Loading...
HomeMy WebLinkAbout20131200 Ver 2_More Info Received_20140227 (2)Strickland, Bev From: Devane, Boyd Sent: Monday, March 03, 2014 11:09 AM To: Strickland, Bev Cc: Cranford, Chuck Subject: FW: Tryon #13 -1200 Attachments: Permeable Pavement Drainage Area 4 revised 2- 27- 14.pdf; Permeable Pavement Drainage Area 5 revised 2- 27- 14.pdf; Permeable Pavement Drainage Area 6 revised 2- 27- 14.pdf Bev, please file this letter and attachment in LF, thanks. From: David Odom [ mai Ito: davidodom Ca)odomenaineerina.com] Sent: Thursday, February 27, 2014 9:27 AM To: Devane, Boyd Subject: Tryon Boyd Here are the revised supplement sheets as we discussed. Let me know if everything looks okay to you. Dave Permit No. (to be provided by DWQ) v STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM - NCDENR p PERMEABLE PAVEMENT SUPPLEMENT This form must be completely filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project Name Tryon International Equestrian Site Contact Person David Odom, PE Phone Number 828 - 247 -4495 Date 2/5/2014 Drainage Area #5 Soils Report Summary Hydrologic soil group (HSG) of subgrade C Infiltration rate 0.38 Pavement Design Summary Permeable Pavement (PP) design type Infiltration - HSG C/D SA of PP being proposed (AP) 47,910 Resulting BUA counted as impervious for main application form 23,955 Adjacent BUA directed to PP (AJ 5,345 Ratio of Ac to AP 0.11 Flow from pervious surfaces is directed away from PP? Yes Design rainfall depth 1.0" Permeable pavement surface course type PC Layer 1 - Washed aggregate size (ex. No. 57) No. 57 Layer 1 - Aggregate porosity (n) 0.40 Layer 2 - Washed aggregate size (ex. No. 57) Layer 2 - Aggregate porosity (n) Minimum total aggregate depth for design rainfall (Dwq) 5.0 Drawdown /infiltration time for Dwq How is 10 -yr, 24 -hr storm handled? bypassed Aggregate depth to infiltrate 10 -yr, 24 -hr storm (D10) 20.0 Drawdown /infiltration time of 10 -yr, 24 -hr storm 1.00 Actual provided total aggregate depth 8.0 Top of aggregate base layer elevation 900.00 Storage elevation of design rainfall depth 899.59 Overflow elevation 899.59 Bottom elevation at subgrade 899.17 SHWT elevation 890.00 Underdrain diameter 4 in /hr BUA Credit for Permeable Pavement Footprint: 50% BUA Credit ftz ftz ftz OK (unitless) OK in (unitless) OK (unitless) in days Underdrain Required in days in fmsl fmsl fmsl fmsl fmsl in I Form SW401- Permeable Pave ment- Rev.4- October 16, 2012 PP Supplement Form, Page 1 of 3 Detention Systems (skip for infiltration systems) Diameter of orifice Coefficient of discharge (Cc) Driving head (Ho) Storage volume discharge rate (through discharge orifice) Storage volume drawdown time Pre - development 1 -yr, 24 -hr peak flow Post - development 1 -yr, 24 -hr peak flow Additional Information Slope of soil subgrade at bottom of permeable pavement Slope of the permeable pavement surface Construction sequence minimizes compaction to soils? Subsoil preparation specified (must select one) Meets industry standards for structural requirements? Washed stone is specified for the aggregate? Required signage specified on plans? Number of observation wells provided Distance to structure Distance to surface waters Distance to water supply well(s) in (unitless) ft ft3 /sec days ft3 /sec ft3 /sec 0.50 % OK 0.50 % OK Yes OK scarified Yes OK Yes OK Yes OK 1 OK 10.00 ft 100.00 ft OK 400.00 ft OK Permit No. (to be provided by DWQ) Form SW401- Permeable Pave ment- Rev.4- October 16, 2012 PP Supplement Form, Page 2 of 3 Permit No. (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 1. Plans (1" = 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Location of permeable pavement, Roof and other surface flow directed away from permeable pavement, - Location of the permeable pavement sign(s). 2. Section view of the permeable pavement (1" = 20' or larger) showing: All layers (including details about the surface course), and SHWT 3. A detail of what the permeable pavement sign 4. A site specific soils report that is based upon an actual field investigation, soil borings, and infiltration tests within the footprint of the proposed permeable pavement. The soils investigation shall state the infiltation rate, SHWT elevation, and information about any confining layers. County soil maps are not an acceptable source of soils information. (Projects in the WiRO - The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form.) 5. A construction sequence that shows how the permeable pavement will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (O &M) agreement. 8. A copy of the deed restrictions (if required). Form SW401- Permeable Pave ment- Rev.4- October 16, 2012 PP Supplement Form, Page 3 of 3 Permit No. (to be provided by DWQ) v STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM - NCDENR p PERMEABLE PAVEMENT SUPPLEMENT This form must be completely filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project Name Tryon International Equestrian Site Contact Person David Odom, PE Phone Number 828 - 247 -4495 Date 2/5/2014 Drainage Area #i6 Soils Report Summary Hydrologic soil group (HSG) of subgrade B Infiltration rate 1.66 Pavement Design Summary Permeable Pavement (PP) design type Infiltration - HSG A/B SA of PP being proposed (AP) 33,187 Resulting BUA counted as impervious for main application form 8,297 Adjacent BUA directed to PP (AJ 31,681 Ratio of Ac to AP 0.95 Flow from pervious surfaces is directed away from PP? Yes Design rainfall depth 1.0" Permeable pavement surface course type PC Layer 1 - Washed aggregate size (ex. No. 57) No. 57 Layer 1 - Aggregate porosity (n) 0.40 Layer 2 - Washed aggregate size (ex. No. 57) Layer 2 - Aggregate porosity (n) Minimum total aggregate depth for design rainfall (Dwq) 5.0 Drawdown /infiltration time for Dwq How is 10 -yr, 24 -hr storm handled? bypassed Aggregate depth to infiltrate 10 -yr, 24 -hr storm (D10) 20.0 Drawdown /infiltration time of 10 -yr, 24 -hr storm 1.00 Actual provided total aggregate depth 8.0 Top of aggregate base layer elevation 900.00 Storage elevation of design rainfall depth 899.75 Overflow elevation 899.75 Bottom elevation at subgrade 899.33 SHWT elevation 890.00 Underdrain diameter 4 in /hr BUA Credit for Permeable Pavement Footprint: 75% BUA Credit ftz ftz ftz OK (unitless) OK in (unitless) OK (unitless) in days Underdrain Required in days in fmsl fmsl fmsl fmsl fmsl in I Form SW401- Permeable Pave ment- Rev.4- October 16, 2012 PP Supplement Form, Page 1 of 3 Detention Systems (skip for infiltration systems) Diameter of orifice Coefficient of discharge (Cc) Driving head (Ho) Storage volume discharge rate (through discharge orifice) Storage volume drawdown time Pre - development 1 -yr, 24 -hr peak flow Post - development 1 -yr, 24 -hr peak flow Additional Information Slope of soil subgrade at bottom of permeable pavement Slope of the permeable pavement surface Construction sequence minimizes compaction to soils? Subsoil preparation specified (must select one) Meets industry standards for structural requirements? Washed stone is specified for the aggregate? Required signage specified on plans? Number of observation wells provided Distance to structure Distance to surface waters Distance to water supply well(s) in (unitless) ft ft3 /sec days ft3 /sec ft3 /sec 0.50 % OK 0.50 % OK Yes OK scarified Yes OK Yes OK Yes OK 1 OK 10.00 ft 100.00 ft OK 400.00 ft OK Permit No. (to be provided by DWQ) Form SW401- Permeable Pave ment- Rev.4- October 16, 2012 PP Supplement Form, Page 2 of 3 Permit No. (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 1. Plans (1" = 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Location of permeable pavement, Roof and other surface flow directed away from permeable pavement, - Location of the permeable pavement sign(s). 2. Section view of the permeable pavement (1" = 20' or larger) showing: All layers (including details about the surface course), and SHWT 3. A detail of what the permeable pavement sign 4. A site specific soils report that is based upon an actual field investigation, soil borings, and infiltration tests within the footprint of the proposed permeable pavement. The soils investigation shall state the infiltation rate, SHWT elevation, and information about any confining layers. County soil maps are not an acceptable source of soils information. (Projects in the WiRO - The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form.) 5. A construction sequence that shows how the permeable pavement will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (O &M) agreement. 8. A copy of the deed restrictions (if required). Form SW401- Permeable Pave ment- Rev.4- October 16, 2012 PP Supplement Form, Page 3 of 3 Permit (to be provided by DWQ) -� STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM PERMEABLE PAVEMENT SUPPLEMENT This form must be completely filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project Name Tryon International Equestrian Site Contact Person Phone Number Date Drainage Area David Odom, PE 828 - 247 -4495 2/5/2014 #4 II. DESIGN INFORMATION Soils Report Summary Hydrologic soil group (HSG) of subgrade D Infiltration rate 0.11 in /hr Pavement Design Summary BUA Credit for Permeable Pavement Footprint: Permeable Pavement (PP) design type Infiltration - HSG C/D 50% BIJA Credit SA of PP being proposed (AP) 6,142 ft 2 Resulting BUA counted as impervious for main application form 3,071 ft 2 Adjacent BUA directed to PP (AJ 5,345 ft 2 OK Ratio of Ac to Ap 0.87 (unitless) Flow from pervious surfaces is directed away from PP? Yes OK Design rainfall depth 1.0" in Permeable pavement surface course type PC Layer 1 - Washed aggregate size (ex. No. 57) No. 57 Layer 1- Aggregate porosity (n) 0.40 (unitless) OK Layer 2 - Washed aggregate size (ex. No. 57) Layer 2 - Aggregate porosity (n) (unitless) Minimum total aggregate depth for design rainfall (Dwq) 5.0 in Drawdown /infiltration time for Dwq days How is 10 -yr, 24 -hr storm handled? bypassed Underdrain Required Aggregate depth to infiltrate 10 -yr, 24 -hr storm (D10) 20.0 in Drawdown /infiltration time of 10 -yr, 24 -hr storm 1.00 days Actual provided total aggregate depth 8.0 in OK Top of aggregate base layer elevation 895.50 fmsl Storage elevation of design rainfall depth 895.25 fmsl Overflow elevation 895.25 fmsl Bottom elevation at subgrade 894.83 fmsl # REFI SHWT elevation 882.00 fmsl Underdrain diameter 4 in Form SW401- Permeable Pavement- Rev.4- October 16, 2012 PP Supplement Form, Page 1 of 3 Detention Systems (skip for infiltration systems) Diameter of orifice in Coefficient of discharge (Co) (unitless) Driving head (Ho) ft Storage volume discharge rate (through discharge orifice) ft3 /sec Storage volume drawdown time days Pre - development 1 -yr, 24 -hr peak flow ft3 /sec Post - development 1 -yr, 24 -hr peak flow ft3 /sec Additional Information Slope of soil subgrade at bottom of permeable pavement 0.50 Slope of the permeable pavement surface 0.50 Construction sequence minimizes compaction to soils? Yes Subsoil preparation specified (must select one) scarified Meets industry standards for structural requirements? Yes Washed stone is specified for the aggregate? Yes Required signage specified on plans? Yes Number of observation wells provided 1 Distance to structure 10.00 ft Distance to surface waters 100.00 ft Distance to water supply well(s) 400.00 ft OK OK OK OK OK OK OK OK OK Permit (to be provided by DWQ) Form SW401- Permeable Pavement- Rev.4- October 16, 2012 PP Supplement Form, Page 2 of 3 Permit (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 1. Plans (1" = 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Location of permeable pavement, Roof and other surface flow directed away from permeable pavement, - Location of the permeable pavement sign(s). 2. Section view of the permeable pavement (1" = 20' or larger) showing: All layers (including details about the surface course), and SHWT 3. A detail of what the permeable pavement sign. 4. A site specific soils report that is based upon an actual field investigation, soil borings, and infiltration tests within the footprint of the proposed permeable pavement. The soils investigation shall state the infiltation rate, SHWT elevation, and information about any confining layers. County soil maps are not an acceptable source of soils information. (Projects in the WiRO - The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form.) 5. A construction sequence that shows how the permeable pavement will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (O &M) agreement. 8. A copy of the deed restrictions (if required). Form SW401- Permeable Pavement- Rev.4- October 16, 2012 PP Supplement Form, Page 3 of 3