in the State of North Carolina, having been authorized to observe periodically, ® weekly, 0 full time) the construction of the Millbridge Phase 2A, in Union County, Nart retina„ for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T:„ the Division of Water duality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted November 1, 2000 as applicable; and other supporting materials. The partial certification included Millbridge Phase 2A lot numbers 267.272, 327-333, 354, 338-347, 371-375. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 1 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. Fast Track Engineerin+ Certification Permit No. W0.003177f (r,1O1 IFIrATrON) November 13, 2012 Owner WTPNWQCS Union County Public Works Millbridge-Phase 2A 500 N Main St., Suite 500 Monroe, NC 28112 Chris Capellini, PE Land Design 223 North Graham Street Charlotte, NC 28202 Comptet : and submit this form to the pe rnit issuing regional office with the following: One copy of the project record drawings (plan profile views of sewer lines) of the wastewater collection system extension Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project Changes to the project should be clearly identified on the record drawings or in wertten summary form, Per modifications are required for any changes resuitin in non-compliance with this permit, regulations or minimum desjQn criteria This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division, Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION [] Partial Final `►ze. C. z as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe periodically,, [l weekly, [7 full time) the construction of Miflbridge Phase 2A, a Union County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit, 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date`. k. SEND THIS FORM & SUPPORTING DOCUMENTATION WIT t f REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUiTE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions.