HomeMy WebLinkAbout20140179 Ver 1_Emails_20140307Sullivan, Shelton
From: Sullivan, Shelton
Sent: Friday, March 07, 2014 5:21 PM
To: 'sa ra.cerm i na ra @ya hoo.com'
Cc: Dale.Mosteller @duke - energy.com; 'Joe.Kluttz @duke - energy.com'; Alan.Johnson
Subject: Shoreline Application Review
Importance: High
Sa ra,
I am currently reviewing the application and I have a few questions...
1. 1 understand that the proposal is for riprap along 80 ft. of shoreline but I need to know how much (square
footage) of the riprap is proposed for above the normal water level and below. This would be from looking at
the shoreline from an overhead view. You can send these to me via email. See the below example.
*"V� r, J&j'TA
2. Also, the shoreline appears to have little slope with minimal bank height. I am not sure if Duke will allowjust
riprap for shorelines for bank heights less than 2 feet but please clarify with Duke. Banks of this height may
need bioengineering techniques or enhanced riprap. I have copied to Duke representatives on this email so you
can contact them directly. See Section 5 of the http: / /www .duke- energy.com /pdfs /shoreline mgt guide.pdf
Let me know if you have any questions or if you need clarification on these items.
Thank you,
Shelton Su]li�Tan
401 & Buffer Permitting Unit
NCDENR I DMsion of grater Resources I grater Permitting Section
1650 Mail Sei0ce Center, Raleigh, NC 27699 -1650
Phone: (919)807 -6361 Fax: (919)807 -6494
Email: shelton.sullivan @ncdenr.gov
�/Vebsite: http: / /portal.ncdenr.org /web /wq /sw /ws /websca�e
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties
h 11case 447? ider be emkonnient beforeprintingthsc PA