HomeMy WebLinkAbout20211410 Ver 1_Correction 20211410_South Scales Street_Bridge_Gen Cert_2-2-22_20220202 DocuSign Envelope ID:5A53A427-D895-4C00-B087-3FB4C7341609
ROY COOPER _
Governor ,
ELIZABETH S.BISER
Secretary QWM Nw
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
February 2,2022
Rockingham County
NCDWR Project No.20211410
NCDOT TIP Project SF-780280
Bridge#280 on South Scales Street
APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
Mr.W.R Archer III,PE-Division Engineer
NCDOT Division 7
PO Box 14996
1584 Yanceyville Street
Greensboro,NC 27415-4996
Dear Mr.Archer:
You have our approval, in accordance with the conditions listed below, for the following impacts regarding the
replacement of Bridge#280 on South Scales Street over Little Troublesome Creek located in Rockingham County.
Stream Impacts in the Cape Fear River Basin
Perm.Fill in Temp.Fill in
Perennial Stream Perennial Stream Stream Impacts
Site (linear ft) (linear ft) Total Stream Impact Requiring
(linear ft) Mitigation
Fill Fill (linear ft)
1 134 40 174 99
2 54 0 54 54
Totals 188 40 228 153
Total Stream Impacts: 228 linear feet.
The project shall be constructed in accordance with your application dated received on November 5, 2021. After
reviewing your application,we have decided that these impacts are covered by General Water Quality Certification
Number 4135. This certification corresponds to the NWP 14 Permit (SAW 2019-02006) issued by the Corps of
Engineers on January 28, 2022. This approval is also valid for the Jordan Lake Riparian Buffer Rules (15A NCAC
213.0267.In addition,you should acquire any other federal,state or local permits before you proceed with your project
including(but not limited to)Sediment and Erosion Control,Non-Discharge and Water Supply Watershed regulations.
This approval will expire with the accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application(unless modified below). Should
your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new
owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all
the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to
perennial streams(now or in the future)exceed 300 linear feet,compensatory mitigation may be required as described
in 15A NCAC 2H.0506(h)(6)and(7). Additional buffer impacts may require compensatory mitigation as described
in 15A NCAC 213.0267. For this approval to remain valid,you must adhere to the conditions listed in the attached
D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617
NORTH CAROLINA -
DepartmemmEr.iummur>aiauar� /`� 919.707.9000
DocuSign Envelope ID:5A53A427-D895-4C00-B087-3FB4C7341609
certification(s)and any additional conditions listed below.
Condition(s)of Certification:
Project Specific Conditions
1. The post-construction removal of any temporary bridge structures must return the project site to its
preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species.
[15A NCAC 02H.0506(b)(2)
2. As a condition of this 401 Water Quality Certification, the bridge demolition and construction must be
accomplished in strict compliance with the most recent version of NCDOT's Best Management Practices for
Construction and Maintenance Activities. [15A NCAC 02H.0507(d)(2)and 15A NCAC 02H.0506(b)(5)]
3. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge
and pre-treated through site-appropriate means(grassed swales,pre-formed scour holes,vegetated buffers, etc.)
before entering the stream. To meet the requirements of NCDOT's NPDES permit NCS0000250,please refer to
the most recent version of the North Carolina Department of Transportation Stormwater Best Management
Practices Toolbox manual for approved measures. [15A NCAC 02H .0507(d)(2) and 15A NCAC 02H
.0506(b)(5)]
4. Bridge piles and bents shall be constructed using driven piles(hammer or vibratory)or drilled shaft construction
methods.More specifically,jetting or other methods of pile driving are prohibited without prior written approval
from the NCDWR first. [15A NCAC 02H.0506(b)(2)]
5. No drill slurry or water that has been in contact with uncured concrete shall be allowed to enter surface waters.
This water shall be captured,treated,and disposed of properly. [15A NCAC 02H.0506(b)(3)
General Conditions
1. If concrete is used during construction,a dry work area shall be maintained to prevent direct contact between curing
concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface
waters due to the potential for elevated pH and possible aquatic life and fish kills. [I 5A NCAC 02B.0200]
2. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or
protected riparian buffers. [I 5A NCAC 02H.0506(b)(2)]
3. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed
floodplains and streams shall be restored to natural geomorphic conditions. [15A NCAC 02H.0506(b)(2)]
4. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization
shall be placed in stream channels in such a manner that it does not impede aquatic life passage. [15A NCAC
02H.0506(b)(2)]
5. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted
for approval. [15A NCAC 02H.0507(c)and 15A NCAC 02H.0506(b)(2)and(c)(2)]
6. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the
most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms,
cofferdams and other diversion structures shall be used to prevent excavation in flowing water. [15A NCAC
02H.0506(b)(3)and(c)(3)]
7. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream. [15A NCAC 02H.0506(b)(3)]
D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1617 Mail Service Center I Raleigh,North Carolina 27699-1617
NORTH CAROLINA
oew�ammemimnm.nmio�siKy /`� 919.707.9000
DocuSign Envelope ID:5A53A427-D895-4C00-B087-3FB4C7341609
8. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC
02H.0506(b)(3)]
9. No rock,sand or other materials shall be dredged from the stream channel except where authorized by this certification.
[15A NCAC 02H.0506(b)(3)]
10. Discharging hydroseed mixtures and washing out hydro seeders and other equipment in or adjacent to surface waters is
prohibited. [15A NCAC 02H.0506(b)(3)]
11. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards(including any requirements resulting from compliance with §303(d)of the Clean Water Act) and any other
appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being
met(including the failure to sustain a designated or achieved use)or that State or federal law is being violated,or that
further conditions are necessary to assure compliance,the NCDWR may reevaluate and modify this certification. [15A
NCAC 02B.0200]
12. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1,unless otherwise authorized
by this certification. [15A NCAC 02H.0506(b)(2)]
13. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the
Water Quality Certification and all subsequent modifications,if any,shall be maintained with the Division Engineer and
the on-site project manager. [15A NCAC 02H.0507(c)and 15A NCAC 02H.0506(b)(2)and(c)(2)]
14. The outside buffer,wetland or water boundary located within the construction corridor approved by this authorization
shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the
fencing are prohibited unless otherwise authorized by this certification. [15A NCAC 02H.0501 and.0502]
15. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements,etc.
16. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of
discovery. [15A NCAC 02B.0506(b)(2)]
17. Upon completion of the project(including any impacts at associated borrow or waste sites),NCDOT project engineer
(or appointee) shall complete and return the enclosed"Certification of Completion Form"to notify the NCDWR when
all work included in the 401 Certification has been completed. [15A NCAC 02H.0502(f)]
18. There shall be no excavation from,or waste disposal into,jurisdictional wetlands or waters associated with this permit
without appropriate modification. Should waste or borrow sites,or access roads to waste or borrow sites,be located in
wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction
activities. [15A NCAC 02H.0506(b)(3)and(c)(3)]
19. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design,
installation and operation and maintenance of such Best Management Practices in order to protect surface waters
standards [I 5A NCAC 02H.0506(b)(3)and(c)(3]):
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design Manual.
b. The design,installation,operation,and maintenance of the sediment and erosion control measures must
be such that they equal, or exceed, the requirements specified in the most recent version of the North
Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction
sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits
associated with the project.
�OLINAI North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1617 Mail Service Center I Raleigh,North Carolina 27699-1617
NORTH G
oewrWammemimnmenmiousiKy /`� 919.707.9000
DocuSign Envelope ID:5A53A427-D895-4C00-B087-3FB4C7341609
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
20. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
Certification. [15A NCAC 02H.0506(b)(3)and(c)(3)]
If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing.
You may obtain the petition form from the office of Administrative hearings. You must file the petition with the
office of Administrative Hearings within sixty(60)days of receipt of this notice. A petition is considered filed when
it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative
Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official state
holidays. The original and one(1)copy of the petition must be filed with the Office of Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five(5)business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh,NC 27699-6714
Telephone:(919)431-3000,Facsimile: (919)431-3100
A copy of the petition must also be served on DEQ as follows:
Mr.Bill F.Lane,General Counsel
Department of Environmental Quality
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions,please contact Ryan Conchilla at ryan.conchillana,ncdenr.gov.
Sincerely,
EDocuSigned by:
Q14Ay (6wlpwla Al
9C9886312DCD474...
S.Daniel Smith,Director
Division of Water Resources
Electronic copy only distribution:
David Bailey,US Army Corps of Engineers,Raleigh Field Office
Jerry Parker,DOT Division 7 Environmental Officer
Beth Harmon,Division of Mitigation Services
�QLINAI North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1617 Mail Service Center I Raleigh,North Carolina 27699-1617
NORTH G
oewrWammemimnm.nmiousiKy 919.707.9000