Loading...
HomeMy WebLinkAbout20211593 Ver 1_03_UpdatedImpactTable_20220103C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): ❑ Buffers Construction // Wetlands /1 Streams - tributaries ❑ Open Waters ❑ Pond 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number — Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland (if known) 2d. Forested 2e. Type of jurisdiction (Corps - 404, 10 DWQ — non-404, other) 2f. Area of impact (acres) Site 1 Fill Headwater Forest (Non-404) /1 Yes ❑ Corps 0.05 W3 /1 P ❑ T 0 No i1 DWQ Site 1 Fill Headwater Forest (Non-404) 0 Yes ❑ Corps 0.10 W7 /1 P ❑ T No i1 DWQ Site 2 Fill Headwater Forest (Non-404) Yes ❑ Corps 0.02 W1 /1 P ❑ T 0 No i1 DWQ Site 2 Fill Headwater Forest (Non-404) Yes ❑ Corps 0.06 W2 /1 P ❑ T 0 No i1 DWQ Site 2 Roadway Construction/Fill Headwater Forest (404/401) Yes /1 Corps 0.34 W11 // P ❑ T ❑ No /1 DWQ Site 2 Construction Access Headwater Forest (404/401) Yes Corps 0.08 W11 ❑ P I T ❑ No /1 DWQ 2g. Total wetland impacts 0.23 (Non 404) 0.42 (404/401)