HomeMy WebLinkAboutSW8960818_Historical File_20090515NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
May 15, 2009
Robert S. Rippy, Owner
5320 Oleander Dr.
Wilmington, NC 28403
Subject: State Stormwater Management Permit No. SW8 960818 Renewal
Jungle Rapids
High Density Commercial Project
New Hanover County
Dear Mr. Rippy:
Dee Freeman
Secretary
The Wilmington Regional Office received a complete Stormwater Management Permit
Application for Jungle Rapids on March 31, 2009. Staff review of the plans and specifications
has determined that the project, as proposed, will comply with the Stormwater Regulations set
forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 960818, dated May 15,
2009, for the construction of the subject project.
This permit shall be effective from the date of issuance until November 19, 2019, and shall be
subject to the conditions and limitations as specified therein. Please pay special attention to the
Operation and Maintenance requirements in this permit. Failure to establish an adequate
system for operation and maintenance of the stormwater management system will result in
future compliance problems.
The renewal of this stormwater permit does not imply that the site is currently in compliance with
the terms and conditions of this state stormwater permit. A plan of action to correct the
deficiencies noted in the May 7, 2009 Notice of Inspection will need to be submitted to the
Division of Water Quality by June 15, 2009. Failure to provide the requested plan of action may
initiate enforcement action. The plans previously approved on November 19, 1999 remain in full
force and effect.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following
receipt of this permit. This request must be in the form of a written petition, conforming to
Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative
Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this
permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact
David Cox, or me at (910) 796-7215.
Sinrely,
Georgette Cott
Stormwater Supervisor
Surface Water Protection Section
GDS/dwc: S:IWQSISTORMWATERIPERMIT1960818ren.may09
cc: David Cox
Wilmington Regional Office
Central Files
Wilmington Regional Office
127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One
Phone: 910-796-72151 FAX: 910-350-20041 Customer Service:1-877-623-6748 NorlhCarohn
Internet: www.ncwaterquality.org � �}� d i 1�N����
An Equal opportunity 1 Affirmative Action Employer � �/
State Stormwater Management Systems
Permit No. SW8 960818 Renewal
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY COMMERCIAL DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Robert S. Rippy
Jungle Rapids
5320 Oleander Dr. New Hanover County
FOR THE
operation and maintenance of a wet detention pond in compliance with the provisions
of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the
approved stormwater management plans and specifications and other supporting data
as attached and on file with and approved by the Division of Water Quality and
considered a part of this permit.
This permit shall be effective from the date of issuance until October 9, 2019, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.7 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 765,349 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated ,common areas or recorded easements. The final plats for the project
will be recorded showing_ all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area(s) of this
project must be directed into the permitted stormwater control system.
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
Page 2 of 5
State Stormwater Management Systems
Permit No. SW8 960818 Renewal
a.
Drainage Area, 9.cres:
25.1
Onsite, ft :
1,093,356
Offsite, ft2:
N/A
b.
Total Impprvious Surfaces, ft2:
765,349
Onsite, ft
515,315
Offsite, ft2
250,034
C.
Design Storm, inches:
1"
d.
Average Pond Design Depth, feet:
6
e.
TSS removal efficiency:
90%
f.
Permanent Pool Elevation, FMSI :
16
g.
Permanent Pool Surface Areq, ft :
43,650
h.
Permitted Storage Volume, ft :
173,355
i.
Temporary Storage Elevation, FMSL:
17.5
j.
Controlling Orifice:
4""0 pipe
k.
Permitted Forebay Volume, ft3:
35,155
I.
Fountain Horsepower, HP
3/4
M.
Receiving Stream/River Basin:
Hewletts Creek / Cape Fear
n.
Stream Index Number:
18-87-26
o.
Classification of Water Body:
"SA"
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all time provide the operation and maintenance necessary
to assure the permitted stormwater system functions at optimum efficiency. The
approved Operation and Maintenance Plan must be followed in its entirety and
maintenance must occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond.
c. The falling water from the fountain must be centered in the pond, away
from the shoreline.
d. The maximum horsepower for a fountain in this pond is 3/4 horsepower.
Page 3of5
State Stormwater Management Systems
Permit No. SW8 960818 Renewal
6. The facilities shall be constructed as shown on the approved plans. This permit
shall become void unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy..
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
8. if the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
9. Access to the stormwater facilities for inspection and maintenance shall be
maintained via appropriate recorded easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. Prior to the construction of any permitted future areas shown on the approved
plans, the permittee shall submit final site layout and grading plans to the
Division for approval.
12. A copy of the approved plans and specifications shall be maintained on file by
the Permittee at all times. At the time the permit is transferred to a new owner,
the permittee shall forward the approved plans to the new owner.
13. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
Page 4 of 5
State Stormwater Management Systems
Permit No. SW8 960818 Renewal
III. GENERAL CONDITIONS
1. This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a completed Name/Ownership Change Form signed by both parties, to
the Division of Water Quality, accompanied by the supporting documentation as
listed on page 2 of the form. The approval of this request will be considered on
its merits and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves the transfer request.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit remains in force and effect until modified, revoked, terminated or
renewed. The permit may be modified, revoked and reissued or terminated for
cause. The filing of a request for a permit modification, revocation and re -
issuance or termination does not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
10. The permittee shall notify the Division of any name, ownership or mailing
address changes at least 30 days prior to making such changes.
11. The permittee shall submit a permit renewal request at least 180 days prior to
the expiration date of this permit. The renewal request must include the
appropriate documentation and the processing fee.
Permit issued this the 15t' day of May, 2009.
NOR H CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for Coleen . Sullins, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 5
KtL'U MAR 3 2009
DWQ USE ONLY
Date Received
Fee Paid
Permit Number
3-31-oy
�. � � � �/56J
"? o8'/
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT RENEWAL APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Stormwater Management Permit Number: SW 8 960818 qR 2
00q
2. Permit Holder's name (specify the name of the corporation, individual, etc.):
Tunele Rapids
3. Print Owner/Signing Official's name and title (person legally responsible for permit):
Robert S. Rippy, Owner
4. Mailing Address for person listed in item 2 above:
5320 Oleander Drive
City: Wilmington State:NC Zip:28403
Phone: (910 ) 791-8107 Fax:
Email:
5. Project Name: Tunele Rapids Project
6. Location of Project (street address):
5320 Oleander Drive
City:Wilmington County:New Hanover Zip: 28403
7. Directions to project (from nearest major intersection):
From the intersection of College Rd. and Oleander Dr., follow Oleander Drive east approximately 1 mile
Facility will be on the right.
II. PERMIT INFORMATION:
1. Specify the type of stormwater treatment: ❑Constructed Wetland ❑Bioretent on ®Wet Detention Basin
❑Dry Detention Basin ❑Infiltration Basin ❑Infiltration Trench ❑Sand Filter ❑Other:
2. List any changes from project that was originally approved (attach additional pages if needed):
The original permit was issued November 20, 1996 and was modified on October 19 1999 In October 2001
and Tune 2008 plan revisions were approved. The most recent revision is attached
Form SWU-102 (Renewal Form) Version 02.16.09 Pagel of 3
3. Do you have a copy of the original Operation and Maintenance Agreement? (check one)
®Yes (If yes, submit the attached (page 3) Operations and Maintenance verification sheet.)
❑No (If no, then submit a new Operations and Maintenance Agreement that can be located on the
Division of Water Quality Home Page under the BMP Manual link:
http://h2o.enr.state.nc.us/su/bmp_forms.htm)
III. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the
interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm)
1. Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
• Original & 1 copy of the Stormwater Management Permit Renewal Application Form
• Application fee of $505.00 (made payable to NCDENR)
• Operation & Maintenance Verification or a new O&M Agreement
• SWU-101 Application Form (if requesting a modification to the permit)
• Transfer of Ownership/Name Change Form (if requesting transfer of ownership)
VI. APPLICANT'S CERTIFICATION
I, (print or type name of person listed in General Information, item 3) '"crae,,. �t,, i ,., Q�
certify that the information included on this permit renewal application is, to the best 9f my im wledge, correct
and complete.
Date: M+Ke.L 2v 2,,0 q
Form SWU-102 (Renewal Form) Version 02.16.09 Page 2 of 3
Compliance Inspection Report
Permit: SW8960818 Effective: 06/27/08 Expiration:
County: New Hanover
Region: Wilmington
Contact Person:- Robert Rippy Title: Owner
Directions to Project:
Type of Project: State Stormwater - HD - Detention Pond
Drain Areas:
On -Site Representative(s):
Related Permits:
Inspection Date: 05/07/2009 Entry Time: 05:30 PM
Primary Inspector: David W Cox
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ■ Not Compliant
Question Areas:
0 State Stormwater
(See attachment summary)
Owner: Robert Rippy
Project: Jungle Rapids
5320 Oleander Dr
Wilmington NC 28403
Phone:
Exit Time: 06:00 PM
Phone: 910-796-7215
Inspection Type: Stormwater
Page: 1
Permit: SW8960818 Owner - Project: Robert Rippy
Inspection Date: 05/07/2009 Inspection Type: Stormwater
Reason for Visit: Routine
Inspection Summary:
The maintenance performed on this stormwater system meets the minimum requirments for this office. However, the
parking arrangment on the large grassed parking area needs to layed out with parking curbs or timbers to ensure that only
the areas that were permitted for parking are being utilized and that patrons are not parking on areas approved as green
space.
File Review
Yes
No
NA
NE
Is the permit active?
0000
Signed copy of the Engineer's certification is in the file?
■
❑
❑
❑
Signed copy of the Operation & Maintenance Agreement is in the file?
■
❑
n
❑
Copy of the recorded deed restrictions is in the file?
❑
❑
■
❑
Comment:
SW Measures
Yes
No
NA
NE
Are the SW measures constructed as per the approved plans?
■
❑
❑
❑
Are the inlets located per the approved plans?
■
❑
❑
❑
Are the outlet structures located per the approved plans?
■
❑
❑
❑
Comment:
Operation and Maintenance
Yes
No
NA
NE
Are the SW measures being maintained and operated as per the permit requirements?
■
❑
❑
❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ
❑
❑
❑
■
upon request?
Comment:
Other Permit Conditions
Yes
No
NA
NE
Is the site compliant with other conditions of the permit?
❑
■
❑
❑
Comment: Although the parking lot in front of the retention pond was never
completed, there still needs to be a physical layout to ensure that overparking does not
occur.
Page: 2