HomeMy WebLinkAbout20200142 Ver 6_B4484_Permit_Mod_01272022_20220131
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J. ERIC BOYETTE
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
HIGHWAY DIVISION 2
2815 ROUSE ROAD EXTENSION
KINSTON, NC 28504
Telephone: (252) 775-6100
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
2815 ROUSE ROAD EXTENSION
KINSTON, NC 28504
January 27, 2022
N.C. Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
ATTN: Stephen Lane
NCDOT Coordinator
U.S. Army Corps of Engineers
Washington Regulatory Field Office
2407 West Fifth St.
Washington, NC 27889
ATTN: Thomas Steffens
NCDOT Coordinator
N.C. Division of Water Resources
Washington Regional Office
943 Washington Square Mall
Washington, NC 27889
ATTN: Garcy Ward
NCDOT Coordinator
Subject: Request for Modification of the CAMA Major Development Permit, and
Revision of Section 404 and Section 10 Individual Permit, and Section 401
Water Quality Certification for the Proposed Replacement of Bridges 138 and
139 over the Neuse River on SR 14770 (Maple Cypress Road) in Craven County,
North Carolina; TIP Project B-4484. Debit permit fees from WBS No. 33723.3.1
References: Section 404/Section 10 Individual Permit, U.S. Army Corps of Engineers Action
ID SAW-2017-00829, issued May 5, 2020.
Section 401 Water Quality Certification No. WQC004214, NCDWR Project No.
20200142, issued March 24, 2020.
CAMA Major Development Permit, NCDCM Permit No. 45-20, issued April 14,
2020.
The North Carolina Department of Transportation (NCDOT) requests a modification to the above
referenced CAMA Major Development Permit to authorize the replacement of the existing 84”
culverts along Maple Cypress Road. Additionally, NCDOT is requesting modification or
reissuance of the referenced permits from USACE and NCDWR for this work.
The proposed changes, presented in the attached permit impact sheets, include replacing the
existing 84” x 62’ culverts with two 90” x 70’ culverts with headwalls. The original roadway
plans and permit drawings requested for an extension of the existing culverts and the addition of a
collar. Upon further evaluation during construction, a complete replacement of the existing
culverts was determined to be more practical and address long-term maintenance.
The previously permitted impacts for channel relocation have been removed from the attached
permit drawings. Although a channel is shown in this location, it remains inundated and provides
no hydraulic benefit to the system. The excavation in wetlands previously associated with the
channel relocation and the mechanized clearing impacts at the inlet of the culvert have been
changed to hand clearing, which has already occurred on site.
To accommodate construction and installation of the new culverts and headwalls, small
permanent fill and excavation impacts have been added to both the inlet and outlet of the
proposed culverts. These impacts are less than 0.01 acre in total, and do not result in an increase
to the impact totals noted in Table 1 below. The individual increases can be seen in the attached
permit impact summary worksheet.
Summary Table of Impacts
For comparison, Table 1 is an abbreviated version of the wetland and surface water impacts and
the changes in impacts due to the modifications described above. A decrease of 0.09 acre of
excavation in wetlands and 0.27 acre of temporary fill associated with the channel relocation is
offset by 0.36 acre increase in hand clearing in wetlands.
Table 1. Wetland and Surface Water Impact Changes
Permanent Fill
in Wetlands (ac)
Excavation in
Wetlands (ac)
Mechanized Clearing
in Wetlands (ac)
Hand Clearing
in Wetlands (ac)
Temporary Fill
in Wetlands (ac)
Impact
Site No.
March
2020
Jan.
2022
March
2020
Jan.
2022
March
2020
Jan.
2022
March
2020
Jan.
2022
March
2020
Jan.
2022
Site 2 0.66 0.66 0.20 0.11 0.90 0.90 0 0.36 0.29 0.02
Total 1.09 1.09 0.20 0.11 1.20 1.20 0 0.36 0.29 0.02
Proposed Mitigation
The proposed changes detailed above would decrease total permanent impacts to jurisdictional
wetlands from 2.5 acres (represented by cumulative individual summation, not rounded totals, of
impacts at Sites 1 and 2) to 2.4 acres. Total temporary impacts to jurisdictional wetlands are being
increased from 0.29 acres to 0.38 acres. These revised permanent and temporary impacts to
jurisdictional wetlands do not exceed the mitigation compensated through in-lieu fee payment to
the NCDMS in association with the original permits issued for this project.
Regulatory Approvals
CAMA Permit: NCDOT requests that the N.C. Division of Coastal Management review this
permit modification request and issue a modification for the CAMA Major Development Permit
issued April 14, 2020.
Section 404/Section 10 Individual Permit: NCDOT requests that the U.S. Army Corps of
Engineers (USACE) review this permit modification request and modify the Section 404/Section
10 Individual Permit.
401 Certification: NCDOT requests that the N.C. Division of Water Resources review this permit
modification request and reissue a Section 401 Water Quality Certification.
If you have any questions regarding this information, please contact me at (252) 439-2811 or
ckwhitley@ncdot.gov.
Sincerely,
Casey Whitley, PE PLS
NCDOT Division 2
Cc: NCDOT Permit Application Standard Distribution List
Jay Johnson, NCDOT Division 2
Jennifer Farino, P.E., RS&H
Phil May, Carolina Ecosystems, Inc.
Attachments:
• Revised Permit Drawings
CLASS "I" GRANITE RIP RAP
WITH APPROX. 22 TONS OF
FILL EX SCOUR HOLE
2 @ 90" CAAP
EXCAVATION IN WETLANDS
555
10 7 MATCH TO SHEET 6 -L1- STA. 48+00FOR -L1- PROFILE, SEE SHEET 9
SHEET 9 OF 15
PERMIT DRAWING
WETLAND
DENOTES FILL INFF
0'50'100'150'50'
E E IN WETLAND
DENOTES EXCAVATION
SITE 2
SEE INSET A
INSET A
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
REVISED 1/25/2022
HC HC
CLEARING
DENOTES HAND
T T FILL IN WETLAND
DENOTES TEMPORARY
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
B-4484 25-JAN-2022 18:14X:\P\1030036014_B-4484 Design\Design\Roadway\Proj\Culvert Revisions 20220119\B4484_Hyd_prm_09_psh_07_con.dgn$$$$USERNAME$$$$8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NC FIRM LICENSE No: F-0493
F
FINV=4.78'INV=4.72'
WD HW
-WL- 40-WL- 45F
F
F
F F
F
F
F
8
7
7
5055-L1- POC STA. 50+50 +/- RT
BEGIN ROCK PLATING
-L1- POC STA. 53+00 +/- LT/RT
END ROCK PLATING
-L1- POC STA. 54+00.00
END TIP PROJECT B-4484
-L1- POC STA. 54+90.53
END CONSTRUCTION B-4484
OVER EXIST. 84" PIPES
USE 25' CLEAR SPAN GUARDRAIL SECTION
-L1- POT STA. 50+50 +/- LT
END ROCK EMBANKMENT
T
107
108
109
110
111
SR 1470 MAPLE CYPRESS RD 22' BST
SR 1450 NELSON RD 22' BSTINV=4.45'INV=4.39'INV=4.78'INV=4.72'84" CMP84" CMPWD HW 60.00'60.00'EXISTING R/W
EXISTING R/W
EXISTING R/
W
EXISTING R/
W
15" HDPE
N 04°02'11" W243.23'S 32°51'25" W
77.87'N 57°06'12" W195.83'
B
E
A
V
E
R
D
AM1SBKD
20' GR
.HAROLD HARGETT JR & TONYA H. BYRD
HAROLD HARGETT JR & TONYA H. BYRD
LINDA B. McKEEL, ET AL
JUDY K. HEATH
CYPRESS SWAMP
CYPRESS SWAMP
WOODS
WOODS
WOODS
CYPRESS SWAMP
CYPRESS SWAMP
HAROLD HARGETT JR & TONYA H. BYRD
10"
10"
6"
6"H10"
P
LAS.0555
5
5
5
55555510
10101010101010
10
1010
10
1
0
101
0 10151515 15
15151515151515 1
515151515151515
15
15 202020 2020202
02020NAD 83/ 2001
AATUR
AATUR
GV
CLASS "I" GRANITE RIP RAP
WITH APPROX. 22 TONS OF
FILL EX SCOUR HOLE
2 @ 90" CAAP
EXCAVATION IN WETLANDS
7 MATCH TO SHEET 6 -L1- STA. 48+00FOR -L1- PROFILE, SEE SHEET 9
SHEET 8 OF 15
PERMIT DRAWING
WETLAND
DENOTES FILL INFF
0'50'100'150'50'
E E IN WETLAND
DENOTES EXCAVATION
SITE 2
SEE INSET A
INSET A
CLEARING
DENOTES MECHANIZED*
*
*
*
**
*
**
*
*
REVISED 1/25/2022
HC HC
CLEARING
DENOTES HAND
T T FILL IN WETLAND
DENOTES TEMPORARY
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
B-4484 25-JAN-2022 18:19R:\Roadway\Proj\Culvert Revisions 20220119\B4484_Hyd_prm_08_psh_07.dgn$$$$USERNAME$$$$8/17/99DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
NC FIRM LICENSE No: F-0493
F
FINV=4.78'INV=4.72'
WD HW
-WL- 40-WL- 45F
F
F
F F
F
F
F
8
7
7
5055-L1- POC STA. 50+50 +/- RT
BEGIN ROCK PLATING
-L1- POC STA. 53+00 +/- LT/RT
END ROCK PLATING
-L1- POC STA. 54+00.00
END TIP PROJECT B-4484
-L1- POC STA. 54+90.53
END CONSTRUCTION B-4484
OVER EXIST. 84" PIPES
USE 25' CLEAR SPAN GUARDRAIL SECTION
-L1- POT STA. 50+50 +/- LT
END ROCK EMBANKMENT
T
107
108
109
110
111
SR 1470 MAPLE CYPRESS RD 22' BST
SR 1450 NELSON RD 22' BSTINV=4.45'INV=4.39'INV=4.78'INV=4.72'84" CMP84" CMPWD HW 60.00'60.00'EXISTING R/W
EXISTING R/W
EXISTING R/
W
EXISTING R/
W
15" HDPE
N 04°02'11" W243.23'S 32°51'25" W
77.87'N 57°06'12" W195.83'
B
E
A
V
E
R
D
AM1SBKD
20' GR
.HAROLD HARGETT JR & TONYA H. BYRD
HAROLD HARGETT JR & TONYA H. BYRD
LINDA B. McKEEL, ET AL
JUDY K. HEATH
CYPRESS SWAMP
CYPRESS SWAMP
WOODS
WOODS
WOODS
CYPRESS SWAMP
CYPRESS SWAMP
HAROLD HARGETT JR & TONYA H. BYRD
10"
10"
6"
6"H10"
P
LAS.
NAD 83/ 2001
AATUR
AATUR
GV
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 -L1- 17+85 RT Exist. 12" CMP Removal < 0.01
1 -L1- 19+41 LT Rip Rap Outlets < 0.01 < 0.01
1 -L1- 20+50 RT Rip Rap Outlet < 0.01 < 0.01
1 -L1- 20+62 to 22+28 LT Ret Wall / Fill / Work Platform 0.07 0.19
1 -L1- 27+85 to 32+70 LT Ret Wall / Fill / Work Platform 0.36 0.10
1 -L1- 29+73 RT Rip Rap Outlet < 0.01
2 -L1- 39+17 LT Roadway Fill Slope 0.03
2 -L1- 39+62 RT Roadway Cut Slope < 0.01
2 -L1- 39+71 to 40+45 RT Roadway Cut Slope 0.04
2 -L1- 39+00 to 43+32 Proposed Bridge / Work Platform 0.82
2 -L1- 42+26 to 43+32 RT Roadway Cut Slope 0.07
2 -L1- 43+32 to 51+32 LT Proposed Roadway/Fill Slope 0.61 0.08
2 -L1- 48+60 to 50+66 LT Proposed Culvert Inlet < 0.01 < 0.01 0.36
2 -L1- 48+90 RT Proposed Culvert Outlet < 0.01 0.02 < 0.01
2 -L1- 53+00 LT Roadway Fill Slope < 0.01
2 -L1- 52+97 RT Roadway Fill Slope < 0.01
TOTALS*:1.09 0.02 0.11 1.20 0.36 0 0 0
*Rounded totals are sum of actual impacts
NOTES:
Revised 2016 09 09 SHEET 15 OF 15
Temp Work Platform
Based on 20' or shorter spans, with pile rows 2' long and the full width of the platform (both conservative):
*6/9/2021 REVISON NOTES: 0.27ac Temp Fill for "Channel Relocation" and 0.03ac Temp Fill for "Temporary Dike for Slipline" were revised to Mech Clearing
*1/25/2022 REVISON NOTES: "Channel Relocation" changed to "Proposed Culvert Inlet". Impacts at "Proposed Culvert Inlet" and "Proposed Culvert Outlet" were modified per
construction methodology change.
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Craven County
B-4484
33723.1.2
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
3/2/2020 (REVISED 1/25/2022*)
Total permanent Wetland Impacts due to proposed piles = 38 sq.ft.
Total permanent SW Impacts due to proposed piles = 141 sq.ft.