Loading...
HomeMy WebLinkAbout20140122 Ver 1_More Info Letter_20140227A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder John E. Skvarla III Governor Director Secretary February 27, 2014 DWQ Project # 14 -0122 Pitt County CERTIFIED MAIL: RETURN RECEIPT REQUESTED 7011 1150 0000 4206 5438 City of Greenville Kinsey Holton 1500 Beatty Street Greenville, NC 27834 Subject Property: Eastbrook Culvert Removal & Stream Bank Improvements Tar River Basin, Meeting House Branch [TAR 05, 28 -97 -1; NSW, C] REQUEST FOR ADDITIONAL INFORMATION Dear Mr. Holton: On February 7, 2014, the Division of Water Resources (DWR) received your application dated January 28, 2014 to impact 80 linear feet on stream and 6,460 square feet of Zone I and 1,920 square feet of Zone II of the Tar - Pamlico River Riparian Buffer. The DWR has determined that your application was incomplete and /or provided inaccurate information as discussed below. The DWR will require additional information in order to process your application to impact protected isolated wetlands and /or streams on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .1300 and 15A NCAC 213.0200 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. It is required use of a temporary in stream check dams be requested in your Pre - Construction Notification (PCN). It is also necessary to describe maintenance of check dams while in stream and how check dams will be removed and area restored after construction is completed. Water Quality Regional Operations Section Internet: www.ncwaterqualiV.org 943 Washington Square Mall Phone: 252- 946 -6481 Washington, NC27889 FAX 252- 946 -9215 Page 2 of 2 2. It is necessary to illustrate areas where erosion control matting will be used on the subject project. 3. PCN and plan drawings must show restoration plantings of the Riparian Buffers within impact areas for Zone 1 in accordance with 15A NCAC 2B .0260, (9), (d), (e). 4. PCN form and /or plan drawings should indicate total number of linear feet of stream bank improvements. Please respond in writing to the DWR within four weeks of the date of this letter to with the requested information, If we do not hear from you within four weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWR. Please call Roberto Scheller of the Washington Regional Office at 252- 948 -3940 or Karen Higgins of the DWR Central Office at 919- 807 -6360 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, For Thomas A. Reede cc: William Wescott, USACE Washington, Regulatory Field Office DWQ Webscape Unit File Copy