Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0029458_Regional Office Historical File Pre 2018 (2)
Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality February 14, 2006 Ms. Christie Putnam, Interim Director Union County Public Works 400 North Church Street Monroe, North Carolina 28112 Subject: Permit No. WQ0029458 Modification Tuscany Phase IIA Union County Public Works - Wastewater Collection System Extension Union County, North Carolina Dear Ms Putnam: In accordance with your application received on January 20, 2006, we are forwarding herewith Permit No. WQ0029458, dated February 14, 2006, to Union County Public Works for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, shall void Permit No. WQ0029458 issued October 27, 2006 and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein' by reference. The modification was made to add 7,560 gallons to the prior no -flow permit. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H .0227 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2H .0200; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June- 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement Wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-1699 Fax: (704) 663-6040 Internet: h2o.enr.state.nc.tts Customer Service: 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper o t NhCarohna 7Qaturalllf Ms. Christy Putnam Page 2 February 14, 2006 In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to Union County Public Works for the construction and operation of approximately 5,705 linear feet of 8-inch gravity sewer as part of the Tuscany Phase !IA project; and the discharge of 7,560 gallons per day of collected domestic wastewater into Union County's existing sewerage system, pursuant to the application received January 20, 2006, and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Union County - Twelve Mile Creek WWTP (NPDES No. NC0085359) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Dee Browder at (704) 663-1699. Sincerely, for Alan W. Klimek, P.E. cc: Union County Health Department Mooresville Regional Office, Surface Water Protection (WWCP Permit No. NC0085359) Bradley Smith, RD Davis Consulting Engineering, PLLC Surface Water Protection Central Files Marie Doklovic, PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200;-the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227. if an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1 C. 1 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Per 15A NCAC 2H .0220, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may, subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. 2 Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Part 11 of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 14th day of February, 2006. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 1J ✓ for Alan W. Klimek, F/.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0029458 3 Fast Track Engineering Certification Permit No. WQ0029458 Modification February 14, 2006 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. .ENGINEER'S CERTIFICATION ❑ Partial ❑ Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the Tuscany Phase IIA, Union County for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. !'i RACJ( APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 3 USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: iY►r �( `�„'Q 002-41 t3 (to be completed by DWQ) 0 I, 1Y 0 LL — Z Q O LL Q 1. Owner: _ _ _ la. Union County Public Works Full Legal Name (company, municipality, HOA, utility, etc.) 11 b. Christie L. Putnam, P.E>, Interim Director Union County Public Works Signing Official Name and Title (Please review 15A NCAC 2H .0206(b) for authorized signing officials!) 1 c. The legal entity who will own this system is: Partnership ❑ Individual ■ Federal 0 Municipality ►:l State/County ■ Private ■ Corporation ■ Other (specify): Id. 400 North Church Street le. Monroe Mailing Address 1f. North Carolina City lg. 1j. ,2b. 28112-4804 State lh. 704-296-4212 1 i. 704-296-4232 Zip Code Telephone Facsimile 2. Project (Facility) Information: 2a. Tuscany Phase IIA E-mail Union Brief Project Name (permit will refer to this name) 3. Contact Person: - _ 3a. Charles P. O'Cain, Deputy Director Union County Public Works County Where Project is Located- - __- - _-_ - _ _ _ _ - - _ -_ _ --- — -- - - Name and Affiliation of Someone Who Can Answer Questions About 3b. 704-296-4214 3c. I this Application o'cain@co.union.nc.us Phone Number E-mail Z 0 1- IY 0 LL Z I-- 2 re fa.❑ CO (of an existing permit) If Modification, Permit No.: WQ0029458 Project is ■ New 0 Modification Ji. For modifications, attach a separate phase, changing line size/length, duplicate project information in sheet clearly explaining the reason for the modification (i.e. adding another etc.). Only include the modified information in this permit application - do not B(7) and B(10-11) that has already been included in the original permit. B(3)) 0 Private (go to Item 2(a)) 2. Owner is ►4 Public (skip to Item 2a. If private, applicant will be: l 2b. church, single office, etc.) or 1 etc. - skip to Item B(3)) etc. - go to Item 13(2b)) If sold facilities owned by a (must choose one) (Instruction 111) Assoc./Developer (Instruction IV) ■ Retaining Ownership (i.e. store, • Public Utility 0 Leasing units (lots, townhomes, ❑ Homeowner • Selling units (lots, townhomes, 3. Union County Public Works Owner of Wastewater Treatment Facility (WINTF) Treating Wastewater From This Project Twelve Mile Creek 4b. NC0085359 Name of WWTF WWTF Permit No. 5a. Union County Public Works 5b. 24" ® Gravity ❑ Force Main 5c. WQ00014152 Owner of Downstream Sewer Receiving Sewer Size Permit Number of Downstream Sewer (if known) 6. The origin of this wastewater is (check all that apply): Home i (specify): 100 % Domestic/Commercial 0 Residential Subdivision j ■ Car Wash 0 Apartments/Condominiums Mobile Home Park 0 Institution MI Hospital %Industrial • School • Church • Restaurant • Nursing % Other(specify): ❑ Office II Other 7. Volume of wastewater to be allocated for this particular project: allocations *(see note `7560 gallons per day `Do not include previously permitted #8 below) 8. If the permitted flow is zero, indicate 0 Interceptor Line - Flow will ❑ Flow has already been allocated ■ Rehabilitation or replacement why: be permitted in of existing will be in subsequent permits Permit No. that connect to this line expected Sewer in these areas for construction only. sewer with permitted at a no new flow future date. G Flows for additional 4l lots FrA 02/03 - Rev. 3 04/05 RAOK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 4 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1) for Item B(7) or the design flow for line or pump station sizing if zero flow in the space below. Values other than that in 15A NCAC 2H .0219(1)(1-2) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2H .0219(I)(3). 120 gpd/bedroom/home x 3 bedrooms x 21 homes = 7560 gpd 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) Length (feet) Gravity or Force Main (use the pull down menu) Z ENTER TOTAL LINE LENGTH IN MILES 0 V 11. Summary of Pump Stations to be Permitted (attach additional sheets as necessary) Z Location 1D 0 ▪ (self chosen - as shown on Design Flow plans for cross-reference) (MGD) of U. ; I I 1 • 112. W d m Operational Point GPM @ TDH Power Reliability Option (1- dual line feed; 2- permanent generator w1ATS; 3- portable generator wltelemetry; 4-wet well storage) Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC 2H .0200 as applicable? ® Yes 0 No If no, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION 113. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings - General Permit or 401 Certification? ❑ Yes ❑ No ® N/A Sedimentation and Erosion Control Plan? ® Yes 0 No ❑ N/A Stormwater? ❑ Yes ❑ No ® N/A 114. Does this project involve aerial lines or siphons? Check if yes: ❑ (These tfines.wilLbe_consideredbiah.odority and muslbe.checlted.once.everv.six.months__._..�_......__........._ '15. Does this project have gravity sewer lines designed at minimum slopes? IE Be aware that the Division will not accept installed lines more than 10% flatter than the minimum slope. Lines installed outside This tolerance should be corrected prior to submitting the final engineering certification,. VIA 02/03 - Rev. 3 04/05 z 2d. CK APPLICATION for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS PAGE 5 Use the Division's guidance document entitled DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02/03 (FAST -TRACK SEWER SYSTEMS)" to collect and record the stream classification data below (attach additional sheets as necessary). This document is available from our web site or by contacting the appropriate Division of Water Quality regional office (see instructions for addresses) OR indicate the following: 'D A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope waterbody, AND, A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map (self chosen - as shown on map for cross-reference) 1 Name of Waterbody Ju le Twekve Mule Creek County Union Waterbody Stream River Basin Index. Catawba 11-138-2-3 Submit the 8.5" x 11" COLOR topographic map as required in Instruction VI regardless of whether a classification is provided! 1. Applicant's Certificat crr Waterbody Classification C ! Christie L Putnam, P. E, attest that this application for Tuscany Phase IIA has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete, tote,: In accordance with North Carolina General Statutes 143-215.6A and 143-215.68, any person who knowingly a es any false statement represontation, Pr certification in any application shall be guilty of a Class 2 rnisderrr� h+�� m"nelude a, nenot t6 exceeq$'10, 000 as well as civil penalties up to $25, ©0© per violation. e Professional Engineer's Certification~ Date I attest that this application for Tuscany Phase /IA has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. 2a, Bradley W. Smith Professional Engineer Name 2b, RD Davis Consulting Engineers, PLLC Engineering. Firm 2c, 323 Indian Trail Road, North Mailing Address Indian Trail City 704-821-7760 2h, 704-821-8014 Telephone Facsimile 2e, NC 2f, 28079 State Zip 2i, rddavis2carolina:rr.com E-mail FTA 02/03 - Rev, 304/0` Name: WAXHAW Date: 10112/105 ScaNe: 1 inch equals 1333 feet Location: 034' 57' 40.8" N 080" 40' 33.6" W Copyright (C) 1E 7, Maptecf, Inc. UNION COUNTY PUBLIC WORKS 400 N. Church Street Monroe, NC 28112-4804 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue, Suite 391 Mooresville, N.C. 28115 Attention: Dee Browder Regarding: Sanitary Sewer to serve Tuscany Phase 2A We are sending you: ' Copies 1 TRANSMITTAL Date: 12/27/05 Copy of letter E Plans Prints ❑ Shop Drawings Other Description Original Non Discharge Application Copy of Non Discharge Application Check for $400.00 (Application Fee) These are transmitted as checked below: El For approval D For your use Remarks: Signed: Received by: Y EcT As requested [1 For review and comments Date: Permit Number WQ0029458 Central Files: APS SWP 02/13/06 Permit Tracking Slip Program Category Status Non -discharge In review Permit Type Version Gravity Sewer Extension, Pump Stations, & Pressure Sewer B Extensions Primary Reviewer dee.browder Permitted Flow 7560 Facility Project Type Major modification Permit Classification Individual Permit Contact Affiliation Facility Name Major/Minor Region Tuscany Phase IIA Minor Mooresville Location Address County Union Facility Contact Affiliation Owner Owner Name Union County Public Works Department Dates/Events Owner Type Government - County Owner Affiliation Mark Tye 400 N Church St Monroe NC 28111 Orig issue App Received 10/27/05 01/20/06 Regulated Activities Subdivision Wastewater collection Outfall NULL Draft Initiated Scheduled Issuance Public Notice Issue Effective Expiration Requested/Received Events Additional Information requested Additional information received Waterbody Name Stream Index Number Current Class Subbasin PAY TO THE OHCER OF..,.._,_„.,_,_ THE MATHISEN CO PH. 704.B82.1193 6208 CREPT CIR STE 230 INDIAN TRAIL, NC 28079.6597 DATE BB&T BRANCH BANKING AND TRUST COMPANY NDIAN TRAIL, NORTH CAROLINA { Y 1000 291,9e I: ©5 3 1❑ L l? l 1. S p 1, C, L? AA Fi t_ L II, 2919 DOLLARS 66- 112/5'I 557E37 THE MATHISEN COMPANY LAND PLANNING & DEVELOPMENT e-mail A mathisencoC+alltei.net 6208 CREST CIRCLE, SUITE 230, INDkAN TRAIL, NC 28079 . TELEPHONE: (704) 882.1193 FAX (704) 882-1195 6, 2006 Mr. Charles O'Cain Union County Public Works 400 North Church Street Monroe, NC 28112-4804 Subj: Tuscany Phase 2, Sewer Permit Dear rvrr. O'Cam, The Mathisen Company hereby requests plan approval and re-perrnitting of construction of the Tuscany Phase 2A sewer collection system being designed by R I.] Davis Consulting Engineers. We understand that this per wi be primarily for construction and only 31 lots will be permitted until further allocations can be made. Thank you for your favorable consideration. Yours very truly, "UHE MATHISEN C'OMf?ANY N. A. Mathisen NAM:bam cc: R D Davis Consulting Erg Brian Johnson Dale: T-I F I �; UNION COUNTY PUBLIC WORKS 400 N. Church Street Monroe, NC 28112-4804 704/296-4210 Fax 704/296-4232 To: NC Department of Environment and Natural Resources Mooresville Regional Office 610 East Center Avenue Suite 301 Mooresville, N.C. 28115 Attention: TRANSMITTAL Regarding: Sanitary Sewer to serve Tuscany, Phase II -A Subdivision Vy-12 Date: 3/13/06 We are sending you: ❑ Copy of letter ❑ Plans ❑ Prints ❑ Shop Drawings ® Other Copies Date No. Description 1 3/2/06 Original Non -Discharge Permit Application 1 3/2/06 Copy of Non -Discharge Permit Application 1 3/3/06 2953 Check for $400.00 (Application Fee) A.K3, rry,..,::,.�"I 1 3/6/06 Letter from Developer r -. „'F,, MAR 1 5 2Q0r, These are transmitted as checked below: WATER QUAUTY SECTION ® For approval D For your use ❑ As requested ❑ For review and comments Remarks: Signed: Received by: Date: