HomeMy WebLinkAbout20200142 Ver 6_B4484_Permit_Mod_01272022_20220131 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION 2 2815 ROUSE ROAD EXTENSION KINSTON, NC 28504 Telephone: (252) 775-6100 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 2815 ROUSE ROAD EXTENSION KINSTON, NC 28504 January 27, 2022 N.C. Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 ATTN: Stephen Lane NCDOT Coordinator U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 West Fifth St. Washington, NC 27889 ATTN: Thomas Steffens NCDOT Coordinator N.C. Division of Water Resources Washington Regional Office 943 Washington Square Mall Washington, NC 27889 ATTN: Garcy Ward NCDOT Coordinator Subject: Request for Modification of the CAMA Major Development Permit, and Revision of Section 404 and Section 10 Individual Permit, and Section 401 Water Quality Certification for the Proposed Replacement of Bridges 138 and 139 over the Neuse River on SR 14770 (Maple Cypress Road) in Craven County, North Carolina; TIP Project B-4484. Debit permit fees from WBS No. 33723.3.1 References: Section 404/Section 10 Individual Permit, U.S. Army Corps of Engineers Action ID SAW-2017-00829, issued May 5, 2020. Section 401 Water Quality Certification No. WQC004214, NCDWR Project No. 20200142, issued March 24, 2020. CAMA Major Development Permit, NCDCM Permit No. 45-20, issued April 14, 2020. The North Carolina Department of Transportation (NCDOT) requests a modification to the above referenced CAMA Major Development Permit to authorize the replacement of the existing 84” culverts along Maple Cypress Road. Additionally, NCDOT is requesting modification or reissuance of the referenced permits from USACE and NCDWR for this work. The proposed changes, presented in the attached permit impact sheets, include replacing the existing 84” x 62’ culverts with two 90” x 70’ culverts with headwalls. The original roadway plans and permit drawings requested for an extension of the existing culverts and the addition of a collar. Upon further evaluation during construction, a complete replacement of the existing culverts was determined to be more practical and address long-term maintenance. The previously permitted impacts for channel relocation have been removed from the attached permit drawings. Although a channel is shown in this location, it remains inundated and provides no hydraulic benefit to the system. The excavation in wetlands previously associated with the channel relocation and the mechanized clearing impacts at the inlet of the culvert have been changed to hand clearing, which has already occurred on site. To accommodate construction and installation of the new culverts and headwalls, small permanent fill and excavation impacts have been added to both the inlet and outlet of the proposed culverts. These impacts are less than 0.01 acre in total, and do not result in an increase to the impact totals noted in Table 1 below. The individual increases can be seen in the attached permit impact summary worksheet. Summary Table of Impacts For comparison, Table 1 is an abbreviated version of the wetland and surface water impacts and the changes in impacts due to the modifications described above. A decrease of 0.09 acre of excavation in wetlands and 0.27 acre of temporary fill associated with the channel relocation is offset by 0.36 acre increase in hand clearing in wetlands. Table 1. Wetland and Surface Water Impact Changes Permanent Fill in Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Temporary Fill in Wetlands (ac) Impact Site No. March 2020 Jan. 2022 March 2020 Jan. 2022 March 2020 Jan. 2022 March 2020 Jan. 2022 March 2020 Jan. 2022 Site 2 0.66 0.66 0.20 0.11 0.90 0.90 0 0.36 0.29 0.02 Total 1.09 1.09 0.20 0.11 1.20 1.20 0 0.36 0.29 0.02 Proposed Mitigation The proposed changes detailed above would decrease total permanent impacts to jurisdictional wetlands from 2.5 acres (represented by cumulative individual summation, not rounded totals, of impacts at Sites 1 and 2) to 2.4 acres. Total temporary impacts to jurisdictional wetlands are being increased from 0.29 acres to 0.38 acres. These revised permanent and temporary impacts to jurisdictional wetlands do not exceed the mitigation compensated through in-lieu fee payment to the NCDMS in association with the original permits issued for this project. Regulatory Approvals CAMA Permit: NCDOT requests that the N.C. Division of Coastal Management review this permit modification request and issue a modification for the CAMA Major Development Permit issued April 14, 2020. Section 404/Section 10 Individual Permit: NCDOT requests that the U.S. Army Corps of Engineers (USACE) review this permit modification request and modify the Section 404/Section 10 Individual Permit. 401 Certification: NCDOT requests that the N.C. Division of Water Resources review this permit modification request and reissue a Section 401 Water Quality Certification. If you have any questions regarding this information, please contact me at (252) 439-2811 or ckwhitley@ncdot.gov. Sincerely, Casey Whitley, PE PLS NCDOT Division 2 Cc: NCDOT Permit Application Standard Distribution List Jay Johnson, NCDOT Division 2 Jennifer Farino, P.E., RS&H Phil May, Carolina Ecosystems, Inc. Attachments: • Revised Permit Drawings CLASS "I" GRANITE RIP RAP WITH APPROX. 22 TONS OF FILL EX SCOUR HOLE 2 @ 90" CAAP EXCAVATION IN WETLANDS 555 10 7 MATCH TO SHEET 6 -L1- STA. 48+00FOR -L1- PROFILE, SEE SHEET 9 SHEET 9 OF 15 PERMIT DRAWING WETLAND DENOTES FILL INFF 0'50'100'150'50' E E IN WETLAND DENOTES EXCAVATION SITE 2 SEE INSET A INSET A CLEARING DENOTES MECHANIZED* * * * ** * ** * * REVISED 1/25/2022 HC HC CLEARING DENOTES HAND T T FILL IN WETLAND DENOTES TEMPORARY DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. B-4484 25-JAN-2022 18:14X:\P\1030036014_B-4484 Design\Design\Roadway\Proj\Culvert Revisions 20220119\B4484_Hyd_prm_09_psh_07_con.dgn$$$$USERNAME$$$$8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NC FIRM LICENSE No: F-0493 F FINV=4.78'INV=4.72' WD HW -WL- 40-WL- 45F F F F F F F F 8 7 7 5055-L1- POC STA. 50+50 +/- RT BEGIN ROCK PLATING -L1- POC STA. 53+00 +/- LT/RT END ROCK PLATING -L1- POC STA. 54+00.00 END TIP PROJECT B-4484 -L1- POC STA. 54+90.53 END CONSTRUCTION B-4484 OVER EXIST. 84" PIPES USE 25' CLEAR SPAN GUARDRAIL SECTION -L1- POT STA. 50+50 +/- LT END ROCK EMBANKMENT T 107 108 109 110 111 SR 1470 MAPLE CYPRESS RD 22' BST SR 1450 NELSON RD 22' BSTINV=4.45'INV=4.39'INV=4.78'INV=4.72'84" CMP84" CMPWD HW 60.00'60.00'EXISTING R/W EXISTING R/W EXISTING R/ W EXISTING R/ W 15" HDPE N 04°02'11" W243.23'S 32°51'25" W 77.87'N 57°06'12" W195.83' B E A V E R D AM1SBKD 20' GR .HAROLD HARGETT JR & TONYA H. BYRD HAROLD HARGETT JR & TONYA H. BYRD LINDA B. McKEEL, ET AL JUDY K. HEATH CYPRESS SWAMP CYPRESS SWAMP WOODS WOODS WOODS CYPRESS SWAMP CYPRESS SWAMP HAROLD HARGETT JR & TONYA H. BYRD 10" 10" 6" 6"H10" P LAS.0555 5 5 5 55555510 10101010101010 10 1010 10 1 0 101 0 10151515 15 15151515151515 1 515151515151515 15 15 202020 2020202 02020NAD 83/ 2001 AATUR AATUR GV CLASS "I" GRANITE RIP RAP WITH APPROX. 22 TONS OF FILL EX SCOUR HOLE 2 @ 90" CAAP EXCAVATION IN WETLANDS 7 MATCH TO SHEET 6 -L1- STA. 48+00FOR -L1- PROFILE, SEE SHEET 9 SHEET 8 OF 15 PERMIT DRAWING WETLAND DENOTES FILL INFF 0'50'100'150'50' E E IN WETLAND DENOTES EXCAVATION SITE 2 SEE INSET A INSET A CLEARING DENOTES MECHANIZED* * * * ** * ** * * REVISED 1/25/2022 HC HC CLEARING DENOTES HAND T T FILL IN WETLAND DENOTES TEMPORARY DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. B-4484 25-JAN-2022 18:19R:\Roadway\Proj\Culvert Revisions 20220119\B4484_Hyd_prm_08_psh_07.dgn$$$$USERNAME$$$$8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NC FIRM LICENSE No: F-0493 F FINV=4.78'INV=4.72' WD HW -WL- 40-WL- 45F F F F F F F F 8 7 7 5055-L1- POC STA. 50+50 +/- RT BEGIN ROCK PLATING -L1- POC STA. 53+00 +/- LT/RT END ROCK PLATING -L1- POC STA. 54+00.00 END TIP PROJECT B-4484 -L1- POC STA. 54+90.53 END CONSTRUCTION B-4484 OVER EXIST. 84" PIPES USE 25' CLEAR SPAN GUARDRAIL SECTION -L1- POT STA. 50+50 +/- LT END ROCK EMBANKMENT T 107 108 109 110 111 SR 1470 MAPLE CYPRESS RD 22' BST SR 1450 NELSON RD 22' BSTINV=4.45'INV=4.39'INV=4.78'INV=4.72'84" CMP84" CMPWD HW 60.00'60.00'EXISTING R/W EXISTING R/W EXISTING R/ W EXISTING R/ W 15" HDPE N 04°02'11" W243.23'S 32°51'25" W 77.87'N 57°06'12" W195.83' B E A V E R D AM1SBKD 20' GR .HAROLD HARGETT JR & TONYA H. BYRD HAROLD HARGETT JR & TONYA H. BYRD LINDA B. McKEEL, ET AL JUDY K. HEATH CYPRESS SWAMP CYPRESS SWAMP WOODS WOODS WOODS CYPRESS SWAMP CYPRESS SWAMP HAROLD HARGETT JR & TONYA H. BYRD 10" 10" 6" 6"H10" P LAS. NAD 83/ 2001 AATUR AATUR GV Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L1- 17+85 RT Exist. 12" CMP Removal < 0.01 1 -L1- 19+41 LT Rip Rap Outlets < 0.01 < 0.01 1 -L1- 20+50 RT Rip Rap Outlet < 0.01 < 0.01 1 -L1- 20+62 to 22+28 LT Ret Wall / Fill / Work Platform 0.07 0.19 1 -L1- 27+85 to 32+70 LT Ret Wall / Fill / Work Platform 0.36 0.10 1 -L1- 29+73 RT Rip Rap Outlet < 0.01 2 -L1- 39+17 LT Roadway Fill Slope 0.03 2 -L1- 39+62 RT Roadway Cut Slope < 0.01 2 -L1- 39+71 to 40+45 RT Roadway Cut Slope 0.04 2 -L1- 39+00 to 43+32 Proposed Bridge / Work Platform 0.82 2 -L1- 42+26 to 43+32 RT Roadway Cut Slope 0.07 2 -L1- 43+32 to 51+32 LT Proposed Roadway/Fill Slope 0.61 0.08 2 -L1- 48+60 to 50+66 LT Proposed Culvert Inlet < 0.01 < 0.01 0.36 2 -L1- 48+90 RT Proposed Culvert Outlet < 0.01 0.02 < 0.01 2 -L1- 53+00 LT Roadway Fill Slope < 0.01 2 -L1- 52+97 RT Roadway Fill Slope < 0.01 TOTALS*:1.09 0.02 0.11 1.20 0.36 0 0 0 *Rounded totals are sum of actual impacts NOTES: Revised 2016 09 09 SHEET 15 OF 15 Temp Work Platform Based on 20' or shorter spans, with pile rows 2' long and the full width of the platform (both conservative): *6/9/2021 REVISON NOTES: 0.27ac Temp Fill for "Channel Relocation" and 0.03ac Temp Fill for "Temporary Dike for Slipline" were revised to Mech Clearing *1/25/2022 REVISON NOTES: "Channel Relocation" changed to "Proposed Culvert Inlet". Impacts at "Proposed Culvert Inlet" and "Proposed Culvert Outlet" were modified per construction methodology change. WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Craven County B-4484 33723.1.2 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 3/2/2020 (REVISED 1/25/2022*) Total permanent Wetland Impacts due to proposed piles = 38 sq.ft. Total permanent SW Impacts due to proposed piles = 141 sq.ft.