Loading...
HomeMy WebLinkAboutWQ0037555_NOD-2021-PC-0520 Monitoring Well Plan Proposal_20220127January 27, 2022 Privileged and Confidential | Attorney Work Product | Prepared at Request of Counsel Anchor QEA of North Carolina , PLLC 231 Haywood Street Asheville, North Carolina 28801 828.281.3350 A:\Projects\Trillium Links\Text\2022-027-Trillium Links-NOD Response.docx Brett Laverty North Carolina Department of Environmental Quality Water Quality Regional Operations 2090 U.S. Highway 70 Swannanoa, North Carolina 28778 Re: Monitoring Well Plan Notice of Deficiency NOD -2021-PC-0520 Trillium Links & Village W astewater Treatment Plant Cashiers , North Carolina Dear Mr. Laverty: Anchor QEA of North Carolina, PLLC (Anchor QEA), on behalf of Trillium Links & Village (Trillium), is submitting this monitoring well plan to address the deficiencies identified in the Notice of Deficiency (NOD) received through email by Trillium on November 29, 2021. The NOD identified the following deficiencies: 1. Failure to submit a new monitoring well plan and associated documentation within 90 days of permit issuance. a. Part I.3 requires that within 90 days of the effective date of this permit, the Permittee shall submit a new monitoring well plan for monitoring wells MW-1C, MW-2C, and MW-3C to be located near Basin C to the Asheville Regional Office. b. This submittal shall include a site map, an engineer’s statement for the basis of design for the proposed monitoring well locations, and the proposed well construction parameters for the installation of three new monitoring wells to replace MW -2, MW-3, and MW-4. c. The Asheville Regional Office shall approve monitoring wells MW -1C, MW-2C, and MW-3C prior to installation, and the monitoring wells shall be installed within 180 days of the effective date of this permit. d. The Asheville Regional Office shall be notified at least two bus iness days in advance of construction of any monitoring well. e. The monitoring wells shall be constructed such that the water level in the well is never above or below the screened portion of the well, and in accordance with 15A NCAC 02C.0108 [15A NCAC 02C.0108, 02T.0108(b)(1)(B)]. January 27, 2022 Page 2 2. Failure to submit a final operation and maintenance plan within 30 days of permit issuance. a. Part I.7 requires that within 30 days of the effective date of this permit, a Final Operation and Maintenance Plan meeting the requirements of 15A NCAC 02T.0707(a) shall be submitted for review. This letter addresses the requirements related to the monitoring well plan (see I tem 1). In accordance with the Required Corrective Actions listed in the NOD, Anchor QEA, on behalf of Trillium, has prepared a monitoring well plan consisting of the following components: • Site Map with new well locations • Statement for basis of the well placement • Proposed well construction The details of the monitoring well plan are provided below. Also, discussed b elow are the well abandonment requirements specified in the August 13, 2021, High Rate Infiltration System (HRIS), Permit No. WQ0037555. Monitoring Well Plan Proposed Well Locations and Justification The HRIS is positioned on the side of a steep northeast facing slope. Overland flow from precipitation events will drain toward the northwest until it discharges to the northeast-trending drainage feature that runs toward Lake Glenville. A portion of water from precipitation events will infiltrate the soil, and the unsaturated regolith and will migrate downward until it intersects with the water table. At that point the water will migrate from areas of high hydraulic head (higher groundwater elevation) to areas of low hydraulic head (lower groundwater elevations) either through porous media (e.g., unconsolidated materials) or through fractured bedrock. The existing monitoring well network (MW-2, MW-3, and MW-4) is shown on Figure 1. These wells have historically been dry and are only installed to a depth of approximately 20 feet below ground surface. These wells will be abandoned and replaced by three new wells : MW-1C; MW-2C; and MW-3C. Documentation of the construction of these wells is not available; therefore, Anchor QEA does not know what the subsurface conditions were like at the time of drilling for these monitoring wells. Review of the hydrogeologic report submitted for the permit approval application1 provided data on the depth to bedrock and groundwater depth from a boring located approximately 500 feet southwest of the infiltration gallery. According to the report, depth to bedrock is approximately 5 1 feet below ground surface, and the water table is approximately 49 feet below ground surface. Anchor QEA also 1 Soils, Hydrogeologic and Agronomic Investigation, Reclaimed Water – Drip Irrigation Site, Trillium Development, Jackson County, N.C., Edwin Andrews and Associates, P.C., August 2014. January 27, 2022 Page 3 reviewed a geotechnical report 2 prepared by Kessel Engineering Group (Kessel; January 2016). The Kessel report described the installation of the two boring s located on the upgradient side of the infiltration gallery where auger refusal (generally considered top of bedrock) was encountered between 13.5 and 16.5 feet below ground surface and groundwater stabilized between 11 and 13 feet below ground surface. Based on the review of the historical data, depth to bedrock is variable; the true depth to groundwater across the infiltration gallery is unknown; and downgradient from where existing wells MW-2 and MW- 3 are located , groundwater is greater than 20 feet below ground surface. Anchor QEA visited the Site on January 12, 2022, and evaluated potential new well locations with regard to accessibility, the potential compliance boundary, and the likely direction of groundwater flow. Based on that field visit, Anchor QEA recommends that the two downgradient monitoring wells MW-2C and MW-3C be installed along the road at the base of the hill (Figure 1). The reasons for the selection of these locations is due to the following concerns : • The steep slope leading up to the existing well locations MW-2 and MW-3 makes access difficult. • The new mo nitoring wells will have to be installed to a deeper depth and may intersect bedrock. Bedrock drilling requires more tooling and support than drilling through unconsolidated regolith. These requirements result in a larger area for drilling equipment, which is difficult to create on steep slopes. • These locations are in line with the likely groundwater flow direction from the HRIS, assuming that groundwater surface is a subdued expression of the topography. For proposed well location MW -1C, access is not an issue. The well will be installed in the general vicinity of the former well MW-4 and will represent the background monitoring well. Figure 1 shows the proposed locations. The downgradient well locations are positioned where a wide median occurs adjacent to the road. Traffic control would be required to shut down a lane to allow for safe work conditions. Underground utilities may also be present along the road and would require a location service to identify their locations. The proposed well locations are also positioned in areas where overhead electrical lines are present; however, there appears to be sufficient distance to allow safe erection of the drilling mast. A site visit with the chosen well driller will be performed prior to installation of the new wells to ensure drill rig safety and access . There may also be requirements related to right-of-way agreements with North Carolina Department of Transportation. Anchor QEA will also review the existing well locations, MW-2 and MW-3, with a drilling contractor and will rely on their opinion with regards to best locations for installation of the new monitoring wells. 2 Report of Geotechnical Exploration and Slope Stability Analyses, Trillium Links WWTP Slopes, Kessel Engineering Group, January 2016 January 27, 2022 Page 4 Decommission Former Wells MW-2, MW-3, and MW-4 The existing wells MW-2, MW-3 and MW-4 will be abandoned in accordance with Title 15A North Caro lina Administrative Code, Subchapter 2C, Well Construction rules. The work will be performed by a licensed well driller, and the well abandonment forms will be provided to the North Carolina Department of Environmental Quality (DEQ) as required by the well construction rules. Well Construction Provided that DEQ agrees with the proposed locations for the new monitoring wells, Anchor QEA will proceed with contracting a licensed well driller to perform the installation. It is anticipated that the well borings will be advanced into bedrock. Anchor QEA will explore different drilling options for advancing the borings; however, the anticipated depth for each boring is planned for 100 feet below ground surface or the first productive fracture interval, whichever is reached first. The wells will be constructed of 2-inch-diameter, schedule 40 polyvinyl chloride (PVC) risers and screens. The screens with have 0.01 - inch slots and will have an appropriately sized filter pack (sand) between the screened interval and the borehole wall. Sand will extend above the screened interval and will be separated from the grout by a bentonite seal of 3 to 5 feet. The grout will extend from the ground surface to the top of the bentonite. The well head will be finished with a 2-foot-by-2-foot concrete pad with either a protective steel casing with locking lid or an 8 -inch manhole with bolted cover. A survey will be performed to determine the top of casing elevations and ground surface elevations. Closing On behalf of Trillium, Anchor QEA appreciates DEQ’s review of the proposed well locations and is prepared to answer additional questions should they arise. Once Anchor QEA receives concurrence with the well locations from DEQ, we will begin work to schedule their installation. Sincerely, Chuck Pippin, PG, RSM Senior Managing Geologist cc: Julie Babcock, Trillium Links & Villages Attachments Figure 1 Proposed New Well Locations @A @A @A @A @A @A MW-4 MW-3 MW-2 MW-1C MW-3C MW-2C Publish Date: 2022/01/24, 11:59 AM | User: cpippinFilepath: Q:\Jobs\Trillium\Figure 1.mxd [0 150 Feet LEGEND: Power Pole @A Existing Well to be Abandoned @A Proposed New Well High Rate Infiltration System Potential Compliance Boundary (50 feet from Property Line) Compliance Boundary (250 feet from Infiltration Gallery) Access Road Drainage Overland Flow Direction Power Transmission Line Contours: 20' Interval Jackson County Parcels Figure 1Propose New Well Locations Trillium Links & Village Approximate locaiton of boring from the Edwin Andrews and Associates (2014) hydrogeologic report. Approximate locaiton of borings from the Kessel Engineering Group (2016). If review by well driller determines that locations MW-2 and MW-3 are better for installation of the new wells, then these locations will be used for MW-2C and MW-3C.