Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20171559 Ver 3_More Info Received - Baseline Water Sampling and SW_20211229
Homewood, Sue From: Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com> Sent: Wednesday, December 29, 2021 9:24 PM To: Homewood, Sue; Wojoski, Paul A; Mcdaniel, Chonticha Cc: Wendee Smith; Masemore, Sushma; Wojoski, Paul A; Smith, Danny; Gibby, Jean B CIV USARMY CESAW (USA); Jim Melvin; Williams, Andrew E CIV USARMY CESAW (USA) Subject: RE: [External] GRMS Follow-up - Baseline Water Sampling and Stormwater Attachments: GRMS Addtl Info Request Responses 12292021.pdf Follow Up Flag: Follow up Flag Status: Completed CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Sue, Chonticha, Paul, and others, We are providing the remaining responses to the comments that we have received from DWR. The attached letter provides the responses to the remaining items sent in the letter on November 5, 2021 (Items 1-8, 24-25, and 32-34) and the items below from December 16, 2021. You will receive a OneDrive link to files which are referenced in the attached response but too large to send in email. It is our understanding that we have now addressed all of the comments from DWR. Please note that these files are marked as confidential. The public notice comments were provided to us on December 8, 2021. We intend to provide responses to those items next week. Please let us know if you have any issues with the files. Thank you, Vickie Vickie Miller, AICP, Pws D 919.232.6637 M 919.559.2632 hdrinc.com/follow-us 1 FN December 29, 2021 U.S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 North Carolina Department of Environmental Quality 217 West Jones Street Raleigh, NC 27603 ATTN: Ms. Sue Homewood and Mr. Andy Williams SUBJECT: Individual Permit Application Additional Information Request Greensboro Randolph Megasite and Associated Infrastructure Randolph County, North Carolina Ms. Homewood and Mr. Williams: This letter encloses trade secrets and confidential information that no one may release or make available to any person other than a USACE employee responsible for processing the GRMS 404 permit or a DEQ employee responsible for processing the GRMS water quality certification. Any page of any enclosure that includes one or more of the following three stamps must not be released to any third party pursuant to the North Carolina public records law, FOIA, or otherwise: • Contains information exempt from disclosure pursuant to Exemption 4 of the FOIA; trade secrets and commercial or financial information that are customarily considered to be confidential; submitted to the government for the sole purpose of informing the permit evaluation process; this information shall not be disclosed without the express authorization of the applicant, Greensboro -Randolph Megasite Foundation, Inc. • CONFIDENTIAL BUSINESS INFORMATION/TRADE SECRET/SUBJECT TO G.S. 132-1.2(1) • CONFIDENTIAL/NOT FOR PUBLIC DISCLOSURE/SUBJECT TO G.S. 132-6(d) The Greensboro -Randolph Megasite Foundation, Inc. (GRMF) is providing the following additional information requested by the DWR regarding the individual permit application for development of the proposed Greensboro -Randolph Megasite, located in northern Randolph County, North Carolina. Attached you will find responses to comments provided hdrinc.com 555 Fayetteville Street, Suites 900 & 210, Raleigh, NC 27601-3034 (919) 232-6600 in the DWR letter received on November 5, 2021 and DWR email received on December 16, 2021(Attachments A and B). The Jurisdictional Determination, Stormwater Plan, and Residential Well Sampling Plan files are being provided on OneDrive. As a follow up to the applicants Oct. 27, 2021 response specifically regarding WRC's comment to DWR on the state listed mussel and crayfish species, the applicant is providing the results of the recently completed surveys for the species noted. The report shares details about the survey and notes that no federal or state threatened or endangered species were identified on the site. The report is included as Attachment C. With this submission WRC comments have been addressed. The Applicant looks forward to working with the DWR on completing the permitting process and issuance of a 401 Water Quality Certification for the GRMS project. Please call me at 919-232-6637 or email at vickie.miller@hdrinc.com if you need additional information or clarification on any of the information provided. Sincerely, HDR Engineering Inc. of the Carolinas V�rkul aAillat� Vickie Miller, AICP, PWS Senior Environmental Planner cc: Jim Melvin, Greensboro Randolph Megasite Foundation Wendee Smith, S2 Consulting Attachments: A. Response to DWR Letter Received 11/5/2021 B. Response to DWR Email Received 12/16/2021 C. Freshwater Mussel and Burrowing Crayfish Survey Report •• PROTECTED r411 t5'f• :6 ATTACHMENT A 1. We have requested a supporting narrative that expands upon the broad outline and process flow description recently provided in order to further document Avoidance and Minimization forproposed manufacturing facility. The response received on October 20 uses broad speculative language such as "has the capability to manufacture" and "potential use". Please provide an updated process narrative that is more specific as to what is occurring on the site. The Overall Site Plan and Site Flow Narrative provide an overview of the proposed site layout and use of the site as an automotive vehicle battery manufacturing, production, and assembly facility with utilities (electricity, water, sewer, roads, rail, and more). The applicant has minimized and avoided impacts to streams and wetlands by, among other things, configuring and reducing the facility footprint as much as practicable (i.e., available and capable of being done after taking into consideration cost, existing technology and logistics in light of overall project purposes). Some of the practicability factors for the proposed project include (for example) the size of the facility needed for production purposes, existing technology, and logistics. 1- A contiguous, flat area with size and layout as shown on the site plan for the facility and described in the Site Flow Narrative is necessary to accommodate: production operations; transportation and storage of heavy equipment, materials and product (including ingress and egress to/from the site and areas/buildings within the site); employees (including their ingress and egress to/from the site and areas/buildings Attachment A 1 •• PROTECTED r411 t5'f• :6 within the site); and the orderly, safe, and efficient flow and interaction of production operations trucks, trains, and employees. 2- The concrete surface areas are necessary to allow for transportation of the heavy materials needed for the facility. This includes transportation of materials onto the site for incorporation into manufacturing processes and transportation of product offsite. It is anticipated that transportation and shipping will occur by both trucking and rail. 3- The planned location and configuration of buildings was based on, among other considerations, building requirements for the manufacturing processes (e.g., footprint required to accommodate manufacturing machinery and operators; relative locations of buildings based on the sequence of manufacturing, transportation, and storage/staging operations, as well as existing railroad and road locations at the site, which will be used for employee ingress and egress and for transportation of materials and products. For example: a. The buildings are located and positioned in accord with the need for a large, level, contiguous area. The need for a large, level, contiguous area is reflected in the Site Flow Narrative and Master Site Plan figure, which provide an abridged description and depiction of the processes and logistics (including the flow of people and materials) necessary for electric vehicle battery cell production at the GRMS site. b. The plan for the facility includes shipment of manufactured product and raw materials via truck and rail, c. This trucking/transportation requirement, existing roads, and the need for separate employee ingress and egress due to safety considerations largely dictate the truck (green arrows) and employee flows (orange arrows) depicted in the site plan and narrative. d. The production operation flows and sequences (depicted in the site plan and described in the narrative) are required for an efficient and productive facility and determine the building and site layout. Attachment A 2 •• PROTECTED r411 t5'f• :6 2. Based on the response received October 27, please explain this statement: "shared resources exist in each product line which provide avoidance and minimization as requested". What shared resources are providing avoidance? What shared resources result in minimization? As described in a letter to the agencies on October 15, 2021 the Parts Storage (or BLDG BPTS) buildings will receive chemicals and rolls of metals for the manufacturing process. The parts buildings are shared with in order to reduce the number of parts receiving facilities on the site and minimize the overall site footprint. 3. The parking area is based on 'planned employee capacity." What is the planned employee capacity? How many parking spaces/area is needed to meet this capacity? Attachment A 3 •• PROTECTED r411 t5'f• :6 4. It's stated that the rail yard/warehouse area is based on the raw material storage and product storage. What are the storage area needs as related to the specific materials and products being stored? The manufacturing and transportation design parameters and logistics dictate warehouse storage area and rail yard capacities, location and configuration as illustrated. 5. Please explain this statement that was included in the October 27 information submittal: "It is not possible to have different pads on the site due to the manufacturing process and logistics through the site." What specifically about the manufacturing process and logistics requires a contagious [sic] pad? A contiguous, level pad is needed to convey parts, materials, and product(s) between and among the buildings and warehouses and truck and rail shipping yards depicted on the Site Plan in order to safely and efficiently carry out the planned manufacturing operations. Without a contiguous pad, logistics and parts, materials, and products delivery and shipping patterns would be limited and impacted, such that the applicant would not be able to carry out the manufacturing and shipping operations in a safe and efficient manner. Each set of buildings must be level. For instance, on the Site Plan, Building A, Parts Storage, Building B and Building C must all be at the same elevation for the process to flow from building to building and to take advantage of the single parts storage to be shared with each manufacturing building. Significant grade changes would create safety and logistical concerns for movement of employees, materials, and products. Elevation changes must also be at grades that are considered safe and accessible. This ensures that through parking lots or other areas that employees can maneuver safely including those covered by the Americans with Disabilities Act. It also ensures adequate sight distances (lengths of passageways ahead that are visible to a driver), etc. 6. In the October 27 information submittal you stated: "there may be potential to take these elements off the pad and potentially reduce the impact to the channel at this location" in regards to a proposed solar farm and wastewater pre-treatment facility. Your response indicates that the removal of these items may be feasible and result in impact avoidance. Please clarify if thesecomponents are being removed from the pad and update exhibits and impact maps accordingly. If the components are not being removed from the pad please explain why. These items are being removed from the pad. Updated exhibits and revised impact information will be provided under separate cover. Attachment A 4 •• PROTECTED r411 t5'f• :6 7. Please explain the statement in your October 27t response: "Parking decks would inhibit movement through the site as required by the end user'. What specifically about a parking deck will inhibit movement and contradict the end users requirements? The end user's requirements include safe and efficient ingress and egress of hundreds of workers and visitors to the site each day. A parking deck inhibits movement through the site by creating bottlenecks during ingress and egress. These bottlenecks create safety concerns with visibility and stop/go conditions. Parking decks also produce safety problems by introducing conflict points between pedestrians and vehicles due to numerous blind spots and tight corners. 8. Based on your statement, "Parking decks are cost prohibitive," please provide justification or cost analysis that eliminates a parking deck option due to cost. The component cost as a percentage of overall project cost is a common metric used to determine cost prohibition. The average cost to build a parking deck is $25,700 .er space in 2021 see the included reference material and .ustification of construction cost). This indicates that the average construction cost of parking decks onsite would be approximately dollars. Note that one deck on site would not be sufficient and it would require multiple decks across the site which could drive the cost up from the estimate, and increase other site development costs. The referenced document also had prices that are more regional. The nearest location to the GRMS is Charlotte with a cost er space of $22,359. The more regional estimate indicates a cost of approximately However, aside from the financial infeasibility of this option, it does not meet the safety and efficiency of ingress and egress of workers. 24. As communicated previously, the Division will need confirmation from USACE for all isolated features in order to confirm they are subject to 15A NCAC 02H .1300. Please provide total impacts to all non jurisdictional features evaluated under 15A NCAC 02H .1300 to determine any permitting requirements in accordance with 02H .1301. In the information provided, you have shown one wetland "WD" at 0.018 acre as a non - jurisdictional feature and an isolated surface water pond "PB". Please update your October 27th response to include this feature. The USACE has provided the Jurisdictional Determination for the project and it is provided in OneDrive for review. Pond B is a non jurisdictional pond that totals 1.06 acres of surface water. This pond was created by the previous property owner. The pond was shown as an impact due to the potential for a stormwater basin at this location; however, the stormwater basin has been relocated to avoid impacts to Pond B and HDR WD. 25. In the October 27th information submittal you stated "The original avoidance and minimization underestimated the impacts of the two options that impacted Dodson's Lake". You also stated "Similar to other projects which impact a lake, the entire lake is taken." Please explain why the entire lake must be lost if partially impacted. DWR is not aware of any "similar projects" that result in a total loss of a lake or pond aside from projects that intentionally impact dams. Please update the avoidance and minimization analysis as needed. Attachment A 5 •• PROTECTED r411 t5'f• :6 Public comments have identified Dodson's Lake as an important local aquatic resource. The applicant's proposal avoids and minimizes impacts, including avoidance of impacts to Dodson's Lake. In contrast, on -site alternatives are considered that would require (among other things) the placement of fill in Dodson's Lake (Alternatives 2 and 3) which would be expected to trigger subsequent effects and actions that would cause the loss of wetlands adjacent to the lake. Based on our experience: placing fill in the lake would reduce the storage volume of Dodson's Lake; storage reduction would cause water surface elevation increases produced by storm events to be higher; the higher water surface elevations would trigger requirements to modify the dam to ensure its structural and operational integrity; the cost of dam modifications or reconstruction would be cost prohibitive and the dam would be breached instead; and the resulting absence of the lake would allow the return of upland conditions where wetlands are currently located adjacent to the lake. 32. Please indicate whether the potential manufacturer intends to operate the entire facility as shown on the proposed site plans at one time or plans to phase in operations. Facility operations (manufacturing/production operations; transportation and storage of heavy equipment, materials and product (including ingress and egress to/from the site and areas/buildings within the site); ingress and egress of employees to/from the site and areas/buildings within the site); and the orderly, safe, and efficient flow and interaction of production operations trucks, trains, and employees) will begin while the construction of the facility is underway. The facility will reach full capacity at buildout (see Site Plan). There will be no phases of construction of the contiguous pad - site grading and construction of the pad will be continuous. Full grading of the pad area is necessary prior to constructing buildings and initiating manufacturing operations in order for manufacturing operations to continue and remain ongoing during construction of additional buildings to full build out. 33. If the US Army Corps of Engineers determines that the current project warrants an updated public notice, the Division will not able to finalize it's review until the public comment period has concluded and all comments have been evaluated. Additional information may be required upon review of any public comments received. We understand DWR's position and the USACE reissued the Public Notice on November 19, 2021. The public notice comment deadline was December 6, 2021. The DWRs comment deadline was December 10, 2021. 34. Note that the project includes NCDOT transportation infrastructure improvements. The application includes conceptual plans for the proposed improvements. Please provide a very detailed description of the overall project dependency on the transportation infrastructure improvements and the proposed schedules for construction activities of the various portions ofthe proposed project. The interchanges need to be in place before manufacturing operations begin. The interchanges are necessary to safely move trucks carrying materials and product as well as employees into and out of the manufacturing facility. The timing for these proposed improvements is noted in the table below: Attachment A 6 •• PROTECTED r411 t5'46 TRANSPORTATION IMPROVEMENTS APPROXIMATE TIME FRAME OF DEVELOPMENT Northern interchange June 2022 - Dec 2023 Southern interchange Dec 2022 - Dec 2024 Attachment A 7 Howl%\ rl University of Iowa Hospitals and Clinics Underground Parking Ramp I Iowa City, IA PARKING STRUCTURE COST OUTLOOK FOR 2021 Rob McConnell, PE, Vice President, WGI Raymond Smith, PE, Vice President, WGI WGI specializes in parking structure planning and design, and for more than 40 years, we maintained a database of construction costs from hundreds of parking facilities of varying sizes and scopes throughout the country. Since 2003, publishing our annual parking structure construction cost report provides an important planning tool for owners, contractors, and design teams. The disruptions from COVID-19 during 2020-21 created industry- wide uncertainty and challenges for predicting construction costs. Using the best industry sources as a guide, we analyzed the data and prepared our parking structure outlook for the year. For this forecast, we only omit the cost of parking structures that are completely or significantly below grade since their cost is much higher. The cost data is assigned factors based on the time of bidding and location of the parking structure. The time factor is based on the Building Cost Index (BCI), published by Engineering News -Record (ENR). The location factor is taken from the yearly edition of the RS Means Building Construction Cost Data. Applying these two factors to actual construction cost data adjusts the cost to a current national basis, and from that we determine the national median. The national median can then be re -adjusted to reflect a median construction cost in almost every city in the United States. As of August 2021, our statistical data indicates that the median construction cost for a new parking structure is $25,700 per space, or $76.70 per square foot; a 15.8% increase from 2020 when the median cost was $22,200 per space. The table on the following page lists the 2021 median parking structure construction costs in various U.S. cities with the lowest cost in Jacksonville, the highest in New York, and Detroit at the national median index of 100.0. Please note that the construction cost data does not include costs for items such as land acquisition, architectural and engineering fees, environmental evaluations, materials testing, special inspections, geotechnical borings and recommendations, financing, insurance, owner administrative and legal, or other project soft costs. Soft costs are typically about 20% of construction costs but can be higher for owners who allocate their internal costs directly to the project. Four -level, 326-space, CIP PT parking structure. This garage was designed for future expansion and included glass -enclosed stair towers for optimal passive security. The parking facility provides crucial additional parking for the VA Siera Nevada, Reno, NV campus. Ideas for parking. SOLUTIONS FOR OEOPLE Offices Nationwide 1800.394.7275 I WGInc.com FOR COMPARISON, A MEDIAN -COST PARKING STRUCTURE TODAY TYPICALLY INCLUDES: • 8'-6" to 8'-9" wide parking spaces • Precast concrete superstructure • Precast concrete facade with a single integral color and basic reveal pattern or basic thinset brick • One or two elevators and stairs open to the interior, and clad with exterior glass curtain wall • Standard wayfinding and signage • Shallow -spread footing foundations • All above -grade construction • Open parking structure with natural ventilation; without mechanical ventilation or fire sprinklers • Minimal or no grade -level commercial space • Standard parking access and revenue -control system • Standard energy efficient LED lighting OVERALL PARKING STRUCTURE CONSTRUCTION COST WOULD BE HIGHER THAN THE MEDIAN IF IT INCLUDES THESE ENHANCED FEATURES • 9'-0" wide parking spaces or larger for improved user comfort • Cast -in -place post -tensioned concrete superstructure for lower maintenance costs • Architectural facade with adorned precast, brick, metal panels, and other materials • Stormwater management including on -site retention/ detention • Deep foundations such as caissons or piles • Below -grade construction • Enclosed stair towers due to local code requirements • Enclosed parking structure without natural ventilation where mechanical ventilation, fire sprinklers, and fire -rated stair shafts are required • Flexibility for future parking/building expansion, or incorporation of roof -level photovoltaic ("solar") panels • Service life in northern/ coastal regions beyond a standard 50 to 60 years • Grade -level commercial space • Mixed -use development where the parking is integrated with office, retail, residential, or other uses • Custom wayfinding and signage system • ParkSmart® Certification following the Green Business Certification, Inc. (GBCI) program • Energy efficient LED lighting with occupancy and photocell computer -control system • Electric vehicle charging stations • Enhanced parking technology • License -plate recognition • Parking -guidance system • Car -count system with variable -message LED signs • WiFi and cellular services • Solar -energy collection • Building Management System PARKING GARAGE ACCFSS Building Management Systems are often used to help manage technology. 2021 CONSTRUCTION COST 15.8% FROM 2020 Urn( II Cost/Space Cost/SF Albuquerque 87.1 $22,385 $66.81 Atlanta 89.2 $22,924 $68.42 Birmingham 86.4 $22,205 $66.27 Boston 114.3 $29,375 $87.67 Charlotte 87.0 $22,359 $66.73 Chicago 119.5 $30,712 $91.66 Cincinnati 89.9 $23,104 $68.96 Cleveland 96.0 $24,672 $73.64 Denver 91.5 $23,516 $70.18 Dallas 86.0 $22,102 $65.97 Detroit -Median $25,700 $76.70 Houston 86.6 $22,256 $66.43 Indianapolis 92.3 $23,721 $70.80 Jacksonville - Lowest 84.0 $21,588 $64.43 Kansas City, MO 99.3 $25,520 $76.17 Las Vegas 105.4 $27088 $80.85 Los Angeles 118.8 $30,532 $91.12 Miami 85.1 $21,871 $65.28 Minneapolis 107.0 $27499 $82.07 Nashville 89.0 $22,873 $68.27 New Orleans 85.0 $21,845 $65.20 New York - Highest 132.2 $33,975 $101.40 Oklahoma City 84.8 $21,794 $65.05 Philadelphia 115.8 $29,761 $88.82 Phoenix 87.0 $22,359 $66.73 Pittsburgh 100.7 $25,880 $77.24 Portland, OR 103.2 $26,522 $79.16 Richmond 88.8 $22,822 $68.11 St. Louis 100.6 $25,854 $77.16 Salt Lake City 90.5 $23,259 $69.42 San Diego 109.4 $28,116 $83.91 San Francisco 129.8 $33,359 $99.56 Seattle 106.7 $27,422 $81.84 Tampa 84.8 $21,794 $65.05 Washington, D.C. 95.5 $24,544 $73.25 National Median 100 $25,700 576.70 Ideas for parking. SOLUTIONS FOR OEOPLE® Offices Nationwide 1800.394.7275 I WGInc.com PARKING INDUSTRY 2021 CONSTRUCTION ECONOMIC FORECAST Four -level, 399-space, precast parking structure. This garage is located off the historic courthouse square in the City of Oxford, MS. This garage offers convenient parking for visitors and employees of local businesses, especially during Ole Miss fall football season and Double Decker Festival in the Spring. Construction in the United States saw unprecedented challenges in 2021 as we emerge from the COVID-19 pandemic. Material and labor shortages are the new normal, resulting in cost increases for both design and construction. Challenges in the construction market prior to the pandemic were headlined by skilled and unskilled labor shortages in the construction trades, tariffs, and international trade relationships. Today, those challenges still exist, are more pronounced, and are now joined by material production, manufacturing, and shipping bottlenecks and the ongoing and often intermittent government restrictions intended to curb the spread of COVID-19. Turner Construction reported price spikes in material costs for lumber, steel, copper, aluminum, PVC, and gypsum although — heading into Q3 — raw material costs appear to be returning to earth. The global pandemic certainly impacted every asset class in some manner. Urban core office buildings, hotels, education, and the retail sector were all negatively impacted by a decrease in new project starts. Richard Branch, chief economist for Dodge Data & Analytics ("Dodge") told ENR that, "the dollar value of hotel construction starts fell 46% in 2020, to $9.7 billion... in 2021 Dodge forecasts an additional 7% decline:'' Meanwhile, healthcare, industrial/warehouse, and residential construction all saw increases in activity. After falling 26% in 2020, overall forecasts for commercial construction are mixed, with a consensus that office and hotel construction will remain depressed while other types of commercial buildings will show modest increases over last year. Dodge posits that parking structure starts will increase by 4% during the year, possibly linked to the forecast growth of retail, healthcare, and transportation buildings. This past March 2021, President Biden signed into law the American Rescue Plan Act (ARPA). Passage of ARPA promoted communities around the country to start developing strategies for how to win and spend American Rescue Plan Act (ARPA) funding. ARPA provided $350 billion for state, local, territorial, and tribal governments to address COVID-19-related economic impacts. Building infrastructure is notably eligible for ARPA funding, specifically including construction or enhancement to medical and educational facilities. The Congressional Budget Office projects real GDP growth of 6.7%, but coupled with that, many economic models show inflation of more than 2.5% persisting through 2023. On the horizon, in the Fall of 2021, are two potential infrastructure bills currently making their way through Congress; potentially totaling over $4.5 trillion in broadly classified infrastructure spending. Should one or both infrastructure bills become law, we would anticipate an increase in construction costs and labor challenges for construction markets. Finally, construction starts and spending will be uneven across the country. Speaking to ENR, Jay Bowman of FMI Corp. suggested, we believe correctly, that, "geography will be a defining characteristic of the post -pandemic recovery. Although this always has influence on how recessions and expansions are experienced, it will be much more pronounced [this time]:'' Geographic differences due to different political policies, that were and continue to be adopted at state and local levels to curb COVID-19 infections, are a significant factor in the recovery of local construction markets. COST DRIVERS: Features That Impact the Cost of a Parking Structure 0 /xi • Cast -in -Place Concrete Construction • Increased Building Area/Car • Below -Grade Construction • Architectural Enhancements • Deep Foundation System • Northern Climate Durability Features • Enhanced Technology • Sophisticated Parking Management System • Integration of Solar Panels • Enhanced Snow and Ice Management System • EV Charging Stations • LED Lighting System Premiums - Motion Sensors/Dimming • Unique Site Conditions • Stormwater Management • Forestry Management • Enclosed Floors/Mechanical Ventilation and Fire Sprinklers • Bicycle Housing • Custom Wayfinding • Flexibility for Future Parking or Building Expansion • Pedestrian Bridge • Integration of Mixed Uses • Enhanced Landscaping / Hardscape COST INCREASE MEDIAN FEATURES • Pretopped Precast Concrete • Single Supported Level • Decreased Building Area/Car • Eliminate Parking Access Control • Plain Precast Facade • Eliminate Glass -Backed Elevators • Eliminate Exterior Glass Stair Enclosure • Reduced Durability Features (Regional) • Eliminate Enclosed Stairs (Regional) • Asphalt Paving at Grade • Eliminate Grade -Level Barrier Wall . •f COST DECREASE REASE FEATURES iiir Ideas for parking. SOLUTIONS FOR OEOPLE® Offices Nationwide 1800.394.7275 I WGInc.com SUMMARY REFERENCES What does this mean for the new parking structure construction and the median construction cost for these facilities in 2021 and near term? The short answer is costs are going up. We believe that nearly all local markets will see an increase in the construction cost of parking facilities over 2020, primarily due to the increase in the cost of manufactured goods and the increasingly acute skilled and unskilled labor shortages, more so than due to an increase in overall demand. Meanwhile, above -average demand will play a significant factor in markets that experienced greater post -pandemic population growth than the already -expected net population growth, and construction will be necessary to accommodate that growth. As previously mentioned, WGI's cost model shows a construction cost increase of 15.8% over last year, but most economic indicators suggest that this trend will not continue at this pace but is expected to increase at a more normal 3% to 5% through 2022 and 2023. The parking professionals at WGI are happy to assist with the planning and budgeting of your next parking structure. If you have any questions or would like specific cost information for your area, contact Raymond Smith at Raymond.Smith@WGlnc.com and Rob McConnell at Rob.McConnell@WGInc.com. Or call us at 800.FYI.PARK (800.394.7275). As a multidisciplinary solutions -providing consulting firm, WGI has 20 offices in seven states, serving an active client base in 30 states, specializing in the following disciplines: parking facility design and engineering, building restoration and structural engineering, mobility planning, transportation engineering, land development/municipal engineering, traffic and transportation engineering, geospatial and land surveying, subsurface utility engineering, landscape architecture, environmental sciences and water resources, architecture, land planning, and MEP engineering. In 2021, ENR ranked WGI #175 — up 12 places — on its list of the Top 500 Design Firms, while at the same time naming WGI its 2021 Design Firm of the Year in the southeast United States. !,31 1. After a Rocky Year, PCA Forecasts Slight Growth in Cement Demand in 2021;' Engineering News -Record, February 3, 2021. https://www.enrcom/articles/51142-after-a-rocky year-pca- forecasts-sligh t-gro wth-in-cemen t-demand-in-2021 2. AIA Consensus Construction Forecast, July 2021, American Institute of Architects. http://info.aiaorg/aiarchitect/2021/charts/Jul%20 2021/ccf 071621.html 3. "Reading Between the Trendlines'; William Richards, American Institute of Architects, June 2021. https://www.aiaorg/ articles/6345080-read ing-between-the-trend-lines 4. Architecture Billing Index (ABI), American Institute of Architects , July 2021. https://www.aia.org/pages/6425639-abijuly-2021-business- conditions-remain-s 5. Dodge Construction Outlook 2021, Dodge Data & Analytics, November 2020. https://www.construction.com/news/dodge-data- analytics-expects-construction-starts-recover-2021 6. Turner Construction Company. "Turner Cost Index - Turner's Second Quarter Building Cost Index'; Turner Construction Company, July 2021. http://www.turnerconstruction.com/cost-index 7 "2021 Construction Forecast: A Slow Road to Recovery;' Engineering News -Record, November 18, 2020. https://www.enrcom/ articles/50766-construction-forecast-a-slow-road-to-recovery 8. "2021 Expected to be Another Down Year for Nonresidential Building;' Kermit Baker, American Institute of Architects, January 2021. https://www.aia.org/articles/6364941-2021-expected-to-be- another-down-year-for- 9. The American Rescue Plan Act of 2021 (ARPA), Congressional Research Service, March 16, 2021. https://crsreports.congress.gov/ prod uc t/pd f/R/R46680 10. "Higher Inflation is Here to Stay for Years, Economists Forecast' Gwynn Guilford and Anthony DeBarros, Wall Street Journal, July 11, 2021. https://www.wsj.com/articles/higher-inflation-is-here-to-stay- for-years-economists-forecast-11626008400 11. An Update to the Budget and Economic Outlook: 2021 to 2031',' Congressional Budget Office, July 2021, https://www.cbo.gov/ publication/57339# idTextAnchor006 For more information about this study or to have a conversation with one of our experts, please contact us: Rob McConnell, PE VP Market Leader Structures + Parking Rob.McConnell@WGlnc.com Raymond Smith, PE VP Market Leader Structures + Parking RaymondSmith@WGInc.com WGIm TOMORROW'S INFRASTRUCTURE SOLUTIONS, TODAY Offices Nationwide 1800.394.7275 I WGInc.com •• PROTECTED r411 t5'f• :6 ATTACHMENT B • The US Fish and Wildlife Service has requested that the GRMF utilize innovative stormwater designs and other BMP's to reduce impacts to downstream waters and habitat during all phases of the project and to maintain buffers on all remaining streams. Please address this request. BMPs will be used during and post construction to avoid impacts to downstream waters and habitat. The applicant has been working with DEQ staff reviewing erosion control plans and will continue that process for construction as well as finalizing the stormwater management plan with the state for the site during and post construction. There are 50-foot riparian buffers on streams within Water Supply Watershed Class III (WS-III) that are applicable to the site. However, to offset mitigation requirements, the applicant would be willing to discuss adding 100-foot buffers to streams within the property boundary which are not impacted by the development footprint or utilities. This has been discussed with the Corps and DWR in the past and the applicant would be willing to engage in these conversations again. • The reconfiguration of Wet Pond B2 appears to partially resolve the Division's concerns regarding potential indirect impacts to Stream Si. Please provide a plan sheet that shows the location of the edge of fill impact and the location of the proposed outlet of Wet Pond B2 at a sufficient scale to clearly determine the length of stream channel S1 between the two points so that we may further evaluation the potential impacts on this channel. Attachment B 1 •• PROTECTED r411 t5'f• :6 An additional plan view of Wet Pond B2 was added to Appendix E. Due to file size, the revised Stormwater Plan is being provided on OneDrive. • Studies and modeling conducted by the Division indicate that watershed size cannot be used as a predictor of the presence or absence of a stream, therefore the assumption that a certain watershed size will continue to provide hydrology to these streams does not satisfy the Division's concerns. You have indicated that underdrain systems will be installed "in the existing stream channel and will remain in place and provide additional hydrology to streams S17 and S18", however streams 17 and 18 begin below the footprint of the construction pad, therefore the Division is not confident that providing underdrains in these locations will be sufficient to support existing uses in downstream waters. The Division continues to have concerns that since many piedmont headwater streams are fed by interflow and shallow groundwater as a result of infiltration from surface flow and since a significant portion of these watersheds will be redirected away from these features there is likely to be indirect impacts from reduced hydrology in these channels. Please provide a detailed hydrology analysis and/or model to document the downstream waters will be maintained or provide a monitoring plan that establishes baseline conditions and a specific monitoring protocol to document hydrology in these channels and adjacent wetlands for a minimum of 3 years post construction. The statement above appears to be concerned with continuing to support existing uses in downstream waters. These channels, although determined perennial by the agencies, have times when they are dry and lack flow as illustrated in the attached photos taken December 21, 2021 of both S17 and S18 reaches. The Stream Assessment Method (SAM) form for S17 had an overall medium score due to low hydrology, medium water quality, and medium habitat. The medium habitat score was due to a high score for stream -side habitat. S18 had an overall low score with a medium hydrology score, low water quality score, and a low habitat score. S17 was noted as having weak macrobenthos, crayfish, and fish (near the lake), and absent for amphibians, algae, and mollusks. S18 was noted as having weak crayfish, amphibians, and algae and absent for macrobenthos, fish, and mollusks. The streams should continue to support the aquatic fauna they currently support following construction with a similar flow regime as they currently have. In addition, both of these channels have existing riparian buffers which will remain and continue to provide stream side habitat which led to higher scores for those items on the SAM forms. The invert elevations of Stream 17 and Stream 18 (S17 and S18) are much deeper than our deepest cut elevations so the temporary and permanent dewatering will have no effect on S17 and S18 since we are only dewatering to a few feet below the proposed pad elevation. The headwaters of any existing streams on -site in a fill area will be filled with open graded stone to allow any groundwater to continue to flow until it daylights at the edge of the fill slope from the pad. In addition, we have reduced impacts to S17 as we continue to look for avoidance and minimization opportunities. S17 is no longer impacted by the pad footprint although it will still have a road crossing into the site. Please see the attached graphic illustrating the minimization of impacts to S17. The pad has also been edited slightly near S18 and the pad is now approximately 275 feet north of the stream invert of S18. Attachment B 2 •• PROTECTED r411 t5'f• :6 • It appears that Wet Pond C2 has been reconfigured so that it impacts a pond that as shown as Isolated on the jurisdictional map previously provided to the Division. As indicated in Item 24 of the November 5th Request for Additional Information, please provide confirmation of all Isolated features from the USACE and provide total impacts to all isolated features evaluated pursuant to 15A NCAC 2H .1300 An Approved Jurisdictional Determination (AJD) was complete and provided to the applicant on December 20, 2021. Wet Pond C2 has been reconfigured to avoid impacts to Pond B and HDR WD. The Corps has noted these as non -jurisdictional features in the provided AJD on OneDrive. Wet Pond C2 was relocated and is upstream of the existing pond and wetlands. During final design the outlet structure will divert some flow to the pond to supplement the natural hydrology through the pond. The revised Stormwater Plan is being provided on OneDrive. • Pond IDs are confusingly referenced throughout the document due to the change in the design, however, the document should be revised for its accuracy and consistency. Some examples of these discrepancies are: Wet pond A is referred to as pond A 1 but sometimes as pond A3 in the narratives, calculations, and forms. - Drainage area of wet pond A is 278.5 acres under the narrative but 224.6 acres in the calculations. - Supplemental EZ form's cover page still lists 4 dry ponds for the project. - Supplemental EZ form still has the now -removed dry ponds A 1 and A2. - Supplemental EZ form, drainage areas 6 and 7 are incorrectly identified for ponds Al and A2 where they should be for dry pond C1 and wet pond C2. - Dry pond sheet, under item #4, it was indicated that the ponds are not located away from contaminated soils. - Dry ponds exhibit on page 70 of the document shows dry ponds being identified as B2 and C2 where they should be ponds B1 and C1. Page 6 was modified to reflect the Pond A3 in the narrative to match the calculations, figures and exhibits and the drainage area was modified to reflect the calculations. The Stormwater Management Permit Application Form and the Supplemental EZ form has been updated to reflect the most recent submittal. The dry pond exhibit in Appendix E has been modified to reflect Pond B1 and Pond C1. The revised Stormwater Plan is being provided on OneDrive. • Scour hole calculations for wet pond C2 still used Q 10 (364 cfs) from the previous version, the new Q 10 is 388 cfs according to the updated HydroCAD. The scour hole calculation for wet pond C2 was updated to reflect 388 cfs. The revised Stormwater Plan is being provided on OneDrive. • Wet pond C2 is moved slightly south and is now located over an existing pond. Please provide reason for the relocation and whether the existing water feature(s) will be accounted for as new impact. Attachment B 3 •• PROTECTED r411 t5'f• :6 The pond was relocated due to a potential solar farm in the previous location. The pond was located just upstream of the existing pond water surface and wetland. During final design the outlet structure will divert some flow to the pond to supplement the natural hydrology through the pond and therefore no additional impacts are warranted. The revised Stormwater Plan is being provided on OneDrive. • In a previous response to the Division submitted on October 27, 2021 it was stated that "If the need to connect to the public water supply is a result of contamination due to processes on the GRMS, then the manufacturer will be responsible for financing the connection." The Division has expressed concerns for both surface water contaminants and yield reduction impacts to adjacent wells Please update the Well Testing and Resolution Plan to include a statement that the need to connect to a public water supply may also be a result of well yield reduction due to the GRMS facility, and that in either case the manufacturer will be responsible for financing the connection. Provide a copy of the updated plan to the Division. The Residential Well Testing and Resolution Plan has been updated to include well yield reduction and is provided on OneDrive. • The Residential Well Testing Resolution Plan dated 11/02/2021 indicates that wells proposed for testing are those within 150 feet of the GRMS property line. You indicate that in most cases this will be well beyond the 500 feet requested based on the location of the 1000-acre construction pad. However, the application indicates additional construction activities outside of the "construction pad" limits which include utilities, roadways and stormwater control measures. The Division reiterates that the Well Testing Plan should address a 500-foot distance from the site limits/property lines. The Residential Well Testing and Resolution Plan has been updated to 500 feet beyond the property line. • The Division specifically requested documentation of assurance from Randolph County of the commitments identified in the Residential Well Testing Resolution Plan. A copy of the relevant letter from the County Manager is on OneDrive with the Residential Well Testing and Resolution Plan. Attachment B 4 •• PROTECTED r411 t5'46 Photos of S17 on December 21, 2021 iY: 5 fib/ wr -101.1 S17 - No flow at pipe outlet. Attachment B 5 •• PROTECTED r411 t5'46 S17 - No water or flow in channel. Attachment B 6 •• PROTECTED r411 t5'46 S17 - Headcut with standing water — deeply incised. Attachment B 7 •• PROTECTED r411 t5'46 S17 - Downstream of headcut — deeply incised. Attachment B 8 •• PROTECTED r411 t5'46 Photos of S18 on December 21, 2021 S18 - Standing water at pipe outlet but no flow beyond the small scour at the end of the pipe. Attachment B 9 •• PROTECTED r411 t5'46 S18 - Downstream of the pipe outlet. Attachment B 10 •• PROTECTED r411 t5'46 S18 - Ponded water downstream. Attachment B 11 •• PROTECTED r411 t5'46 S 18 - Ponding of water at pipe crossing downstream. Attachment B 12 •• PROTECTED r411 t5'46 Legend I Megasite Boundary nApprox. Pad Area Perennial Screams Intermittent Screams Wetlands LOpen Water o Feet 150 godsons Lake Attachment B RC�t�Ain-_(CPC�.7=p-1�JIiA.O:iRLurs7Bo C`,Gti:glOE:. S17 & S18 MAP 13 ATTACHMENT C Freshwater Mussel and Burrowing Crayfish Survey Report For Greensboro Randolph Megasite Randolph County, North Carolina Prepared For: F�2 555 Fayetteville St., Suite 900 Raleigh, North Carolina Contact Person: Vickie Miller Senior Environmental Planner HDR Vickie.Miller@hdrinc.com November 19, 2021 Prepared by: RK5K 8601 Six Forks Road, Forum 1 Suite 700 Raleigh, NC 27615 Contact Person: Neil Medlin Manager, Natural Resources nmedlin@rkk.com 919-878-9560 Table of Contents 1.0 Introduction 1 2.0 Waters Affected 2 2.1 NPDES Dischargers 2 2.2 303(d) Classification 3 3.0 Target Species 3 3.1 State or Federally Listed Mussels 3 3.2 Greensboro Burrowing Crayfish (Cambarus catagius) 3 3.2.1 Characteristics 3 3.2.2 Distribution and Habitat Requirements 4 4.0 Survey Efforts 4 4.1 Mussel Survey Locations: 4 4.1.1 Stream S21 (Location 1) 4 4.1.2 Stream SQ (Location 2) 5 4.1.3 Stream SE (Location 3) 5 4.1.4 Stream S 1 (Location 4) 5 4.2 Burrowing Crayfish Survey Locations: 5 4.3 Methodology 6 4.3.1 Mussel Survey 6 4.3.2 Burrowing Crayfish Survey 6 5.0 Results 6 5.1 Mussel Survey 6 5.2 Burrowing Crayfish Survey 7 6.0 Discussion/Conclusions 7 7.0 References 9 Appendix A. Figures: Figure 1: Project Vicinity & Survey Location Figure 2: NCNHP Element Occurrences Figure 3: NPDES Dischargers and 303(d) Listed Streams 1.0 Introduction This evaluation was conducted as part of the environmental studies conducted for the potential development of a tract of land located in northeast Randolph County typically referred to as the Greensboro Randolph Megasite (Appendix A, Figure 1). As of November 15, 2021, the U.S. Fish and Wildlife Service (USFWS) Information for Planning and Consultation (IPaC) webpage listed the Cape Fear Shiner (Notropis mekistocholas) as an Endangered species under the Endangered Species Act (ESA) that could potentially be affected by activities at the Greensboro Randolph Megasite (Megasite) location (Table 1). Habitat evaluations and an electrofishing survey for the Cape Fear Shiner at the Megasite were conducted by RK&K personnel on September 26, 2017, and summarized in a previous report. The Atlantic Pigtoe (Fusconaia masoni) was listed as a Threatened species under the ESA on November 16, 2021, and IPaC listed it as a species that also could be potentially affected by activities at the Megasite location. The IPaC webpage indicated that there are no critical habitats that overlap with the Megasite location. Table 1. Federally protected species that potentially occur within the upper Sandy Creek watershed. Scientific Name Common Name Federal Status Notropis mekistocholas Cape Fear Shiner Endangered Fusconaia masoni Atlantic Pigtoe Threatened This portion of Randolph County potentially harbors three rare freshwater mussel species (i.e., Carolina Creekshell (Villosa vaughaniana, NC Endangered), Notched Rainbow (Villosa constricta, NC Threatened), Eastern Creekshell (Villosa delumbis, NCNHP Significantly Rare) and the Greensboro Burrowing Crayfish (Cambarus catagius, NC Special Concern) (Table 2). Therefore, targeted mussel and burrowing crayfish surveys were recommended by the North Carolina Wildlife Resources Commission (NCWRC). Currently, there are no statutory requirements to conduct these surveys; however, the potential endpoint owner has voluntarily elected to proactively address NCWRC comments by having mussel and burrowing crayfish surveys conducted within the boundaries of the Megasite. Table 2. North Carolina rare species that occur or potentially occur within the upper Sandy Creek watershed. Scientific Name Common Name State Status NCNHP Designation Freshwater Mussels Villosa constricta Notched Rainbow Threatened Threatened Villosa delumbis Eastern Creekshell -- Significantly Rare Villosa vaughniana Carolina Creekshell Endangered Endangered Crayfishes Cambarus catagius Greensboro Burrowing Crayfish Special Concern Special Concern Freshwater Mussel and Burrowing Crayfish Survey Report; HDR, Randolph County November 2021 Page 1 A review of the NC Natural Heritage Program (NCNHP) records, last accessed on November 19, 2021, indicated that no element occurrences (EOs) exist for federally or state listed species within a 5-mile buffer from a point on Stream SQ at the Megasite's southern boundary (Table 3; Figure 2). Table 3. NC Natural Heritage Program Element Occurrence records and approximate distance from Stream SQ at the Megasite's southern boundary (i.e., stream miles (SM)). Species EO ID EO Status Waterway First Observation Last Observation SM Eastern Creekshell 29595 Current Sandy Creek May 2002 May 2002 1.9 Notched Rainbow 29482 Current Sandy Creek July 2002 May 2019 7 Carolina Creekshell 25532 Current Sandy Creek July 2002 May 2019 7 Eastern Creekshell 25594 Current Sandy Creek July 2002 May 2019 7 Greensboro Burrowing Crayfish 1826 Historical Muddy Creek April 1993 April 1993 >30 The Eastern Creekshell EO 29595 is located within the 5-mile buffer. However, the species is not state listed by the NCWRC but is designated as Significantly Rare (SR) by the NCNHP. NCNHP is a non -regulatory agency responsible for inventorying and tracking native flora and fauna in North Carolina. Significantly Rare is a lower level NCNHP designation and is generally defined as any species that "has been determined by the NCNHP to need monitoring". The Carolina Creekshell and Notched Rainbow are listed the NCWRC as state Endangered and Threatened, respectively. The EOs for these two species are both approximately seven stream miles from the Megasite boundary. The Greensboro Burrowing Crayfish EO is not located within the 5-mile buffer and there are no known occurrences of the species within the Sandy Creek watershed. 2.0 Waters Affected The small streams located within the Megasite boundaries are all in the Cape Fear River Basin (HUC # 03030003). All of the streams converge to exit the property via one of two streams, Stream SQ (Dodsons Creek) which flows out of Dodsons Lake, or Stream S21 (Figure 1). From the Megasite's southern boundary, Stream SQ (Dodsons Creek) flows approximately 0.4 stream miles downstream to its confluence with Sandy Creek. From the southern site boundary, Stream S21 flows approximately 1.1 stream miles to its confluence with Sandy Creek. 2.1 NPDES Dischargers There are no NPDES permitted dischargers in a location that could directly affect streams on the Megasite (Figure 3). Freshwater Mussel and Burrowing Crayfish Survey Report; HDR, Randolph County November 2021 Page 2 2.2 303(d) Classification None of the streams located on the Megasite are on the North Carolina Department of Environmental Quality (NCDEQ) - Division of Water Resources 2020 303(d) list of impaired streams. The streams from the Megasite flow into Sandy Creek. Sandy Creek is on the 2020 303(d) list for exceeding Chlorophyll criteria. 3.0 Target Species 3.1 State or Federally Listed Mussels Based on current distribution records, two state listed mussel species are known to occur within the mid to upper Sandy Creek watershed, the Notched Rainbow and Carolina Creekshell. While the federally listed Atlantic Pigtoe is reported by IPaC as a species that could potentially be affected by activities in this area, it has not been observed from the Sandy Creek watershed or the Deep River watershed upstream of Richland Creek confluence (i.e., southern eastern Randolph County). The Notched Rainbow and Carolina Creekshell are sexually dimorphic (i.e., males and females have distinct shell shape) mussels that rarely exceed 50mm in length. Females have a more broadly rounded posterior slope, which creates the marsupial chamber. In comparison, males have a slightly pointed posterior slope and exhibit an overall elongate elliptical shell shape. Characteristics to separate these two species include subtle differences in shell morphology, foot color, location of green rays, and marsupial band color. Specifically, the Notched Rainbow usually has a slightly smaller and more robust shell, black to yellowish periostracum with thin unbroken green rays dispersed throughout most of the shell, white foot, and females have a dark marsupial band on top of the gills. In comparison, the Carolina Creekshell usually has a slightly larger and thinner shell, thin unbroken green rays generally restricted to the posterior ridge, bright orange foot, and females have a white marsupial band on top of the gills. The maximum age for the Notched Rainbow is approximately 3-14 years and it is presumed that the Carolina Creekshell has a similar life span. Both are known to be long-term brooding (bradytictic) species. Notched Rainbow host fish species include the Fantail Darter (Etheostoma flabellare), and Green Sunfish (Lepomis cyanellus), Pumpkinseed (Lepomis gibbosus), and Redbreast Sunfish (Lepomis auritus) for the Carolina Creekshell. Both species are typically collected in areas with moderate current and substrate consisting of clay, silt, sand, and gravel. 3.2 Greensboro Burrowing Crayfish (Cambarus catagius) — NC Special Concern 3.2.1 Characteristics The Greensboro Burrowing Crayfish is a small, dark brown burrowing crayfish with light tan flecks that transition to a pinkish -tan ventral coloration. The rostrum and postorbital ridges are orange and the dorsal surface of chelipeds are greenish to tan with two rows of pale pinkish - orange to cream tubercles on the mesial margin of the palm. In addition, a green color phase is occasionally observed, which results the brown base coloration being replaced with dark green Freshwater Mussel and Burrowing Crayfish Survey Report; HDR, Randolph County November 2021 Page 3 and orange markings appear to be more conspicuous. The gonopod of first form males (i.e., reproductively active form) has a central projection that is slightly curved and set at an angle greater than 90°, and the mesial projection is bulbous with a tapered point. Life history information on the Greensboro Burrowing Crayfish is extremely limited due to the lack of a species -specific life history study. First form males have been collected in February, April, and June. Males and females typically occupy separate burrows and females share their burrow with newly hatched crayfish in late spring to early summer. This species is classified as a primary burrower, which indicates that the species can construct a complex burrow system that does not typically connect to surface waters. It is not known to construct a burrow chimney and instead piles burrow spoils near the burrow entrance. The burrow pathway is highly variable and ranges from a simple, straight down burrow to lateral tunnels with multiple chambers. 3.2.2 Distribution and Habitat Requirements The Greensboro Burrowing Crayfish is endemic to the piedmont of North Carolina and is known to occur in Davidson, Guilford, Montgomery, and Randolph counties. Prior collection localities include portions of the Yadkin -Pee Dee and Cape Fear River basins. Within this range, the species often occupies urban and rural backyards; however, they are known to occupy areas that transition into bottomland forests. Burrows are excavated in sand, clay, and sand -clay soil mixtures. Burrowing sites are typically located within areas that are classified as "usually wet"; however, a drainage feature may or may not be present. Ground water level varies considerably from site to site and is known to range from 15 cm to >1.2 m at occupied sites. 4.0 Survey Efforts Mussel and Burrowing Crayfish surveys were conducted by RK&K personnel Neil Medlin (Permit # 21-ES00030), Tyler Black (Permit # 19-ES00554) and Gordon Marsh on November 3, 2021. Burrowing Crayfish surveys were conducted by RK&K personnel Tyler Black, Gordon Marsh, and Matt Martin on November 4-5, 2021. 4.1 Mussel Survey Locations: 4.1.1 Stream S21 (Location 1) The survey location began at the southern boundary of the Megasite and continued upstream for approximately 300 meters. Stream S21 had a width that varied from 1- 4 meters and depth ranging from 1 meter in a pool to 0.010 meters in constricted shallow riffles. Average stream depth was 0.10 meters. The substrate was composed of clay, sand, gravel, cobble, and occasional boulders. Sand was the dominant substrate type with cobble subdominant. Although there was very little water flow, the stream had run, riffle, and pool flow regimes and generally stable banks with some areas of erosion/undercutting. No evidence of beaver activity was noted in the survey reach. A wide forested buffer was present along the survey location. Freshwater Mussel and Burrowing Crayfish Survey Report; HDR, Randolph County November 2021 Page 4 4.1.2 Stream SQ (Location 2) This survey location extended from the southern boundary of the Megasite along SR 2407 (Starmount Road) upstream to near the Dodsons Lake dam for a total of approximately 200 meters. Stream SQ had a wetted width varying from 2 — 3 meters and a depth ranging from 0.010 — 1 meter. The average depth was 0.10 meters. The substrate consisted of silt, clay, sand, gravel, and cobble with sand dominant and clay subdominant. The stream banks averaged 1 meter high with some areas of erosion/undercutting. Riffle, run, and pool flow regimes were noted during the mussel survey. No evidence of beaver activity was observed within the survey reach. A moderate to wide forested buffer was present along the survey reach. 4.1.3 Stream SE (Location 3) The Stream SE survey location ran from approximately 25 meters below SR 2408 (Browns Meadow Road) to approximately 200 meters above the road crossing. Wetted width varied from 1 — 3 meters and depth ranged from 0.10 — 1.5 meters with an average depth of 0.5 meters. The substrate was composed of silt, clay, sand, gravel, and an area of bedrock. Sand was the dominant substrate type with silt subdominant. The survey reach had primarily a run flow regime with few shallow riffles and occasion pools. Beaver dams were present within the survey reach and created impounded areas upstream of the dams. Slow flowing water was visible at a shallow riffle at the upper end of the survey reach and some flow was observed going through the beaver dams. A moderate width forested buffer was present along the survey reach with the exception of the road crossing. 4.1.4 Stream S1 (Location 4) Mussel survey Location 4 in Stream S1 was the most narrow (1 — 2 meters wetted width) and the most shallow (0 01 — 0.1 meters deep) of the mussel survey locations. No visibly flowing water was observed during the survey. The stable stream banks were approximately 0.25 meters high. The substrate consisted of silt, clay, sand, and gravel. Sand was the dominant substrate type with silt subdominant. No evidence of beaver activity was observed at this location. 4.2 Burrowing Crayfish Survey Locations: Biologists established survey locations within the upper, middle, and lower portions of the drainages within the study area. A total of eleven burrowing crayfish sites were visited during the survey. The majority of the survey sites were located within forested upland areas associated with waterway floodplains, dry to nearly dry drainage features, ponds, or toe of slope seeps. In contrast, two sites were located within the powerline right of way, which contained mowed grass and shrub vegetation. Soils within these areas were primarily composed of clay, sand, clay loam, and sandy loam. Freshwater Mussel and Burrowing Crayfish Survey Report; HDR, Randolph County November 2021 Page 5 4.3 Methodology 4.3.1 Mussel Survey Within the survey reaches for each stream assessed, the areas of appropriate habitat were searched, concentrating on the stable habitats preferred by mussel species. Visual surveys were conducted with and without view buckets (bathyscopes) along with tactile methods that were employed where appropriate. All freshwater bivalves were identified, recorded, and returned to the substrate. Timed survey efforts (recorded in person -hours) typically provide Catch Per Unit Effort (CPUE) data for each mussel species. 4.3.2 Burrowing Crayfish Survey A burrowing crayfish survey was conducted within waterway floodplains, drainage features, and areas previously identified as wetlands. Biologists visually searched targeted habitats for the presence of active crayfish burrows. Once identified, burrows were excavated using shovels and yabby pumps to extract crayfish. Timed survey efforts were recorded in person -hours and all collected crayfish were temporarily placed in a divided tackle box containing freshwater. All crayfish were identified, recorded, and released onsite. 5.0 Results 5.1 Mussel Survey No mussels or mollusk of any species were observed at three of the four survey locations (Table 4). Three mussel species and one clam (the invasive Asian Clam) were observed in Stream SQ (Location 2). None of the mussel species documented during the survey are currently federally listed under the ESA or state listed by the NCWRC. Table 4. Bivalves for Randolph Greensboro Megasite, November 03, 2021, by Mussel Survey Location (MSLI. Scientific Name Common Name No. of Live (Shell)/Search Time/CPUE MSL 1 (1 p-h) MSL 2p (3.0 p-h) MSL 3 (1 p-h) MSL 4 (0.5 p-h) Freshwater Mussels Elliptio complanata Eastern Elliptio -- 268(45) CPUE=89.33 -- -- Uniomerus carolinianus Florida Pondhorn -- 3(0) CPUE=1.0 -- -- Pyganodon cataracta Eastern Floater -- 1(0) CPUE=0.33 -- -- Freshwater Clams Corbicula fluminea Asian Clam -- 2 (60) -- -- Total Number of Mussels -- 272 -- -- Total Number of Mussel Species -- 3 -- -- Freshwater Mussel and Burrowing Crayfish Survey Report; HDR, Randolph County November 2021 Page 6 5.2 Burrowing Crayfish Survey Three crayfish species were collected during the survey of the Megasite with a total of 29 individuals observed (Table 5). Burrows were observed at 11 sites and crayfish were collected at 10 of 11 sites (i.e., No crayfish were collected from Site 11). No Greensboro Burrowing Crayfish individuals were observed during the survey. A total of 22.5 person -hours of excavation time were utilized during the surveys. Table 5. Burrowing crayfishes on the Megasite, November 3-5, 2021. Scientific Name Common Name No. of Individuals Survey Site Cambarus davidi* Carolina Ladle Crayfish 7 2, 5, 6, 7 Cambarus reduncus Sickle Crayfish 19 1, 3, 4, 5, 8, 9, 10 Lacunicambarus diogenes Devil Crawfish 3 10 Total Number of Individuals 29 Total Number of Species 3 Excavation Person -hours 22.5 * Denotes a Significantly Rare species (NC Natural Heritage Program (NCNHP) designation only, not affording official state protection). 6.0 Discussion/Conclusions Physical stream substrate components including silt, clay, sand, gravel, and cobble that are typically associated with native freshwater mussel populations were present at all four of the mussel survey locations. However, based on observations by RK&K personnel in 2017 and 2021, and repeated observations by HDR personnel over multiple years, many of the streams within the Megasite boundaries not only cease to have flowing water, but are completely dry for prolonged periods of time during most years. Dry stream conditions place aquatic species unable to relocate, such as freshwater mussels, under extreme stress. Even occasional drought conditions can result in inhospitable instream conditions for freshwater mussels (e.g., Golladay et al., Haag and Warren) and lead to a reduction in number of species present and reduced numbers of individuals. No mollusks were detected at the mussel survey locations on Stream S21 (Location 1), Stream SE (Location 3), or Stream S 1 (Location 4). These three streams have been observed to experience frequent nonflowing and/or dry periods during the late summer and fall seasons. These periods of stressful conditions reduce the likelihood of these three streams supporting any freshwater mussel species. The exception to the streams having little to no water was Stream SQ (Location 2) below Dodsons Lake. RK&K personnel observed that this stream segment had visibly flowing water in 2017 and contained visibly flowing water at the time of the November 3, 2021, mussel survey. Three freshwater mussel species and 272 total individuals were collected during the mussel survey. None of the species collected during this survey are currently state listed by the NCWRC or have an NCNHP designation. Freshwater Mussel and Burrowing Crayfish Survey Report; HDR, Randolph County November 2021 Page 7 Burrowing crayfish habitat is present throughout the Megasite, including habitat and soils consistent with that reported for the Greensboro Burrowing Crayfish. Three species of burrowing crayfish were collected within the boundaries of the property; however, no Greensboro Burrowing Crayfish individuals were collected during the survey. Burrows within Site 11 (i.e., only site where crayfish were not collected) were excavated to a depth of approximately 1.5 meters without observing the water table or crayfish; thus, burrows extended well below the excavation depth or were abandoned by the crayfish prior to excavation. The closest known record for Greensboro Burrowing Crayfish is approximately 11.6 air miles north of the project location (i.e., Alamance Creek watershed). To date, there are no known occurrences of Greensboro Burrowing Crayfish within the Sandy Creek watershed, which drains south to the Deep River. Within the Deep River watershed, Greensboro Burrowing Crayfish are known to occur within the upper portion of the watershed, >30 stream miles from the project location. Furthermore, the Greensboro Burrowing Crayfish often inhabits lawns within urban and suburban landscapes, as such, the species appears to be somewhat tolerant of some landuse disturbance. Based on the survey results and distance to known localities, the likelihood of Greensboro Burrowing Crayfish occurring on the Megasite is low. Freshwater Mussel and Burrowing Crayfish Survey Report; HDR, Randolph County November 2021 Page 8 7.0 References Eads, C. B., A. E. Bogan, and J. F. Levine. 2006. Status and life -history aspects of Villosa constricta (Conrad 1838) (Notched Rainbow), in the upper Neuse River basin, North Carolina. Southeastern Naturalist 5(4):649-660. Eads, C., and J. Levine. 2007. A Summary of Laboratory and Field Research Related to Freshwater Mussels: July 2006-June 2007. North Carolina State University College of Veterinary Medicine Aquatic Epidemiology and Conservation Laboratory, Final Report. Golladay, S.W., P Gagmon, M. Kearns, J.M. Battle, and D.W. Hicks. 2004. Response of freshwater mussel assemblages (Bivalvia: Unionidae) to a record drought in the Gulf Coastal Plain of southwestern Georgia. Journal of the North American Benthological Society, 23(3):494-506. Haag, W.R. and M.L. Warren, Jr. 2008. Effects of Severe Drought on Freshwater Mussel Assemblages. Transactions of the American Fisheries Society, 137:1165-1178. Hobbs, H.H., Jr., and F.O. Perkins. A New Burrowing Crayfish from North Carolina (Decapoda, Astacidae). Proceedings of the Biological Society of Washington. 80: 141-146. Kendig, K. M. 2014. Freshwater Mussels of North Carolina (Atlantic Slope). North Carolina Department of Transportation, Raleigh, North Carolina. McGrath, C. 1994. Status Survey for the Greensboro Burrowing Crayfish. The Proceedings of the Annual Conference of the Southeastern Association of Fish and Wildlife Agencies. 48: 343-349. North Carolina Department of Environmental Quality - Division of Water Resources. 2020 North Carolina 303(d) List. Available: https://files. nc. gov/ncdeq/W ater%20Quality/Planning/TMDL/3 03 d/2020/2020-NC-3 03 - d--List-Final.pdf. (August 2021). North Carolina Department of Environmental Quality. 2021. NPDES Wastewater Discharge Permits. Available: https://data-ncdenr.opendata.arcgis.com/datasets/npdes-wastewater- discharge-permits?geometry=-87.493%2C33.635%2C-72.200%2C36.776. (August 2021). North Carolina Natural Heritage Program. 2020. List of Rare Animal Species of North Carolina. Available: https://www.ncnhp.org/media/522/open. (November 2021). North Carolina Natural Heritage Program. 2021. nheo-2021-10. Natural Heritage Element Occurrence polygon shapefile. (October 2021). Freshwater Mussel and Burrowing Crayfish Survey Report; HDR, Randolph County November 2021 Page 9 North Carolina Wildlife Resources Commission. 2017. Protected Wildlife Species of North Carolina. Available: https://www. ncwildlife. org/Portals/0/Conserving/documents/Protected-Wildlife-Species- of-NC.pdf. (November 2021). North Carolina Wildlife Resources Commission. 2021. Atlantic Pigtoe Species Profile. Available: http://www.ncwildlife.org/Learning/Species/Mollusks/Atlantic-Pigtoe. (March 2021). North Carolina Wildlife Resources Commission. 2021. Greensboro Burrowing Crayfish Species Profile. Available: https://www.ncwildlife.org/Learning/Species/Crustaceans/Cambarus- D-catagius. (November 2021). North Carolina Wildlife Resources Commission. 2021. Unpublished Aquatics Database. (November 2021). U.S. Fish and Wildlife Service. 2021. Information for Planning and Consultation (IPaC). Available: https://ecos.fws.gov/ipac/. (November 2021). Freshwater Mussel and Burrowing Crayfish Survey Report; HDR, Randolph County November 2021 Page 10 Appendix A Figures 4ialt;uv` 'Ahia9terV Dr Legend Study Area Survey Locations O Burrowing Crayfish ❑ Freshwater Mussel Bandy Cie plc 4, ,nere v e„ Dods•. is _ tiiteny 5• Trn, sFrRt Rd K,rna:y Ln State of North Carolina DOTS, Esri, ERE, Garmin, I�R- ENT��PPASDA Prepared By: RKK Prepared For: EN) Freshwater Aquatics Survey Greensboro Randolph Megasite RANDOLPH COUNTY Date: November 2021 Scale 0 1,500 3,000 US Feet Job No. Drawn by: GSM Checked by: KNM Figure 1 I Legend Study Area 5-Mile Buffer Freshwater Mussels Element Occurrence Villosa constricta Villosa delumbis �] Villosa vaughaniana Prepared By: RKIKK Prepared Far: F�2 NC NHP Element Occurrence Greensboro Randolph Megasite RANDOLPH COUNTY Date: November 2021 Vo Scale 0 1 Miles Job No. Drawn Y GSM Checked by' KNM Figure Legend / NPDES Sites Study Area 5-Mile Buffer 303(d) Streams M�nt�Q�f C0038164 Prepared By R4101 Prepared Far: FEZ NPDES Dischargers and 303(d) Listed Streams Greensboro Randolph Megasite Date: November 2021 Scale 0 1 Miles Joh No. Figure RANDOLPH COUNTY Drawn Y GSM Checked by KN M Randolph County December 20, 2021 Paul Wojoski, Supervisor 401 Buffer Permitting Branch Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Office of the County Manager 725 McDowell Road Asheboro, North Carolina 27205 www.randolphcountync.gov Subject: Greensboro - Randolph Megasite Residential Well Sampling and Complaint Resolution Plan DWR # 20171559 v3 Dear Mr. Wojoski, Randolph County has reviewed the wording of the proposed Well Sampling Plan along with your comments and concerns. Please accept this letter as evidence that Randolph County is in agreement with the requirements of this plan and are committed to ensuring that if any well is found to be compromised by the construction associated with the Greensboro — Randolph Megasite, that a solution will be provided at no cost to the property owner. Please let me know if you have any questions or need any additional information. Best Regards, Hal Johnson, County Manager Telephone: 336-318-63o0 CountyManager@randolphcountync.gov Residential Well Sampling and Complaint Resolution Plan Greensboro Randolph Megasite Attachment A Randolph County, North Carolina December 20, 2021 Table of Contents 1.0 WATER RESOURCES IDENTIFICATION AND TESTING PLAN 2 2.0 IDENTIFYING WATER RESOURCES 2 2.1 Private Wells and Springs 2 3.0 WATER RESOURCE EVALUATION 3 3.1 Private Water Supplies 3 4.0 POST -CONSTRUCTION BASELINE WATER RESOURCE TESTING 4 5.0 COMPLAINT RESOLUTION PROCESS 4 6.0 REFERENCES 5 Tables 6 Table 1. Potential Properties with Private Water Supply Wells Within 500 Feet 6 Appendices 9 Appendix A. Water Sample Application 10 Appendix B. Well Test for Yield 12 1 1.0 WATER RESOURCES IDENTIFICATION AND TESTING PLAN Randolph County prepared and will execute the terms of this Residential Well Testing and Complaint Resolution Plan (Plan) in connection with the Greensboro Randolph Megasite (Project) to document pre - construction baseline and post- construction water quality and quantity of privately -owned water supply systems. This Plan summarizes protocols for identifying and assessing private water supplies in the vicinity of the Project. Randolph County documented locations and characteristics of private water supplies directly adjacent to the Project boundary and will offer pre- and post -construction quality and yield testing for all water wells located within 500 feet of construction workspaces. Several wells have already been tested by the County. This Plan discusses the outreach methodology that will be followed and the general plan for testing. Private water resources identified for water quality and quantity testing within 500 feet of the GRMS property boundary are summarized in Table 1. Prior to construction, the private water supply owners will be contacted by Randolph County via certified mail to confirm the location and characteristics of water resource(s) on the owner' s property and to request permission for the Project to conduct water quality and quantity sampling. Field confirmation of private water sources began in 2018 but has not been completed on some parcels because property access permission has not been granted. Therefore, this Plan is subject to change following the completion of field environmental investigations. 2.0 IDENTIFYING WATER RESOURCES 2.1 Private Wells and Springs Private wells located within 500 feet of the GRMS property boundary will be identified by desktop review and field observation (where property access was granted). The private water supply sources will be confirmed through pre -construction water supply testing (see Table 1) as described in this Plan. As part of the desktop review for potential drinking water sources an indirect method was employed to identify potential private wells. GIS data taken from the various counties were used to identify if a structure was present on the parcel. To maximize the potential for identifying private water resources all structures were assumed to have one or more private wells. As discussed in this Plan, the property owners identified by desktop review along the Project boundaries will be contacted by Randolph County prior to construction via certified mail to confirm drinking water sources on the identified property and to request permission to conduct water quality and quantity testing. If a private property owner does not respond to the certified mail request for information within approximately four (4) weeks of submittal by Randolph County, a second request will be sent. If no response is provided to the Project through the second submittal, no further contacts will be initiated with the property owner regarding water resources. Potential locations with private wells within 500 feet of the property boundary are identified as described above in Table 1. Appendix A includes the provides the Water Sample Application that will be requested from the water supply owners during the initial contact along with a request for permission to sample the water supply. 2 3.0 WATER RESOURCE EVALUATION The following discussion outlines protocols water supply testing activities. The testing results will be documented by Randolph County and provided directly to the water supply owner. 3.1 Private Water Supplies 1. Randolph County will offer pre- and post- construction quality and yield testing for all water wells and water supple springs located within 500 feet of the Project property boundary. The Project proposes to collect one sample before construction and a second sample three to six months post construction and conduct a well yield test. 2. All private property owners with a known or suspected water source (see earlier discussion) will be contacted prior to construction as discussed below: a. Send contact by mail to mailing address listed for the property owner; b. If no response is received within approximately 4 weeks of sending the first letter, a second follow-up letter will be sent; c. If no response is provided by property owner after two (2) attempts this result will be documented and Randolph County will suspend further contact to the property owner regarding water quality testing; d. If a property owner declines permission to conduct water quality testing, this will be documented, and the Project will suspend further contact with the property owner regarding water quality testing; 3. Property and water supply access approval documentation will be secured by Randolph County before entering the property. See Appendix A for information to be collected from the water supply owner during initial and follow-up contact. 4. A field crew will be deployed to collect water samples at the identified locations. 5. The sampling location coordinates will be collected using GPS (1-meter resolution) and recorded. 6. Field testing, sample collection and sample management techniques will be implemented consistent with industry standards and approved guidance (U.S. EPA and North Carolina Department of Environmental Quality). 7. For water well testing, a water sample will be collected from a flowing spigot (after a minimum of 10 minutes purging) upstream of any treatment system (if applicable) in order to collect a raw water sample in the appropriate laboratory -prepared sample bottle with appropriate preservatives. Field parameters will be analyzed at the time of water sample collection. a. If the well does not have a pump installed, or does not demonstrate artesian flow, there will be limited ability to complete the testing described in this plan. 8. Water samples will be kept cool and transported to the analytical laboratory(ies) under Chain of Custody. 9. The water quality testing will include groundwater quality standards for Bacteriological, Inorganic Chemical, Volatile Organic Compounds, Pesticides, Metals, Turbidity, and Total Dissolved Solids (15A NCAC 02L .0202 GROUNDWATER QUALITY STANDARDS) and the USEPA drinking water testing methods EPA 524.2, EPA 525.2, respectively, and Total Petroleum Hydrocarbons in EPA SW846 8015C. a. The pre and post -construction sampling events will be comprised of the same tests per the groundwater quality standards unless there is a concern noted by the property owner, or if there is a verified detection of a VOC or SVOC or TPH from the first sampling event. 3 b. National Environmental Laboratory Accreditation Program (NELAP)- accredited laboratories will be utilized for water sample analyses. These analyses must be performed by laboratories that are also currently certified for these testing methods by NCDWR. 10. Water resources testing activities (including the condition of the water resource and equipment) will be photo -documented. All field activities and meter calibration for each water resources sampling event will be documented. 11. The first pre -construction sampling event provides an opportunity to evaluate the condition of each well, surrounding topography, land characteristics/land-use, and generally assess the overall vulnerability of the water supply to existing or future sources of impact. 12. Randolph County will provide the water supply owner with the water supply testing results. Concurrent with providing the owner these results, the County will discuss with the owner any conditions that observed at the water supply that represent potential for existing or future sources of impacts. 13. The second sampling event will also include well yield testing. The water supply owner will be apprised of the well yield testing procedure, and Randolph County will request permission to access the well for the quantity testing, at the owner's discretion. This testing will be performed under the supervision of a NC licensed geologist or engineer. 14. Randolph County will consult with an owner who appears to have a compromised water supply based on pre -construction sampling results. The Project will tailor an evaluation protocol for the second round of water quality testing as appropriate to evaluate the integrity of the water supply and ensure a comprehensive pre and post construction assessment is completed. 4.0 POST -CONSTRUCTION BASELINE WATER RESOURCE TESTING Randolph County will conduct post -construction testing of all water supply wells within 500 feet of the GRMS property boundaries within properties where the owner has accepted the testing offer. Randolph County will follow the same procedures described above for water supply sampling. The Project will provide the post -construction monitoring results directly to the property owner. Randolph County will maintain water supply contingency planning efforts through the construction period and until final land reclamation is completed. 5.0 COMPLAINT RESOLUTION PROCESS If a claim of impact is made by a private well owner, a thorough investigation of the alleged impact will be conducted by qualified groundwater and surface water scientists and engineers using industry standard hydrogeologic investigative practices. This will include a review of the timing of the claim relative to the construction schedule, detailed interview with the supply owner, mechanical evaluation of the water system, possible resampling and analysis of the supply, performance of a hydrogeologic assessment, and other pertinent evaluations. Because each water supply system and hydrogeologic setting is unique, the only means to establish a clear link between a water supply quality or quantity issue and Project activities is through a comprehensive evaluation leading to complaint resolution. If the Randolph County Health Department determines that an impact was related to construction of the GRMS, then the investigations described above will provide valuable information concerning the appropriate remedies. Restoration of a water supply could include: • temporary supplied water until the water quality returns to baseline; • connection to secondary source, if available; and/or 4 • temporary treatment to establish baseline quality (or better). If the hydrogeologic assessment indicates that a long-term solution is needed, the following remedies as appropriate may be used to restore water quality and quantity to pre- construction conditions: • a new on -site source (new water well); or a combination of source replacement and treatment options; or • connection to the City of Greensboro's water supply system. 6.0 REFERENCES National Environmental Laboratory Accreditation Program (NELAP), 2016. http://www.nelacinstitute.org/content/NELAP/index.php 5 Tables Table 1. Potential Properties with Private Water Supply Wells Within 500 Feet of the Property Boundary Parcel ID Street Address City State Zip 8708732576 1907 US 29 BUSINESS REIDSVILLE NC 27320 8708724709 200 HAMMOCK FARM RD WINSTON SALEM NC 27105 8707872846 202 N COX ST ASHEBORO NC 27205 8717520081 204 LOYD RD STATESVILLE NC 28625 8718144265 2239 NC HWY 62 E JULIAN NC 27283 8718145450 2247 NC 62 EAST JULIAN NC 27283 8708607893 8708713955 8708721231 2309 MICHELLE LN GREENSBORO NC 27407 8717459812 2809 HIGHWOODS BLVD RALEIGH NC 27604 8718357641 306 HOLYOKE RD GREENSBORO NC 27406 8718540083 8717456557 324 W WENDOVER AVE, STE 207 GREENSBORO NC 27408 8708940226 329 N SMITH ST LIBERTY NC 27298 8717064874 3299 RANDOLPH CHURCH RD CLIMAX NC 27233 8708639054 331 COLONIAL LOOP RANDLEMAN NC 27317 8708722883 4531 CALHOUN DR LIBERTY NC 27298 8708721061 4534 WOODVERY DR LIBERTY NC 27298 8708629042 4550 WOODVERY DR LIBERTY NC 27298 8708720745 4561 CALHOUN DR LIBERTY NC 27298 8717648977 4595 TROY SMITH RD LIBERTY NC 27298 8708807291 4606 CRUTCHFIELD FARM RD LIBERTY NC 27298 8708639599 8708730768 4735 CALHOUN DR LIBERTY NC 27298 8708731216 8708733381 4742 CALHOUN DR LIBERTY NC 27298 8708721423 4791 WOODVERY DR LIBERTY NC 27298 8717442907 4807 HOOTS HOLLOW RD LIBERTY NC 27298 8717455066 4811 HOOTS HOLLOW RD LIBERTY NC 27298 8708723471 4813 WOODVERY DR LIBERTY NC 27298 8717950680 8727050151 4948 TROY SMITH RD LIBERTY NC 27298 8717969801 8717971072 4977 PEARL FERGUSON RD LIBERTY NC 27298 8717960600 5014 TROY SMITH RD LIBERTY NC 27298 8708723262 5085 STALEYS DAIRY RD LIBERTY NC 27298 6 8717982190 8717989604 5230 TROY SMITH RD LIBERTY NC 27298 8708713423 5324 SHADY HOLLOW RD STALEY NC 27355 8717996279 5334 TROY SMITH RD LIBERTY NC 27298 8717728661 5466 STARMOUNT RD LIBERTY NC 27298 8707990472 5536 JULIAN AIRPORT RD LIBERTY NC 27298 8707797855 5585 JULIAN AIRPORT RD LIBERTY NC 27298 8708709448 5616 JULIAN AIRPORT RD LIBERTY NC 27298 8718826895 5630 MACEDONIA LOOP RD LIBERTY NC 27298 8708803377 565 W PERRY RD SILER CITY NC 27344 8708704424 5667 JULIAN AIRPORT RD LIBERTY NC 27298 8708614323 5729 JULIAN AIRPORT RD LIBERTY NC 27298 8708710363 5731 JULIAN AIRPORT RD LIBERTY NC 27298 8708616529 5775 JULIAN AIRPORT RD LIBERTY NC 27298 8708713756 5781 JULIAN AIRPORT RD LIBERTY NC 27298 8717446289 5902 STARMOUNT RD LIBERTY NC 27298 8708722536 5925 JULIAN AIRPORT RD LIBERTY NC 27298 8708724777 5945 JULIAN AIRPORT RD LIBERTY NC 27298 8717993994 8718042294 8718043525 8718915221 8728002688 5948 MACEDONIA LOOP RD LIBERTY NC 27298 8708723059 600 PURTIS CREEK LN GEORGETOWN TX 78628 8708734021 6029 JULIAN AIRPORT RD LIBERTY NC 27298 8717335231 6041 STARMOUNT RD LIBERTY NC 27298 8708735760 8708735798 6135 JULIAN AIRPORT RD LIBERTY NC 27298 8718631987 8718635901 6140 SMITHWOOD RD LIBERTY NC 27298 8717046253 8717069331 8717153169 6411 SHILOH RD LIBERTY NC 27298 8707969260 6435 SHILOH RD LIBERTY NC 27298 8708942175 6602 HOLDER INMAN RD EXT, TRLR 1206 RANDLEMAN NC 27317 8717558375 6767 BROOKBANK RD SUMMERFIELD NC 27358 8708619799 8708711767 701 HUB MORRIS RD RANDLEMAN NC 27317 8718244733 7025 OLD 421 RD LIBERTY NC 27298 8718243375 7027 OLD 421 RD LIBERTY NC 27298 8718248475 7039 OLD 421 RD JULIAN NC 27283 8718340658 7041 OLD 421 RD LIBERTY NC 27298 7 8718450972 8718457365 7059 OLD 421 RD LIBERTY NC 27298 8708847337 8718149344 8718241701 8718247227 8718275172 8718354798 7157 BOBBY JEAN RD JULIAN NC 27283 8718141285 8718144723 7217 BOBBY JEAN RD JULIAN NC 27283 8718534909 725 MCDOWELL RD ASHEBORO NC 27205 8728024087 7611 OLD 421 RD LIBERTY NC 27298 8718920708 7761 OLD 421 RD LIBERTY NC 27298 8708731051 8708732050 7825 MITCHELL MILL RD ZEBULON NC 27597 8718733763 7846 OLD 421 RD LIBERTY NC 27298 8718535877 8718537779 8124 OLD 421 RD LIBERTY NC 27298 8708944178 8868 OLD 421 RD JULIAN NC 27283 8708847188 8920 OLD 421 RD JULIAN NC 27283 8708748290 9010 OLD 421 RD JULIAN NC 27283 8708743132 8708746407 8708848592 9154 OLD 421 RD JULIAN NC 27283 8718446055 8718446221 P O BOX 1691 LIBERTY NC 27298 8708940260 P O BOX 183 CLIMAX NC 27283 8717222927 P 0 BOX 2189 THOMASVILLE NC 27361 8708734596 P O BOX 434 LIBERTY NC 27298 8717442242 P O BOX 887 LIBERTY NC 27298 8708733810 PO BOX 23 GOLDSTON NC 27252 8718738218 PO BOX 326 LIBERTY NC 27298 8718823833 PO BOX 326 LIBERTY NC 27298 8 Appendices 9 Appendix A. Water Sample Application 10 Applicant: Address: Application #: City, ST ZIP Parcel number: COUNTY OF RANDOLPH Health Department 204 E Academy St - Asheboro, NC 27203 WATER SAMPLE APPLICATION Date: Owner: Contact name: Address: Contact phone: City, ST ZIP Contact e-mail: LOCATION INFORMATION: Location: Subdivision: Lot number: WELL AND WATER INFORMATION: Facility Type: Well Type: Select the well type. Well Location: Select the well location. Faucet at well: Select faucet at well. If No, Specify Location: Water Treatment System Present: Select treatn Treatment Type: WATER SAMPLE INFORMATION: Type of water sample needed: Type of water sample needed. Additional water sample needed: Type of water sample needed. Additional water sample needed: Type of water sample needed. COMMENTS: AUTHORIZATION TO PROCEED: I have read this application and certify that the information provided herein is true, complete and correct. Authorized County and State officials are granted right of entry to conduct necessary inspections to determine compliance with applicable laws and rules. I understand that I am solely responsible for making the site accessible so that a water sample can be collected. Signature of property owner/legal representative Date LOCAL TELEPHONE NUMBERS Asheboro: (336) 318-6262 • Archdale/Trinity: (336) 819-3262 http://www.randolphcountync.gov Water Sample Application (EHWS 1) Rev. 9/5/2019 Appendix B. Well Test for Yield 12 15A NCAC 02C .0110 WELL TESTS FOR YIELD (a) Every domestic well shall be tested for capacity by one of the following methods: (1) Pump Method (A) select a permanent measuring point, such as the top of the casing; (B) measure and record the static water level below or above the measuring point prior to starting the pump; (C) measure and record the discharge rate at intervals of 10 minutes or less; (D) measure and record water levels using a steel or electric tape at intervals of 10 minutes or less; (E) continue the test for a period of at least one hour; and (F) make measurements within an accuracy of plus or minus one inch. (2) Bailer Method (A) select a permanent measuring point, such as the top of the casing; (B) measure and record the static water level below or above the measuring point prior to starting the bailing procedure; (C) bail the water out of the well for a period of one hour or longer; (D) determine and record the bailing rate in gallons per minute at the end of the bailing period; and (E) measure and record the water level after stopping bailing process. (3) Air Rotary Drill Method (A) measure and record the amount of water being inj ected into the well during drilling operations; (B) measure and record the discharge rate in gallons per minute at intervals of one hour or less during drilling operations; (C) after completion of the drilling, continue to blow the water out of the well for 30 minutes or longer and measure and record the discharge rate in gallons per minute at intervals of 10 minutes or less during the period; and (D) measure and record the water level after discharge ceases. (4) Air Lift Method. Measurements shall be made through a pipe placed in the well. The pipe shall have an inside diameter of at least five -tenths of an inch or greater and shall extend from top of the well head to a point inside the well that is below the bottom of the air line. (A) Measure and record the static water level prior to starting the air compressor; (B) Measure and record the discharge rate at intervals of 10 minutes or less; (C) Measure and record the pumping level using a steel or electric tape at intervals of 10 minutes or less; and (D) Continue the test for a period of one hour or longer. (b) Public, Industrial, and Irrigation Wells. Every industrial or irrigation well and, if required by rule adopted by the Commission for Public Health, every well serving a public water supply system upon completion shall be tested for capacity by the following or equivalent method: (1) The water level in the well to be pumped and in all observation wells shall be measured and recorded prior to starting the test. (2) The well shall be tested by a pump of sufficient size and lift capacity to test the yield of the well, consistent with the well diameter and purpose. (3) The pump shall be equipped with throttling devices to reduce the discharge rate to approximately 25 percent of the maximum capacity of the pump. (4) The test shall be conducted for a period of 24 hours or longer without interruption and, except for wells constructed in Coastal Plain aquifers, shall be continued for a period of four hours or longer after the pumping water level stabilizes. (5) The pump discharge shall be set at a constant rate or rates that can be maintained throughout the testing period. If the well is tested at two or more pumping rates (a step-drawdown test), pumping at each pumping rate shall continue to the point that the pumping water level declines no more than 0.1 feet per hour for a period of four hours or more for each pumping rate, except for wells constructed to Coastal Plain aquifers. In wells constructed in Coastal Plain aquifers, pumping at each pumping rate shall continue for four hours or longer. (6) The pump discharge rate shall be measured by an orifice meter, flowmeter, weir, or equivalent metering device. The metering device used shall have a calibration accuracy within plus or minus five percent of a known standard. (7) The discharge rate of the pump and time shall be measured and recorded at intervals of 10 minutes or less during the first two hours of the pumping period for each pumping rate. If the pumping rate is constant after the first two hours of pumping, discharge measurements and recording may be made at longer time intervals not to exceed one hour. (8) The water level in each well and time shall be measured and recorded at intervals of five minutes or less during the first hour of pumping and at intervals of 10 minutes or less during the second hour of pumping. After the second hour of pumping, the water level in each well shall be measured at such intervals that the lowering of the pumping water level does not exceed three inches between measurements. (9) A reference point for water level measurements shall be selected and recorded for the pumping well and each observation well to be measured during the test. All water level measurements shall be made from the selected reference points, which shall be permanently marked. (10) All water level measurements shall be made with a steel or electric tape or equivalent measuring device. (11) All water level measurements shall be made within an accuracy of plus or minus one inch or to 0.1 foot. (12) After the completion of the pumping period, measurements of the water level recovery rate in the pumped well shall be made in the same manner as the drawdown for a period of two hours or greater. History Note: Authority G.S. 87-87; 87-88; Eff. February 1, 1976; Amended Eff. September 1, 2009, April 1, 2001; December 1, 1992; September 1, 1984; April 20, 1978; Readopted Eff. September 1, 2019. U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2015-01268 County: Randolph County U.S.G.S. Quad: Climax NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner/Applicant: HDR Vickie Miller Address: 555 Fayetteville Street, Suite 900 Raleigh, North Carolina 27601 Telephone Number: 919-232-6637 Size (acres) 1900 (approximately) Nearest Town Liberty Nearest Waterway Sandy Creek River Basin Cape Fear USGS HUC 03030003 Coordinates Latitude: 35.890540 Longitude: -79.629148 Location description: GREENSBORO RANDOLPH MEGASITE PROJECT SITE. The Greensboro Randolph Megasite (GRMS) is located in northern Randolph County approximately two miles northwest of the Town of Liberty and east of the Town of Julian. The site is generally bounded by Old US 421 to the north, Julian Airport Road to the west, Troy Smith Road to the east, and US Highway 421 to the south. Both Approved and Preliminary jurisdictional determinations (JDs) were conducted at this site. The specific waters that were reviewed under the Approved JD (AJD) are identified as follows: Wetland HDR WD, Ponds P18, P19, P20, P21, P22, PA and PB. These features are bounded by 3 separate orange polygons (indicated as AJD Areas) (see attached maps). The specific waters that were reviewed under the Preliminary JD (PJD) are listed on the attached PJD form and include all other potential waters not reviewed under the AJD. The project area for these waters is bounded by a solid red polygon (indicated as Megasite JD boundary), excluding the areas bounded by the orange polygons, described above (See attached maps). Indicate Which of the Following Apply: A. Preliminary Determination X There are waters, including wetlands, on the above described project area, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. _ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands, at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. Page 1 of 2 SAW-2015-01268 B. Approved Determination _ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are waters of the U.S., including wetlands, on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. _ The waters of the U.S., including wetlands, on your project area have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. _ The waters of the U.S., including wetlands, have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are no waters of the U.S., to include wetlands, present on the above described project area s which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Andrew Williams at (919) 554-4884 or Andrew.E.Williams2(ausace.army.mil. C. Basis For Determination: See the attached Approved and Preliminary jurisdictional forms. D. Remarks: This AJD/PJD is for the Megasite Project Site location associated with the Greensboro Randolph Megasite and does not include other components of the project (Electrical Utilities, Water/Sewer Utilities and Transportation components). Waters identified in the AJD are excluded waters and are not subject to Section 404 of the Clean Water Act. E. Attention USDA Program Participants The delineation included herein has been conducted to identify the location and extent of the aquatic resource boundaries and/or the jurisdictional status of aquatic resources for purposes of the Clean Water Act for the particular site identified in this request. This delineation and/or jurisdictional determination may not be valid for the Wetland Conservation Provisions of the Food Security Act of 1985, as amended. If you or your tenant are USDA program participants, or anticipate participation in USDA programs, you should discuss the applicability of a certified wetland determination with the local USDA service center, prior to starting work. F. Appeals Information for Approved Jurisdiction Determinations (as indicated in Section B. above) SAW-2015-01268 If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Mr. Philip A Shannin Administrative Appeal Review Officer 60 Forsyth Street SW, Floor M9 Atlanta, Georgia 30303-8803 AND PHILIP.A.SHANNIN@USACE.ARMY.MIL In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by: 17 February 2022. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Date: 2021.12.20 Corps Regulatory Official:�� �� 09:32:25-05'00' Date: December 20, 2021 Expiration Date: December 20, 2026 (AJD only) The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0. Legend II Megasite JD Boundary AJD Areas Open Water Wetlands Perennial Streams Intermittent Streams Map Panels r F�2 age% 03,4c2VVE112 kGn -Lah©rh £3 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - COVER SHEET PATH: G:IGISIPROJECTS1005]]0 CITYDFGREENSBOR010259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISED PJDBAJDIGRMS REVISED PJDSAJO MAP 2021121] GRID COVER.MXD - USER: JGARVEY - DATE: 1211712021 r F�2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 1 OF 21 PATH: G:1GISIPROJECTS1005110 CITYDFGREENSBOR010259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 20211209 GRID. MXD - USER: JGARVEY - DATE: 12/912021 Legend Megasite JD Boundary AJD Areas Wetlands Open Water Map Panels Perennial Streams Intermittent Streams 0 Feet 230 A PA (Non -jurisdictional) F�2 0 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 2 OF 21 PATH: G:1GISIPROJECTS1995119 CITYDFGREENSBOR019259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 29211299 GRID. MXD - USER: JGARVEY - DATE: 12/912021 JAI M1""Cl. 1i4.4,r• Legend r Megasite JD L Boundary LJ AJD Areas Wetlands Open Water Map Panels ///ro Streams Intermittent Streams 0 Feet 230 F�2 4 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 3 OF 21 PATH: G:1GISIPROJECTS1995119 CITYDFGREENSBOR019259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 29211299 GRID. MXD - USER: JGARVEY - DATE: 12/912021 Legend Megasite JD Boundary LJ AJD Areas Wetlands Open Water Map Panels ///ro Streams Intermittent Streams r 0 Feet F�2 } *3140104,14:i,;.,,,,,,,.74,,,ii*t,emlit'i POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 4 OF 21 PATH: GAGISIPRGJECTS199fi]]9 CITYUFGREENSBURU19259114 GBURUMSWATER-SEWERENVIRGIMAP UGCSIMXOIGRMS NEPAIREVISEU PJUBAJUIGRMS REVISED PJUSAJO MAP 29211299 GRID. MXU - USER: JGARVEY - DATE: 12/912021 F�2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 5 OF 21 PATH: G:1GISIPROJECTS1005110 CITYDFGREENSBOR010259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 20211209 GRID. MXD - USER: JGARVEY - DATE: 12/912021 Legend li r Megasite JD L Boundary LJ AJD Areas Wetlands Open Water Map Panels ///ro Streams Intermittent Streams Feet 0 A F�2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 6 OF 21 PATH: G:1GISIPROJECTS1995119 CITYDFGREENSBOR019259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 29211299 GRID. MXD - USER: JGARVEY - DATE: 12/912021 FY2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 7 OF 21 PATH: G:1GISIPROJECTS1005110 CITYDFGREENSBOR010259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 20211209 GRID. MXD - USER: JGARVEY - DATE: 12/912021 Legend Megasite JD Boundary AJD Areas Wetlands Open Water Map Panels Perennial Streams Intermittent Streams 0 Feet 230 F�2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 8 OF 21 PATH: G:1GISIPROJECTS1995119 CITYDFGREENSBOR019259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 29211299 GRID. MXD - USER: JGARVEY - DATE: 12/912021 Legend Megasite JD Boundary LJ AJD Areas Wetlands Open Water Map Panels ///ro Streams Intermittent Streams 0 Feet 230 F�2 0 183 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 9 OF 21 PATH: G:1GISIPROJECTS1995119 CITYDFGREENSBOR019259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 29211299 GRID. MXD - USER: JGARVEY - DATE: 12/912021 Legend Megasite JD Boundary LJ AJD Areas Wetlands Open Water Map Panels ///ro Perennial Streams Intermittent Streams 20A 0 F�2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 10 OF 21 PATH: G:1GISIPROJECTS1995119 CITYDFGREENSBOR019259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 29211299 GRID. MXD - USER: JGARVEY - DATE: 12/912021 Legend Megasite JD Boundary LJ AJD Areas Wetlands Open Water Map Panels Perennial Streams Intermittent Streams 0 Feet 230 F�2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 11 OF 21 PATH: G:\GIS\PROJECTS\006]]0 CITY0FGREENSBOR010259114 GBOROMSWATER-SEWERENVIRO\MAP DOGS\MXD\GRMS NEPA\REVISED PJD&AJD\GRMS REVISED PJD&AJD MAP 2021121] GRID.MXD - USER: JGARVEY - DATE: 12/17/2021 FY2 0 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 12 OF 21 PATH: G:1GISIPROJECTS1005110 CITYDFGREENSBOR010259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 20211209 GRID. MXD - USER: JGARVEY - DATE: 12/912021 Legend Megasite JD Boundary AJD Areas Wetlands Open Water Map Panels Perennial Streams Intermittent Streams F�2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 13 OF 21 PATH: G:1GISIPROJECTS1005110 CITYDFGREENSBOR010259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 20211209 GRID. MXD - USER: JGARVEY - DATE: 12/912021 FY2 PATH: G:1GISIPROJECTS1005110 CITYDFGREENSBOR010259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 20211209 GRID. MXD - USER: JGARVEY - DATE: 12/912021 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 14 OF 21 Legend Megasite JD Boundary LJ AJD Areas Wetlands Open Water Map Panels Perennial Streams Intermittent Streams F�2 PATH: G:1GISIPROJECTS1005110 CITYDFGREENSBOR010259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 20211209 GRID. MXD - USER: JGARVEY - DATE: 12/912021 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 15 OF 21 Legend Megasite JD Boundary LJ AJD Areas Wetlands Open Water Map Panels Perennial Streams Intermittent Streams 0 Feet 230 it F�2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 16 OF 21 PATH: G:1GISIPROJECTS1995119 CITYDFGREENSBOR019259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 29211299 GRID. MXD - USER: JGARVEY - DATE: 12/912021 • 0 Legend r Megasite JD L Boundary LJ AJD Areas Wetlands Open Water Map Panels ///ro Perennial Streams Intermittent Streams Feet �o 0 F�2 43 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 17 OF 21 PATH: G:1GISIPROJECTS1005110 CITYDFGREENSBOR010259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 20211209 GRID. MXD - USER: JGARVEY - DATE: 12/912021 • FY2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 18 OF 21 PATH: G:1GISIPROJECTS1005110 CITYDFGREENSBOR010259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 20211209 GRID. MXD - USER: JGARVEY - DATE: 12/912021 ; Legend Megasite JD Boundary LJ AJD Areas Wetlands Open Water Map Panels ///ro Streams Intermittent Streams rFeet 230 ,__-k F�2 POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 19 OF 21 PATH: G:1GISIPROJECTS1995119 CITYDFGREENSBOR019259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 29211299 GRID. MXD - USER: JGARVEY - DATE: 12/912021 i Legend Megasite JD Boundary AJD Areas Wetlands Open Water Map Panels Perennial Streams Intermittent Streams 0 Feet 230 F�2 Dodsons Lake HDR WC HDR S6 P22 (Non -jurisdictional) P19 (Non -jurisdictional) P21 (Non - jurisdictional) P20 (Non - jurisdictional) P18 (Non - jurisdictional) POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 20 OF 21 PATH: G:1GISIPROJECTS1995119 CITYDFGREENSBOR019259114 GBDRDMSWATER-SEWERENVIROIMAP DDCSIMXDIGRMS NEPAIREVISEO PJD&AJDIGRMS REVISED PJDSAJO MAP 29211299 GRID. MXD - USER: JGARVEY - DATE: 12/912021 'C Legend Megasite JD Boundary AJD Areas Wetlands Open Water Map Panels 1: Perennial Streams Intermittent Streams 3( 0 Feet 230 P18 (Non - jurisdictional), 1111L11114-k.-- FY POTENTIAL JURISDICTIONAL FEATURES AND NON- JURISDICTIONAL FEATURES MAP FIGURE 5 - PAGE 21 OF 21 PATH: G - - USER: JGARVEY - DATE: 12/9/2021 SAW-2015-01268 PROCESS AND NOTIFICATION OF ADNIINISTRATIVE APPEAL OPTIONS AND REQUEST FOR APPEAL Applicant: Vickie Miller, HDR File Number: SAW-2015-01268 Date: December 20, 2021 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C F APPROVED JURISDICTIONAL DETERMINATION D F PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION Additional Corps I - The following identifies your rights and options information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx regarding an administrative appeal of the above decision. or regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept • ACCEPT: If you received a Standard Permit, you may sign authorization. If you received a Letter of Permission (LOP), on the Standard Permit or acceptance of the LOP means that permit, including its terms and conditions, and approved jurisdictional • OBJECT: If you object to the permit (Standard or LOP) permit be modified accordingly. You must complete Section objections must be received by the district engineer within the permit in the future. Upon receipt of your letter, the district permit to address all of your concerns, (b) modify the permit having determined that the permit should be issued as previously will send you a proffered permit for your reconsideration, or object to the permit. the permit document and return you may accept the LOP and your you accept the permit in its entirety, determinations associated it to the district engineer for final work is authorized. Your signature and waive all rights to appeal the with the permit. therein, you may request that the to the district engineer. Your or you will forfeit your right to appeal and may: (a) modify the or (c) not modify the permit objections, the district engineer because of certain terms and conditions II of this form and return the form 60 days of the date of this notice, engineer will evaluate your objections to address some of your objections, written. After evaluating your as indicated in Section B below. B: • • PROFFERED PERMIT: You may accept or appeal ACCEPT: If you received a Standard Permit, you may sign authorization. If you received a Letter of Permission (LOP), on the Standard Permit or acceptance of the LOP means that permit, including its terms and conditions, and approved jurisdictional APPEAL: If you choose to decline the proffered permit may appeal the declined permit under the Corps of Engineers the permit the permit document and return you may accept the LOP and your you accept the permit in its entirety, determinations associated it to the district engineer for final work is authorized. Your signature and waive all rights to appeal the with the permit. terms and conditions therein, you by completing Section II of this form within 60 days of the date of (Standard or LOP) because of certain Administrative Appeal Process and sending the form to the division engineer. This form must be received by the division engineer this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: provide • • APPROVED JURISDICTIONAL DETERMINATION: new information. ACCEPT: You do not need to notify the Corps to accept an this notice means that you accept the approved JD in its entirety, APPEAL: If you disagree with the approved JD, you may Appeal Process by completing Section II of this form and sending You may accept or appeal the approved JD. Failure to notify the Corps within and waive all rights to appeal the approved appeal the approved JD under the Corps of the form to the division engineer. This approved JD or 60 days of the date of JD. Engineers Administrative form must be received by the division engineer within 60 days of the date of this notice. SAW-2015-01268 E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the appeal process you may contact: District Engineer, Wilmington Regulatory Division, Attn: Andrew Williams 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 andrew.e.williams2(ausace.army.mil If you only have questions regarding the appeal process you may also contact: US Army Corps of Engineers South Atlantic Division Attn: Mr. Philip A. Shannin Administrative Appeal Review Officer 60 Forsyth Street SW, Floor M9 Atlanta, Georgia 30303-8803 PHILIP.A. SHANNIN(a,USACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Andrew Williams, 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, FLOOR M9, Atlanta, Georgia 30303-8803 Phone: (404) 562-5136 EMAIL: PHILIP.A.SHANNIN@USACE.ARMY.MIL Greensboro Megasite Stormwater Management Permit Application Form Additional Drainage Area Table Basin Information Drainage Area C2 Drainage Area Drainage Area Receving Stream Name Sandy Creek Stream Class WS-III Stream Index Number 17-16-(1) Total Drainage Area (sf) 23252328 On -Site Drainage Area (sf) 23252328 Proposed Impervious Area (sf) 14170068 % Impervious Area (total) 60.9 Impervious Surface Area Drainage Area C2 Drainage Area Drainage Area On -site Buildings/Lots (sf) On -site Streets (sf) On -site Parking (sf) On -site Sidewalks (sf) Other on -site (sf) Future (sf) Off -site (sf) Existing BUA (sf) Total (sf) FN STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Randolph County, North Carolina December21, 2021 F�2 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Randolph County. North Carolina December 21, 2021 STORMWATER MANAGEMENT PLAN F)� GREENSBORO-RANDOLPH MEAGASITE Table of Contents 1 Introduction 1 2 Site Description 1 3 Project Description 1 4 Stormwater Management Plan 1 4.1 Design Requirements 2 4.2 Existing Conditions Model 2 4.2.1 Outfall Locations and Drainage Areas 2 4.2.2 Runoff Curve Numbers and Time of Concentration 3 4.2.3 Rainfall 3 4.2.4 Existing Peak Discharges 3 4.3 Proposed Stormwater Control Measures 4 4.3.1 Proposed Hydrologic Parameters 4 4.3.2 Proposed Dry Detention Basins 5 4.3.3 Proposed Wet Ponds 6 4.4 Proposed Conditions Model Results 7 4.5 Conclusion 7 5 References 8 Tables Table 1. Summary of RCN and Tc 3 Table 2. 24-hour Total Rainfall 3 Table 3. Existing Peak Discharges 4 Table 4. Summary of Proposed RCN and Tc 5 Table 5. Proposed Peak Discharges 7 Appendices Appendix A — Figures Appendix B - NOAA Atlas 14 Rainfall Depths Appendix C — Existing Condition Model Results Appendix D — Proposed Weighted RCN Calculations Appendix E — Proposed Ponds Calculations and Grading Appendix F — Proposed Conditions Model Results December21, 2021 I i STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE 1 Introduction The Greensboro -Randolph Megasite (GRMS) is a large tract of land located in Randolph County, North Carolina that can support large-scale manufacturing facilities. Currently, there are plans to construct approximately 1000 acres of manufacturing and distribution facilities. The purpose of this document is to summarize how the stormwater will be managed to meet the State of North Carolina requirements as well as provide additional controls to manage the larger flood events to reduce risk of increased downstream flooding. 2 Site Description The roughly 1,800-acre site is in the northeast portion of Randolph County between US 421 and Old 421 Road near the county line as shown on Figure 1 in Appendix A. Old 421 Road bounds the northern property boundary and is also the natural ridge, so all of the property drains in southerly direction towards Dodson Lake and Sandy Creek. Dodson Lake stream and Dodson Lake is located along the southern boundary of the site and confluences with Sandy Creek just southeast of the property. There are two (2) main tributaries on the site that drain into Dodson Lake and one (1) main tributary on the site that drains into Sandy Creek. Dodson Lake stream and portions of Dodson Lake Tributary 1 and Sandy Creek Tributary 7 have limited detailed studied (LDS) special flood hazard areas (SFHAs) The site consists mainly of farm and pasture lands with some forested areas in the southern and eastern portion of the site. There are several small farm ponds within the project area. 3 Project Description The overall project is the construction of a manufacturing facility that covers approximately 1,000 acres. The facility includes multiple office, manufacturing, and storage buildings along with employee parking, truck access, rail yard, and other ancillary facilities that support the manufacturing process. The manufacturing facility requires large level areas for efficient processes and therefore the site will require significant areas of cut and fill to create a few level pads at different elevations to reduce the necessary earthwork. A significant portion of the site will be impervious surfaces and the remaining areas will likely be grass and landscape areas. 4 Stormwater Management Plan The overall stormwater management plan for the GRMS includes a combination of dry attenuation basins located on the level pads and water quality ponds located near the toe of the pads to control stormwater runoff and comply with the North Carolina post construction stormwater requirements. The built upon site area will drain to the dry December21, 2021 11 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE attenuation basins which will reduce the peak discharges to existing levels and the water quality ponds will provide treatment of the stormwater runoff from the built upon area prior to the identified outfalls which are just upstream of Dodson Lake and where Sandy Creek Tributary 7 leaves the site. This section summarizes the stormwater management requirements, describes how the existing peak discharges were determined at the identified outfall locations, presents each of the proposed dry attenuation basins and water quality ponds and summarizes the results of the hydrologic and hydraulic model. 4.1 Design Requirements The State of North Carolina Department of Environmental Quality (NCDEQ) Division of Energy, Mineral, and Land Resources (DEMLR) Stormwater Program oversees compliance of the stormwater runoff regulations. The regulations vary across the state depending on the watershed. The GRMS is located within a Watershed III Basin and is a high -density project requiring compliance with the post construction stormwater regulations that meet 15A NCAC 02H .1020 Universal Stormwater Management Program which includes: • Runoff treatment of the built upon area through a primary stormwater control measure (SCM) as identified in the NCDEQ Stormwater Design Manual. o The wet pond is a primary SCM. • Demonstration that the 10-year peak discharge from the site will not increase downstream erosion. o By attenuating the proposed 10-year peak discharge to the existing condition level, the stormwater outlets will not cause erosion downslope of the discharge point over current levels. In addition to the NCDEQ post construction regulations, the GRMS SCMs were also designed to not increase the existing 100-year peak discharge. This additional attenuation is being performed to reduce the risk of increased downstream flooding and supports the removal of existing SFHA areas on the project site. 4.2 Existing Conditions Model The existing peak discharges were developed using the HydroCAD computer model which generates stormwater hydrographs for defined areas and routes and combines these hydrographs at specified locations. For this project the stormwater hydrographs were generated using the National Resource Conservation Service (NRCS) runoff curve number method (RCN) method along with the NOAA Atlas 14 center weighted storm distribution for the different storm frequency events. 4 2.1 Outfall Locations and Drainage Areas Five (5) outfalls were identified and referred to as A-1, A-2, B-1, B-2 and C. Outfall A-1, A-2, B-1, and B-2 are located just upstream of Dodson Lake and outfall C is located on Sandy Creek Tributary 7 just upstream of where the tributary leaves the project site. These outfall locations are shown on Figure 1 in Appendix A. 2 I December 21, 2021 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE 4.2.2 Runoff Curve Numbers and Time of Concentration A weighted RCN was determined for each drainage area based on the landuse and soil type. The landuse and soils are shown in Figures 2 and 3 in Appendix A. The time of concentration (Tc) represent the longest travel time of stormwater runoff in a drainage area. The NRCS Tc method identifies three (3) different travel paths, sheet flow, shallow concentrated, and channel flow. The travel time for each of these paths are summed up to determine the Tc. A summary of the RCN and Tc for each of the drainage areas are shown in Table 1 below. Table 1. Summary of RCN and Tc Drainage Area Area (Ac) RCN Tc (min) Al 235 78 63 A2 51 78 B1 440 77 83 B2 81 77 Cl 740 77 103 1.2.3 Rainfall The point frequency rainfall data was obtained from NOAA Atlas 14 for the 1-, 10-, 25-, 50-, and 100-year annual frequency events. For the stormwater management plan the 24-hour duration event was used to demonstrate compliance. A summary of the total rainfall amounts is shown in Table 2 below and a copy of the NOAA Atlas 14 is provided in Appendix B. Table 2. 24-hour Total Rainfall Annual Frequency Depth (in) 1-Year 2.89 10-Year 25-Year 5.95 50-Year 100-Year 7.42 The NRCS Curve B was used to distribute the rainfall across the 24-hour period. This distribution is based on the NOAA Atlas 14 recommended center weighted storm and introduces a smoothing factor depending on the location. The GRMS is in the curve B region. 4.2.4 Existing Peak Discharges The results of the existing conditions HydroCAD model are shown in Table 3 below. The HydroCAD model results are provided in Appendix C. December21, 2021 13 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Table 3. Existing Peak Discharges Outfall Point 10-yr Peak Discharge (cfs) 100-yr Peak Discharge (cfs) A-1 308 544 A-2 121 B-1 464 832 B-2 145 680 1220 4.3 Proposed Stormwater Control Measures The proposed SCMs include two (2) dry detention basins located within the site pads and three (3) wet ponds located just off the site pads fill slope and upstream of the outfall locations. The proposed built upon area (BUA) in drainage areas A drains directly to the wet pond through a combination of onsite storm drainage pipes and swales. The proposed BUA in drainage areas B and C all drain to a dry detention basin through a combination of onsite storm drainage pipes and swales The SCMs in drainage area A and B were designed for all the area naturally draining to the facilities. The offsite area in drainage area C will be diverted around the site pad. Figure 4 in Appendix A shows the pond locations and the overall site grading and proposed storm piping from each stormwater facility is shown in Appendix E. This section describes how the proposed hydrologic parameters were developed and then describes each SCM in more detail. 4.3.1 Proposed Hydrologic Parameters The proposed GRMS consists of large flat pads that supports large scale manufacturing, storing and distribution activities. The proposed drainage areas are shown on Figure 4 in Appendix A. The BUA draining to either the wet pond or dry attenuation basins were broken up into impervious areas and grassed areas as shown in Figure 5 in Appendix A. Weighted RCNs were calculated with the assumption that the grassed areas would be on D type soil which produces the most runoff. It was assumed that all BUA draining to either the wet pond or dry attenuation basins would be directly connected to the storm drainage system and no adjustment was made to the curve number based on disconnected impervious surfaces. The natural undisturbed areas that drain either to the wet ponds or directly to outfall A-1, A-2, B-1, B-2, and C were identified with a "U" as shown in Figure 4 in Appendix A. The weighted RCNs for these areas were calculated using the existing condition landuse and soil types. The proposed RCN calculations were provided in Appendix D. The proposed time of concentration (Tc) were estimated for the BUA assuming sheet flow of 10 minutes and quick travel times through storm pipes and channels to the wet 4 I December 21, 2021 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE pond or dry attenuation basins. A summary of the RCN and Tc for each of the drainage areas are shown in below. Table 4. Summary of Proposed RCN and Tc Drainage Area Area (Ac) RCN Tc (min) Al 99 94 20 A2 125 951 A3.0 54 76 30 37 781 .22 B1 279 95 30 34 737 IIP B3.0 62 69 30 Cl 534 91 30 C2.0 183 75 50 C3.0 162 72 45 4.3.2 Proposed Dry Detention Basins The dry detention basins were only designed to provide peak flow attenuation. These basins do not include extended detention for the water quality volume and do not include the water quality features identified in the NCDEQ Stormwater Design Manual. These facilities are designed to drain quickly and discharge to a primary SCM for water quality treatment. The outlet structures for the dry detention basins include an outlet pipe sized to attenuate the larger storm peak discharges. The outlet storm pipe systems will discharge directly to the wet pond sediment forebays which will dissipate the energy. The proposed grading of each of the dry detention basins are shown in Appendix E. Below is a brief description of each of the proposed dry detention basins. Pond B1 Dry Detention Basin Pond B1 is a dry detention basing that will have a ponded surface area of approximately 8.1 acres and a maximum depth of 10.0 feet during the 100-year rainfall event. The outlet structure is an 84-inch barrel that will discharge to the Pond B2 — Wet Pond sediment forebay. The pond captures 279 acres of the site. The pond bottom is at elevation 676 which is approximately 30 feet above the existing grade at the lowest portion of the pond and will above the existing groundwater elevation. Pond Cl — Dry Detention Basin Pond C1 is a dry detention basing that will have a ponded surface area of approximately 17 acres and a maximum depth of 17 feet during the 100-year rainfall event. The outlet is December21, 2021 15 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE a 72-inch storm drainage pipe barrel that will discharge directly to the Pond C2 Wet Pond sediment forebay. The pond captures 534 acres of the site The pond bottom is at elevation 664 which is approximately 7 feet above the existing grade at the lowest portion of the pond and approximately 30 feet above the existing groundwater elevation. 4.3.3 Proposed Wet Ponds The proposed wet ponds were located outside the BUA and were designed to satisfy the primary SCM per the NCDEQ Stormwater Design Manual. The ponds were designed to have a normal pool with a maximum depth of 6 feet and average depth between 4.5 and 5.0 feet and a surface area greater than the SA/DA ratio and volume greater than the water quality volume. The sediment forebays were sized to be between 15 and 20% of the normal pool volume. The riser structures were sized to temporarily store the water quality volume and release this volume over a 4-to-5-day period. Preformed scour basins were sized for the wet pond outlet protection. These scour holes in addition to the peak flow attenuation will prevent additional downstream erosion. In addition to the water quality The wet pond sizing calculations, scour basin sizes and pond grading are shown in Appendix E. Pond A3 — Wet Pond Pond A3 will provide WQ volume for 224.6 acres of the site and will have a permeant pool surface area of approximately 3.9 acres. The maximum pool depth is 6 feet, and the average pool depth is 4.8 feet. The wet pond also provides the peak flow attenuation for drainage area A. This pond is controlled by 10 feet x 10 feet riser that extends 10 feet above the normal pool elevation. There is a 6-inch orifice at the normal pool elevation of 678 and a 54-inch orifice at elevation 681. The 6-inch orifice ponds up the water quality volume and slowly discharges it over a 4-day period. The 54-inch orifice attenuates the 10-year peak discharge. The riser discharges to a 60-inch outlet barrel which attenuates the 100-year peak discharge. The top of dam is set at elevation 692 which provides over 1 foot of freeboard during the 100-year event. Pond B2 — Wet Pond Pond B2 will provide WQ volume for 279 acres of the site and will have a permanent pool surface area of approximately 4.9 acres. The normal pool maximum depth is 6 feet and the average pool depth is 5.3 This pond is controlled by a 10 feet x 10 feet riser that extends 3 feet above the normal pool elevation. There is a 7-inch orifice at the normal pool elevation of 614 and the top of the riser is at elevation 617. The 7-inch orifice ponds up the water quality volume and slowly discharges it over a 5-day period. The riser discharges to a 66-inch outlet barrel. The top of dam is set at elevation 622 which provides 1 foot of freeboard during the 100- year event. 6 I December 21, 2021 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Pond C2 — Wet Pond Pond C2 will provide WQ volume for 533.8 acres of the site and will have a permeant pool surface area of approximately 8.9 acres. The maximum normal pool depth is 6 feet, and the average pool depth is 4.6 feet. This pond is controlled by a 10 feet x 10 feet riser that extends 3 feet above the normal pool elevation. There is a 10-inch orifice at the normal pool elevation of 650 and the top of the riser is at elevation 653. The 10-inch orifice ponds up the water quality volume and slowly discharges it over a 4-day period. The riser discharges to a 72-inch outlet barrel. The top of dam is set at elevation 657.5 which provides just less than 1 foot of freeboard during the 100-year event. 4.4 Proposed Conditions Model Results A separate HydroCAD model was produced for the proposed conditions. The BUA was added to the dry detention basin ponds which then discharged to a wet pond. Since the wet ponds are located near the natural ridges, additional area was not added to the ponds. The undisturbed natural areas that don't drain to the ponds were added to the model to determine the proposed peak discharges at each outfall. The results of the proposed conditions HydroCAD model are shown in Table 5 below. 1 abbe 5. Proposed NeaK uiscnarges Duffel! Point 10-yr Peak Discharge (cfs) Existing Proposed 100-yr Peak Discharge (cfs) Existing Proposed A-1 308 278 544 530 A-2 121 88 -I A 154 B-1 464 347 832 416 B-2 145 89 259 T 177 680 512 1220 1144 These results show that the peak discharge for all three outfalls were reduced compared to the existing conditions presented in Table 3. The HydroCAD model results are presented in Appendix F. 4.5 Conclusion This stormwater management plan demonstrates that the dry detention basins and wet ponds reduce the proposed peak discharges to at or below the existing conditions peak discharges at the three (3) of the five (5) identified outfall locations. The other two (2) outfall locations proposed peak discharges are reduced because the BUA is diverted to the dry detention basins. The reduction in the 10-year peak discharge to below the existing condition peak discharge will prevent an increase in erosion downstream of the property. The reduction in the 100-year peak discharge to below existing condition peak discharge will reduce the risk of downstream flooding during the 100-year event and support the removal of some SFHAs on the project site. All the outflow from the dry detention basins will be discharged to wet ponds that are sized per the NCDEQ December21, 2021 17 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Stormwater Design Manual to provide the required water quality treatment prior to being discharge off the site. Preformed scour basins were designed for each wet pond outlet to dissipate energy and discharge downstream with non -erosive velocities. 5 References HydroCAD version 10.00-25 2019, HydroCAD Software Solutions LLC Stormwater Design Manual January 1, 2017, updated on November 20, 2020 — North Carolina Division of Environmental Quality, Department of Energy, Mineral, and Land Resources Urban Hydrology for Small Watersheds — TR-55 June 1986 — United States Department of Agriculture, Natural Resource Conservation Service NOAA Atlas 14 Precipitation -Frequency Atlas of the United States — Volume 2 2006 — National Oceanic and Atmospheric Administration 8 I December 21, 2021 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Appendix A - Figures December21, 2021 11 LEGEND Existing Flowpaths Existing Drainage Areas Site Boundary • Outfall Points Outfall A" Outfall A`- tfall B-1 B2 � Outfall B-2 Outfall C F�2 EXISTING DRAINAGE CONDITIONS GREENSBORO MEGASITE FIGURE 1 PATH: A:\GIS\PROJECTSY10000000_GRMS_UPDATE\7.2_VNP\MAP_DOCS\APRX\EXHIBITS.APRX - USER: LVANDERLIN - DATE: 11/10/2021 INITIAL STORMWATER MANAGEMENT PLAN ■ �i ■ LEGEND NLCD Landuse - Open Water Developed, Open Space - Developed, Low Intensity - Developed, Medium Intensity Pasture/Hay ▪ Developed, High Intensity Barren Land Deciduous Forest I 0 F�2 ▪ Evergreen Forest Mixed Forest ▪ Cutivated Crops Woody Wetlands ▪ Emergent Herbaceous Wetlands Im0.6 tift7wt ogri • Tin • • • • _ EXISTING LANDUSE GREENSBORO MEGASITE FIGURE 2 PATH:A:\GIS\PROJECTS,00000000_GRMS_UPDATE\7.2_VNP\MAP_DOCS\APRX\EXHIBITS.APRX - USER: LVANDERLIN - DATE: 10/15/2021 INITIAL STORMWATER MANAGEMENT PLAN LEGEND LJ Site Boundary Soil HSG Water A 1 B 0 Miles MaB keB2 WtC • WpE ChA F�2 MeB2 PaC B/D C C/D D WtC ApC WzB Wp ApC ApB MaD CmA CeB WtB WpC P PATH: A:\GIS\PROJECTSY10000000_GRMS_UPDATE\7.2_VNP\MAP_DOCS\APRX\EXHIBITS.APRX - USER: LVANDERLIN - DATE: 10/15/2021 CcC CcC WtB cC eB2 C CeB2 1 EXISTING SOILS GREENSBORO MEGASITE FIGURE 3 INITIAL STORMWATER MANAGEMENT PLAN O Outfall Points Proposed Drainage Areas Proposed Ponds Site Boundary Outfall Outfall F�2 PROPOSED DRAINAGE CONDITIONS GREENSBORO MEGASITE FIGURE 4 PATH:A:\GIS\PROJECTS \00000000_GRMS_UPDATE/7.2_VNP\MAP_DOCS\APRX\EXHIBITS.APRX - USER: LVANDERLIN - DATE: 11/11/2021 INITIAL STORMWATER MANAGEMENT PLAN Proposed Grass Proposed Impervious Site Boundary F�2 PATH:A:\GIS\PROJECTSY10000000_GRMS_UPDATE\].2_VNP\MAP_DOCS\APRX\EXHIBITS.APRX - USER: LVANDERLIN - DATE: 11/11/2021 PROPOSED SITE IMPERVIOUSNESS GREENSBORO MEGASITE FIGURE 5 INITIAL STORMWATER MANAGEMENT PLAN STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Appendix B — NOAA Atlas 14 Rainfall Depths 2 I November 15, 2021 11/1/2017 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Liberty, North Carolina, USA* Latitude: 35.89°, Longitude: -79.6222° Elevation: 666.1 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Durati n Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.398 0.472 0.549 0.600 0.656 0.691 0.722 0.746 0.770 0.786 (0.364-0.435) (0.433-0.517) (0.502-0.600) (0.549-0.655) (0.596-0.715) (0.626-0.754) (0.651-0.787) (0.670-0.815) (0.686-0.842) (0.693-0.859) 10-min 0.636 0.756 0.879 0.960 1.05 1.10 1.15 1.18 1.22 1.24 (0.582-0.695) (0.693-0.826) (0.805-0.961) (0.877-1.05) (0.950-1.14) (0.997-1.20) (1.03-1.25) (1.06-1.29) (1.08-1.33) (1.09-1.35) 15-min 0.795 0.950 1.11 1.21 1.33 1.39 1.45 1.49 1.53 1.55 (0.728-0.868) (0.871-1.04) (1.02-1.22) (1.11-1.32) (1.21-1.44) (1.26-1.52) (1.31-1.58) (1.34-1.63) (1.37-1.68) (1.37-1.70) 30-min 1.09 1.31 1.58 1.76 1.96 2.10 2.22 2.32 2.44 2.52 (0.998-1.19) (1.20-1.44) (1.45-1.73) (1.61-1.92) (1.78-2.14) (1.90-2.29) (2.00-2.42) (2.09-2.54) (2.17-2.67) (2.22-2.75) 60-min 1.36 (1.24-1.48) 1.65 (1.51-1.80) 2.03 (1.85-2.21) 2.29 (2.09-2.50) 2.61 (2.38-2.85) 2.84 (2.58-3.10) 3.06 (2.76-3.34) 3.26 (2.93-3.56) 3.50 (3.12-3.83) 3.67 (3.24-4.01) 2-hr 1.61 (1.48-1.76) 1.95 (1.79-2.13) 2.42 (2.22-2.65) 2.76 (2.52-3.01) 3.19 (2.90-3.48) 3.51 (3.17-3.82) 3.82 (3.43-4.16) 4.12 (3.67-4.49) 4.51 (3.97-4.91) 4.79 (4.18-5.22) 3-hr 1.72 (1.58-1.88) 2.09 (1.93-2.28) 2.60 (2.39-2.83) 2.97 (2.72-3.23) 3.46 (3.14-3.75) 3.62 (3.46-4.14) I 4.16 (3.76-4.52) 4.53 (4.04-4.91) 4.99 (4.40-5.41) 5.34 (4.66-5.80) 6-hr 2.09 (1.93-2.28) 2.53 (2.33-2.75) 3.14 (2.89-3.42) 3.61 (3.31-3.92) 4.23 (3.85-4.58) 4.71 (4.25-5.10) 5.20 (4.66-5.62) 5.69 (5.04-6.15) 6.35 (5.55-6.86) 6.86 (5.92-7.43) 12-hr 2.48 (2.29-2.71) 3.00 (2.76-3.28) 3.75 (3.44-4.09) 4.34 (3.97-4.72) 5.14 (4.66-5.58) 5.78 (5.20-6.25) 6.44 (5.74-6.96) 7.13 (6.28-7.69) 8.09 (6.99-8.72) 8.85 (7.53-9.55) 24-hr 2.90 (2.71-3.11) 3.50 (3.27-3.75) 4.37 (4.07-4.68) 5.04 (4.69-5.41) 5.96 (5.53-6.40) 6.69 (6.18-7.19) 7.43 (6.84-8.00) 8.20 (7.52-8.84) 9.25 (8.43-10.00) 10.1 (9.14-10.9) 2-day 3.39 (3.18-3.63) 4.08 (3.82-4.37) 5.05 (4.73-5.41) 5.79 (5.41-6.21) 6.79 (6.31-7.28) 7.57 (7.01-8.13) 8.36 (7.72-9.00) 9.17 (8.43-9.90) 10.3 (9.39-11.1) 11.1 (10.1-12.1) 3-day 3.59 4.31 5.32 6.10 7.15 7.98 8.82 9.68 10.9 11.8 (3.37-3.85) (4.04-4.62) (4.98-5.70) (5.70-6.53) (6.65-7.66) (7.40-8.56) (8.14-9.48) (8.90-10.4) (9.93-11.7) (10.7-12.8) 4-day 3.80 4.55 5.60 6.41 7.51 8.39 9.28 10.2 11.4 12.4 (3.56-4.06) (4.27-4.87) (5.24-5.98) (5.99-6.86) (7.00-8.04) (7.78-8.99) (8.57-9.96) (9.38-11.0) (10.5-12.4) (11.3-13.5) 7-day 4.35 5.18 6.29 7.17 8.36 9.30 10.3 11.3 12.6 13.7 (4.09-4.63) (4.88-5.52) (5.91-6.70) (6.73-7.64) (7.81-8.91) (8.67-9.94) (9.51-11.0) (10.4-12.1) (11.6-13.6) (12.5-14.8) 10-day 4.93 5.86 7.04 7.96 9.22 10.2 11.2 12.2 13.6 14.7 (4.66-5.24) (5.53-6.23) (6.63-7.48) (7.49-8.47) (8.63-9.80) (9.52-10.9) (10.4-11.9) (11.3-13.1) (12.5-14.6) (13.4-15.8) 20-day 6.60 7.80 9.21 10.3 11.9 13.1 14.3 15.6 17.3 18.6 (6.25-6.98) (7.38-8.24) (8.72-9.73) (9.77-10.9) (11.2-12.6) (12.3-13.9) (13.4-15.2) (14.5-16.6) (16.0-18.5) (17.1-20.0) 30-day 8.18 (7.81-8.59) 9.63 (9.17-10.1) 11.2 (10.6-11.7) 12.4 (11.8-13.0) 14.0 (13.3-14.7) 15.2 (14.4-16.0) 16.4 (15.5-17.3) 17.6 (16.6-18.6) 19.3 (18.0-20.4) 20.5 (19.1-21.8) 45-day 10.4 (9.89-10.9) 12.1 (11.6-12.7) 13.9 (13.2-14.5) 15.3 (14.5-16.0) 17.1 (16.2-17.9) 18.4 (17.5-19.3) 19.8 (18.7-20.8) 21.1 (19.9-22.2) 22.9 (21.5-24.2) 24.3 (22.6-25.7) 60-day 12.4 (11.9-13.0) 14.5 (13.9-15.1) 16.3 (15.7-17.1) 17.8 (17.0-18.6) 19.6 (18.7-20.5) 21.0 (20.0-22.0) 22.3 (21.3-23.4) 23.6 (22.4-24.8) 25.3 (23.9-26.6) 26.5 (25.0-28.0) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability hat precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to ToD PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.8900&Ion=-79.6222&data=depth&units=english&series=pds 1/3 11/1/2017 Precipitation Frequency Data Server Precipitation depth (in) Precipitation depth (in) 30 25 20 15 10 30 25 20 15 10 PDS-based depth -duration -frequency (DDF) curves Latitude: 35_8900°, Longitude:-79.6222° C C E .E - rl Duration 7n r N r 0 r A ro N ro 2 5 10 25 50 100 200 500 1000 NOAA Atlas 14, Volume 2, Version 3 Average recurrence interval (years) Created (GMT): Wed Mou 1 20:27:41 2017 Back to Toa Maps & aerials Small scale terrain Large scale terrain Average recurrence interval (years) — 1 2 5 10 — 25 — 50 — 100 — 200 — 500 1000 Duration — 5-non — 2-day — 10-rnm — 3-day 15-min — 4-day — 30-min — 7-day — 60-min — 10-aay — 2-hr — 20-eay — 3-hr — 30-day — 6-hr — 45-eay — 12-hr — 60-eay — 24-hr https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage. htnnriat=35.8900&Ion=-79.6222&data=depth&units=english&series=pds 2/3 11/1/2017 Precipitation Frequency Data Server Durham Raleigh Rocky Blacksburg Roanoke 46 .6.. :N i r 0 Winston-Salem ■ u Durham Greensbars • • hail NORTH CAROLINA • Charlotte Mlle 100km -- 1Omr Fayette/ i l l e Large scale map Winston-Salem ail Otte 100km 6fOmi Greensboro • North Carolina Larae scale aerial • Winston-Salem Greensboro • DU -ham . • .:.Rock • Raleigh•• Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.QuestionsAnoaa.00v Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.htnnriat=35.8900&Ion=-79.6222&data=depth&units=english&series=pds 3/3 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Appendix C — Existing Condition Model Results November 15, 2021 13 (Al) `A2) (B1) �2) (1) D Al D A2 A-1 Outfall A-1 <Subca> Reach A-2 Outfall A-2 D B1 (new ubcat) DAC1 B-1 Outfalll B-1 B-2 Outfall B-2 Outfall C Routing Diagram for ExistingConditions Prepared by HDR, Inc, Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC ExistingConditions Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Printed 11/15/2021 Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 286.100 78 (A1, A2) 1,259.900 77 (B 1, B2, C1) 1,546.000 77 TOTAL AREA ExistingConditions Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Printed 11/15/2021 Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 0.000 HSG B 0.000 HSG C 0.000 HSG D 1,546.000 Other A1, A2, B1, B2, Cl 1,546.000 TOTAL AREA ExistingConditions Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Printed 11/15/2021 Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.000 0.000 1,546.000 1,546.000 Al , A2, B1, B2, C1 0.000 0.000 0.000 0.000 1,546.000 1,546.000 TOTAL AREA ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 5 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentAl : DA Al SubcatchmentA2: DA A2 SubcatchmentBl: DA B1 SubcatchmentB2: (new Subcat) SubcatchmentCl : DA C1 Link A-1: Outfall A-1 Link A-2: Outfall A-2 Link B-1: Outfalll B-1 Link B-2: Outfall B-2 Link C: Outfall C Runoff Area=235.100 ac 0.00% Impervious Runoff Depth>4.79" Tc=63.3 min CN=78 Runoff=544.52 cfs 93.851 af Runoff Area=51.000 ac 0.00% Impervious Runoff Depth>4.84" Tc=22.0 min CN=78 Runoff=212.86 cfs 20.549 af Runoff Area=439.700 ac 0.00% Impervious Runoff Depth>4.66" Tc=83.4 min CN=77 Runoff=831.96 cfs 170.596 af RunoffArea=80.700 ac 0.00% Impervious Runoff Depth>4.71" Tc=35.0 min CN=77 Runoff=259.40 cfs 31.670 af RunoffArea=739.500 ac 0.00% Impervious Runoff Depth>4.63" Tc=102.9 min CN=77 Runoff=1,219.94 cfs 285.510 af Inflow=544.52 cfs 93.851 af Primary=544.52 cfs 93.851 af Inflow=212.86 cfs 20.549 af Primary=212.86 cfs 20.549 af Inflow=831.96 cfs 170.596 af Primary=831.96 cfs 170.596 af Inflow=259.40 cfs 31.670 af Primary=259.40 cfs 31.670 af Inflow=1,219.94 cfs 285.510 af Primary=1,219.94 cfs 285.510 af Total Runoff Area = 1,546.000 ac Runoff Volume = 602.176 af Average Runoff Depth = 4.67" 100.00% Pervious = 1,546.000 ac 0.00% Impervious = 0.000 ac ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment Al: DA Al Runoff = 544.52 cfs @ 12.85 hrs, Volume= 93.851 af, Depth> 4.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Area (ac) CN Description * 235.100 78 235.100 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 63.3 60/ 5507' NRCC 24-hr BI Direct Entry, Subcatchment Al: DA Al Hydrograph soot' NCp-4,00yr44-hr Rainfall=7.42 45O- Runoff Area=235�10b ao RpnOff YOlump=p-3.861-af + + aoo— Runs fff tlepth4 719" 1 1 1 35O Tp=03.3 m i n 300:- 250� 200J 150— 100j 50- CN=78 7 r + r + 1 rt 4 1 rt 4 1 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment A2: DA A2 Runoff = 212.86 cfs @ 12.32 hrs, Volume= 20.549 af, Depth> 4.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Area (ac) CN Description 51.000 78 51.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.0 Direct Entry, Subcatchment A2: DA A2 Hydrograph 230,' - T T r 7 7 T r 212.86 cfs 210 ' + N IRC C-2441r- V - soJ' NRCC-100yr--Z4-11r R,1ain,fali=7.4211 180,'fi-RunoffAr-ea=54.-O04lac---_--rt--t 170 1RpncIff 1 ▪ 0 l ,l m -Z6. 514S 111af 150J' 1lanaf€3ept�44" + 140 1 =T 212 0' m � i1n ▪ 1301 1 1 � - 1 1 1 1 1 1 1 3 120 -N=7-8T + r r 1 r 1 100= 90 I I I I 80— — 1 1 J + + L 70J - 60 50 - 40 30 20 10 0 ▪ 1 + - + + 1 7 T + T 1 T T T 11 1 T T T 1 + r 1 1 + I+ 1 4 4 + + 1 1 + + — — + — — 1 — — + — — + 1 1 1 + — — + / • + 1 1 + r • + 4- • + r 1 1 1 1 + y — — + - - r 1 1 1 rt - - + J L L 1 1 1 1 + 1 + r T + 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Runoff ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment B1: DA B1 Runoff = 831.96 cfs @ 13.11 hrs, Volume= 170.596 af, Depth> 4.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Area (ac) CN Description * 439.700 77 439.700 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 83.4 Direct Entry, 900- 850- 800- 750 7OO- 650J 600—:' • 550 ▪ 500 450� 0 u- 400= 350= 300- 250= 200- 150= 100- 50- Subcatchment B1: DA B1 Hydrograph 1 1 1 1 I 1 1 1 1 L 1 i N Rir-24-- r Bt ▪ L NRCC-100yr-24-hr Rainfall R'undff Arela=439.700 ad Runoff Volurn 17-0. -Runff€ 43eptih'48G" Tp=93.4 min CN=77 1 + 1 1 1 L L L L 831.96 cfs 698of =7.42" 7 7 T 7 T ▪ 7 1 ▪ 1 1 1 1 1 1 1 ▪ L 7 1 1 1 L L 1 L LI // 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Runoff ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment B2: (new Subcat) Runoff = 259.40 cfs @ 12.49 hrs, Volume= 31.670 af, Depth> 4.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Area (ac) CN Description 80.700 77 80.700 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 35.0 Direct Entry, Subcatchment B2: (new Subcat) Hydrograph 280-L--/ �r i i 7 7 t r 7 -t 11259.40 cfs I 1 260J NRCC 24-hlr BI 240J' NRCC-100yr-224-her Rainfall=7142"1 220 Runoff Area=80.700 ac 2oo� Runoff Volume=1.670 -r ofII 180J ' Runoff bepth>4.71" 160 Tp=35.0 min CN-77 T 14o,- 60- 40- 2 1 1 i L r 4- Tri 1 iLi L 1 1 L - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Runoff ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment Cl: DA C1 Runoff = 1,219.94 cfs @ 13.37 hrs, Volume= 285.510 af, Depth> 4.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Area (ac) CN Description * 739.500 77 739.500 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 102.9 Direct Entry, 1,300J 1,200� 1,100- 1, 000L- 900" 800- Tp=192T9min 7007' CN=77 Subcatchment C1: DA C1 Hydrograph N N 6007 500- 400- 300— - 2007 = T 100- RCC 24-hr 8 RCC-00Yr-24-hr F ainfal =7 42' unbff Area=39.r0b ac unosff Volume=4,519a unaff iDept-h: 443'1 1,219.94 cfs 5 6 II i 1- r r r it it rt 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Runoff ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 11 Summary for Link A-1: Outfall A-1 Inflow Area = 235.100 ac, 0.00% Impervious, Inflow Depth > 4.79" for NRCC-100yr-24-hr event Inflow = 544.52 cfs @ 12.85 hrs, Volume= 93.851 af Primary = 544.52 cfs @ 12.85 hrs, Volume= 93.851 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 600— 550J 500J 450� 100J 50- 1 L Link A-1: Outfall A-1 Hyd rog raph [inflow Area-215,i QO 1 — 1 L 1544.52 cfs L 1 L L 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) C Inflow ❑ Primary ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 12 Summary for Link A-2: Outfall A-2 Inflow Area = 51.000 ac, 0.00% Impervious, Inflow Depth > 4.84" for NRCC-100yr-24-hr event Inflow = 212.86 cfs @ 12.32 hrs, Volume= 20.549 af Primary = 212.86 cfs @ 12.32 hrs, Volume= 20.549 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link A-2: Outfall A-2 Hyd rog raph 2307:- / - 2204' 210 200� - 190 - 180 170- - 160- / - 150- - 140- - 130i- - 3 1204" z- o 110 u- 100' - 90J, - 80' - 70J - 10 60J - 50J 40- 30= 4 4 1 4 L 4 4 1 4 1 4 L 1 1 1 L 1 1 L _I 212 86 cfs I L f� 0 Ape - .000 12.86 cfs 1 1 4 L L 1 1 L L 4 4 1 L r r L —I t Y Y -rI Y Y Y —IY Y 1 Y Y 41 I I I r r ,.%1 1 1 +I0 II 4 —1 1 1 L 1 / 1 1 1L 1 1 1L 1 l 7 T 1 1 1 1 1 1 1 ' i I. Ti 1r 7 1 1r 1 1 T 0 1 2 3 4 5 6 7 8 9 + 10 11 12 13 14 15 16 17 Time (hours) 18 19 20 21 22 23 24 C Inflow ❑ Primary ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 13 Summary for Link B-1: Outfalll B-1 Inflow Area = 439.700 ac, 0.00% Impervious, Inflow Depth > 4.66" for NRCC-100yr-24-hr event Inflow = 831.96 cfs @ 13.11 hrs, Volume= 170.596 of Primary = 831.96 cfs @ 13.11 hrs, Volume= 170.596 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 900' 850J 800 750- 700'� 650� 600 ' 550� o ▪ 500 3 450J LL 400- 350J 300� 250 - 200- 150= 100� 50 Link B-1: Outfalll B-1 Hyd rog raph I I I II -I + 831.96 cfs Clfiolir Arpa+TVVI��0ia31.96c�A G/ dOI + r + + + + 1- 4- 4- + + + + + Hi- '1- + 1 i +1 1- 1 1 1- + I + 1 1 1- + 1 i + 11 1- 1 1 1- + Hi- '1- 11- i + i + + 4 ~ I 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) C Inflow ❑ Primary ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 14 Summary for Link B-2: Outfall B-2 Inflow Area = 80.700 ac, 0.00% Impervious, Inflow Depth > 4.71" for NRCC-100yr-24-hr event Inflow = 259.40 cfs @ 12.49 hrs, Volume= 31.670 af Primary = 259.40 cfs @ 12.49 hrs, Volume= 31.670 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 0 LL Link B-2: Outfall B-2 Hyd rog raph 280" 260� 2407" 220- 200- 180- 160- 140J 120J 100:" 807" 60= 40= 20- 0 nf10 ,v-Are =$Q I L 4 4 1 iL I I I I l il II L 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Time (hours) 19 20 21 22 23 24 C Inflow ❑ Primary ExistingConditions NRCC 24-hr B NRCC-100yr-24-hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 15 Summary for Link C: Outfall C Inflow Area = 739.500 ac, 0.00% Impervious, Inflow Depth > 4.63" for NRCC-100yr-24-hr event Inflow = 1,219.94 cfs @ 13.37 hrs, Volume= 285.510 of Primary = 1,219.94 cfs @ 13.37 hrs, Volume= 285.510 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 1,3007_ I !If ow Arpa77 1,2007' 1,100� ,ter 1,000� L 900: 800� 700' 6004 5007' 400- r 300- 200 100:- 0 Link C: Outfall C Hyd rog raph 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) C Inflow ❑ Primary ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 16 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentAl : DA Al SubcatchmentA2: DA A2 SubcatchmentBl: DA B1 SubcatchmentB2: (new Subcat) SubcatchmentCl : DA C1 Link A-1: Outfall A-1 Link A-2: Outfall A-2 Link B-1: Outfalll B-1 Link B-2: Outfall B-2 Link C: Outfall C Runoff Area=235.100 ac 0.00% Impervious Runoff Depth>2.70" Tc=63.3 min CN=78 Runoff=307.86 cfs 52.962 af Runoff Area=51.000 ac 0.00% Impervious Runoff Depth>2.73" Tc=22.0 min CN=78 Runoff=121.16 cfs 11.609 af Runoff Area=439.700 ac 0.00% Impervious Runoff Depth>2.60" Tc=83.4 min CN=77 Runoff=463.81 cfs 95.286 af Runoff Area=80.700 ac 0.00% Impervious Runoff Depth>2.63" Tc=35.0 min CN=77 Runoff=145.50 cfs 17.713 af Runoff Area=739.500 ac 0.00% Impervious Runoff Depth>2.59" Tc=102.9 min CN=77 Runoff=679.56 cfs 159.375 af Inflow=307.86 cfs 52.962 af Primary=307.86 cfs 52.962 af Inflow=121.16 cfs 11.609 af Primary=121.16 cfs 11.609 af Inflow=463.81 cfs 95.286 af Primary=463.81 cfs 95.286 af Inflow=145.50 cfs 17.713 af Primary=145.50 cfs 17.713 af Inflow=679.56 cfs 159.375 af Primary=679.56 cfs 159.375 af Total Runoff Area = 1,546.000 ac Runoff Volume = 336.945 af Average Runoff Depth = 2.62" 100.00% Pervious = 1,546.000 ac 0.00% Impervious = 0.000 ac ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment Al: DA Al Runoff = 307.86 cfs @ 12.86 hrs, Volume= 52.962 af, Depth> 2.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description * 235.100 78 235.100 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 63.3 Direct Entry, 340- 320—:' Subcatchment Al: DA Al Hydrograph ▪ 1 1 L I 1 L 300; N 2801.' N 1307.86 cfs RCC 24-fir a RCIC-10yr-24hr Rainfall=5.04' 2607' Runoff-Ar =23 �'Lb0 c 240 -Rub#,Vol un a=296-2 af - - - T • 200 'FI Tc=938 min • 1807' I 0 160=II CN=78 LT__ fi 7 rt r 7 rt 140- 120� ,L 100= 80- 60= z k + + + + + + + 40= zI 20I 0 9 10 11 12 13 14 Time (hours) 15 16 ▪ r ▪ r 7 Y r 17 18 19 20 21 22 T T 4 + T T 4 rt t + rt + 4 + 23 24 • Runoff ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment A2: DA A2 Runoff = 121.16 cfs @ 12.32 hrs, Volume= 11.609 af, Depth> 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description 51.000 78 51.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.0 130-1 120— 110—/ 100-1 90 80 70-- 60-1 50- Direct Entry, Subcatchment A2: DA A2 Hydrograph + 1I —I 121.16 cfs NRCC 24-hr R 2/ 1 1 1 L J 1 NRCIC-10yr-24hr Rainfall=5.p4'"I Runoff Area=51:00b ac I / Runoff iVolunne=11605 at T / gunpffrDe t11>2,73" /T'►c= 2.o min- �.IN=78 ▪ 1 1 1 1 1 1 T 1 L L L L 1 1 1 ▪ r 9 10 11 12 13 14 15 16 1 Time (hours) + 4 1 4 7 18 19 20 21 22 23 24 • Runoff ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment B1: DA B1 Runoff = 463.81 cfs @ 13.14 hrs, Volume= 95.286 af, Depth> 2.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description * 439.700 77 439.700 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 83.4 Direct Entry, Subcatchment B1: DA B1 Hydrograph 500J T 480 r 460- T _N 440 420; -NRCC--10yr 24-hr`- Ra inf al � =5. 1" - - 0J 380JT RUnOff!�rAr01430.760 _aC 7 T 38-- 360 RUiibff iVoi un a 9-5,28S of - - - t 340;- 1r I I I I I I I I I 320 L Runoff-Deptt >2�-6-0!I 1 1 _L w 300---/ T y �. I I I I I I 13280J - -Tc=,,,,, 4 m n- 1 I 1 1 _L O 20� T CN=77 4 1 1 1 1 4 240� �- 1 1 _L L L 1 _L LL 220= T 200 ) 180° T I I I I I I I 160: 1 I 1 4 _L 1 I I 1 1 _L 140� 120=k 100 80° r 60- T I I I I I 40= k 1 1 _L 1 L 1 L L I 1 7 7 T r 1 1 1 7 T T 1 /'► 1 1 _L I I 1 4 1 463.81 c RCC 7.4- r17 20J 0- 1 L I I I 1 L 7 T r 1 7 T 1 1 1 I I I 1 _L 1 1 1 I I I 1 _L 7 T r 1 7 T 1 L L I I I 1 _L 1 1 L I I I 1 _L 1 1 1 I I I 1 _L L I I I 1 _L I 1 I 1 1 I I 1 1 1 1 I I I 1 1 1 1 1 L I I 1 1 1 -- — I— _W I 1 1 L I I I 1 _L 1 1 1 I I I 1 _L I I I I I 1 1 1/ I I 1 1 1 I I 1 1 I I I I I I I I I ii I I I I I I I I 1 4 _L L J 4 _L — l-- L 1 _L 4 4 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Runoff ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment B2: (new Subcat) Runoff = 145.50 cfs @ 12.50 hrs, Volume= 17.713 af, Depth> 2.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description 80.700 77 80.700 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 35.0 Direct Entry, 160 150= Subcatchment B2: (new Subcat) Hydrograph I r r r 1 1 1 1145.50 cfs QNVy_-nr y 140= t NRILII I I I 130Jt NICK-"-0-Vr-24h` Rainfall-=5.94Ir / 120�' RunoffArea=80:170b'ac 11oJ' TRunbffVolunhe17�713 of +I/ 100�r guncilff:Depthi>2.[63''Or (yn 80 ' CN_=-7T a 7n-/ I I I I I I I I 0 ' 60 ' 50J 41 407- 30� 1 20- 0- 1 ✓ r L - I r r r r T I hi HI 11 T L L 1 1 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24 • Runoff ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment Cl: DA C1 Runoff = 679.56 cfs @ 13.39 hrs, Volume= 159.375 af, Depth> 2.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description * 739.500 77 739.500 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 102.9 Direct Entry, Subcatchment C1: DA C1 Hydrograph I L 1 1 L 750- 700J NRCC-144rrB 650: 1 - NKC---1-0yr-24hr Ra1nfalt=5 4'k 600� -Runoff-Area=7 t1.5b0 ac 550' Ru nbfrVol u n}ie=1-59.3?5 500-' 1 1 1 1 1 -i I 1679.56 cfs I I Ti01441 I I I I ? r I I 1 i i r 450— gunpffDeptlp>2,59" Tc= 021.9 min 4007- 1 350J' CN=771 LT_I I I I 300- 1 1 1 1 1 250-1- r ri 1 1 1 1 1 200-'' 11 1 1 1 1 150= 1 1 1 1 1 100r- '11 50= 1 r 0- L L 1-1 L Ir Ir II r 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24 • Runoff ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 22 Summary for Link A-1: Outfall A-1 Inflow Area = 235.100 ac, 0.00% Impervious, Inflow Depth > 2.70" for NRCC-10yr-24hr event Inflow = 307.86 cfs @ 12.86 hrs, Volume= 52.962 af Primary = 307.86 cfs @ 12.86 hrs, Volume= 52.962 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs N o 0 E 3407" 320� 300/ 280� 260/ 240/ 220/ 200/ 180/ 160= 140= 120- 100= Link A-1: Outfall A-1 Hyd rog raph 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) C Inflow ❑ Primary ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 23 Summary for Link A-2: Outfall A-2 Inflow Area = 51.000 ac, 0.00% Impervious, Inflow Depth > 2.73" for NRCC-10yr-24hr event Inflow = 121.16 cfs @ 12.32 hrs, Volume= 11.609 af Primary = 121.16 cfs @ 12.32 hrs, Volume= 11.609 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 0 LL 130- 120- 100J 907- 801- 70-' 60- 50J 40J 30- 20� 10J 0 Link A-2: Outfall A-2 Hyd rog raph nff ow Area,= t, 121.16 cfs I - III II 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) L 7 C Inflow ❑ Primary ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 24 Summary for Link B-1: Outfalll B-1 Inflow Area = 439.700 ac, 0.00% Impervious, Inflow Depth > 2.60" for NRCC-10yr-24hr event Inflow = 463.81 cfs @ 13.14 hrs, Volume= 95.286 af Primary = 463.81 cfs @ 13.14 hrs, Volume= 95.286 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 500" 450- 400- 350— 300:" 250-1" 200J 150— 100- Link B-1: Outfalll B-1 Hyd rog raph 4 4 Inflow Ara=439 700 0 4 50- 0 fl/•lll/(• • 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Time (hours) 4 4 1- I 4 4 14 15 16 17 18 19 20 21 22 23 24 C Inflow ❑ Primary ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 25 Summary for Link B-2: Outfall B-2 Inflow Area = 80.700 ac, 0.00% Impervious, Inflow Depth > 2.63" for NRCC-10yr-24hr event Inflow = 145.50 cfs @ 12.50 hrs, Volume= 17.713 af Primary = 145.50 cfs @ 12.50 hrs, Volume= 17.713 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link B-2: Outfall B-2 Hyd rog raph 160, 150- 140- 130� 120- 110- 100- 90� 80- 70� 60- 50- 40� 30 20J 10- -;:or 1 ;T T nfloW area=$0. T 0 1 2 3 4 5 T i i T 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) C Inflow ❑ Primary ExistingConditions NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 26 Summary for Link C: Outfall C Inflow Area = 739.500 ac, 0.00% Impervious, Inflow Depth > 2.59" for NRCC-10yr-24hr event Inflow = 679.56 cfs @ 13.39 hrs, Volume= 159.375 af Primary = 679.56 cfs @ 13.39 hrs, Volume= 159.375 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 7507" 700 650- 6001: 5507" 500� 450� 400- 350- 300'. 2507." 200- 150= 100 50 0 Link C: Outfall C Hyd rog raph 1_ L 4 1 1 4 r 679.56 cfs 1 1 1 tnf!oi Ares+-745 a0679 i i i r L 1 II- 4 'T r I I I 4- 1- 4 II 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) C Inflow ❑ Primary STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Appendix D — Proposed RCN 4 I November 15, 2021 Greensboro Megasite 01 Curve Numbers Date: 11/15/2021 By: LVL Basin "Al" Existing Land Use Cover Type Area % CN Wtd. CN Impervious 44.3 ac 44.6% 97 43.24 Grass (D soils) 55.0 ac 55.4% 92 50.99 Total 99.3 ac 100.0% 94.23 Composite CN 94.23 Use CN = 94.2 Basin "A2" Existing Land Use Cover Type Area % CN Wtd. CN Impervious 66.3 ac 52.9% 97 51.34 Grass (D Soils) 59.0 ac 47.1% 92 43.30 Total 125.3 ac 100.0% 94.65 Composite CN 94.65 Use CN = 94.6 Basin "A3.U" Future Land Use Cover Type Area % CN Wtd. CN Cultivated Crops (C Soils) 0.8 ac 1.4% 82 1.17 Deciduous Forest (C Soils) 0.9 ac 1.8% 66 1.16 Developed, Open Space (C Soils) 0.1 ac 0.1% 78 0.08 Hay/Pasture (C Soils) 3.0 ac 5.5% 73 4.03 Cultivated Crops (D Soils) 9.1 ac 17.0% 86 14.58 Deciduous Forest (D Soils) 33.5 ac 62.3% 73 45.46 Hay/Pasture (D Soils) 7.8 ac 14.6% 79 11.51 Mixed Forest (D Soils) 0.4 ac 0.7% 73 0.49 Total 53.9 ac 100.0% 76.08 Composite CN 76.08 Use CN = 76.1 Greensboro Megasite 01 Curve Numbers Date: 11/15/2021 By: LVL Basin "A4.U" Future Land Use Cover Type Area % CN Wtd. CN Cultivated Crops (C Soils) 2.0 ac 5.5% 82 4.50 Deciduous Forest (C Soils) 0.4 ac 1.0% 66 0.64 Developed, Open Space (C Soils) 0.1 ac 0.2% 78 0.18 Hay/Pasture (C Soils) 1.5 ac 4.0% 73 2.91 Cultivated Crops (D Soils) 0.0 ac 0.0% 86 0.00 Deciduous Forest (D Soils) 6.8 ac 18.5% 73 13.47 Developed, Low Intensity (D Soils) 0.9 ac 2.3% 93 2.16 Developed, Medium Intensity (D Soils) 0.2 ac 0.6% 94 0.56 Developed, Open Space (D Soils) 4.5 ac 12.2% 84 10.28 Evergreen Forest (D Soils) 0.9 ac 2.5% 73 1.82 Hay/Pasture (D Soils) 14.7 ac 39.8% 79 31.45 Mixed Forest (D Soils) 4.3 ac 11.6% 73 8.48 Open Water 0.7 ac 1.8% 100 1.80 Woody Wetlands (D Soils) 0.0 ac 0.0% 86 0.00 Total 37.0 ac 100.0% 78.25 Composite CN 78.25 Use CN = 78.3 Basin "B1" Existing Land Use Cover Type Area % CN Wtd. CN Impervious 177.9 ac 63.8% 97 61.89 Grass (D soils) 100.9 ac 36.2% 92 33.30 Total 278.8 ac 100.0% 95.19 Composite CN 95.19 Use CN = 95.2 Basin "B2.U" Future Land Use Cover Type Area % CN Wtd. CN Deciduous Forest (D Soils) 25.0 ac 74.4% 73 54.33 Developed, Low Intensity (D Soils) 0.1 ac 0.3% 93 0.26 Developed, Open Space (D Soils) 0.2 ac 0.5% 84 0.39 Evergreen Forest (D Soils) 1.6 ac 4.8% 73 3.53 Hay/Pasture (D Soils) 0.8 ac 2.5% 79 2.00 Mixed Forest (D Soils) 5.8 ac 17.3% 73 12.61 Open Water 0.1 ac 0.2% 100 0.18 Total 33.5 ac 100.0% 73.31 Composite CN 73.31 Use CN = 73.3 Greensboro Megasite 01 Curve Numbers Date: 11/15/2021 By: LVL Basin "B3.U" Future Land Use Cover Type Area % CN Wtd. CN Deciduous Forest (C Soils) 0.8 ac 1.3% 66 0.85 Hay/Pasture (C Soils) 3.8 ac 6.1% 73 4.47 Deciduous Forest (D Soils) 34.8 ac 56.2% 73 41.04 Evergreen Forest (D Soils) 0.8 ac 1.2% 73 0.90 Hay/Pasture (D Soils) 17.0 ac 27.5% 79 21.74 Mixed Forest (D Soils) 4.7 ac 7.6% 73 5.52 Open Water 0.0 ac 0.1% 100 0.06 Total 62.0 ac 100.0% 69.25 Composite CN 69.25 Use CN = 69.3 Basin "Cl" Future Land Use Cover Type Area % CN Wtd. CN Impervious 110.4 ac 39.6% 97 38.42 Grass (D soils) 144.0 ac 51.6% 92 47.50 Total 254.4 ac 91.2% 85.92 Composite CN 85.92 Use CN = 85.9 Basin "C2" Existing Land Use Cover Type Area % CN Wtd. CN Impervious 214.9 ac 77.1% 97 74.77 Grass (D soils) 64.5 ac 23.1% 92 21.28 Total 279.4 ac 100.2% 96.05 Composite CN 96.05 Use CN = 96.0 Greensboro Megasite 01 Curve Numbers Date: 11/15/2021 By: LVL Basin "C2.U" Future Land Use Cover Type Area % CN Wtd. CN Developed, Low Intensity (B Soils) 0.1 ac 0.1% 88 0.06 Developed, Medium Intensity (B Soils) 0.2 ac 0.1% 89 0.09 Hay/Pasture (B Soils) 0.4 ac 0.2% 61 0.14 Deciduous Forest (C Soils) 6.7 ac 3.6% 66 2.40 Developed, Low Intensity (C Soils) 2.9 ac 1.6% 90 1.42 Developed, Open Space (C Soils) 2.5 ac 1.4% 78 1.06 Evergreen Forest (C Soils) 0.3 ac 0.2% 66 0.11 Hay/Pasture (C Soils) 31.0 ac 16.9% 73 12.35 Herbaceous (C Soils) 1.9 ac 1.0% 75 0.77 Mixed Forest (C Soils) 3.4 ac 1.9% 66 1.23 Shrub/Scrub (C Soils) 3.2 ac 1.7% 55 0.95 Deciduous Forest (D Soils) 40.8 ac 22.3% 73 16.25 Developed, High Intensity (D Soils) 0.4 ac 0.2% 94 0.23 Developed, Low Intensity (D Soils) 3.0 ac 1.6% 93 1.53 Developed, Medium Intensity (D Soils) 1.2 ac 0.7% 94 0.63 Developed, Open Space (D Soils) 11.9 ac 6.5% 84 5.45 Evergreen Forest (D Soils) 5.0 ac 2.7% 73 1.98 Hay/Pasture (D Soils) 53.1 ac 29.0% 79 22.91 Herbaceous (D Soils) 0.5 ac 0.2% 85 0.21 Mixed Forest (D Soils) 4.6 ac 2.5% 73 1.83 Shrub/Scrub (D Soils) 9.9 ac 5.4% 62 3.34 Open Water 0.3 ac 0.1% 100 0.14 Total 183.0 ac 100.0% 75.10 Composite CN 75.10 Use CN = 75.1 Greensboro Megasite 01 Curve Numbers Date: 11/15/2021 By: LVL Basin "C3.U" Future Land Use Cover Type Area % CN Wtd. CN Deciduous Forest (C Soils) 41.8 ac 25.7% 66 16.99 Developed, Low Intensity (C Soils) 0.1 ac 0.1% 90 0.07 Developed, Medium Intensity (C Soils) 0.1 ac 0.1% 93 0.08 Developed, Open Space (C Soils) 2.5 ac 1.6% 78 1.22 Hay/Pasture (C Soils) 13.9 ac 8.6% 73 6.26 Herbaceous (C Soils) 0.4 ac 0.3% 75 0.19 Mixed Forest (C Soils) 4.1 ac 2.5% 66 1.66 Woody Wetlands (C Soils) 0.5 ac 0.3% 86 0.24 Deciduous Forest (D Soils) 59.1 ac 36.4% 73 26.55 Developed, Low Intensity (D Soils) 0.7 ac 0.5% 93 0.43 Developed, Open Space (D Soils) 2.2 ac 1.4% 84 1.16 Evergreen Forest (D Soils) 14.3 ac 8.8% 73 6.42 Hay/Pasture (D Soils) 18.9 ac 11.6% 79 9.17 Mixed Forest (D Soils) 3.5 ac 2.2% 73 1.58 Open Water 0.2 ac 0.1% 100 0.09 Total 162.4 ac 100.0% 72.14 Composite CN 72.14 Use CN = 72.1 STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Appendix E — Proposed Pond Calculations and Grading November 15, 2021 15 7 8 \ I 1 rfravvrin - //;•-,":;___,7:-/6/1?p/(01/101/./ el �.JJf)f�llj(11/flljr�� �` / 7. PROPOSED STORM µ PIPING (TYP),T ‘ Vs ��7j1/S" OHE ��Ls='—'\:.N)(:—L.:11\-!*-41":1717-117(11;:------;'. 1 s rrr �rn ♦ ♦ I, EXISTING, j/ DRAINAGE AREA (TYP) i �^_ r t_ \ ` , �11'.111 still' \ iJ \\'\\.t --- •— i 1 1 ' ' 11 1_ POND B1 0 0 Oka r zz f� ))1 j 4_ fl; !! ass'^.lid\` EXISTING STREAM (TYP) A1\ )\; f 2.711jc- ))\\\A�,i�yJ\1 S) t ` f I UNDERDRAIN / 1 1` _/\\ ` INSTALLED IN < < \�lr FILLED STREAM BED FOR GROUND WATER RELIEF, TYP. j. t. l r "/:(\•1 -;\ • Jlavy2 � ////)/// -s- r F'/ (J((/f ,r/r,'{�'�'NI'� \�c(���\;=—r�\\\��1�%�inrrifl11�\ f�{/\�`-��i'>,`,1) 1iS 1�) t //I� / ) ) / �. \ \ r �����.=-.�f�f j i��--ter--' ( 'iram l(l i/r //r r \�� i\(� if ram, '� t � tit/,rI//1 !r/\ltl���•����_ �r� /i �i s �Jt j l(////� �� (li( � �) ����ItI�/ /cf/1/)(t -) \ C �1(/a�� /((c .•\c �� 1 /)�f i� �r(\'``'. (trrAj 1 \ S 1 s r ji ll�j// J1 �:1,1/ �\l�(pI � 15 0� ��` r1, )55Jf ��fll//(l�{16Silf 'l) J/ HDR Engineering Inc. of the Carolinas 440 S. Church Street, Suite 1000 Charlotte, NC 28202 704.338.6700 N.C.B.E.L.S. License Number: F-0116 ISSUE DATE DESCRIPTION PROJECT MANAGER VICKIE M. MILLER, AICP, PWS PROJECT ENGINEER DAVID BAKER, PE DESIGN ENGINEER WES TURLEY, PE DRAWN BY JENNIFER PALONI, EIT DRAWN BY JACOB RUDISILL CHECKED BY ROBERT BAYSDEN, PE PROJECT NUMBER 10068163 GREENSBORO RANDOLPH MEGASITE FOUNDATION GREENSBORO RANDOLPH MEGASITE RANDOLPH COUNTY, NORTH CAROLINA 0 1" STORMWATER EXHIBIT OVERALL 2,, FILENAME SCALE 01 C-BG01-08.dwg 1 "=500' SHEET 1 1 2 / 1 �i / / / * / , o r I / I \ /I 1 // // \ � \ 1 1 1 I FOREBAY // I MAIN POOL BOTTOM OF SHELF EL 677.5 NORMAL POOL EL 678 SURFACE AREA 168,544 SF TOP OF SHELF EL 678.5 / sol • / / / // ( / / / r / / 1 / N. \ \\ / ( � \ / /'- / x\ \ , \\ \\ ) % // // / — • \ \ \ \ \ \ \ / // \ \ \ / / / I ----- \ \ / \ \ \ ( ) -� 1 1 -� \ \ jj ( l //1\� \ \ \\ ) ) —\ \ / / r / ---� \ 1 /// I I ////N —s N_ / / / / / I II\1 /I�r//' — . \\ / j I I r — �\ / �/ %�-T77(F» )'�..f�// ^\ \ \\ / / / / / / )/ to ,N\ -.. / // //// / r �.\ \ / (I I 1 1 1IJ — \ —\: J�f� s. / / i 1 //// ///,„ rINV671. j▪ /r// / /( \ I 1 // I it,, I rti l lr 1i11�11�� �rLe.r.Y�`ry �� � 1 OUTLET ��� �%% / / / PROTECTION .'�� 1y i� r 4.3_ �, / 11 l III'a� , / //�/ // / ) 101 3 TOP OF BE M EL 692 --\ \ N X. v vram \ 1\ \ A 710 \\ \ r \ i \ �1 \ \ \ \ \ ` \ 700 \\ \ \ / \ .- \mil \ \\ \ / I \ \� oN \ \ \ 1 \ \ ~\-1 \ \ \ 690 ONE / \,\ \ �oXo „ _ \ \ / — \\\ \\ \ `680 \�\ `.- �—. -�— \,\ / ` `..)y/) \ \ 1 e \` - �\ \�� -�� // 670 - �. �\Ns. _ // / / 00 s-_-_ \ �----. - - — // y �` .�- - -\ \\� -'_ e 1 660 _ s \\ 1 _ t • ` 1 HDR Engineering Inc. of the Carolinas 440 S. Church Street, Suite 1000 Charlotte, NC 28202 704.338.6700 N.C.B.E.L.S. License Number: F-0116 ISSUE DATE DESCRIPTION 4 NORMAL POOL • EL 678 5 1 6 1 7 1 8 WATER QUALITY VOLUME EL 681 SEDIMENT STORAGE EL 672 o O CCO .- 0 0 cP L) if 03 a- 0 o EE CO CO CD 0) 0) 0) 0) CD 414 LF 60" @ 0.24% N r M C▪ Y) N 00 CO co co CO CO CO co co 0 0 co o Lij w z b 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 PROJECT MANAGER VICKIE M. MILLER, AICP, PWS PROJECT ENGINEER DAVID BAKER, PE DESIGN ENGINEER WES TURLEY, PE DRAWN BY JENNIFER PALONI, EIT DRAWN BY JACOB RUDISILL CHECKED BY ROBERT BAYSDEN, PE PROJECT NUMBER 10068163 GREENSBORO RANDOLPH MEGASITE FOUNDATION GREENSBORO RANDOLPH MEGASITE RANDOLPH COUNTY, NORTH CAROLINA 0 1" STORMWATER EXHIBIT WET POND A3 2" FILENAME SCALE 01 C-BG01-08.dwg 1 "=60' SHEET D C B A Source: NCDEQ Stormwater Design Manual, C-3. Wet Pond - April 2017 MDC 1-2 Main Pool Surface Area, Volume, and Depth Total Drainage Area to Pond (ac) = 224.60 Post -Developed Impervious Area (ac) = 110.60 Average Pool Depth Davg (ft) = 4.8 Pond Bottom Elevation (ft) = 672.00 Bottom of Sediment Storage Elevation (ft) = 671.00 Permanent Pool elevation (ft) = 678.00 Ratio (SAIDA) for Davg 1.31 Surface Area Required (ft2) 128165 Surface Area Provided (ft2) 168544 or 49.2 2.94226 acres Table 1: Piedmont and Mountain SAIDA Table % Permanent Pool Average Depth (ft) Impervious 3.0 4.0 5.0 6.0 7.0 8.0 10 0.51 0.43 0.37 0.30 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.40 30 1.17 0.94 0.84 0.72 0.61 0.56 40 1.51 1.24 1.09 0.91 0.78 0.71 50 1.79 1.51 1.31 1.13 0.95 0.87 60 2.09 1.77 1.49 1.31 1.12 1.03 70 2.51 2.09 1.80 1.56 1.34 1.17 72 2.59 2.15 1.85 1.61 1.40 1.22 80 2.92 2.41 2.07 1.82 1.62 1.40 90 3.25 2.64 2.31 2.04 1.84 1.59 100 3.55 2.79 2.52 2.34 2.04 1.75 Average Pond Depth Davg = VPP-Vshei f Abottornofshelf Where: Davy Vehelf = Where: Vpp Vsher Ahoxom at shelf = Average depth in feet Total volume of permanent pool (feet') Volume over the shelf only (feet') see below Area of wet pond at the bottom of the shelf (feet=) 0.5 * Depthmax aver shelf * Perimeters,,, pcpf * Widths bmerged pan of shelf Dmax over shed Perimeterpem,anant pod = Wldthsubmerged part of shelf = Depth of water at the deep side of the shelf as measured at permanent pool (feet) Perimeter of permanent pool at the bottom of the shelf (feet) Width from the deep side to the dry side of the shelf as measured at permanent pool (feet) Volume of Perm Pool Vpp (ft3)= 783488 Shelf Bottom Area Abot (ft3)= 164112 Max Pool Depth Above Shelf Dmax (ft)= 0.5 Perimeter of Shelf Bottom Pperm (ft)= 1394 Width of Submerged Shelf W sub (ft)= 3.0 Volume Over Shelf Vshelf (ft3)= 1046 Average Depth Davg (ft)= 4.77 Water Quality Volume Rv Where: DV Where: 0.05 + 0.9 * IA Rv IA = Runoff coefficient (unitless) Impervious fraction (unitless) 3630*Ro*Rv*A DV RD A = Design volume (cu ft) Design storm depth (in) Drainage area (ac Runoff Coefficient Rv= 0.5 Design Storm Depth RD (in)= 1.0 Water Quality Volume (ft3)= 402095 Depth of Water Quality Volume Release (ft) 3.00 or 9.2 3.1 ac-ft acres Orifice Sizing WQv Stage in Pond (ft) 681.00 WQv Release Period (days) 4.0 WQv Release Rate (cfs) 1.16 Avg Head (ft) = (WQv Elev - Perm Pool Elev) 12 = 1.50 Estimated Orifice Diameter (in) 6.0 Orifice Diameter Provided (in) 6.0 Actual Release Rate (cfs) 1.16 Actual WQv Release Period (days) 4.0 Pond Grading Normal Pool Stage - Storage Data Elevation Surface Area (sf) Area (ac-ft) Inc. Vol. (ac- ft) Total Vol. (ac-ft) Det. Vol. (ac- ft) Notes 672.00 99117 2.28 0.000 674.00 113009 2.59 4.870 4.870 676.00 144060 3.31 5.901 10.771 677.50 164112 3.77 5.306 16.077 BS 678.00 168544 3.87 1.909 17.986 0.00 NP 678.50 175477 4.03 1.974 19.961 1.97 TS 680.00 183296 4.21 6.177 26.138 8.15 681.00 188578 4.33 4.269 30.407 12.42 WQv 682.00 193916 4.45 4.390 34.797 16.81 684.00 204761 4.70 9.152 43.949 25.96 686.00 215830 4.95 9.655 53.605 35.62 688.00 227123 5.21 10.169 63.774 45.79 690.00 238641 5.48 10.692 74.466 56.48 692.00 250383 5.75 11.226 85.693 67.71 Top Forebay Design Elevation Surface Area (sf) Area (ac-ft) Inc. Vol. (ac- ft) Total Vol. (ac-ft) % of Pool Volume Notes 674.00 5566 0.37 0.000 675.00 16191 0.64 0.250 0.250 1% 676.00 27988 0.90 0.507 0.757 4% 677.00 39214 0.96 0.771 1.528 9% 678.00 41815 0.00 0.930 2.458 16% Scour Hole Calculations Project Name: Greensboro -Randolph Megasite Project No. : Sheet Title : Pond A3 Originated By : Checked By: QA /QC Verification KET Date: Date: Date: November 10, 2021 Description Units Input Calculation Source Notes Q10 cfs 195 From HydroCAD pond routing Diameter Pipe inches 60 Design Manning's "n" 0.013 RCP Slope Pipe FT/FT 0.0048 Design Outlet Invert Elevation FT 670 Design Normal Depth FT 5 Pipe flowing full - see partial flow depth chart at right Velocity at Normal Depth fps 9.93 Tailwater Elevation FT 675 Assumed tailwater TW/D 1.00 Q/D^2.5 3.5 Yo/D 0.70 HEC 14, Figure III-10 Yo=Ye FT 3.5 Area at Ye FT2 13.51 From partial flow depth chart Velocity (V=Q/A) fps 14.43 RIP -RAP D50 FT 1.2 Class II D50/Ye 0.34 "FROUDE #" 1.36 hs/Ye 0.9 HEC 14, Figure X1-2 hs FT 3.15 Dispersion Pool Length FT 31.50 Apron Width FT 15.75 Depth of RIP -RAP Entrance Slope FT 3.60 Depth of RIP -RAP in Basin FT 2.40 Stormwater Exhibit 1 2 3 4 5 6 7 1 8 a/ t ����\ ���—\ 1\ I I / / l l 1 1 1 \ \ \ \ �`\ \\ \ \ \\ i / \\ \ �1 \ I \\ —\\ \ \1 / I I 1 1 l l \\\\ \\\ \\ \ \ ) ►. / / 1 ) \ 1 \ \ \ \ \\\I 1 I \�I ./) 1// / / I \ / \ \\ 1) 1\\\\( �� 11\1�\1/�\��\ \ ' 1 I I\I I _ 1 I \ I _-r`,1 / / ///�// / /I \ 1 ) I I ) / J () I / ) I 1 I \ // / /`�^\= / / // / / /� --- / // / / / / / / INV 618 \ \ \ \ i� /� 1 `�N /—� ,/ . \ / / / \ 1 / / / ) \ ` 1 \ ��—///�\ \\ \\\ / �,/� / // / // //./ // /// / / / / / I I I I / _J \ _\ / INV 604 OUTLET PROTECTION c' l �•-\ // ) ') 111 I \ _ I I (r � / \\ \ (\ / / )1\\l / \\\ \ \ \‘. / \/ // l) 2 ofl\ I ( I 1 1 ► 1 283 L +43.26 1 TOP OF SHELF EL 614.5 NO RMAL POOL EL 614 SURFACE EA 214,613 I / I / / BOTTOM OFISHELF \ \ L613.5 I = 1 t 1 1( l 1 ) I I _ p/ 1, / /I�/ I1\( I 11I 1 / I1Q lI` )I)( //// ///�/I)'// 1?1I 1 I Il / 1r( I/ I I 111 11 11/1 1 II I I / J I II` 11 ` // / / / II 11\I III ( ) /1' //r I /IIII, eI/ / 'TOP OF BERM. 1 I / ' • ; EL622 1 l /l / �// J/'I/' I I 1 / ( 11///l I/I / ///111 Ii/ ' ///// / // / I \ \\ 1\ \ 'y/ // /)/\11\ 11 // // // / 1 I 1 1 )/ ///�/'/;1 / / / ( / / / //y////,/ /� // // / ./v / / / / / / / / / / / /'/ // //// // 1 / / / / / // // /'/ / / l)c l l /' 1 I I l / \ I \ \ \ -INV 608 \4_\ -'/'./� / / / / -+ /// \I/ 1///� / // /// / // %/ / I --i- — // v / / / / 1 1/ I / I I ,'` _ _ __ `.- _ -� _ .i i/ / I / / I I/ / / 1 I 1 1/ / \ / I) / // r __-� _ II I'1I II 1// I1\) 11\ ( / %_ ��` — //"--\ \\ I 111I1 1 I (1 I ( \ \ 1 \ ) ( I \ ` \ ,�_� �� -, 11 / \\\\ 11 \ \ \ I \ \\ o o 660 650 640 630 620 610 600 0+00 0+50 1+00 1+50 CA M CO 2+00 O CO CO 2+50 co N CO N.) CO 3+00 WATER QUALITY VOLUME EL 617 NORMAL POOL EL 614 co CO CO 3+50 O YYT CY) Co 4+00 co CO O CY) CO 4+50 CO CO CO 5+00 O CA N CO 5+50 O O co O Co w o "0 Ro CO 0 N CO 6+00 6+50 CA CY) 7+00 1 .41% c) Co O) O CO 7+50 LO co LC6 0 CO 8+00 v) w u_ O O 0 co �11 W w coz 660 650 640 630 620 610 600 590 8+50 9+00 HDR Engineering Inc. of the Carolinas 440 S. Church Street, Suite 1000 Charlotte, NC 28202 704.338.6700 N.C.B.E.L.S. License Number: F-0116 ISSUE DATE DESCRIPTION PROJECT MANAGER VICKIE M. MILLER, AICP, PWS PROJECT ENGINEER DAVID BAKER, PE DESIGN ENGINEER WES TURLEY, PE DRAWN BY JENNIFER PALONI, EIT DRAWN BY JACOB RUDISILL CHECKED BY ROBERT BAYSDEN, PE PROJECT NUMBER 10068163 GREENSBORO RANDOLPH MEGASITE FOUNDATION GREENSBORO RANDOLPH MEGASITE RANDOLPH COUNTY, NORTH CAROLINA 0 1" STORMWATER EXHIBIT WET POND B2 2., FILENAME SCALE 01 C-BG01-08.dwg 1 "=60' SHEET Greensboro Megasite NC DEQ Wet Pond Analysis Wet Pond B2 Date: Rev: 10/26/2021 By: QC: JP KT Source: NCDEQ Stormwater Design Manual, C-3. Wet Pond - April 2017 MDC 1-2 Main Pool Surface Area, Volume, and Depth Total Drainage Area to Pond (ac) = 279.00 Post -Developed Impervious Area (ac) = 177.90 Average Pool Depth Davg (ft) = 5.2 Pond Bottom Elevation (ft) = 608.00 Bottom of Sediment Storage Elevation (ft) = 607.00 Permanent Pool elevation (ft) = 614.00 Ratio (SAIDA) for Davg 1.55 Surface Area Required (ft2) 188375 Surface Area Provided (ft2) 214613 or 63.8 4.3245 acres Table 1: Piedmont and Mountain SAIDA Table % Permanent Pool Average Depth (ft) Impervious 3.0 4.0 5.0 6.0 7.0 8.0 10 0.51 0.43 0.37 0.30 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.40 30 1.17 0.94 0.84 0.72 0.61 0.56 40 1.51 1.24 1.09 0.91 0.78 0.71 50 1.79 1.51 1.31 1.13 0.95 0.87 60 2.09 1.77 1.49 1.31 1.12 1.03 70 2.51 2.09 1.80 1.56 1.34 1.17 72 2.51 2.09 1.80 1.56 1.34 1.17 80 2.92 2.41 2.07 1.82 1.62 1.40 90 3.25 2.64 2.31 2.04 1.84 1.59 100 3.55 2.79 2.52 2.34 2.04 1.75 Average Pond Depth Doug = Where: %half Where: VPP-Vshelf Abottomofshelf Dav9 Vpp %heir Abo,wm of shelf = Average depth in feet Total volume of permanent pool (feet3) Volume over the shelf only (feet3) - see below Area of wet pond at the bottom of the shelf (feet2) 0.5* ,, , „e, Shah `Perimeters peo, * Width,..brn,d part of shelf Perimeterpe,,,,a„a )pool = Widths„bmereedpen orshell = Depth of water at the deep side of the shelf as measured at permanent pool (feet) Perimeter of permanent pool at the bottom of the shelf (feet) Width from the deep side to the dry side of the shelf as measured at permanent pool (feet) Volume of Perm Pool VPP (ft3)= 1113926 Shelf Bottom Area Abot (ft3)= 211995 Max Pool Depth Above Shelf Dmax (ft)= 0.5 Perimeter of Shelf Bottom perm (ft)= 1874 Width of Submerged Shelf W sub (ft)= 3.0 Volume Over Shelf Vsheif (ft3)= 1406 Average Depth Davg (ft)= 5.25 Water Quality Volume Rv Where: 0.05 + 0.9 ' IA Rv = Runoff coefficient (unitless) IA = Impervious fraction (unitless) DV = 3630*Ro*Rv*A % here DV RD A Design volume (cu ft) Design storm depth (in) = Drainage area (ac) Runoff Coefficient Rv= 0.6 Design Storm Depth RD (in)= 1.0 Water Quality Volume (ft3)= 631838 Depth of Water Quality Volume Release (ft) 3.00 or 14.5 4.8 ac-ft acres Orifice Sizing WQv Stage in Pond (ft) 617.00 WQv Release Period (days) 4.0 WQv Release Rate (cfs) 1.83 Avg Head (ft) = (WQv Elev - Perm Pool Elev) 12 = 1.50 Estimated Orifice Diameter (in) 7.5 Orifice Diameter Provided (in) 7.0 Actual Release Rate (cfs) 1.58 Actual WQv Release Period (days) 4.6 Pond Grading Stage - Storage Data Elevation Surface Area (sf) Area (ac-ft) Inc. Vol. (ac- ft) Total Vol. (ac-ft) Det. Vol. (ac- ft) Notes 608.00 148967 3.42 0.000 610.00 178807 4.10 7.525 7.525 612.00 195255 4.48 8.587 16.112 613.50 211995 4.87 7.012 23.124 BS 614.00 214613 4.93 2.448 25.572 0.00 NP 614.50 223363 5.13 2.514 28.086 2.51 TS 616.00 232041 5.33 7.841 35.927 10.35 617.00 237897 5.46 5.394 41.321 15.75 WQv 618.00 243810 5.60 5.529 46.850 21.28 620.00 255804 5.87 11.470 58.320 32.75 622.00 268025 6.15 12.025 70.345 44.77 Top Forebay Design Elevation Surface Area (sf) Area (ac-ft) Inc. Vol. (ac- ft) Total Vol. (ac-ft) % of Pool Volume Notes 608.00 12287 0.28 0.000 609.00 22118 0.51 0.395 0.395 2% 610.00 30448 0.70 0.603 0.998 4% 611.00 32660 0.75 0.724 1.723 7% 612.00 34945 0.80 0.776 2.499 11% 613.00 37303 0.86 0.829 3.328 15% 614.00 39734 0.91 0.884 4.212 20% Scour Hole Calculations Project Name: Greensboro -Randolph Megastie Project No. : Sheet Title : Pond B2 Originated By : Checked By: QA /QC Verification KET Date: Date: Date: November 15, 2021 Description Units Input Calculation Source Notes Q10 cfs 331 From HydroCAD pond routing Diameter Pipe inches 66 Design Manning's "n" 0.013 RCP Slope Pipe FT/FT 0.0143 Design Outlet Invert Elevation FT 604 Design Normal Depth FT 5.5 Pipe flowing full - see partial flow depth chart at right Velocity at Normal Depth fps 13.93 Tailwater Elevation FT 609 Assumed tailwater TW/D 0.91 Q/D^2.5 4.7 Yo/D 0.66 HEC 14, Figure III-10 Yo=Ye FT 3.63 Area at Ye FT2 16.3471 From partial flow depth chart Velocity (V=Q/A) fps 20.25 RIP -RAP D50 FT 1.2 Class II D50/Ye 0.33 "FROUDE #" 1.87 hs/Ye 0.7 HEC 14, Figure X1-2 hs FT 2.54 Dispersion Pool Length FT 25.41 Apron Width FT 12.71 Depth of RIP -RAP Entrance Slope FT 3.60 Depth of RIP -RAP in Basin FT 2.40 1 2 3 4 5 6 7 8 680 670 660 650 640 630 \\ \\ \\\\ \ X \ \ \\ \\ \\\\ \\ \\\ \ \:\ \ \\ \ \ )Y1\V 654 \\\ \\\\\\\ \\\ \ \ \ \\��\\ I I \\ \\ \\ \ \ ) \ 1 A \ \\\,v v� \ \ /I \\\\(\ (/ / 1 \\\\\\\\\, —. \ I %// I I \/ /i I I \ A 1 I j I I \1 \\\ 1 (/ 7/—/ /) I / I \ 1 II I / 1 I 1 / /) 11 1` r \) \\ j //� ▪ // i 1/ / 1 I 1/ `\1 ( I I �/ I I( I /)\ \ I 1 1 / I II I I `\, ( / // /I l /I \\ I / \ \\ 1 /(/ / 1 I 1 ) I/ -/ 1 � / \ 1 / / / /r / / / 1 ) / / / / / . „FOREB / ////// // / / . \/ / / , \ I \ 1 --i // / / // / / / / / r / s/ %// - 7 / TOP OF SHELF EL 650.5 NORMAL POOL EL 650 SURFACE AREA 386,547 BOTTOM OF SHELF EL 649.5 \ \ 1 \\ y/ \\I \ \ t _ s \\ `I \ I ---- ..--- — \ \ ......\T., , ‘ ,, , , \ -, ...... ._ \ ‘.... s'-'s \ 7 // \\\\ \\ N. e _ r — \ \,—, / / - \ N MAIN POOL - \\ \ \ \ ti\.\ . \,\ \ \� \ \ \. \� \ \-�\\� \N \`— \\�' \ \ \ \\ \ \ \ �_ \ \ '� \ \ \ \ \.""'.... \ \ \ \ / \ \ \ \ \ \ \ \ \ \ \ \\ \\\ \— N. \ \��__I -- \\ \\\\\\� � I1 • i , / I / // / / / //// / 1 /I /I / �/ / / / // //// 1/ / /%/ 7) ( /� // / i j'// / / / / / // 1 - \r/'' / // / / // / // /// / / '/ ki��//' / // //' / / / // /6k0 // /� :///// //,; -7 / /'1 /// / / l I le 1 1 111IX/ ///—/ '//e` \ \ \ 1 ( I 1 1 \ 1 1 \ / /// / / I /,/ \ \ \ \\\ \II 1 11I1/1 1i/ '>/ I ` \ 11'\11 1 1 1 11 11)/ //'i'�/// \ \ \\ \\ (\ \1 \\ \ \ \ \ \� \\ \\ \\\ \\\\\`\\\I'\�. Jx'l \\ \ \ 1 \ \ \ \\\\�\\ \\\\ \\\` \ ` 1\ \ \ \ \\ \ // \ \I \1 \ \ \\\e\\��\\\ \\\ 1 \ \ \ \ \\ \\ \ \ / / 1\1 \ \\\\ \1\\`\\;�\\\\\\\\\\\ \\ \ \/ ) /1// /I //\\ 11\\\\ \1\ I\\\\;1II \\\\ \ �\ \ \\ \/ (1 / //\l \1111II\\1\ \\`\\��\~\\\1 �/ III 1\ 1 1((I \\\1\\\\ 1 I I11\\\\�.\\ \\\1\\1\ _�)eI i�1�'II I\\ \\\\ \ 1\\\\ /— r 1 \ -\fi 1 \ \ \ ) / \ ) \ \ \ — — — --' 1 / / \ 1 \. \? 1t \\\ \I l \\ \\ \\ // // • J/ \- // J (\ \\\\\\ / / z4 1 I \1 \ \ "\\ \\— —'/ /'' �� / \ \ \ \\ — / l \\ \` L. _N N �� �_\ — —_�—▪ / ,� —\\ / I I \ \— / - r O N co 0+00 0+50 CO O CO TY VOLUMr EL 653 NN Cfl CO O O r O 1+00 1+50 O M co 2+00 2+50 1 CO N CO M N x— C4 1 to"' CO N.co 1 3+00 3+50 4+00 NORMAL POOL EL 650 cr) O O ti O (Ni co II.\\ . . . . . . . . . . . . . . I .. / . . . . . \\\ \.\ . I.\. I \ I �_, �\ \\\e / / �1 \ \` \ \\__,-\ ). �. / /1 \ 1 \ \ < \~, \\ \ \ \\ /i_� \. — \�\ \ \ . / . N \—-\\ \\\ \ 1\\ / K� /—— —: , \ \ \1 — \ \ —.---\\ \\ \ \\ I I11 _ // ,�� \— _� \ '1 \ ( / \ / / 7 '\ \ \\, ! I I I I / / / / \ \ ,) \ 1( I 1 \ ( ( \ \ . TOP OF BERM / `\ / / / / \ \ I I 1 \ \ 1 \,/I' -�` \ ) \ / \ 1 \ / I I / / \ \ \ \\ \\\\ \ ) 1 1 I t I 1 / / I I `v/ / //i7. _---\ \ \ \ 1 \ 1 \ I \ \ \ 1 \1 \ 1 I L(\II III/// II ` /////// /;— \\\\\ \ I\ ll\ \ \\ \ I 1 1 \ \ \\\ 1 \ 1 l \\I '1(/ 111(/1 \'// //s /'' T \\\ \\\ \\\ l -( \ \ \ \ \ \ 1 1 1 iII1II/111 /1 ,//�'///'/ I l \\ \ 111\\\ \ \ \� \ \ 1 ) / 1 1// 11I I11I I \:://////////2/1:/ / //// /\\ \\ \ 1 \\` \\ \ ..,\ \ \ \\\ \ // 1 ) /� /I I / I Lil I1// \`\\\`\\\\ \\\�\\\ \\\\e/� / J/I//ll/l \ �/\ / // ///// /// / / / I / /// / ///�./// \ \ > \ \ \\ \\ \\\� \ \ \ 1 \� \ /,/, //// // // / /// r I \ \ 1 \ e \ , , //� / / \ I / I / /// , // /'/ N // // / \ \ I l \ \ \\ \ \ \\\` 1 ....._7 ....... -- ::"- \ , \ \\ \ ) \:\ \ \ \ \\\_ \\\` \\ \\\\ \ 1 I I \‘2-1.1 ‘‘ \ �: \\ \ \ \\ 31 \‘1'\:1-\\\\ \* \I‘N.‘..' \.--::--1:-\-------: -----:'-\ \) \‘ \\\:‘ (‘ \ I T/-r \ \ \ \ \ \ \ \ \ \ \ \ \ \\\ \ \ 1 1 1 13+00 13+36x A \ N\\\ ` \ \ \ 'I \ \ 1 ` \\ 12+00 �.•'�?�'j \\ \\ \ 424LF1+o� I I 1 \ 1\,`\\ \\\\\\ jl // 10+00� \\ ` \ l \ \ \� 1\\�,\\b \\ \\\ \ \ \ \ ti \ ( I 1 L \\ \ \ \\ \ \\ \\ \ \ \ \\ \I �\ I \, I ` \\ \ I 1 1 \ 1 l\\\\ \\\\\ \\\ \\\\\ 1 \ `h I 1 1 1 I \ \\` \ :::\\I\l‘L: \l\\\ I l�\1llI\ I1`I\\\\\\INV 644 / / / 1 e/I 111 � 1 �\11ll11\___, //r" //)// \ly�J\II/(I1I1/ / / /,r/ . // // /�/, r1 \/ // ��/ '/ i// // / \\I /// __ ,.. .. : _ _ __ _ ,_:r:, . .:_ iy //r-?,:; 1; ) , . /.. .:/, - -1 / 7// i i �/i / I ` \\\`` \\ I ___-7 f' i y � /' . . . \\\\N — — —/ ....................... Il. ... / .. 1 ... \. • 4 \ / / \ \\ I, \\ //ii/ /////7 / ii/ / r— / / / /, // // C/ I / I l ( / / l / I \ 1 ( / I / / ,� / SEDIMENT STORAGE yz EL 644 O 00 O Co c0 4+50 5+00 5+50 6+00 6+50 7+00 7+50 cocoO Co co coco I O Co co I 8+00 N- X CV ti 0 0 O M Lc)co \ ,/ I )/ 1 I I 11 1 // / / / ,) / / I I /// // / 1 / /,- // / / // I / /// /// //////////- / / // / /l // / // / 1/ ( % i / / i'// .7 / / / / / / / / // i / / /7 co N O O O M O O 8+50 9+00 9+50 10+00 0 cci N O co u LW 424LF72,, @4.25% \ \ 0 O CO 10+50 co O O co CO co CO N O CM CO 11+00 11+50 12+00 0 W w O Ch CO O Co 12+50 13+00 13+50 680 670 660 650 640 630 HDR Engineering Inc. of the Carolinas 440 S. Church Street, Suite 1000 Charlotte, NC 28202 704.338.6700 N.C.B.E.L.S. License Number: F-0116 ISSUE DATE DESCRIPTION PROJECT MANAGER VICKIE M. MILLER, AICP, PWS PROJECT ENGINEER DAVID BAKER, PE DESIGN ENGINEER WES TURLEY, PE DRAWN BY JENNIFER PALONI, EIT DRAWN BY JACOB RUDISILL CHECKED BY ROBERT BAYSDEN, PE PROJECT NUMBER 10068163 GREENSBORO RANDOLPH MEGASITE FOUNDATION GREENSBORO RANDOLPH MEGASITE RANDOLPH COUNTY, NORTH CAROLINA 0 1" STORMWATER EXHIBIT WET POND C2 2" FILENAME SCALE 01 C-BG01-08.dwg 1 "=60' SHEET Source: NCDEQ Stormwater Design Manual, C-3. Wet Pond - April 2017 MDC 1-2 Main Pool Surface Area, Volume, and Depth Total Drainage Area to Pond (ac) = 533.80 Post -Developed Impervious Area (ac) = 325.30 Average Pool Depth Davg (ft) = 4.6 Pond Bottom Elevation (ft) = 644.00 Bottom of Sediment Storage Elevation (ft) = 643.00 Permanent Pool elevation (ft) = 650.00 Ratio (SAIDA) for Davg 1.49 Surface Area Required (ft2) 346460 Surface Area Provided (ft2) 386547 or 60.9 7.95362 acres Table 1: Piedmont and Mountain SAIDA Table % Permanent Pool Average Depth (ft) Impervious 3.0 4.0 5.0 6.0 7.0 8.0 10 0.51 0.43 0.37 0.30 0.27 0.25 20 0.84 0.69 0.61 0.51 0.44 0.40 30 1.17 0.94 0.84 0.72 0.61 0.56 40 1.51 1.24 1.09 0.91 0.78 0.71 50 1.79 1.51 1.31 1.13 0.95 0.87 60 2.09 1.77 1.49 1.31 1.12 1.03 70 2.51 2.09 1.80 1.56 1.34 1.17 72 2.59 2.15 1.85 1.61 1.40 1.22 80 2.92 2.41 2.07 1.82 1.62 1.40 90 3.25 2.64 2.31 2.04 1.84 1.59 100 3.55 2.79 2.52 2.34 2.04 1.75 Average Pond Depth Davg = Where: Vs het( = VPP-Vshelf Abottomo fshelf Davg Vpp Vshelf = Abottom shelf = Average depth in feet Total volume of permanent pool (feet3) Volume over the shelf only (feet3) - see below Area of wet pond at the bottom of the shelf (feet;) 0.5 ' De p th max over shelf * Peri mete rperm poo, " Width submerged part of shelf Where: Dmexover shelf = Perimeterpem,anent pod Wldthsubmerged part of shelf = Depth of water at the deep side of the shelf as measured at permanent pool (feet) Perimeter of permanent pool at the bottom of the shelf (feet) Width from the deep side to the dry side of the shelf as measured at permanent pool (feet) Volume of Perm Pool Vpp (ft3)= 1763487 Shelf Bottom Area Abot (ft3)= 380777 Max Pool Depth Above Shelf D. (ft)= 0.5 Perimeter of Shelf Bottom Pperm (ft)= 2417 Width of Submerged Shelf W sub (ft)= 3.0 Volume Over Shelf Vshelf (ft3)= 1813 Average Depth Davg (ft)= 4.63 Water Quality Volume Rv Where: 0.05 + 0.9 * IA Rv IA Runoff coefficient (unitless) Impervious fraction (unitless) DV = 3630*Rc*Rv*A Where: DV RD A Design volume (cu ft) Design storm depth (in) Drainage area (ac) Runoff Coefficient Rv= 0.6 Design Storm Depth RD (in)= 1.0 Water Quality Volume (ft3)= 1159640 Depth of Water Quality Volume Release (ft) 3.00 or 26.6 8.9 ac-ft acres Orifice Sizing WQv Stage in Pond (ft) 653.00 WQv Release Period (days) 4.0 WQv Release Rate (cfs) 3.36 Avg Head (ft) = (WQv Elev - Perm Pool Elev) 12 = 1.50 Estimated Orifice Diameter (in) 10.2 Orifice Diameter Provided (in) 10.0 Actual Release Rate (cfs) 3.22 Actual WQv Release Period (days) 4.2 Stage - Storage Data Elevation Surface Area (sf) Area (ac-ft) Inc. Vol. (ac- ft) Total Vol. (ac-ft) Det. Vol. (ac- ft) Notes 644.00 223281 5.13 0.000 646.00 260873 5.99 11.115 11.115 648.00 309169 7.10 13.086 24.201 649.50 380777 8.74 11.879 36.080 BS 650.00 386547 8.87 4.404 40.484 0.00 NP 650.50 395416 9.08 4.488 44.972 4.49 TS 652.00 406548 9.33 13.808 58.780 18.30 653.00 414041 9.51 9.419 68.199 27.71 WQv 654.00 421590 9.68 9.592 77.791 37.31 656.00 436857 10.03 19.707 97.498 57.01 657.50 448455 10.30 15.243 112.741 72.26 Top Forebay Design Elevation Surface Area (sf) Area (ac-ft) Inc. Vol. (ac- ft) Total Vol. (ac-ft) % of Pool Volume Notes 644.00 6348 0.15 0.000 645.00 19104 0.44 0.292 0.292 1% 646.00 33452 0.77 0.603 0.895 2% 647.00 45890 1.05 0.911 1.806 5% 648.00 71058 1.63 1.342 3.149 8% 649.00 74435 1.71 1.670 4.819 14% 650.00 77890 1.79 1.748 6.567 19% Scour Hole Calculations Project Name: Greensboro -Randolph Megastie Project No. : Sheet Title : Pond C2 Originated By : Checked By: QA /QC Verification KET Date: Date: Date: December21, 2021 Description Units Input Calculation Source Notes Q10 cfs 388 From HydroCAD pond routing Diameter Pipe inches 72 Design Manning's "n" 0.013 RCP Slope Pipe FT/FT 0.0425 Design Outlet Invert Elevation FT 626 Design Normal Depth FT 6 Pipe flowing full - see partial flow depth chart at right Velocity at Normal Depth fps 13.72 Tailwater Elevation FT 630 Assumed tailwater TW/D 0.67 Q/D^2.5 4.4 Yo/D 0.80 HEC 14, Figure III-10 Yo=Ye FT 4.8 Area at Ye FT2 22.7448 From partial flow depth chart Velocity (V=Q/A) fps 17.06 RIP -RAP D50 FT 1.2 Class II D50/Ye 0.25 "FROUDE #" 1.37 hs/Ye 1 HEC 14, Figure X1-2 hs FT 4.80 Dispersion Pool Length FT 48.00 Apron Width FT 24.00 Depth of RIP -RAP Entrance Slope FT 3.60 Depth of RIP -RAP in Basin FT 2.40 1 2 3 4 5 6 7 1 8 1 \ ,18‘N ��i'" ////; '/'",' - 2 1 \ irk/4,1!//////ii�� )j 1l111//�/ 1� 11111/1I11 1// /1�` /l/%/6/r /( 1 it►, ) 1 \l ` , \\�`� �• 1 a i \ 11 p ( '�\ / HDR Engineering Inc. of the Carolinas 440 S. Church Street, Suite 1000 Charlotte, NC 28202 704.338.6700 N.C.B.E.L.S. License Number: F-0116 ISSUE DATE DESCRIPTION PROJECT MANAGER VICKIE M. MILLER, AICP, PWS PROJECT ENGINEER DAVID BAKER, PE DESIGN ENGINEER WES TURLEY, PE DRAWN BY JENNIFER PALONI, EIT DRAWN BY JACOB RUDISILL CHECKED BY ROBERT BAYSDEN, PE PROJECT NUMBER 10068163 GREENSBORO RANDOLPH MEGASITE FOUNDATION GREENSBORO RANDOLPH MEGASITE RANDOLPH COUNTY, NORTH CAROLINA 0 1" STORMWATER EXHIBIT DRY PONDS 2" FILENAME SCALE 01 C-BG01-08.dwg 1"=150' SHEET STORMWATER MANAGEMENT PLAN GREENSBORO-RANDOLPH MEAGASITE Appendix E — Proposed Condition Model Results 6 I November 15, 2021 DA Al <Subca> DW A2 Pon A3 A-1 A-2 Outfall Al Outfall A2 Reach <B2.0 DA B2 Pon B1 B2 B-1 Total DA B DA B3. U B-2 Outfall B2 -A Total DA C Routing Diagram for ProposedConditions 11.10.21 Prepared by HDR, Inc, Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Printed 11/15/2021 Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 99.300 94 (A1) 404.100 95 (A2, B1) 53.900 76 (A3.U) 37.000 78 (A4.U) 33.500 73 (B2.U) 62.000 69 (B3.U) 533.800 91 (C1) 183.000 75 (C2.U) 162.400 72 (C3.U) 1,569.000 86 TOTAL AREA ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Printed 11/15/2021 Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 0.000 HSG B 0.000 HSG C 0.000 HSG D 1,569.000 Other Al, A2, A3.U, A4.U, B1, B2.U, B3.U, C1, C2.U, C3.0 1,569.000 TOTAL AREA ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Printed 11/15/2021 Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1,569.000 1,569.000 Al , A2, A3.U, A4.U, B1, B2.U, B3.U, C1, C2.U, C3.0 0.000 1,569.000 1,569.000 TOTAL AREA ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Printed 11/15/2021 Page 5 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 Pond A3 2 Pond B1 3 Pond B2 4 Pond C1 5 Pond C2 672.00 676.00 608.00 665.00 644.00 670.00 617.00 604.00 654.00 626.00 414.0 711.0 280.0 991.0 424.0 0.0048 0.0830 0.0143 0.0111 0.0425 0.013 0.013 0.013 0.013 0.013 60.0 84.0 66.0 72.0 72.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 6 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentAl: Al -A SubcatchmentA2: A2 SubcatchmentA3.U: DAA1 SubcatchmentA4.U: DA A2 SubcatchmentBl: B1-A SubcatchmentB2.U: DA B2.0 SubcatchmentB3.U: DA B3.0 SubcatchmentCl: C1-A SubcatchmentC2.U: DA C2.0 SubcatchmentC3.U: DA C3.0 Pond Pond A3: Pond A3 RunoffArea=99.300 ac 0.00% Impervious Runoff Depth=6.71" Tc=20.0 min CN=94 Runoff=549.10 cfs 55.487 af Runoff Area=125.300 ac 0.00% Impervious Runoff Depth=6.82" Tc=25.0 min CN=95 Runoff=629.70 cfs 71.251 af RunoffArea=53.900 ac 0.00% Impervious Runoff Depth=4.63" Tc=30.0 min CN=76 Runoff=184.14 cfs 20.811 af RunoffArea=37.000 ac 0.00% Impervious Runoff Depth=4.86" Tc=22.0 min CN=78 Runoff=154.43 cfs 14.977 af RunoffArea=278.800 ac 0.00% Impervious Runoff Depth=6.82" Tc=30.0 min CN=95 Runoff=1,275.64 cfs 158.538 af RunoffArea=33.500 ac 0.00% Impervious Runoff Depth=4.30" Tc=30.0 min CN=73 Runoff=106.37 cfs 12.003 af RunoffArea=62.000 ac 0.00% Impervious Runoff Depth=3.86" Tc=30.0 min CN=69 Runoff=176.58 cfs 19.950 af RunoffArea=533.800 ac 0.00% Impervious Runoff Depth=6.35" Tc=30.0 min CN=91 Runoff=2,356.30 cfs 282.572 af Runoff Area=183.000 ac 0.00% Impervious Runoff Depth=4.52" Tc=50.0 min CN=75 Runoff=457.89 cfs 68.954 af Runoff Area=162.400 ac 0.00% Impervious Runoff Depth=4.19" Tc=45.0 min CN=72 Runoff=402.29 cfs 56.697 af Peak EIev=690.31' Storage=3,314,277 cf Inflow=1,164.50 cfs 126.739 af Outflow=354.77 cfs 116.715 af Pond Pond B1: Pond B1 Peak EIev=686.46' Storage=2,157,866 cf Inflow=1,275.64 cfs 158.538 af 84.0" Round Culvert n=0.013 L=711.0' S=0.0830 '/' Outflow=489.01 cfs 158.426 af Pond Pond B2: Pond B2 Peak EIev=620.97' Storage=2,782,860 cf Inflow=489.01 cfs 158.426 af Outflow=365.70 cfs 145.363 af Pond Pond C1: Pond C1 Peak EIev=681.15' Storage=5,401,245 cf Inflow=2,356.30 cfs 282.572 af 72.0" Round Culvert n=0.013 L=991.0' S=0.0111 '/' Outflow=518.18 cfs 280.511 af Pond Pond C2: Pond C2 Peak EIev=656.72' Storage=4,545,124 cf Inflow=518.18 cfs 280.511 af Outflow=424.39 cfs 257.423 af Link A-1: Outfall A1 Inflow=530.21 cfs 137.525 af Primary=530.21 cfs 137.525 af ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 7 Link A-2: Outfall A2 Link B-1: Total DA B Link B-2: Outfall B2 Link C: Total DA C Inflow=154.43 cfs 14.977 af Primary=154.43 cfs 14.977 af Inflow=415.71 cfs 157.366 af Primary=415.71 cfs 157.366 af Inflow=176.58 cfs 19.950 af Primary=176.58 cfs 19.950 af Inflow=1,143.62 cfs 383.074 af Primary=1,143.62 cfs 383.074 af Total Runoff Area = 1,569.000 ac Runoff Volume = 761.241 af Average Runoff Depth = 5.82" 100.00% Pervious = 1,569.000 ac 0.00% Impervious = 0.000 ac ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment Al: Al -A Runoff = 549.10 cfs @ 12.29 hrs, Volume= 55.487 af, Depth= 6.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Area (ac) CN Description 99.300 94 99.300 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, 600—' 550-' 500 450 400—' , 350 U 3007' o _ LL 250� 200� 150_ 100' Subcatchment Al: Al -A Hydrograph ▪ 4 1549.10 c ▪ + 4- T T T t NICq-1 QOyr-24hr r T T —T 50� 8 10 12 14 16 18 20 22 24 26 28 30 Time (hours) rt NRCC 24-hr B RaMfII=47.42" RunoffArea=9$ 300-ac- RR-nq#-yoRim$=55.4 7 f- Runo f Depth=6.71" T Tc=20.0 min CiV=94 r + r T i i 32 34 36 38 40 42 44 46 48 • Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment A2: A2 Runoff = 629.70 cfs @ 12.35 hrs, Volume= 71.251 af, Depth= 6.82" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Area (ac) CN Description * 125.300 95 125.300 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.0 Direct Entry, Subcatchment A2: A2 Hydrograph 700 " 650= 600� 500� 450� 400- o 3 350� o u 300- 250- 200� 150� 100 50 0 7 1629.70 cfs + r -I 4 rt 1 + 7 1 T I- rt T NRCC 2 -tt IIC NRCq-190yf 24hrRa-in-W=7.4r- CnoffAr-ea-i24.300-ic- R}inoff yolpm =7'11.2,5.1 f- Runoff Depth=6.82" Tc=25.0 min I- - 7 r r 1 1 1 1 1 1 - t r r CN=95 + 1 I1 T 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment A3.U: DA Al Runoff = 184.14 cfs @ 12.42 hrs, Volume= 20.811 af, Depth= 4.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Area (ac) CN Description 53.900 76 53.900 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, 200= 190 180= 170- - 160' 150='� - 140- 130= H 120— 110= - 3 100 a 90=' 80 70= 60- 50'_' - 40= - 30=' 20= 10. 0 r 184.14 cfs' 4 4 1 4 4 4- Y 4 4 4 4 4 1 Subcatchment A3.U: DA Al Hydrograph -i 1 Y Y NRCC 24'1-hrlB 1 - 4 4- 4- -Y -NR-C -4QOy 24hrRainfajU=--T4 - Ru1noff Arei=5 900-ic I I 1 1 R�ncff V/�olyme=2�0.811 1f 4 R off-Depth=4.6 "- ▪ t Tc=;0-.0-rnin- Y Y Y r CiV=16 4 4- -r r 8 10 12 14 16 18 20 22 24 26 28 30 Time (hours) - -4 d- ▪ + 1- ▪ r ▪ tr r r r %/17." /////� 32 34 36 38 40 42 44 46 48 • Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment A4.U: DA A2 Runoff = 154.43 cfs @ 12.32 hrs, Volume= 14.977 af, Depth= 4.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Area (ac) CN Description 37.000 78 37.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.0 Direct Entry, U 0 LL Subcatchment A4.U: DA A2 Hydrograph 170/ 1601 150_ 100_ 90i• 80� 70i" 60� 50� 40� 304" 20 10= 0- r r I '154.43 cfs L t L I PA -4 L L t L 1 r r rt t r 7 T NICq-1 00yr-24hr NRCC 24t.hrIB Rainf;II=7.4" Runoff Area=37.000 ac t L t L L Runoff 'oLput=14 9,77;f- Runof#-Depth=4.86" Tc=22.0 rnIn- Cfit=78 y t r r + L L L L L L t i r L L t 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ■ Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment B1: B1-A Runoff = 1,275.64 cfs @ 12.41 hrs, Volume= 158.538 af, Depth= 6.82" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Area (ac) CN Description * 278.800 95 278.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, 1,400 1,300 1,200 1,100 1,000 900 800 700 600 500 400 300 200 100 0 Subcatchment B1: B1-A Hydrograph 1 1 L 1 1 + + + NRCC 241,hra3- NRCC-1_00y-24hr- ta-inf;l1=7 42" E urioff_Area-27$ 840_4c _ 1 Runofi Volume158.538 4f Ru'notf D'epih=6.82" ✓ It r i I r Tp=20.Q mqn 1 1 1 CN=95 1 1 L 4 + ✓ r r r t r 4- r r /;00O%////� 1 1//////////////// 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ■ Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment B2.U: DA B2.0 Runoff = 106.37 cfs @ 12.43 hrs, Volume= 12.003 af, Depth= 4.30" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Area (ac) CN Description 33.500 73 33.500 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, Subcatchment B2.U: DA B2.0 Hydrograph 115= 110 105'' - 100'' - 95= 90 85 80= ` - 75€ N 70 - 1 1 + — — + — — i 65_ 60= 4 7 + r 0 55=1 1 I 1 I 1 111 + LL 50V fi ' y 45i 1 1 40i 35'' 30_ - 1 1 25- 1 1 -4 r 1 1 1 - r 1 71 1 1 -J r r r 20= - 1 7 7 T r I 7 7 T L I I I 7 L r I I 1 7 T 15i I 1 L 1 11 I I ILL I 11 103 = + + L II � 4;IIIPYZAW 7 T r 7 77 7 7 T r 1 1 1 7 r r I I 1 1 1106.37 cfs I 1 1 J 1 1 1 1 1 1 ILLI I +--+--+--INRC-C-24-h-r+B- 7 1 L 7 1 1 L I CCU=fi40y 4hr 111F�a�nfialfl= 4" 4 4 L L 7 T 1 1 7 rt L Runof-Aire=3. 5b0-4c- L RI.inc ffyofpme='f12-L63 r + r 1 , rRtinoff-Depth=43b"- 7 7 T L LI Tc=40.Q min 7 L 7 C -=73— I L L 1 1 11 1 7 L I 1 1 1 L I I I L L I I I 1 1 1 r 7 + r 1 r r I- 1 1 1 7 1 I + + 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Runo ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment B3.U: DA B3.0 Runoff = 176.58 cfs @ 12.43 hrs, Volume= 19.950 af, Depth= 3.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Area (ac) CN Description 62.000 69 62.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, 1 1 1 160 150= 1404- - 130= L' 1 , I I 120=---1L -+ N 110 t + = I I LI 100' 1 L O 90= LT_ _ 1 1 80 =' T 70 1 7 t t LI t t L L 17a 58 pis' Subcatchment B3.U: DA B3.0 Hydrograph 1 1 L 1 1 L 1 1 L L 1 L + 1 L t t L NR1'CC Z4-hr 1 3 -4 1 1 LI I 1 1 L L LI 1 1 L 1 1 NI CQ-190yr-24hr Rainf4II=7.4 " 4 1 1 t 4 Runoff Area= 61000-ic i 4- 1 RPffVo=1119.Wf 1 4 1 1 1 1 1 1 RunoUD'epth= .86"- +--+--+--LI I + + LI L t + t t t Tc=40.0min 41 1 r 1 1 1 1 r 1r Iri Cg=69 - I 4 4 r 4 r t--t 60= 50 r 1 1 T T 40 1 t 1 T t 1 r 1 T 30= T T T T T t i T 1 t T T 20� 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 T 10 0 8 10 12 14 16 18 20 22 24 26 28 30 Time (hours) 32 34 36 38 40 42 44 46 48 ■ Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment C1: C1-A Runoff = 2,356.30 cfs @ 12.41 hrs, Volume= 282.572 af, Depth= 6.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Area (ac) CN Description * 533.800 91 533.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, 2 2 2 2 2 2 2 1 Subcatchment C1: C1-A Hydrograph 1L L ,600i' 1 1 7 TTIT 7 r 1 1 7 r r ,500= - 1 1 1 i L 1 _ 1 L 1 1 1 1 L 2,356.30 cfs 11 1 1 1 1 1 1 400= ; 7 r , r r 7 T NRCC 247,-hrt 300 L L LJ ,200 7 T r T7 T 7 ;1RPC-1-00yr=2,1ir Rai111nf;11=74gn ,10021 1 L J L 1 1 ,00o Furroff'1Area=538b0c 900 + 1 1 + + + 1 1 + + ,800I Runoff VQI-u-n1E=2$g. Of ,700 Runo#fDepth-6.3n 600 1 1 ' 1 ,400 300 4 4 H t + r 1 1 t - -+- -r 1 1 t + r 1 1 CN=4i- ,200 . ,100 lit L 1 1 1 IT r 1 1 7 r ,000 900 800 11 700 - 1 17 1 r T 1 1 1 1 1 1 r 1 1 1 1 4- I 1 1 T 600 I 1 1 L J 1 L L 1 L L 1 LI 1 1 500 1 17 TT T 7 T r T r 7 T r I 7 T I 1 1 7 t I t--t t 1 1 t t t 1 1 t t t 1 1 7 t 7 t I ---t t 1 1 t t t 1 1 t t I 1 1 7 t 400° 1 I 1 1 1 L 1 1 1 1 L 1 1 1 1 L I 1 1 1 300 e - 1 -1 T1111111 200` ---1- --- --1 L 1 1 J 1 L 1 1 1 1 + 1 J 1 1 4 II 100. 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ■ Runo ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment C2.U: DA C2.0 Runoff = 457.89 cfs @ 12.68 hrs, Volume= 68.954 af, Depth= 4.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Area (ac) CN Description * 183.000 75 183.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 50.0 Direct Entry, Subcatchment C2.U: DA C2.0 Hydrograph 7 7 T 7 500- - 4 LLL I I 7 7 1 457.89 cfs t r I 7 7 T + I I I 7 T r I I I 7 T 460= ▪ L I- NRCC 244-hi B 440 i I - 7 + I 7 7 T + 7 T 7 420 ▪ 7 NR-c �-4Q0y hr j art-f 1-1=-.4 "- aoo`' I I I I I 1 I I lturiof$Arlea1 �Ji_ .0ic_ 380= 360- + IT + + T ▪ + I 340+ / I I I I I I 320= +- 7 + + 7 + + 300 _' - III I I I I H , I I I I I I ) Q Tc= _rnIn _ i 280 ; + + + t + 3 260_ III I I I I I I �I14=/5 0 240; + +- + + + + + + + + a 220 1 1 1 I I 200` - I I +--7--+ I + 7 + + 180= - I I I 1 1 I 160i I I + --- --+ + + + + 140 I 120i - I I - 4 + I -4 4 + 100= 1 1 80- - I I _,4 L+ I 60= 1 40` 20= 0 7 7 T T 7 T T I I I 7 T 4 s L L I I I 4 L L I I I s L R ff-Vo =6116.S 4 Ruoff-Depth=4:52- 441 + I 441 + 4- + + 4- 1 I I 7 4 /l77Aree/i'///i//7 8 10 12 14 16 18 20 22 24 26 28 30 Time (hours) 32 34 36 38 40 42 44 46 48 • Runo ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment C3.U: DA C3.0 Runoff = 402.29 cfs @ 12.62 hrs, Volume= 56.697 af, Depth= 4.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Area (ac) CN Description * 162.400 72 162.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 45.0 Direct Entry, Subcatchment C3.U: DA C3.0 Hydrograph 440€ 420 402.29crs 400= - i I , 7 T 380 360= ' 1 1 340= .. + + 320= T 7 T 300= 280 w 260' o 240i z 220 " �° 200' --11 1I 4 180= 1 r 160- 140= 1 1 1 1 1 i I I 120i- ------I--+ + -+ 100= 7 7 r 80 - I I 60 - r L r L 40i 20: 0 y r + + I I I + r + I I 4 + T T T 1 I ; T T 141kCG'I.24'rf-rTe- T 1 1 FN Cq 00y! 4hr'IR a1nf u=T4;" kith oft+Ar'ea�1 .44D- c - REJnc ff-Vorym =56.697 f- I ✓ i r I t Rhiof#-D'ep h =4.19" _ Tc=4tO�nfin ✓ r r r I I I r r r 1 1 1 LI I I I 1 L L I 1 1 ✓ r T r I I I r r r I I I r T 1I -4 T L L y L r L r r I I 1 T I rt t 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ■ Runoff ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Printed 11/15/2021 Page 18 Summary for Pond Pond A3: Pond A3 Inflow Area = 224.600 ac, 0.00% Impervious, Inflow Depth = 6.77" for NRCC-100yr-24hr event Inflow = 1,164.50 cfs @ 12.31 hrs, Volume= 126.739 of Outflow = 354.77 cfs @ 12.81 hrs, Volume= 116.715 af, Atten= 70%, Lag= 29.7 min Primary = 354.77 cfs @ 12.81 hrs, Volume= 116.715 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Starting Elev= 678.00' Surf.Area= 168,544 sf Storage= 781,799 cf Peak Elev= 690.31' @ 12.81 hrs Surf.Area= 240,490 sf Storage= 3,314,277 cf (2,532,478 cf above start) Plug -Flow detention time= 270.1 min calculated for 98.767 af (78% of inflow) Center -of -Mass det. time= 149.6 min (926.5 - 776.8 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 672.00 674.00 676.00 678.00 680.00 682.00 684.00 686.00 688.00 690.00 692.00 672.00' 3,727,860 cf Custom Stage Data (Prismatic)Listed below (Recalc) Device Routing Surf.Area (sq-ft) 99,117 113,009 144,060 168,544 183,296 193,916 204,761 215,830 227,123 238,641 250,383 Invert Inc.Store (cubic -feet) 0 212,126 257,069 312,604 351,840 377,212 398,677 420,591 442,953 465,764 489,024 Outlet Devices Cum.Store (cubic -feet) 0 212,126 469,195 781,799 1,133,639 1,510,851 1,909,528 2,330,119 2,773,072 3,238,836 3,727,860 #1 Primary #2 #3 #4 Device 1 Device 1 Device 1 672.00' 678.00' 688.00' 681.00' 60.0" Round Culvert L= 414.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 672.00' / 670.00' S= 0.0048'/' Cc= 0.900 n= 0.013, Flow Area= 19.63 sf 6.0" Vert. Orifice/Grate C= 0.600 40.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) 54.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=354.74 cfs @ 12.81 hrs HW=690.31' (Free Discharge) t.=Culvert (Barrel Controls 354.74 cfs @ 18.07 fps) -2=Orifice/Grate (Passes < 3.28 cfs potential flow) -3=Sharp-Crested Rectangular Weir(Passes < 459.92 cfs potential flow) -4=Orifice/Grate (Passes < 233.69 cfs potential flow) ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Printed 11/15/2021 Page 19 1,300= 1,2001 1,1001 1000:- 900- 800:- w 7001 6001 LL 500:- 400i 300:- 200f 100� Elevation (feet) 69 69 69 68 68 68 68 68 68 68 68 68 68 67 67 67 67 67 67 67 67 r r Inflow Area=224.600 as Peak tIev=69II 311 Storage=3,314,277 cf r 1354.77 cfs / Pond Pond A3: Pond A3 Hyd rog raph it L L r r L L 7 r 1 i L L r L 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time (hours) Pond Pond A3: Pond A3 Stage -Discharge r 46 48 0= 9= 8- 7= 6 5 4= 3= 24- 0 9 ✓ ✓ L L /'Orifice/Adipra- Grate i 7-fr 5 4m 3 L L i L Orifice/Grate Sharp -Crested Rectangular Weir L L L L L L L L i L L L L r r ✓ Culvert r- r r 0 50 100 150 200 Discharge (cfs) 250 300 350 • Inflow ❑ Primary ❑ Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 20 Elevation (feet) 0 692/ 691-i 690= 689= 688-= 687-E 686- 685 684- Pond Pond A3: Pond A3 Stage -Area -Storage rrface/Horizontal/Wetted Area (sq-ft) 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 r r u1111 L 1 4 1 1111 r r r r 1 r1 il I J L J 11 1111 11 J r---I-� 1 r----tt 683'' I 682 681''r 680i ' - 679 678 f 677-' 676_ 675_ 674' , 673 672 0 500,000 1,000,000 L LI L - L - - L _ _ _ _ JI I- r r 1,500,000 2,000,000 2,500,000 Storage (cubic -feet) 3,000,000 3,500,000 Surface El Storage ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 21 Stage -Discharge for Pond Pond A3: Pond A3 Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 672.00 0.00 682.40 78.50 672.20 0.00 682.60 95.53 672.40 0.00 682.80 104.76 672.60 0.00 683.00 110.36 672.80 0.00 683.20 115.69 673.00 0.00 683.40 120.78 673.20 0.00 683.60 125.67 673.40 0.00 683.80 130.37 673.60 0.00 684.00 134.91 673.80 0.00 684.20 139.29 674.00 0.00 684.40 143.55 674.20 0.00 684.60 147.68 674.40 0.00 684.80 151.70 674.60 0.00 685.00 155.61 674.80 0.00 685.20 159.43 675.00 0.00 685.40 163.16 675.20 0.00 685.60 166.81 675.40 0.00 685.80 170.37 675.60 0.00 686.00 173.87 675.80 0.00 686.20 177.29 676.00 0.00 686.40 180.65 676.20 0.00 686.60 183.95 676.40 0.00 686.80 187.19 676.60 0.00 687.00 190.38 676.80 0.00 687.20 193.51 677.00 0.00 687.40 196.59 677.20 0.00 687.60 199.63 677.40 0.00 687.80 202.61 677.60 0.00 688.00 205.56 677.80 0.00 688.20 220.16 678.00 0.00 688.40 244.42 678.20 0.11 688.60 274.95 678.40 0.36 688.80 310.54 678.60 0.56 689.00 339.20 678.80 0.70 689.20 341.61 679.00 0.82 689.40 344.01 679.20 0.92 689.60 346.39 679.40 1.01 689.80 348.75 679.60 1.10 690.00 351.10 679.80 1.18 690.20 353.43 680.00 1.25 690.40 355.75 680.20 1.32 690.60 358.05 680.40 1.39 690.80 360.34 680.60 1.45 691.00 362.62 680.80 1.51 691.20 364.88 681.00 1.57 691.40 367.12 681.20 5.76 691.60 369.35 681.40 13.37 691.80 371.57 681.60 23.22 692.00 373.78 681.80 34.86 682.00 48.06 682.20 62.65 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 22 Stage -Area -Storage for Pond Pond A3: Pond A3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 672.00 99,117 0 682.40 196,085 1,588,851 672.20 100,506 19,962 682.60 197,170 1,628,177 672.40 101,895 40,202 682.80 198,254 1,667,719 672.60 103,285 60,720 683.00 199,339 1,707,478 672.80 104,674 81,516 683.20 200,423 1,747,454 673.00 106,063 102,590 683.40 201,507 1,787,647 673.20 107,452 123,942 683.60 202,592 1,828,057 673.40 108,841 145,571 683.80 203,676 1,868,684 673.60 110,231 167,478 684.00 204,761 1,909,528 673.80 111,620 189,663 684.20 205,868 1,950,591 674.00 113,009 212,126 684.40 206,975 1,991,875 674.20 116,114 235,038 684.60 208,082 2,033,381 674.40 119,219 258,572 684.80 209,189 2,075,108 674.60 122,324 282,726 685.00 210,296 2,117,056 674.80 125,429 307,501 685.20 211,402 2,159,226 675.00 128,535 332,898 685.40 212,509 2,201,617 675.20 131,640 358,915 685.60 213,616 2,244,230 675.40 134,745 385,554 685.80 214,723 2,287,064 675.60 137,850 412,813 686.00 215,830 2,330,119 675.80 140,955 440,694 686.20 216,959 2,373,398 676.00 144,060 469,195 686.40 218,089 2,416,903 676.20 146,508 498,252 686.60 219,218 2,460,633 676.40 148,957 527,798 686.80 220,347 2,504,590 676.60 151,405 557,835 687.00 221,477 2,548,772 676.80 153,854 588,360 687.20 222,606 2,593,180 677.00 156,302 619,376 687.40 223,735 2,637,815 677.20 158,750 650,881 687.60 224,864 2,682,675 677.40 161,199 682,876 687.80 225,994 2,727,760 677.60 163,647 715,361 688.00 227,123 2,773,072 677.80 166,096 748,335 688.20 228,275 2,818,612 678.00 168,544 781,799 688.40 229,427 2,864,382 678.20 170,019 815,655 688.60 230,578 2,910,382 678.40 171,494 849,807 688.80 231,730 2,956,613 678.60 172,970 884,253 689.00 232,882 3,003,075 678.80 174,445 918,995 689.20 234,034 3,049,766 679.00 175,920 954,031 689.40 235,186 3,096,688 679.20 177,395 989,363 689.60 236,337 3,143,840 679.40 178,870 1,024,989 689.80 237,489 3,191,223 679.60 180,346 1,060,911 690.00 238,641 3,238,836 679.80 181,821 1,097,127 690.20 239,815 3,286,682 680.00 183,296 1,133,639 690.40 240,989 3,334,762 680.20 184,358 1,170,404 690.60 242,164 3,383,077 680.40 185,420 1,207,382 690.80 243,338 3,431,628 680.60 186,482 1,244,572 691.00 244,512 3,480,413 680.80 187,544 1,281,975 691.20 245,686 3,529,432 681.00 188,606 1,319,590 691.40 246,860 3,578,687 681.20 189,668 1,357,417 691.60 248,035 3,628,176 681.40 190,730 1,395,457 691.80 249,209 3,677,901 681.60 191,792 1,433,709 692.00 250,383 3,727,860 681.80 192,854 1,472,174 682.00 193,916 1,510,851 682.20 195,001 1,549,743 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 23 Summary for Pond Pond B1: Pond B1 Inflow Area = 278.800 ac, 0.00% Impervious, Inflow Depth = 6.82" for NRCC-100yr-24hr event Inflow = 1,275.64 cfs @ 12.41 hrs, Volume= 158.538 of Outflow = 489.01 cfs @ 12.90 hrs, Volume= 158.426 af, Atten= 62%, Lag= 29.4 min Primary = 489.01 cfs @ 12.90 hrs, Volume= 158.426 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 686.46' @ 12.90 hrs Surf.Area= 353,105 sf Storage= 2,157,866 cf Plug -Flow detention time= 67.4 min calculated for 158.261 af (100% of inflow) Center -of -Mass det. time= 67.8 min (849.4 - 781.6 ) Volume Invert Avail.Storage Storage Description #1 676.00' 2,737,543 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 676.00 75,404 0 0 678.00 120,832 196,236 196,236 680.00 169,974 290,806 487,042 682.00 222,421 392,395 879,437 684.00 278,551 500,972 1,380,409 686.00 338,363 616,914 1,997,323 688.00 401,857 740,220 2,737,543 Device Routing Invert Outlet Devices #1 Primary 676.00' 84.0" Round Culvert L= 711.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 676.00' / 617.00' S= 0.0830'/' Cc= 0.900 n= 0.013, Flow Area= 38.48 sf Primary OutFlow Max=488.99 cfs @ 12.90 hrs HW=686.46' (Free Discharge) t1=Culvert (Inlet Controls 488.99 cfs @ 12.71 fps) ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Printed 11/15/2021 Page 24 1,400:' 1,300� 1,200 1,1001-/ 1,0001: 900� w 800� o 700+_ O - 600 500- 400= 300= 200 ' 1001' Elevation (feet) 0 Pond Pond B1: Pond B1 Hyd rog raph Hi 1- 4 II 1__L rt--r Hr 1,275.64 cf 1 1489 01 cfs Peak t1ev=S86.461 1 7 i Sto r�►ge=2 ,157 866 cif r -84.0" f'koa rid C ulve rt H - - II n=0.013 + - - 1 - -I - - 7 - - 1 - - I L=711.01 S=O O$-3$ 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond Pond B1: Pond B1 Stage -Discharge 688—/ 687:- 686: 685:- 684:: 683-- 682: 681-- 680_ 679-- 678:- 677:- 676 4 H • // Culvert L H IL 4 4 0 50 100 150 200 250 300 Discharge (cfs) 350 400 450 500 ❑ Inflow ❑ Primary • Primary ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Printed 11/15/2021 Page 25 Elevation (feet) 688- 6877' 686—' 6857' 6847' 683 6827' 6817 6807" 679 678— 6777' 676 0 Pond Pond B1: Pond B1 Stage -Area -Storage Surface/Horizontal/Wetted A 50,000 100,000 150,000 200,000 250,000 500,000 1,000,000 1,500,000 Storage (cubic -feet) L 300,000 350,000 400,000 2,000,000 L 2,500,000 4 4 4 Surface El Storage ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 26 Stage -Discharge for Pond Pond B1: Pond B1 Elevation Primary Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) (feet) (cfs) 676.00 0.00 679.12 99.76 682.24 308.09 685.36 448.57 676.06 0.04 679.18 103.25 682.30 311.76 685.42 450.86 676.12 0.17 679.24 106.78 682.36 315.37 685.48 453.14 676.18 0.39 679.30 110.36 682.42 318.89 685.54 455.41 676.24 0.68 679.36 113.97 682.48 322.34 685.60 457.66 676.30 1.07 679.42 117.63 682.54 325.69 685.66 459.91 676.36 1.53 679.48 121.33 682.60 328.95 685.72 462.14 676.42 2.08 679.54 125.06 682.66 332.09 685.78 464.37 676.48 2.71 679.60 128.83 682.72 335.11 685.84 466.58 676.54 3.42 679.66 132.63 682.78 337.98 685.90 468.78 676.60 4.21 679.72 136.47 682.84 340.69 685.96 470.97 676.66 5.08 679.78 140.33 682.90 343.19 686.02 473.16 676.72 6.03 679.84 144.23 682.96 345.42 686.08 475.33 676.78 7.06 679.90 148.17 683.02 347.66 686.14 477.49 676.84 8.16 679.96 152.12 683.08 350.61 686.20 479.64 676.90 9.34 680.02 156.11 683.14 353.53 686.26 481.79 676.96 10.60 680.08 160.13 683.20 356.44 686.32 483.92 677.02 11.93 680.14 164.16 683.26 359.31 686.38 486.04 677.08 13.34 680.20 168.22 683.32 362.17 686.44 488.16 677.14 14.82 680.26 172.31 683.38 365.00 686.50 490.26 677.20 16.38 680.32 176.41 683.44 367.81 686.56 492.36 677.26 18.00 680.38 180.54 683.50 370.60 686.62 494.45 677.32 19.70 680.44 184.68 683.56 373.37 686.68 496.53 677.38 21.47 680.50 188.84 683.62 376.12 686.74 498.60 677.44 23.31 680.56 193.01 683.68 378.85 686.80 500.66 677.50 25.21 680.62 197.20 683.74 381.56 686.86 502.71 677.56 27.19 680.68 201.39 683.80 384.25 686.92 504.76 677.62 29.23 680.74 205.60 683.86 386.92 686.98 506.79 677.68 31.34 680.80 209.82 683.92 389.58 687.04 508.82 677.74 33.52 680.86 214.04 683.98 392.21 687.10 510.84 677.80 35.76 680.92 218.27 684.04 394.83 687.16 512.85 677.86 38.06 680.98 222.50 684.10 397.43 687.22 514.86 677.92 40.43 681.04 226.73 684.16 400.01 687.28 516.86 677.98 42.86 681.10 230.97 684.22 402.58 687.34 518.85 678.04 45.36 681.16 235.20 684.28 405.13 687.40 520.83 678.10 47.91 681.22 239.42 684.34 407.66 687.46 522.80 678.16 50.52 681.28 243.64 684.40 410.18 687.52 524.77 678.22 53.20 681.34 247.85 684.46 412.69 687.58 526.73 678.28 55.93 681.40 252.04 684.52 415.18 687.64 528.68 678.34 58.71 681.46 256.23 684.58 417.65 687.70 530.62 678.40 61.56 681.52 260.39 684.64 420.11 687.76 532.56 678.46 64.46 681.58 264.54 684.70 422.55 687.82 534.49 678.52 67.41 681.64 268.67 684.76 424.98 687.88 536.42 678.58 70.42 681.70 272.78 684.82 427.40 687.94 538.33 678.64 73.48 681.76 276.85 684.88 429.80 688.00 540.24 678.70 76.60 681.82 280.90 684.94 432.19 678.76 79.76 681.88 284.91 685.00 434.57 678.82 82.97 681.94 288.89 685.06 436.94 678.88 86.24 682.00 292.83 685.12 439.29 678.94 89.55 682.06 296.72 685.18 441.63 679.00 92.90 682.12 300.56 685.24 443.95 679.06 96.31 682.18 304.36 685.30 446.27 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 27 Stage -Area -Storage for Pond Pond B1: Pond B1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 676.00 75,404 0 683.80 272,938 1,325,260 676.15 78,811 11,566 683.95 277,148 1,366,517 676.30 82,218 23,643 684.10 281,542 1,408,414 676.45 85,625 36,232 684.25 286,028 1,450,981 676.60 89,032 49,331 684.40 290,513 1,494,222 676.75 92,440 62,941 684.55 294,999 1,538,135 676.90 95,847 77,063 684.70 299,485 1,582,722 677.05 99,254 91,695 684.85 303,971 1,627,981 677.20 102,661 106,839 685.00 308,457 1,673,913 677.35 106,068 122,494 685.15 312,943 1,720,518 677.50 109,475 138,659 685.30 317,429 1,767,796 677.65 112,882 155,336 685.45 321,915 1,815,747 677.80 116,289 172,524 685.60 326,401 1,864,370 677.95 119,696 190,223 685.75 330,887 1,913,667 678.10 123,289 208,442 685.90 335,372 1,963,636 678.25 126,975 227,212 686.05 339,950 2,014,281 678.40 130,660 246,534 686.20 344,712 2,065,631 678.55 134,346 266,410 686.35 349,474 2,117,695 678.70 138,032 286,838 686.50 354,237 2,170,473 678.85 141,717 307,819 686.65 358,999 2,223,966 679.00 145,403 329,354 686.80 363,761 2,278,172 679.15 149,089 351,440 686.95 368,523 2,333,094 679.30 152,774 374,080 687.10 373,285 2,388,729 679.45 156,460 397,273 687.25 378,047 2,445,079 679.60 160,146 421,018 687.40 382,809 2,502,143 679.75 163,831 445,316 687.55 387,571 2,559,922 679.90 167,517 470,167 687.70 392,333 2,618,415 680.05 171,285 495,573 687.85 397,095 2,677,622 680.20 175,219 521,561 688.00 401,857 2,737,543 680.35 179,152 548,139 680.50 183,086 575,307 680.65 187,019 603,065 680.80 190,953 631,413 680.95 194,886 660,351 681.10 198,820 689,879 681.25 202,753 719,997 681.40 206,687 750,705 681.55 210,620 782,003 681.70 214,554 813,891 681.85 218,487 846,369 682.00 222,421 879,437 682.15 226,631 913,116 682.30 230,840 947,426 682.45 235,050 982,368 682.60 239,260 1,017,941 682.75 243,470 1,054,146 682.90 247,679 1,090,982 683.05 251,889 1,128,450 683.20 256,099 1,166,549 683.35 260,309 1,205,280 683.50 264,519 1,244,642 683.65 268,728 1,284,635 ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Printed 11/15/2021 Page 28 Summary for Pond Pond B2: Pond B2 [79] Warning: Submerged Pond Pond B1 Primary device # 1 OUTLET by 3.97' Inflow Area = Inflow = Outflow = Primary = 278.800 ac, 0.00% Impervious, Inflow Depth > 6.82" for NRCC-100yr-24hr event 489.01 cfs @ 12.90 hrs, Volume= 158.426 af 365.70 cfs @ 14.07 hrs, Volume= 145.363 af, Atten= 25%, Lag= 70.1 min 365.70 cfs @ 14.07 hrs, Volume= 145.363 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Starting Elev= 614.00' Surf.Area= 213,648 sf Storage= 1,110,739 cf Peak Elev= 620.97' @ 14.07 hrs Surf.Area= 261,730 sf Storage= 2,782,860 cf (1,672,121 cf above start) Plug -Flow detention time= 234.2 min calculated for 119.739 af (76% of inflow) Center -of -Mass det. time= 98.8 min (948.2 - 849.4 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 608.00 610.00 612.00 616.00 618.00 620.00 622.00 608.00' 3,055,722 cf Custom Stage Data (Prismatic)Listed below (Recalc) Device Routing Surf.Area (sq-ft) 148,967 178,807 195,255 232,041 243,810 255,804 268,025 Invert Inc.Store (cubic -feet) 0 327,774 374,062 854,592 475,851 499,614 523,829 Outlet Devices Cum.Store (cubic -feet) 0 327,774 701,836 1,556,428 2,032,279 2,531,893 3,055,722 #1 Primary #2 Device 1 #3 Device 1 608.00' 614.00' 617.00' 66.0" Round Culvert L= 280.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 608.00' / 604.00' S= 0.0143'/' Cc= 0.900 n= 0.013, Flow Area= 23.76 sf 7.0" Vert. Orifice/Grate C= 0.600 40.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=365.69 cfs @ 14.07 hrs HW=620.97' (Free Discharge) t1=Culvert (Inlet Controls 365.69 cfs @ 15.39 fps) 12=Orifice/Grate (Passes < 3.33 cfs potential flow) 3=Sharp-Crested Rectangular Weir(Passes < 1,034.36 cfs potential flow) ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Printed 11/15/2021 Page 29 Elevation (feet) 62 62 62 61 61 61 61 61 61 61 61 61 61 60 60 r 1▪ 489.01 Os i Pond Pond B2: Pond B2 Hyd rog raph r 1 L L L 4- T t r r t r of low Area=278.800ac Peak Elev=620.97' Storage=2,782,860_G#_ - 1- T L T T T L T L T L 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond Pond B2: Pond B2 Stage -Discharge Sharp -Crested Rectangular Weir- - Orifice/Grate 0 50 100 150 200 Discharge (cfs) 250 300 350 ❑ Inflow ❑ Primary ❑ Primary ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Printed 11/15/2021 Page 30 Elevation (feet) 622- 621 620� 6194- 618-� 6174- 616� 6154' 614� f - 613 612 611� 610� 609= 608" 0 Pond Pond B2: Pond B2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-f. 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000 r Ir L r- 500,000 H 1,000,000 1 I 1,500,000 2,000,000 Storage (cubic -feet) r 2,500,000 3,000,000 Surface El Storage ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 31 Stage -Discharge for Pond Pond B2: Pond B2 Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 608.00 0.00 615.80 1.58 608.15 0.00 615.95 1.66 608.30 0.00 616.10 1.73 608.45 0.00 616.25 1.80 608.60 0.00 616.40 1.87 608.75 0.00 616.55 1.93 608.90 0.00 616.70 2.00 609.05 0.00 616.85 2.06 609.20 0.00 617.00 2.12 609.35 0.00 617.15 9.77 609.50 0.00 617.30 23.72 609.65 0.00 617.45 41.77 609.80 0.00 617.60 63.13 609.95 0.00 617.75 87.35 610.10 0.00 617.90 114.12 610.25 0.00 618.05 143.23 610.40 0.00 618.20 174.49 610.55 0.00 618.35 207.76 610.70 0.00 618.50 242.93 610.85 0.00 618.65 279.91 611.00 0.00 618.80 318.61 611.15 0.00 618.95 327.58 611.30 0.00 619.10 330.56 611.45 0.00 619.25 333.52 611.60 0.00 619.40 336.45 611.75 0.00 619.55 339.35 611.90 0.00 619.70 342.23 612.05 0.00 619.85 345.09 612.20 0.00 620.00 347.92 612.35 0.00 620.15 350.73 612.50 0.00 620.30 353.52 612.65 0.00 620.45 356.28 612.80 0.00 620.60 359.03 612.95 0.00 620.75 361.75 613.10 0.00 620.90 364.45 613.25 0.00 621.05 367.14 613.40 0.00 621.20 369.80 613.55 0.00 621.35 372.45 613.70 0.00 621.50 375.07 613.85 0.00 621.65 377.68 614.00 0.00 621.80 380.27 614.15 0.07 621.95 382.84 614.30 0.26 614.45 0.51 614.60 0.71 614.75 0.87 614.90 1.00 615.05 1.12 615.20 1.23 615.35 1.32 615.50 1.41 615.65 1.50 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 32 Stage -Area -Storage for Pond Pond B2: Pond B2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 608.00 148,967 0 615.80 230,202 1,510,204 608.15 151,205 22,513 615.95 231,581 1,544,837 608.30 153,443 45,361 616.10 232,629 1,579,662 608.45 155,681 68,546 616.25 233,512 1,614,622 608.60 157,919 92,066 616.40 234,395 1,649,715 608.75 160,157 115,922 616.55 235,277 1,684,941 608.90 162,395 140,113 616.70 236,160 1,720,298 609.05 164,633 164,640 616.85 237,043 1,755,789 609.20 166,871 189,503 617.00 237,926 1,791,411 609.35 169,109 214,701 617.15 238,808 1,827,166 609.50 171,347 240,236 617.30 239,691 1,863,054 609.65 173,585 266,105 617.45 240,574 1,899,074 609.80 175,823 292,311 617.60 241,456 1,935,226 609.95 178,061 318,852 617.75 242,339 1,971,510 610.10 179,629 345,696 617.90 243,222 2,007,927 610.25 180,863 372,733 618.05 244,110 2,044,477 610.40 182,097 399,955 618.20 245,009 2,081,161 610.55 183,330 427,362 618.35 245,909 2,117,980 610.70 184,564 454,954 618.50 246,809 2,154,934 610.85 185,797 482,731 618.65 247,708 2,192,022 611.00 187,031 510,693 618.80 248,608 2,229,246 611.15 188,265 538,840 618.95 249,507 2,266,605 611.30 189,498 567,172 619.10 250,407 2,304,098 611.45 190,732 595,690 619.25 251,306 2,341,727 611.60 191,965 624,392 619.40 252,206 2,379,490 611.75 193,199 653,279 619.55 253,105 2,417,388 611.90 194,433 682,352 619.70 254,005 2,455,422 612.05 195,715 711,610 619.85 254,904 2,493,590 612.20 197,094 741,071 620.00 255,804 2,531,893 612.35 198,474 770,739 620.15 256,721 2,570,332 612.50 199,853 800,613 620.30 257,637 2,608,909 612.65 201,233 830,695 620.45 258,554 2,647,623 612.80 202,612 860,983 620.60 259,470 2,686,475 612.95 203,992 891,478 620.75 260,387 2,725,465 613.10 205,371 922,180 620.90 261,303 2,764,591 613.25 206,751 953,090 621.05 262,220 2,803,856 613.40 208,130 984,206 621.20 263,137 2,843,257 613.55 209,510 1,015,529 621.35 264,053 2,882,797 613.70 210,889 1,047,058 621.50 264,970 2,922,473 613.85 212,269 1,078,795 621.65 265,886 2,962,288 614.00 213,648 1,110,739 621.80 266,803 3,002,239 614.15 215,027 1,142,890 621.95 267,719 3,042,328 614.30 216,407 1,175,247 614.45 217,786 1,207,812 614.60 219,166 1,240,583 614.75 220,545 1,273,562 614.90 221,925 1,306,747 615.05 223,304 1,340,139 615.20 224,684 1,373,738 615.35 226,063 1,407,544 615.50 227,443 1,441,557 615.65 228,822 1,475,777 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 33 Summary for Pond Pond C1: Pond C1 Inflow Area = 533.800 ac, 0.00% Impervious, Inflow Depth = 6.35" for NRCC-100yr-24hr event Inflow = 2,356.30 cfs @ 12.41 hrs, Volume= 282.572 af Outflow = 518.18 cfs @ 13.20 hrs, Volume= 280.511 af, Atten= 78%, Lag= 47.3 min Primary = 518.18 cfs @ 13.20 hrs, Volume= 280.511 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 681.15' @ 13.20 hrs Surf.Area= 404,267 sf Storage= 5,401,245 cf Plug -Flow detention time= 132.2 min calculated for 280.219 af (99% of inflow) Center -of -Mass det. time= 128.4 min (926.0 - 797.6 ) Volume Invert Avail.Storage Storage Description #1 664.00' 6,161,365 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 664.00 49,861 0 0 665.00 106,320 78,091 78,091 668.00 311,540 626,790 704,881 670.00 324,958 636,498 1,341,379 675.00 359,560 1,711,295 3,052,674 680.00 395,673 1,888,083 4,940,756 683.00 418,066 1,220,609 6,161,365 Device Routing Invert Outlet Devices #1 Primary 665.00' 72.0" Round Culvert L= 991.0' RCP, groove end w/headwall, Ke= 0.200 Inlet / Outlet Invert= 665.00' / 654.00' S= 0.0111 '/' Cc= 0.900 n= 0.013, Flow Area= 28.27 sf Primary OutFlow Max=518.17 cfs @ 13.20 hrs HW=681.15' (Free Discharge) t1=Culvert (Barrel Controls 518.17 cfs @ 18.33 fps) ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Printed 11/15/2021 Page 34 2,600- 2,4001 2,200 2,000-' 1,800� 1,600+ 1,4001 1,200f 1,0001� 8001 6001 400f 200' 68 68 68 68 67 67 67 67 w 67 c 67 67 w 67 w 67 67 66 66 66 66 66 66 Pond Pond C1: Pond C1 Hyd rog raph • L • r • L L 12,256:30 cf ✓ T T 1--L L Ir T 1 1 L L. L I 1 L ▪ 1 1 L 1 LI 1 L T 10o`01� a-=543.8Q01; a T Poaic t1ev=681-.-1 Storage=3,401,245 c'f L IL 72.OIn QundCulvert n=0 O13 1 I 1 L 1 1 1 - - - 6%Wl// 1 L 1 L 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond Pond C1: Pond C1 Stage -Discharge 3J / 2� 13' 03' 9 8- 7� - 6 53- 43' 3. 23-- 1- 0J - 8 5 t ri r r 1 1 - 1 1 1 - 1 - 1 Culvert t 1 H 1 1 1 1 • r • 1 • 1 L 1 • 1 L 1 • 1 0 50 100 150 200 250 300 350 400 450 500 Discharge (cfs) • Inflow ❑ Primary 0 Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 35 Elevation (feet) 683-� 682" 681-E 680= 679- 678 6774 676-= 675 674- 673' 672 r 671 E 670-- 669-n 668= 667 666® 665& 664- 0 Pond Pond C1: Pond C1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-fe 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 s . . . 1 . . . 1 Cus -LI II 11 7 7 Ali r 1- -r---- -rI- II II II i _I i T + +I IIL + 7 7 r I I P iJI i I -L I L -+-Ir I Ir II II +-+ I 7 I T I7 I7 1,000,000 2,000,000 3,000,000 4,000,000 Storage (cubic -feet) 5,000,000 6,000,000 Surface El Storage ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 36 Stage -Discharge for Pond Pond Cl: Pond C1 Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 664.00 0.00 674.40 427.55 664.20 0.00 674.60 430.51 664.40 0.00 674.80 433.45 664.60 0.00 675.00 436.37 664.80 0.00 675.20 439.27 665.00 0.00 675.40 442.15 665.20 0.48 675.60 445.01 665.40 2.12 675.80 447.86 665.60 4.85 676.00 450.68 665.80 8.53 676.20 453.49 666.00 13.18 676.40 456.28 666.20 18.77 676.60 459.05 666.40 25.25 676.80 461.81 666.60 32.58 677.00 464.55 666.80 40.73 677.20 467.28 667.00 49.66 677.40 469.98 667.20 59.30 677.60 472.68 667.40 69.63 677.80 475.36 667.60 80.59 678.00 478.02 667.80 92.14 678.20 480.67 668.00 104.21 678.40 483.30 668.20 116.76 678.60 485.92 668.40 129.72 678.80 488.53 668.60 143.03 679.00 491.12 668.80 156.63 679.20 493.70 669.00 170.44 679.40 496.26 669.20 184.38 679.60 498.81 669.40 198.38 679.80 501.35 669.60 212.32 680.00 503.88 669.80 226.10 680.20 506.39 670.00 239.59 680.40 508.89 670.20 252.65 680.60 511.38 670.40 265.07 680.80 513.86 670.60 276.61 681.00 516.32 670.80 286.83 681.20 518.77 671.00 294.75 681.40 521.21 671.20 304.42 681.60 523.64 671.40 313.79 681.80 526.06 671.60 322.88 682.00 528.47 671.80 331.73 682.20 530.87 672.00 340.35 682.40 533.25 672.20 348.76 682.60 535.63 672.40 356.96 682.80 537.99 672.60 364.99 683.00 540.35 672.80 372.84 673.00 380.52 673.20 388.06 673.40 395.45 673.60 402.71 673.80 409.84 674.00 416.84 674.20 423.73 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 37 Stage -Area -Storage for Pond Pond Cl: Pond C1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 664.00 49,861 0 674.40 355,408 2,838,183 664.20 61,153 11,101 674.60 356,792 2,909,403 664.40 72,445 24,461 674.80 358,176 2,980,900 664.60 83,736 40,079 675.00 359,560 3,052,674 664.80 95,028 57,956 675.20 361,005 3,124,730 665.00 106,320 78,091 675.40 362,449 3,197,075 665.20 120,001 100,723 675.60 363,894 3,269,710 665.40 133,683 126,091 675.80 365,338 3,342,633 665.60 147,364 154,196 676.00 366,783 3,415,845 665.80 161,045 185,037 676.20 368,227 3,489,346 666.00 174,727 218,614 676.40 369,672 3,563,136 666.20 188,408 254,927 676.60 371,116 3,637,214 666.40 202,089 293,977 676.80 372,561 3,711,582 666.60 215,771 335,763 677.00 374,005 3,786,239 666.80 229,452 380,285 677.20 375,450 3,861,184 667.00 243,133 427,544 677.40 376,894 3,936,419 667.20 256,815 477,539 677.60 378,339 4,011,942 667.40 270,496 530,270 677.80 379,783 4,087,754 667.60 284,177 585,737 678.00 381,228 4,163,855 667.80 297,859 643,941 678.20 382,672 4,240,245 668.00 311,540 704,881 678.40 384,117 4,316,924 668.20 312,882 767,323 678.60 385,561 4,393,892 668.40 314,224 830,033 678.80 387,006 4,471,149 668.60 315,565 893,012 679.00 388,450 4,548,694 668.80 316,907 956,259 679.20 389,895 4,626,529 669.00 318,249 1,019,775 679.40 391,339 4,704,652 669.20 319,591 1,083,559 679.60 392,784 4,783,065 669.40 320,933 1,147,611 679.80 394,228 4,861,766 669.60 322,274 1,211,932 680.00 395,673 4,940,756 669.80 323,616 1,276,521 680.20 397,166 5,020,040 670.00 324,958 1,341,379 680.40 398,659 5,099,622 670.20 326,342 1,406,509 680.60 400,152 5,179,503 670.40 327,726 1,471,915 680.80 401,644 5,259,683 670.60 329,110 1,537,599 681.00 403,137 5,340,161 670.80 330,494 1,603,559 681.20 404,630 5,420,938 671.00 331,878 1,669,797 681.40 406,123 5,502,013 671.20 333,262 1,736,311 681.60 407,616 5,583,387 671.40 334,647 1,803,102 681.80 409,109 5,665,060 671.60 336,031 1,870,169 682.00 410,602 5,747,031 671.80 337,415 1,937,514 682.20 412,095 5,829,300 672.00 338,799 2,005,135 682.40 413,587 5,911,868 672.20 340,183 2,073,033 682.60 415,080 5,994,735 672.40 341,567 2,141,208 682.80 416,573 6,077,901 672.60 342,951 2,209,660 683.00 418,066 6,161,365 672.80 344,335 2,278,389 673.00 345,719 2,347,394 673.20 347,103 2,416,677 673.40 348,487 2,486,236 673.60 349,871 2,556,071 673.80 351,256 2,626,184 674.00 352,640 2,696,574 674.20 354,024 2,767,240 ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Printed 11/15/2021 Page 38 [79] Warning: Inflow Area = Inflow = Outflow = Primary = Summary for Pond Pond C2: Pond C2 Submerged Pond Pond C1 Primary device # 1 OUTLET by 2.72' 533.800 ac, 0.00% Impervious, Inflow Depth > 6.31" for NRCC-100yr-24hr event 518.18 cfs @ 13.20 hrs, Volume= 280.511 af 424.39 cfs @ 15.79 hrs, Volume= 257.423 af, Atten= 18%, Lag= 155.7 min 424.39 cfs @ 15.79 hrs, Volume= 257.423 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Starting Elev= 650.00' Surf.Area= 386,547 sf Storage= 1,749,912 cf Peak Elev= 656.72' @ 15.79 hrs Surf.Area= 442,406 sf Storage= 4,545,124 cf (2,795,212 cf above start) Plug -Flow detention time= 250.8 min calculated for 217.251 af (77% of inflow) Center -of -Mass det. time= 112.4 min (1,038.4 - 926.0 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 644.00 646.00 648.00 650.00 652.00 654.00 656.00 657.50 644.00' 4,893,576 cf Custom Stage Data (Prismatic)Listed below (Recalc) Surf.Area (sq-ft) 223,281 260,873 309,169 386,547 406,548 421,590 436,857 448,455 Device Routing Invert Inc.Store (cubic -feet) 0 484,154 570,042 695,716 793,095 828,138 858,447 663,984 Outlet Devices Cum.Store (cubic -feet) 0 484,154 1,054,196 1,749,912 2,543,007 3,371,145 4,229,592 4,893,576 #1 Primary 644.00' #2 Device 1 #3 Device 1 650.00' 653.00' 72.0" Round Culvert L= 424.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 644.00' / 626.00' S= 0.0425'/' Cc= 0.900 n= 0.013, Flow Area= 28.27 sf 10.0" Vert. Orifice/Grate C= 0.600 40.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=424.39 cfs @ 15.79 hrs HW=656.72' (Free Discharge) t1=Culvert (Inlet Controls 424.39 cfs @ 15.01 fps) 12=Orifice/Grate (Passes < 6.59 cfs potential flow) 3=Sharp-Crested Rectangular Weir(Passes < 937.58 cfs potential flow) ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Printed 11/15/2021 Page 39 550- 500-' 450 -� 400 ' 350-- N U 0 u 250 Elevation (feet) 200 150- 100- : 50 Pond Pond C2: Pond C2 Hyd rog raph 4 8_ 8 10 12 14 16 18 r r - r + +ri T I I r T jnffow Area=53 .SQOI; ac Pea C Iev=656;72' Storage=4,545,124 cf r + -r 1 + T 1 i 7 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond Pond C2: Pond C2 Stage -Discharge 657' 656� 655' 654� L 'Sharp -Crested Rectangular Weir 653: 650- % 652- 651 649- 648- 647-- 646- 645 644 Orifice/Grata r 1 1 + + - r Culvert T i r• 0 50 100 150 200 250 Discharge (cfs) 300 350 400 • Inflow ❑ Primary ❑ Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 40 Elevation (feet) 657- 656 655e 654-; 653- 652-; 651 -, 650- 649= 6487, 647= 646- 645, 644 Pond Pond C2: Pond C2 Stage -Area -Storage arizontal/V €ed Area (s: 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 1 1 1 1 I I I 1 I I I I I I I I 1 + ++ + -+ +---+ 1 + 1 1 1 1 I I I I I I I 1 1 Custom Stage Data 400,000 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 4,500,000 Storage (cubic -feet) Surface El Storage ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 41 Stage -Discharge for Pond Pond C2: Pond C2 Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 644.00 0.00 651.80 3.09 644.15 0.00 651.95 3.25 644.30 0.00 652.10 3.41 644.45 0.00 652.25 3.56 644.60 0.00 652.40 3.70 644.75 0.00 652.55 3.84 644.90 0.00 652.70 3.97 645.05 0.00 652.85 4.10 645.20 0.00 653.00 4.22 645.35 0.00 653.15 11.94 645.50 0.00 653.30 25.95 645.65 0.00 653.45 44.06 645.80 0.00 653.60 65.48 645.95 0.00 653.75 89.75 646.10 0.00 653.90 116.58 646.25 0.00 654.05 145.74 646.40 0.00 654.20 177.05 646.55 0.00 654.35 210.38 646.70 0.00 654.50 245.60 646.85 0.00 654.65 282.63 647.00 0.00 654.80 321.37 647.15 0.00 654.95 361.76 647.30 0.00 655.10 387.46 647.45 0.00 655.25 391.03 647.60 0.00 655.40 394.57 647.75 0.00 655.55 398.08 647.90 0.00 655.70 401.56 648.05 0.00 655.85 405.00 648.20 0.00 656.00 408.42 648.35 0.00 656.15 411.81 648.50 0.00 656.30 415.17 648.65 0.00 656.45 418.51 648.80 0.00 656.60 421.82 648.95 0.00 656.75 425.10 649.10 0.00 656.90 428.36 649.25 0.00 657.05 431.59 649.40 0.00 657.20 434.80 649.55 0.00 657.35 437.98 649.70 0.00 657.50 441.14 649.85 0.00 650.00 0.00 650.15 0.09 650.30 0.33 650.45 0.69 650.60 1.11 650.75 1.52 650.90 1.83 651.05 2.09 651.20 2.32 651.35 2.54 651.50 2.73 651.65 2.92 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 42 Stage -Area -Storage for Pond Pond C2: Pond C2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 644.00 223,281 0 651.80 404,548 2,461,897 644.15 226,100 33,704 651.95 406,048 2,522,692 644.30 228,920 67,830 652.10 407,300 2,583,699 644.45 231,739 102,380 652.25 408,428 2,644,879 644.60 234,559 137,352 652.40 409,556 2,706,228 644.75 237,378 172,747 652.55 410,685 2,767,746 644.90 240,197 208,565 652.70 411,813 2,829,433 645.05 243,017 244,806 652.85 412,941 2,891,290 645.20 245,836 281,470 653.00 414,069 2,953,316 645.35 248,656 318,557 653.15 415,197 3,015,510 645.50 251,475 356,067 653.30 416,325 3,077,875 645.65 254,294 394,000 653.45 417,453 3,140,408 645.80 257,114 432,355 653.60 418,582 3,203,111 645.95 259,933 471,134 653.75 419,710 3,265,983 646.10 263,288 510,362 653.90 420,838 3,329,024 646.25 266,910 550,127 654.05 421,972 3,392,234 646.40 270,532 590,435 654.20 423,117 3,455,616 646.55 274,154 631,287 654.35 424,262 3,519,169 646.70 277,777 672,681 654.50 425,407 3,582,894 646.85 281,399 714,620 654.65 426,552 3,646,791 647.00 285,021 757,101 654.80 427,697 3,710,860 647.15 288,643 800,126 654.95 428,842 3,775,100 647.30 292,265 843,694 655.10 429,987 3,839,512 647.45 295,888 887,805 655.25 431,132 3,904,096 647.60 299,510 932,460 655.40 432,277 3,968,852 647.75 303,132 977,658 655.55 433,422 4,033,779 647.90 306,754 1,023,400 655.70 434,567 4,098,878 648.05 311,103 1,069,703 655.85 435,712 4,164,149 648.20 316,907 1,116,804 656.00 436,857 4,229,592 648.35 322,710 1,164,775 656.15 438,017 4,295,208 648.50 328,514 1,213,617 656.30 439,177 4,360,997 648.65 334,317 1,263,329 656.45 440,336 4,426,961 648.80 340,120 1,313,912 656.60 441,496 4,493,098 648.95 345,924 1,365,365 656.75 442,656 4,559,409 649.10 351,727 1,417,689 656.90 443,816 4,625,895 649.25 357,530 1,470,883 657.05 444,976 4,692,554 649.40 363,334 1,524,948 657.20 446,135 4,759,387 649.55 369,137 1,579,883 657.35 447,295 4,826,395 649.70 374,940 1,635,689 657.50 448,455 4,893,576 649.85 380,744 1,692,365 650.00 386,547 1,749,912 650.15 388,047 1,808,007 650.30 389,547 1,866,326 650.45 391,047 1,924,871 650.60 392,547 1,983,640 650.75 394,047 2,042,635 650.90 395,547 2,101,855 651.05 397,048 2,161,299 651.20 398,548 2,220,969 651.35 400,048 2,280,863 651.50 401,548 2,340,983 651.65 403,048 2,401,328 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 43 Summary for Link A-1: Outfall Al Inflow Area = 278.500 ac, 0.00% Impervious, Inflow Depth > 5.93" for NRCC-100yr-24hr event Inflow = 530.21 cfs @ 12.47 hrs, Volume= 137.525 af Primary = 530.21 cfs @ 12.47 hrs, Volume= 137.525 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs 550- 5007' 45O- 400 350- N _ 300- o U 250- 200- 150 100 50- H 1- Link A-1: Outfall Al Hyd rog raph H rt err bv�r Are _ 0.5O0r ac - H H 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ® Inflow ❑ Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 44 Summary for Link A-2: Outfall A2 Inflow Area = 37.000 ac, 0.00% Impervious, Inflow Depth = 4.86" for NRCC-100yr-24hr event Inflow = 154.43 cfs @ 12.32 hrs, Volume= 14.977 af Primary = 154.43 cfs @ 12.32 hrs, Volume= 14.977 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs 170i- 160i- 150� 140 130� 120 110�� w 100 o 90 ' 80 LL 70� 60 50� 1o. 0- L r Link A-2: Outfall A2 Hyd rog raph J rt J L r J J In f lor�lr_ A-ea=37.000! a� - J ✓ + J 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ■ Inflow ❑ Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 45 Summary for Link B-1: Total DA B Inflow Area = 312.300 ac, 0.00% Impervious, Inflow Depth > 6.05" for NRCC-100yr-24hr event Inflow = 415.71 cfs @ 12.56 hrs, Volume= 157.366 af Primary = 415.71 cfs @ 12.56 hrs, Volume= 157.366 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs U 0 LL Link B-1: Total DA B Hyd rog raph 460= 440i' 420i 400— 380' 360 340- 320i 300i 280= 260'' 240= 220- i 200 160€ 1404/ 120— 100i 80- 60' 40= 20- 0 T r 1 1 1--1--I T r 1 415.f1 cis 1 1 L i rr r r $nfUow_Are0:=112.10O ac- T r 1 1 T r 1 T r 1 T + + + 1 + + + + + L + + 11 1 r 1I 1 1 1 L 1 1 1 L 1 1 1 r r 1 1 T r 1 1 T r 1 1 T r 1 1 T 1 1 T T 1 L 1 1 1 L 1 1 1 L 1 1 1 Y 1 1 r1ti r 1 1 -4 r1 1 1- r r T 1 1 r 1 T 1 L 1 1 1 L 1 1 L 1 1 r 1 1 T r 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Inflow ❑ Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 46 Summary for Link B-2: Outfall B2 Inflow Area = 62.000 ac, 0.00% Impervious, Inflow Depth = 3.86" for NRCC-100yr-24hr event Inflow = 176.58 cfs @ 12.43 hrs, Volume= 19.950 af Primary = 176.58 cfs @ 12.43 hrs, Volume= 19.950 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs 190 180= 170= 160/ 150=' 140='� 130 . 120= w 110 100. 0 90= LL 80 70- 60= 50= 40 30=' 20� 10€ 0 1 176.58 cf 1 1 4- Link B-2: Outfall B2 Hyd rog raph 1 1 1 ' !'°'lA' i Ai-ea_072.030* a-1 T 1 T T T T T T 1 1 ✓ 1 1 4 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Inflow El Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-100yr-24hr Rainfall=7.42" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 47 Summary for Link C: Total DA C Inflow Area = 879.200 ac, 0.00% Impervious, Inflow Depth > 5.23" for NRCC-100yr-24hr event Inflow = 1,143.62 cfs @ 12.73 hrs, Volume= 383.074 af Primary = 1,143.62 cfs @ 12.73 hrs, Volume= 383.074 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs 1,200 1,100�� 1,0001" 900� 800� F 7001" 0 600f LL 5001" 400� 300f 200f Link C: Total DA C Hyd rog raph 1' f�oyv Arga=879:200; ap /®/77- //%%//////////////////% 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ® Inflow ❑ Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 48 Time span=0.00-48.00 hrs, dt=0.05 hrs, 961 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentAl: Al -A SubcatchmentA2: A2 SubcatchmentA3.U: DAA1 SubcatchmentA4.U: DA A2 SubcatchmentBl: B1-A SubcatchmentB2.U: DA B2.0 SubcatchmentB3.U: DA B3.0 SubcatchmentCl: C1-A SubcatchmentC2.U: DA C2.0 SubcatchmentC3.U: DA C3.0 Pond Pond A3: Pond A3 Runoff Area=99.300 ac 0.00% Impervious Runoff Depth=4.35" Tc=20.0 min CN=94 Runoff=364.42 cfs 35.975 af Runoff Area=125.300 ac 0.00% Impervious Runoff Depth=4.46" Tc=25.0 min CN=95 Runoff=420.37 cfs 46.561 af RunoffArea=53.900 ac 0.00% Impervious Runoff Depth=2.57" Tc=30.0 min CN=76 Runoff=102.04 cfs 11.537 af RunoffArea=37.000 ac 0.00% Impervious Runoff Depth=2.75" Tc=22.0 min CN=78 Runoff=87.90 cfs 8.466 af RunoffArea=278.800 ac 0.00% Impervious Runoff Depth=4.46" Tc=30.0 min CN=95 Runoff=851.32 cfs 103.601 af RunoffArea=33.500 ac 0.00% Impervious Runoff Depth=2.31" Tc=30.0 min CN=73 Runoff=56.73 cfs 6.454 af RunoffArea=62.000 ac 0.00% Impervious Runoff Depth=1.99" Tc=30.0 min CN=69 Runoff=88.85 cfs 10.263 af RunoffArea=533.800 ac 0.00% Impervious Runoff Depth=4.02" Tc=30.0 min CN=91 Runoff=1,527.46 cfs 178.864 af Runoff Area=183.000 ac 0.00% Impervious Runoff Depth=2.48" Tc=50.0 min CN=75 Runoff=249.95 cfs 37.847 af RunoffArea=162.400 ac 0.00% Impervious Runoff Depth=2.23" Tc=45.0 min CN=72 Runoff=211.17 cfs 30.162 of Peak Elev=687.28' Storage=2,612,029 cf Inflow=775.28 cfs 82.536 af Outflow=194.81 cfs 72.563 af Pond Pond B1: Pond B1 Peak Elev=683.88' Storage=1,346,008 cf Inflow=851.32 cfs 103.601 af 84.0" Round Culvert n=0.013 L=711.0' S=0.0830 '/' Outflow=387.61 cfs 103.491 af Pond Pond B2: Pond B2 Peak EIev=619.10' Storage=2,304,541 cf Inflow=387.61 cfs 103.491 af Outflow=330.59 cfs 90.491 af Pond Pond C1: Pond C1 Peak EIev=675.47' Storage=3,224,204 cf Inflow=1,527.46 cfs 178.864 af 72.0" Round Culvert n=0.013 L=991.0' S=0.0111 '/' Outflow=443.22 cfs 176.812 af Pond Pond C2: Pond C2 Peak EIev=655.10' Storage=3,841,601 cf Inflow=443.22 cfs 176.812 af Outflow=387.58 cfs 153.916 af LinkA-1: OutfallA1 Inflow=278.19 cfs 84.099 af Primary=278.19 cfs 84.099 af ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 49 Link A-2: Outfall A2 Link B-1: Total DA B Link B-2: Outfall B2 Link C: Total DA C Inflow=87.90 cfs 8.466 af Primary=87.90 cfs 8.466 af Inflow=347.70 cfs 96.945 af Primary=347.70 cfs 96.945 af Inflow=88.85 cfs 10.263 af Primary=88.85 cfs 10.263 af Inflow=511.88 cfs 221.924 af Primary=511.88 cfs 221.924 af Total Runoff Area = 1,569.000 ac Runoff Volume = 469.730 af Average Runoff Depth = 3.59" 100.00% Pervious = 1,569.000 ac 0.00% Impervious = 0.000 ac ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment Al: Al -A Runoff = 364.42 cfs @ 12.29 hrs, Volume= 35.975 af, Depth= 4.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description 99.300 94 99.300 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 400- 380 360 340 320 300 280 260 240 u 220 0 200 LL 180 160 140 120 100 80 60 40 20 0 Direct Entry, Subcatchment Al: Al -A Hydrograph 364.42 i rt fi T 1 7 7 1 1 + L 1 1 L L I I 1 1 L L 1 1 L L L L IIRCC_244hri13_ L NRCC- F0'yr 24hr I a'rrtifa I= G4„ I un+ r 1 1 offArea=99.300 ac � + r + H t Runoff V6Futne*36975- f - 7 Fit' riofrDP t117=i1*" TQ=210 o'I mun - C N=941 1 L 1 IL L 1 1 -I + + 1 1 1 + + + '+ + + + + + I 1 + + + 1 1 + + 1 'I 1 I L 11 1 1 I t r 1 1 1 1 t i T T 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 51 Summary for Subcatchment A2: A2 Runoff = 420.37 cfs @ 12.35 hrs, Volume= 46.561 af, Depth= 4.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description * 125.300 95 125.300 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 25.0 Direct Entry, 460= Subcatchment A2: A2 Hydrograph ▪ 1 L L 1 1 L J•• r , 1 1 1 7 1 1 L 440= jazo.7cfs l 1 + L + 420 1 1 isiR-CC 24»hr13- 400=L 1 1 1 L 1 L L 1 �+1 L L L 1 1 1 1 L 380i i 1 rt t rt t L NR C11-1D;yr-2-4br Rarhfa I=_$.04„ 360 - Runoff -Area= t25 d0 ac 340= 1 1 1 1 1 1 L 320 7 L rt l Runoff uoku ne*4 561 af 300 280 = 1 1 JI IT,260.. 1 1T T 1,-=25 m I n U �' 1 1 1 1 1 1 I 1 1 240= 5 220 --2--+ L 1 1 1 1--+--11- • 200= 1--1--r r 1 r r I 1 r 1 180 I I 1 1 1 II 160= - 1 1 - 7 L 1 1 4 ' i- 1 1 1 1 L-- --1 1 1 4--+-- 140" 7 7 L 7 7 T r 1 7 L r 1 7 T 120 ill I 1 1 1 1 1 1 1 1 1 II 80=' T 7 T r 44 T L 7 T T r r 7 T 60= LI L 1 - 1 1 1 L L 1 1 1 L 20- Ruhoff 1 CN= 5 Y �12 • �14 1. 8 10 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Runo ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 52 Summary for Subcatchment A3.U: DA Al Runoff = 102.04 cfs @ 12.43 hrs, Volume= 11.537 af, Depth= 2.57" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description 53.900 76 53.900 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, Subcatchment A3.U: DA Al Hydrograph 1 1 1 L 110=' - 1--1 _r 105 _' 11 1102.04 cfs 1 100i 1 95= - 1 1 1--+--L 90 1 85" 80 -' 75 ' 1 1 r r r r 7O— - w 65= 60"� - 1 + 1 30 55i 1 1 1 1 LT_50-'' 1 1 1 45'L L ' + 40=' - 7 7 T 35= , 1 1 30= - I I L L 25 - 1 7 T 20' — 15 10= 5= 1 1 r 1 1 LI L 1 L r _J 1 + 1I C_I24»hrs_ NRICC_ r -24hr Ra-mill 5 G4'. i unoff Area=53.9-00 -ac - - 1'Rurn1 o rVf Furne=11-.53raf - r r f ux1-0ff-D pt =Z -57'= - 1 1 Tc=30 miln +--+--+ 1 L+ 1 1 1 7 1 r 1 1 1 1 r 1 1 1 i I -=- 6- 41 41 + 4 1 1 1 41 + 4 1 1 1 44 7 7 T r 1 1 1 7 r r 1 1 r 7 T + 4 41 + 4 1 1 41 + 7 7 T r 1 1 1 7 r r IT 7 T _II 1 + r 11 11 1 - t r r r 1 + 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Runo ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 53 Summary for Subcatchment A4.U: DA A2 Runoff = 87.90 cfs @ 12.32 hrs, Volume= 8.466 af, Depth= 2.75" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description 37.000 78 37.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 22.0 95€ 90= 85_` 80 - 75 70 65= 6O- H 55= 3 50 0 45_ LL 40_ 35= 307. 25= 20. 15- 107 53 Direct Entry, Subcatchment A4.U: DA A2 Hydrograph z 4 4 87.90 cfs I HI 41 I ▪ I rt ✓ 4 ✓ rt r r r 7 r 7 4- r r r r r 4- r r rt 7 4 7 III 1ifRC-C 124»'hr 4N "CC-1 y-r-'1241tir RaittfalL=L.04„ *urtof -Area=3 .-000'c - RUmiff Voila mie=8.466-a f r t r r Runo D00L 2.7 " 7 7 7 7 7 7 TE=-22.0'rmin-- rr �.I/ 0 4 r N� LI r r r ▪ r r r r ▪ r 7 r r r 7 7 r T T T r T 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ■ Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 54 Summary for Subcatchment B1: B1-A Runoff = 851.32 cfs @ 12.41 hrs, Volume= 103.601 af, Depth= 4.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description * 278.800 95 278.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, 0 LL Subcatchment B1: B1-A Hydrograph 950s 900:' 8503" 800 750 700- 650= 600= 550: 500: 4504- 4004- 3503- 300:- " 2504- 200= 1504- 100 r r NRQC ▪ 1-1 I I y r r I I + ▪ --+--+--------I--+--+ 14JRCC-I124»hr13- -1-0y r-24hr Ra'mfai l=$ M4" - Runoff Area=278.8O0 ac L I I L Runoff ,Volu nie=103.6b 1_ of - Runoff Dpt1h=4 " - J L Tc=30 • mien CN=95 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment B2.U: DA B2.0 Runoff = 56.73 cfs @ 12.44 hrs, Volume= 6.454 af, Depth= 2.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description 33.500 73 33.500 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 60- 55� 50� 45� 40� 35� 0 30J , lL 201 15� 10� 5 Direct Entry, Subcatchment B2.U: DA B2.0 Hydrograph rt t 56.73 c 4 r 4- 4- 4- I-I II— NRCC 124»hr 4N R,`CC=1 yr =24hr Rai t fall=$.114" - -F unof -Area aa.-500 ac - Rran_dff Vohanie=6.454_ff _ Runoff Depth=2.31_" Tc=30.0�� mien L CN=73 //i///// /%//////////)//,//////////F%/.0i//®%////% 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ■ Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 56 Summary for Subcatchment B3.U: DA B3.0 Runoff = 88.85 cfs @ 12.44 hrs, Volume= 10.263 af, Depth= 1.99" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description 62.000 69 62.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, Subcatchment B3.U: DA B3.0 Hydrograph J 95� 904" - 85 _ 8o 75 7o 65" 60= 55- 50_ 45= 40= 35=' 30=' 25i _ 207 15:' 10i 5. 88.85 cfs 1 4 4 7 7 7 7 ftIRCC 2441rB- + r NRCC- 1Qyr-24hr Rainfall=$.04" *ur of -Area&&AD-0 4c- - Runoff iidlu d=1b-263-af 1 1 1 1 1 1 1 1 1 r 1 i Rurtof1 Dpptii=1.90_" 4- 1 Tc=30.O-mwrn- r r r 1 1 1 4 4I I 1I 11 11 CN =69 + -4 rt rt + r r 1I I '1- r -I Y Y Y r r 1 r r T r r r r r T T 'r r T T T 4- 1 r ir r 4- 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ■ Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 57 Summary for Subcatchment C1: C1-A Runoff = 1,527.46 cfs @ 12.41 hrs, Volume= 178.864 af, Depth= 4.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description * 533.800 91 533.800 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, Subcatchment C1: C1-A Hydrograph 1,700: r 1,6004' 1,500 1,4004 1,3004' 1,200% 1,100=' 1,000 N o 9004' 8004' • 7004' 600='F 500 4004' 3001 2004" 100= 0- — — — — — — H --I---1--+--+-- L 1 1 1,527.46 cf5 CIS=91 i LI + --+--r--1--H--+--+ L I 1 L 1 LI J r r ▪ r ▪ NRCC r + + NRCC 24-'hr 8 ▪ r r I I 10yr-24h1r ItairtfalI=5.04" -Runoff-*rea= 43*800 aG - Rundf€ ttoIuhe=176:864-af - �ur�,�D�1rtM=�.fl2" - ▪ hTia�.Omnn ✓ —V + + ✓ IT r L L r L r 4 + T r + ▪ i L 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ■ Runo ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 58 Summary for Subcatchment C2.U: DA C2.0 Runoff = 249.95 cfs @ 12.70 hrs, Volume= 37.847 af, Depth= 2.48" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description * 183.000 75 183.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 50.0 Direct Entry, Subcatchment C2.U: DA C2.0 Hydrograph 260 240- 220' 200 1807' 160' 3 140 0 LT- 120," 100-- 807' 60:' 407' L-NRRC-244hr - NRCC-1-0yr-24hr RtmOff$ea=1-83 Od0-ac 1 + 1249.95 cfs 1 L 1 1 1 7 T RunoffVdFu ne37 847-af - Ru flofF Deptff=2 4 " 1 - Tc=40.-0 min - LL _C ICI =%+5 - ✓ 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 Time (hours) 1 i i 44 46 48 ■ Runoff ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 59 Summary for Subcatchment C3.U: DA C3.0 Runoff = 211.17 cfs @ 12.64 hrs, Volume= 30.162 af, Depth= 2.23" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Area (ac) CN Description * 162.400 72 162.400 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 45.0 Direct Entry, 230' 220 = 1 211.17 cfs 210= - 1 1 , 1 T 200= 190= + + + Subcatchment C3.U: DA C3.0 Hydrograph Ti T T T Ti T T 1 T + 180= 7 7 T 170€ - L L 160= - + + + - + 150= 1 1 1 140i 1 1 1 L N 130i' L 120i 0 110'_ � 4 u- 100i- - 1 1 7 7 1 90 - 1 1 80 - -1 + 70= 7 7 T 60=' 1 1 50- - 1 1 +--4--+ 401' - T 7 T 30'.' I i 1 20€ 1 1 +'--+--+ 0..11 . I r 1 1 1 14IR-CC-24.hrtB- + NRICc-'LQyr-Z4hr Raf l=L.Q4„ 4 7 T T RunoffAra= t62.-4d04c 11 1 L L I 1 I J L L I I I 1 1 +--1--I--- Runoff ubFukne*30162-af- 1 F urtoft-Dgpt1,7=22 'f - rt+ r 1 1 1 y--t--r--rTc=45.0 T 7 T 1 1 C N=7+2 r1 1 1 T 1 1 + T 1 1 1 4 T + 1 1 1 1 + 7 7 T T I 7 T 7 I 7 T 1 1 T 1 I 1 1 L I I TT 1 I 1 T ' I + - - + - - + +--+ I 1 1 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Runo ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 60 Inflow Area = Inflow = Outflow = Primary = Summary for Pond Pond A3: Pond A3 224.600 ac, 0.00% Impervious, Inflow Depth = 4.41" for NRCC-10yr-24hr event 775.28 cfs @ 12.31 hrs, Volume= 82.536 af 194.81 cfs @ 12.90 hrs, Volume= 72.563 af, Atten= 75%, Lag= 35.0 min 194.81 cfs @ 12.90 hrs, Volume= 72.563 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Starting Elev= 678.00' Surf.Area= 168,544 sf Storage= 781,799 cf Peak Elev= 687.28' @ 12.90 hrs Surf.Area= 223,083 sf Storage= 2,612,029 cf (1,830,230 cf above start) Plug -Flow detention time= 337.1 min calculated for 54.615 af (66% of inflow) Center -of -Mass det. time= 172.8 min (959.4 - 786.5 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 672.00 674.00 676.00 678.00 680.00 682.00 684.00 686.00 688.00 690.00 692.00 672.00' 3,727,860 cf Custom Stage Data (Prismatic)Listed below (Recalc) Device Routing Surf.Area (sq-ft) 99,117 113,009 144,060 168,544 183,296 193,916 204,761 215,830 227,123 238,641 250,383 Invert Inc.Store (cubic -feet) 0 212,126 257,069 312,604 351,840 377,212 398,677 420,591 442,953 465,764 489,024 Outlet Devices Cum.Store (cubic -feet) 0 212,126 469,195 781,799 1,133,639 1,510,851 1,909,528 2,330,119 2,773,072 3,238,836 3,727,860 #1 Primary #2 #3 #4 Device 1 Device 1 Device 1 672.00' 678.00' 688.00' 681.00' 60.0" Round Culvert L= 414.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 672.00' / 670.00' S= 0.0048'/' Cc= 0.900 n= 0.013, Flow Area= 19.63 sf 6.0" Vert. Orifice/Grate C= 0.600 40.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) 54.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=194.81 cfs @ 12.90 hrs HW=687.28' (Free Discharge) t.=Culvert (Passes 194.81 cfs of 317.73 cfs potential flow) -2=Orifice/Grate (Orifice Controls 2.84 cfs @ 14.47 fps) -3=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) -4=Orifice/Grate (Orifice Controls 191.97 cfs @ 12.07 fps) ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 61 Elevation (feet) Pond Pond A3: Pond A3 Hyd rog raph /�, 850� 800� 750� 700 650� 600 550� 500 450� 400� 350 300-'' 250� 200-'' 150'' 100� 50 0 T I I T T i 775.28 cfs i r t r — —r 1 t r 7 + 7 — —7 T 1--t--r 194.81 cf r jnffow=Area= 24 600 ac Peik lev=$$7,201 Storage=2,612}029 cf T T L L T T T -I T r t -r 4 1 L T T r 1 L A 4- 1 L 1 r 1 1 1 i 1 r T T 1 t 69 69 69 68 68 68 68 68 68 68 68 68 68 67 67 67 67 67 67 67 67 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond Pond A3: Pond A3 Stage -Discharge 0- 9= 8- 7= 6= 5. 4=, 3= 2� 0 9 7 6-% 5 1 L L /'Orifice/Adiro- Grate 4m 3 L L i L Orifice/Grate r r Sharp -Crested Rectangular Weir L L L L L L L r r T Culvert r L i L L L 4- L 4- r r r- r r r r 0 50 100 150 200 Discharge (cfs) 250 300 350 ® Inflow ❑ Primary ❑ Primary ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 62 Elevation (feet) 0 692/ 691-i 690= 689= 688-= 687-E 686- 685 684- Pond Pond A3: Pond A3 Stage -Area -Storage rrface/Horizontal/Wetted Area (sq-ft) 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 4- r u r n r r 1 r1 il I J L J 11 1111 683'' I 682 681''r 680i ' - 679 678 f 677-' 676_ 675_ 674' , 673 672 0 r 500,000 1,000,000 11 J L LI L - L - - L _ _ _ _ JI I- r + 1,500,000 2,000,000 2,500,000 Storage (cubic -feet) 3,000,000 3,500,000 Surface El Storage ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 63 Stage -Discharge for Pond Pond A3: Pond A3 Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 672.00 0.00 682.40 78.50 672.20 0.00 682.60 95.53 672.40 0.00 682.80 104.76 672.60 0.00 683.00 110.36 672.80 0.00 683.20 115.69 673.00 0.00 683.40 120.78 673.20 0.00 683.60 125.67 673.40 0.00 683.80 130.37 673.60 0.00 684.00 134.91 673.80 0.00 684.20 139.29 674.00 0.00 684.40 143.55 674.20 0.00 684.60 147.68 674.40 0.00 684.80 151.70 674.60 0.00 685.00 155.61 674.80 0.00 685.20 159.43 675.00 0.00 685.40 163.16 675.20 0.00 685.60 166.81 675.40 0.00 685.80 170.37 675.60 0.00 686.00 173.87 675.80 0.00 686.20 177.29 676.00 0.00 686.40 180.65 676.20 0.00 686.60 183.95 676.40 0.00 686.80 187.19 676.60 0.00 687.00 190.38 676.80 0.00 687.20 193.51 677.00 0.00 687.40 196.59 677.20 0.00 687.60 199.63 677.40 0.00 687.80 202.61 677.60 0.00 688.00 205.56 677.80 0.00 688.20 220.16 678.00 0.00 688.40 244.42 678.20 0.11 688.60 274.95 678.40 0.36 688.80 310.54 678.60 0.56 689.00 339.20 678.80 0.70 689.20 341.61 679.00 0.82 689.40 344.01 679.20 0.92 689.60 346.39 679.40 1.01 689.80 348.75 679.60 1.10 690.00 351.10 679.80 1.18 690.20 353.43 680.00 1.25 690.40 355.75 680.20 1.32 690.60 358.05 680.40 1.39 690.80 360.34 680.60 1.45 691.00 362.62 680.80 1.51 691.20 364.88 681.00 1.57 691.40 367.12 681.20 5.76 691.60 369.35 681.40 13.37 691.80 371.57 681.60 23.22 692.00 373.78 681.80 34.86 682.00 48.06 682.20 62.65 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 64 Stage -Area -Storage for Pond Pond A3: Pond A3 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 672.00 99,117 0 682.40 196,085 1,588,851 672.20 100,506 19,962 682.60 197,170 1,628,177 672.40 101,895 40,202 682.80 198,254 1,667,719 672.60 103,285 60,720 683.00 199,339 1,707,478 672.80 104,674 81,516 683.20 200,423 1,747,454 673.00 106,063 102,590 683.40 201,507 1,787,647 673.20 107,452 123,942 683.60 202,592 1,828,057 673.40 108,841 145,571 683.80 203,676 1,868,684 673.60 110,231 167,478 684.00 204,761 1,909,528 673.80 111,620 189,663 684.20 205,868 1,950,591 674.00 113,009 212,126 684.40 206,975 1,991,875 674.20 116,114 235,038 684.60 208,082 2,033,381 674.40 119,219 258,572 684.80 209,189 2,075,108 674.60 122,324 282,726 685.00 210,296 2,117,056 674.80 125,429 307,501 685.20 211,402 2,159,226 675.00 128,535 332,898 685.40 212,509 2,201,617 675.20 131,640 358,915 685.60 213,616 2,244,230 675.40 134,745 385,554 685.80 214,723 2,287,064 675.60 137,850 412,813 686.00 215,830 2,330,119 675.80 140,955 440,694 686.20 216,959 2,373,398 676.00 144,060 469,195 686.40 218,089 2,416,903 676.20 146,508 498,252 686.60 219,218 2,460,633 676.40 148,957 527,798 686.80 220,347 2,504,590 676.60 151,405 557,835 687.00 221,477 2,548,772 676.80 153,854 588,360 687.20 222,606 2,593,180 677.00 156,302 619,376 687.40 223,735 2,637,815 677.20 158,750 650,881 687.60 224,864 2,682,675 677.40 161,199 682,876 687.80 225,994 2,727,760 677.60 163,647 715,361 688.00 227,123 2,773,072 677.80 166,096 748,335 688.20 228,275 2,818,612 678.00 168,544 781,799 688.40 229,427 2,864,382 678.20 170,019 815,655 688.60 230,578 2,910,382 678.40 171,494 849,807 688.80 231,730 2,956,613 678.60 172,970 884,253 689.00 232,882 3,003,075 678.80 174,445 918,995 689.20 234,034 3,049,766 679.00 175,920 954,031 689.40 235,186 3,096,688 679.20 177,395 989,363 689.60 236,337 3,143,840 679.40 178,870 1,024,989 689.80 237,489 3,191,223 679.60 180,346 1,060,911 690.00 238,641 3,238,836 679.80 181,821 1,097,127 690.20 239,815 3,286,682 680.00 183,296 1,133,639 690.40 240,989 3,334,762 680.20 184,358 1,170,404 690.60 242,164 3,383,077 680.40 185,420 1,207,382 690.80 243,338 3,431,628 680.60 186,482 1,244,572 691.00 244,512 3,480,413 680.80 187,544 1,281,975 691.20 245,686 3,529,432 681.00 188,606 1,319,590 691.40 246,860 3,578,687 681.20 189,668 1,357,417 691.60 248,035 3,628,176 681.40 190,730 1,395,457 691.80 249,209 3,677,901 681.60 191,792 1,433,709 692.00 250,383 3,727,860 681.80 192,854 1,472,174 682.00 193,916 1,510,851 682.20 195,001 1,549,743 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 65 Summary for Pond Pond B1: Pond B1 Inflow Area = 278.800 ac, 0.00% Impervious, Inflow Depth = 4.46" for NRCC-10yr-24hr event Inflow = 851.32 cfs @ 12.41 hrs, Volume= 103.601 af Outflow = 387.61 cfs @ 12.82 hrs, Volume= 103.491 af, Atten= 54%, Lag= 24.9 min Primary = 387.61 cfs @ 12.82 hrs, Volume= 103.491 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 683.88' @ 12.82 hrs Surf.Area= 275,063 sf Storage= 1,346,008 cf Plug -Flow detention time= 67.2 min calculated for 103.383 af (100% of inflow) Center -of -Mass det. time= 67.6 min (858.5 - 790.9 ) Volume Invert Avail.Storage Storage Description #1 676.00' 2,737,543 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 676.00 75,404 0 0 678.00 120,832 196,236 196,236 680.00 169,974 290,806 487,042 682.00 222,421 392,395 879,437 684.00 278,551 500,972 1,380,409 686.00 338,363 616,914 1,997,323 688.00 401,857 740,220 2,737,543 Device Routing Invert Outlet Devices #1 Primary 676.00' 84.0" Round Culvert L= 711.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 676.00' / 617.00' S= 0.0830'/' Cc= 0.900 n= 0.013, Flow Area= 38.48 sf Primary OutFlow Max=387.45 cfs @ 12.82 hrs HW=683.87' (Free Discharge) t1=Culvert (Inlet Controls 387.45 cfs @ 10.07 fps) ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 66 Pond Pond B1: Pond B1 Hyd rog raph 950 900€ f 850- 800 750= 700= 650i 600€ w 550_ 5004- 0 450 • 400=' 350= 300= 250= 200= 150" f 100=' 50 0 Elevation (feet) 688-7/ 6871 6861 6851 6841: 683-' 682' 681-' 680 6791' 6781' 6771' Culvert 676 7 T T T — — 1 851.329fs. T 1 1 1 1 387.61 4 1 1 7 7 1 + r I 4 T + I 4 T 1 7 r 1 7 7 r 1 T T 1 'wow- rea470.800 a� 1 Pea C eiev=60,8 ' 4 Storage=1111,346 00-8 cf 1 4 184 -0" - gqu-i d- CiFve n=0.0 T8 1 L LL= -11 .Cr- ▪ L I 1 I S=O O -30 IP 1 1 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond Pond B1: Pond B1 Stage -Discharge 1 1 7 H 1 r 4- L r L T T 7 0 50 100 150 200 250 300 Discharge (cfs) 350 400 450 500 II Inflow ❑ Primary • Primary ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 67 Elevation (feet) 688- 6877' 686—' 6857' 6847' 683 6827' 6817 6807" 679 678— 6777' 676 0 Pond Pond B1: Pond B1 Stage -Area -Storage Surface/Horizontal/Wetted A 50,000 100,000 150,000 200,000 250,000 500,000 1,000,000 1,500,000 Storage (cubic -feet) L 300,000 350,000 400,000 2,000,000 L 2,500,000 4 4 4 Surface El Storage ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 68 Stage -Discharge for Pond Pond B1: Pond B1 Elevation Primary Elevation Primary Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) (feet) (cfs) (feet) (cfs) 676.00 0.00 679.12 99.76 682.24 308.09 685.36 448.57 676.06 0.04 679.18 103.25 682.30 311.76 685.42 450.86 676.12 0.17 679.24 106.78 682.36 315.37 685.48 453.14 676.18 0.39 679.30 110.36 682.42 318.89 685.54 455.41 676.24 0.68 679.36 113.97 682.48 322.34 685.60 457.66 676.30 1.07 679.42 117.63 682.54 325.69 685.66 459.91 676.36 1.53 679.48 121.33 682.60 328.95 685.72 462.14 676.42 2.08 679.54 125.06 682.66 332.09 685.78 464.37 676.48 2.71 679.60 128.83 682.72 335.11 685.84 466.58 676.54 3.42 679.66 132.63 682.78 337.98 685.90 468.78 676.60 4.21 679.72 136.47 682.84 340.69 685.96 470.97 676.66 5.08 679.78 140.33 682.90 343.19 686.02 473.16 676.72 6.03 679.84 144.23 682.96 345.42 686.08 475.33 676.78 7.06 679.90 148.17 683.02 347.66 686.14 477.49 676.84 8.16 679.96 152.12 683.08 350.61 686.20 479.64 676.90 9.34 680.02 156.11 683.14 353.53 686.26 481.79 676.96 10.60 680.08 160.13 683.20 356.44 686.32 483.92 677.02 11.93 680.14 164.16 683.26 359.31 686.38 486.04 677.08 13.34 680.20 168.22 683.32 362.17 686.44 488.16 677.14 14.82 680.26 172.31 683.38 365.00 686.50 490.26 677.20 16.38 680.32 176.41 683.44 367.81 686.56 492.36 677.26 18.00 680.38 180.54 683.50 370.60 686.62 494.45 677.32 19.70 680.44 184.68 683.56 373.37 686.68 496.53 677.38 21.47 680.50 188.84 683.62 376.12 686.74 498.60 677.44 23.31 680.56 193.01 683.68 378.85 686.80 500.66 677.50 25.21 680.62 197.20 683.74 381.56 686.86 502.71 677.56 27.19 680.68 201.39 683.80 384.25 686.92 504.76 677.62 29.23 680.74 205.60 683.86 386.92 686.98 506.79 677.68 31.34 680.80 209.82 683.92 389.58 687.04 508.82 677.74 33.52 680.86 214.04 683.98 392.21 687.10 510.84 677.80 35.76 680.92 218.27 684.04 394.83 687.16 512.85 677.86 38.06 680.98 222.50 684.10 397.43 687.22 514.86 677.92 40.43 681.04 226.73 684.16 400.01 687.28 516.86 677.98 42.86 681.10 230.97 684.22 402.58 687.34 518.85 678.04 45.36 681.16 235.20 684.28 405.13 687.40 520.83 678.10 47.91 681.22 239.42 684.34 407.66 687.46 522.80 678.16 50.52 681.28 243.64 684.40 410.18 687.52 524.77 678.22 53.20 681.34 247.85 684.46 412.69 687.58 526.73 678.28 55.93 681.40 252.04 684.52 415.18 687.64 528.68 678.34 58.71 681.46 256.23 684.58 417.65 687.70 530.62 678.40 61.56 681.52 260.39 684.64 420.11 687.76 532.56 678.46 64.46 681.58 264.54 684.70 422.55 687.82 534.49 678.52 67.41 681.64 268.67 684.76 424.98 687.88 536.42 678.58 70.42 681.70 272.78 684.82 427.40 687.94 538.33 678.64 73.48 681.76 276.85 684.88 429.80 688.00 540.24 678.70 76.60 681.82 280.90 684.94 432.19 678.76 79.76 681.88 284.91 685.00 434.57 678.82 82.97 681.94 288.89 685.06 436.94 678.88 86.24 682.00 292.83 685.12 439.29 678.94 89.55 682.06 296.72 685.18 441.63 679.00 92.90 682.12 300.56 685.24 443.95 679.06 96.31 682.18 304.36 685.30 446.27 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 69 Stage -Area -Storage for Pond Pond B1: Pond B1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 676.00 75,404 0 683.80 272,938 1,325,260 676.15 78,811 11,566 683.95 277,148 1,366,517 676.30 82,218 23,643 684.10 281,542 1,408,414 676.45 85,625 36,232 684.25 286,028 1,450,981 676.60 89,032 49,331 684.40 290,513 1,494,222 676.75 92,440 62,941 684.55 294,999 1,538,135 676.90 95,847 77,063 684.70 299,485 1,582,722 677.05 99,254 91,695 684.85 303,971 1,627,981 677.20 102,661 106,839 685.00 308,457 1,673,913 677.35 106,068 122,494 685.15 312,943 1,720,518 677.50 109,475 138,659 685.30 317,429 1,767,796 677.65 112,882 155,336 685.45 321,915 1,815,747 677.80 116,289 172,524 685.60 326,401 1,864,370 677.95 119,696 190,223 685.75 330,887 1,913,667 678.10 123,289 208,442 685.90 335,372 1,963,636 678.25 126,975 227,212 686.05 339,950 2,014,281 678.40 130,660 246,534 686.20 344,712 2,065,631 678.55 134,346 266,410 686.35 349,474 2,117,695 678.70 138,032 286,838 686.50 354,237 2,170,473 678.85 141,717 307,819 686.65 358,999 2,223,966 679.00 145,403 329,354 686.80 363,761 2,278,172 679.15 149,089 351,440 686.95 368,523 2,333,094 679.30 152,774 374,080 687.10 373,285 2,388,729 679.45 156,460 397,273 687.25 378,047 2,445,079 679.60 160,146 421,018 687.40 382,809 2,502,143 679.75 163,831 445,316 687.55 387,571 2,559,922 679.90 167,517 470,167 687.70 392,333 2,618,415 680.05 171,285 495,573 687.85 397,095 2,677,622 680.20 175,219 521,561 688.00 401,857 2,737,543 680.35 179,152 548,139 680.50 183,086 575,307 680.65 187,019 603,065 680.80 190,953 631,413 680.95 194,886 660,351 681.10 198,820 689,879 681.25 202,753 719,997 681.40 206,687 750,705 681.55 210,620 782,003 681.70 214,554 813,891 681.85 218,487 846,369 682.00 222,421 879,437 682.15 226,631 913,116 682.30 230,840 947,426 682.45 235,050 982,368 682.60 239,260 1,017,941 682.75 243,470 1,054,146 682.90 247,679 1,090,982 683.05 251,889 1,128,450 683.20 256,099 1,166,549 683.35 260,309 1,205,280 683.50 264,519 1,244,642 683.65 268,728 1,284,635 ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 70 Summary for Pond Pond B2: Pond B2 [79] Warning: Submerged Pond Pond B1 Primary device # 1 OUTLET by 2.10' Inflow Area = Inflow = Outflow = Primary = 278.800 ac, 0.00% Impervious, Inflow Depth > 4.45" for NRCC-10yr-24hr event 387.61 cfs @ 12.82 hrs, Volume= 103.491 af 330.59 cfs @ 13.44 hrs, Volume= 90.491 af, Atten= 15%, Lag= 37.3 min 330.59 cfs @ 13.44 hrs, Volume= 90.491 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Starting Elev= 614.00' Surf.Area= 213,648 sf Storage= 1,110,739 cf Peak Elev= 619.10' @ 13.44 hrs Surf.Area= 250,417 sf Storage= 2,304,541 cf (1,193,802 cf above start) Plug -Flow detention time= 310.9 min calculated for 64.992 af (63% of inflow) Center -of -Mass det. time= 116.0 min (974.5 - 858.5 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 608.00 610.00 612.00 616.00 618.00 620.00 622.00 608.00' 3,055,722 cf Custom Stage Data (Prismatic)Listed below (Recalc) Device Routing Surf.Area (sq-ft) 148,967 178,807 195,255 232,041 243,810 255,804 268,025 Invert Inc.Store (cubic -feet) 0 327,774 374,062 854,592 475,851 499,614 523,829 Outlet Devices Cum.Store (cubic -feet) 0 327,774 701,836 1,556,428 2,032,279 2,531,893 3,055,722 #1 Primary #2 Device 1 #3 Device 1 608.00' 614.00' 617.00' 66.0" Round Culvert L= 280.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 608.00' / 604.00' S= 0.0143'/' Cc= 0.900 n= 0.013, Flow Area= 23.76 sf 7.0" Vert. Orifice/Grate C= 0.600 40.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=330.59 cfs @ 13.44 hrs HW=619.10' (Free Discharge) t1=Culvert (Inlet Controls 330.59 cfs @ 13.91 fps) 12=Orifice/Grate (Passes < 2.82 cfs potential flow) 3=Sharp-Crested Rectangular Weir(Passes < 398.48 cfs potential flow) ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 71 Elevation (feet) Pond Pond B2: Pond B2 Hyd rog raph 420= 400= 380€ 360€ 340€ 320- f 300- 280 260 240- 220- 200- 180- 160- 140- 120- 100- 80- 60- 40= 20= 0 + + I I + + + + H + + 1 + + + 1 + + I 1 T 1 7 7 1 1 7 r 17717 r r 1 7 T I 1387.61 cfs i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 �r1E how r al7P 80q a0 7 ILs9CfS r 1 7 r 1 1 L I L L L +LStbpag-e=204 51cf --' H L 4 T T I— T T T L T T L 7 T 7 T 1 —L 1 L I J 1 L L 1 I • - 11 1 1 ri1 11 Ir 1 1 1 11 L +—_+ 1 L 1 r L 1 1 I 1 L 1I T Ir LI • 1 1 L 1 Y r 1 1 Y r 1 7 r r 1 1 1 r L I I1. L I J. 1 L I L 1 I 62 62 62 61 61 61 61 61 61 61 61 61 61 60 60 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond Pond B2: Pond B2 Stage -Discharge 1 0- 9 4 2- 1- 0- 9- Sharp-Crested Rectangular Weir -7 T r Orifice/Grate 1 + L + L 1 1 ✓ 1 Culvert L 1 4- r 0 50 100 150 200 Discharge (cfs) 250 300 350 ® Inflow ❑ Primary ❑ Primary ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 72 Elevation (feet) 622- 621 620� 6194- 618-� 6174- 616- 6154' 614� f - 613 612 611� 610i- 609= 608" 0 Pond Pond B2: Pond B2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-f. 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 220,000 240,000 260,000 r Ir L r- 500,000 i H Hh H 1,000,000 1 1,500,000 2,000,000 Storage (cubic -feet) 2,500,000 IL- 3,000,000 Surface El Storage ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 73 Stage -Discharge for Pond Pond B2: Pond B2 Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 608.00 0.00 615.80 1.58 608.15 0.00 615.95 1.66 608.30 0.00 616.10 1.73 608.45 0.00 616.25 1.80 608.60 0.00 616.40 1.87 608.75 0.00 616.55 1.93 608.90 0.00 616.70 2.00 609.05 0.00 616.85 2.06 609.20 0.00 617.00 2.12 609.35 0.00 617.15 9.77 609.50 0.00 617.30 23.72 609.65 0.00 617.45 41.77 609.80 0.00 617.60 63.13 609.95 0.00 617.75 87.35 610.10 0.00 617.90 114.12 610.25 0.00 618.05 143.23 610.40 0.00 618.20 174.49 610.55 0.00 618.35 207.76 610.70 0.00 618.50 242.93 610.85 0.00 618.65 279.91 611.00 0.00 618.80 318.61 611.15 0.00 618.95 327.58 611.30 0.00 619.10 330.56 611.45 0.00 619.25 333.52 611.60 0.00 619.40 336.45 611.75 0.00 619.55 339.35 611.90 0.00 619.70 342.23 612.05 0.00 619.85 345.09 612.20 0.00 620.00 347.92 612.35 0.00 620.15 350.73 612.50 0.00 620.30 353.52 612.65 0.00 620.45 356.28 612.80 0.00 620.60 359.03 612.95 0.00 620.75 361.75 613.10 0.00 620.90 364.45 613.25 0.00 621.05 367.14 613.40 0.00 621.20 369.80 613.55 0.00 621.35 372.45 613.70 0.00 621.50 375.07 613.85 0.00 621.65 377.68 614.00 0.00 621.80 380.27 614.15 0.07 621.95 382.84 614.30 0.26 614.45 0.51 614.60 0.71 614.75 0.87 614.90 1.00 615.05 1.12 615.20 1.23 615.35 1.32 615.50 1.41 615.65 1.50 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 74 Stage -Area -Storage for Pond Pond B2: Pond B2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 608.00 148,967 0 615.80 230,202 1,510,204 608.15 151,205 22,513 615.95 231,581 1,544,837 608.30 153,443 45,361 616.10 232,629 1,579,662 608.45 155,681 68,546 616.25 233,512 1,614,622 608.60 157,919 92,066 616.40 234,395 1,649,715 608.75 160,157 115,922 616.55 235,277 1,684,941 608.90 162,395 140,113 616.70 236,160 1,720,298 609.05 164,633 164,640 616.85 237,043 1,755,789 609.20 166,871 189,503 617.00 237,926 1,791,411 609.35 169,109 214,701 617.15 238,808 1,827,166 609.50 171,347 240,236 617.30 239,691 1,863,054 609.65 173,585 266,105 617.45 240,574 1,899,074 609.80 175,823 292,311 617.60 241,456 1,935,226 609.95 178,061 318,852 617.75 242,339 1,971,510 610.10 179,629 345,696 617.90 243,222 2,007,927 610.25 180,863 372,733 618.05 244,110 2,044,477 610.40 182,097 399,955 618.20 245,009 2,081,161 610.55 183,330 427,362 618.35 245,909 2,117,980 610.70 184,564 454,954 618.50 246,809 2,154,934 610.85 185,797 482,731 618.65 247,708 2,192,022 611.00 187,031 510,693 618.80 248,608 2,229,246 611.15 188,265 538,840 618.95 249,507 2,266,605 611.30 189,498 567,172 619.10 250,407 2,304,098 611.45 190,732 595,690 619.25 251,306 2,341,727 611.60 191,965 624,392 619.40 252,206 2,379,490 611.75 193,199 653,279 619.55 253,105 2,417,388 611.90 194,433 682,352 619.70 254,005 2,455,422 612.05 195,715 711,610 619.85 254,904 2,493,590 612.20 197,094 741,071 620.00 255,804 2,531,893 612.35 198,474 770,739 620.15 256,721 2,570,332 612.50 199,853 800,613 620.30 257,637 2,608,909 612.65 201,233 830,695 620.45 258,554 2,647,623 612.80 202,612 860,983 620.60 259,470 2,686,475 612.95 203,992 891,478 620.75 260,387 2,725,465 613.10 205,371 922,180 620.90 261,303 2,764,591 613.25 206,751 953,090 621.05 262,220 2,803,856 613.40 208,130 984,206 621.20 263,137 2,843,257 613.55 209,510 1,015,529 621.35 264,053 2,882,797 613.70 210,889 1,047,058 621.50 264,970 2,922,473 613.85 212,269 1,078,795 621.65 265,886 2,962,288 614.00 213,648 1,110,739 621.80 266,803 3,002,239 614.15 215,027 1,142,890 621.95 267,719 3,042,328 614.30 216,407 1,175,247 614.45 217,786 1,207,812 614.60 219,166 1,240,583 614.75 220,545 1,273,562 614.90 221,925 1,306,747 615.05 223,304 1,340,139 615.20 224,684 1,373,738 615.35 226,063 1,407,544 615.50 227,443 1,441,557 615.65 228,822 1,475,777 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 75 Summary for Pond Pond C1: Pond C1 Inflow Area = 533.800 ac, 0.00% Impervious, Inflow Depth = 4.02" for NRCC-10yr-24hr event Inflow = 1,527.46 cfs @ 12.41 hrs, Volume= 178.864 of Outflow = 443.22 cfs @ 13.05 hrs, Volume= 176.812 af, Atten= 71%, Lag= 38.1 min Primary = 443.22 cfs @ 13.05 hrs, Volume= 176.812 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Peak Elev= 675.47' @ 13.05 hrs Surf.Area= 362,989 sf Storage= 3,224,204 cf Plug -Flow detention time= 117.9 min calculated for 176.628 af (99% of inflow) Center -of -Mass det. time= 111.7 min (921.1 - 809.4 ) Volume Invert Avail.Storage Storage Description #1 664.00' 6,161,365 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 664.00 49,861 0 0 665.00 106,320 78,091 78,091 668.00 311,540 626,790 704,881 670.00 324,958 636,498 1,341,379 675.00 359,560 1,711,295 3,052,674 680.00 395,673 1,888,083 4,940,756 683.00 418,066 1,220,609 6,161,365 Device Routing Invert Outlet Devices #1 Primary 665.00' 72.0" Round Culvert L= 991.0' RCP, groove end w/headwall, Ke= 0.200 Inlet / Outlet Invert= 665.00' / 654.00' S= 0.0111 '/' Cc= 0.900 n= 0.013, Flow Area= 28.27 sf Primary OutFlow Max=443.21 cfs @ 13.05 hrs HW=675.47' (Free Discharge) t1=Culvert (Barrel Controls 443.21 cfs @ 15.68 fps) ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 76 0 LL 1,700-` 1,600� 1,500," 1,4001 1,300 1,2004" 900:' 8004- 700 6004- 500 400 300= 200: 100= 0 68 68 68 68 67 67 67 67 w 67 c 67 67 w 67 w 67 67 66 66 66 66 66 66 Pond Pond C1: Pond C1 Hyd rog raph 1 4 4 - 1__L 27 T 1 L T 1 1 1 1 4 1 4 1 10, • 1443.22 cfs T 1 4 1 1 L I L I 1 L 1 1 4- I 1 1 Ip_flIIyu-Aria=533.800' a 1 Stcorage=3,224,20-4 -e'f - - 1 L T 4 T F L Round Culvert - • n=b:01 ✓ r • L=phial 0-' - - s=0.-olt1 -- AL, r t T T Y T E F 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 Time (hours) Pond Pond C1: Pond C1 Stage -Discharge 46 48 3- 2� 13' 0� 9 8- 74 - 6 53' 43' 3. 23- 1- 0J - 8 7i' - 5 + 1 1 1 - 1 - 1 - 1 Culvert t 1 1 1 r • r L 1 • 1 • 1 L 1 • 1 0 50 100 150 200 250 300 350 400 450 500 Discharge (cfs) • Inflow ❑ Primary 0 Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 77 Elevation (feet) 683-� 682" 681-E 680= 679- 678 6774 676-= 675 674- 673' 672 r 671 E 670-- 669-n 668= 667 666® 665& 664- 0 Pond Pond C1: Pond C1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-fe 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 400,000 s . . . 1 . . . 1 Cus -LI II 11 7 7 Ali r 1- -r---- -rI- II II II i _I i T + +I IIL + 7 7 r I I P iJI i I -L I L -+-Ir I Ir II II +-+ I 7 I T I7 I7 1,000,000 2,000,000 3,000,000 4,000,000 Storage (cubic -feet) 5,000,000 6,000,000 Surface El Storage ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 78 Stage -Discharge for Pond Pond Cl: Pond C1 Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 664.00 0.00 674.40 427.55 664.20 0.00 674.60 430.51 664.40 0.00 674.80 433.45 664.60 0.00 675.00 436.37 664.80 0.00 675.20 439.27 665.00 0.00 675.40 442.15 665.20 0.48 675.60 445.01 665.40 2.12 675.80 447.86 665.60 4.85 676.00 450.68 665.80 8.53 676.20 453.49 666.00 13.18 676.40 456.28 666.20 18.77 676.60 459.05 666.40 25.25 676.80 461.81 666.60 32.58 677.00 464.55 666.80 40.73 677.20 467.28 667.00 49.66 677.40 469.98 667.20 59.30 677.60 472.68 667.40 69.63 677.80 475.36 667.60 80.59 678.00 478.02 667.80 92.14 678.20 480.67 668.00 104.21 678.40 483.30 668.20 116.76 678.60 485.92 668.40 129.72 678.80 488.53 668.60 143.03 679.00 491.12 668.80 156.63 679.20 493.70 669.00 170.44 679.40 496.26 669.20 184.38 679.60 498.81 669.40 198.38 679.80 501.35 669.60 212.32 680.00 503.88 669.80 226.10 680.20 506.39 670.00 239.59 680.40 508.89 670.20 252.65 680.60 511.38 670.40 265.07 680.80 513.86 670.60 276.61 681.00 516.32 670.80 286.83 681.20 518.77 671.00 294.75 681.40 521.21 671.20 304.42 681.60 523.64 671.40 313.79 681.80 526.06 671.60 322.88 682.00 528.47 671.80 331.73 682.20 530.87 672.00 340.35 682.40 533.25 672.20 348.76 682.60 535.63 672.40 356.96 682.80 537.99 672.60 364.99 683.00 540.35 672.80 372.84 673.00 380.52 673.20 388.06 673.40 395.45 673.60 402.71 673.80 409.84 674.00 416.84 674.20 423.73 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 79 Stage -Area -Storage for Pond Pond Cl: Pond C1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 664.00 49,861 0 674.40 355,408 2,838,183 664.20 61,153 11,101 674.60 356,792 2,909,403 664.40 72,445 24,461 674.80 358,176 2,980,900 664.60 83,736 40,079 675.00 359,560 3,052,674 664.80 95,028 57,956 675.20 361,005 3,124,730 665.00 106,320 78,091 675.40 362,449 3,197,075 665.20 120,001 100,723 675.60 363,894 3,269,710 665.40 133,683 126,091 675.80 365,338 3,342,633 665.60 147,364 154,196 676.00 366,783 3,415,845 665.80 161,045 185,037 676.20 368,227 3,489,346 666.00 174,727 218,614 676.40 369,672 3,563,136 666.20 188,408 254,927 676.60 371,116 3,637,214 666.40 202,089 293,977 676.80 372,561 3,711,582 666.60 215,771 335,763 677.00 374,005 3,786,239 666.80 229,452 380,285 677.20 375,450 3,861,184 667.00 243,133 427,544 677.40 376,894 3,936,419 667.20 256,815 477,539 677.60 378,339 4,011,942 667.40 270,496 530,270 677.80 379,783 4,087,754 667.60 284,177 585,737 678.00 381,228 4,163,855 667.80 297,859 643,941 678.20 382,672 4,240,245 668.00 311,540 704,881 678.40 384,117 4,316,924 668.20 312,882 767,323 678.60 385,561 4,393,892 668.40 314,224 830,033 678.80 387,006 4,471,149 668.60 315,565 893,012 679.00 388,450 4,548,694 668.80 316,907 956,259 679.20 389,895 4,626,529 669.00 318,249 1,019,775 679.40 391,339 4,704,652 669.20 319,591 1,083,559 679.60 392,784 4,783,065 669.40 320,933 1,147,611 679.80 394,228 4,861,766 669.60 322,274 1,211,932 680.00 395,673 4,940,756 669.80 323,616 1,276,521 680.20 397,166 5,020,040 670.00 324,958 1,341,379 680.40 398,659 5,099,622 670.20 326,342 1,406,509 680.60 400,152 5,179,503 670.40 327,726 1,471,915 680.80 401,644 5,259,683 670.60 329,110 1,537,599 681.00 403,137 5,340,161 670.80 330,494 1,603,559 681.20 404,630 5,420,938 671.00 331,878 1,669,797 681.40 406,123 5,502,013 671.20 333,262 1,736,311 681.60 407,616 5,583,387 671.40 334,647 1,803,102 681.80 409,109 5,665,060 671.60 336,031 1,870,169 682.00 410,602 5,747,031 671.80 337,415 1,937,514 682.20 412,095 5,829,300 672.00 338,799 2,005,135 682.40 413,587 5,911,868 672.20 340,183 2,073,033 682.60 415,080 5,994,735 672.40 341,567 2,141,208 682.80 416,573 6,077,901 672.60 342,951 2,209,660 683.00 418,066 6,161,365 672.80 344,335 2,278,389 673.00 345,719 2,347,394 673.20 347,103 2,416,677 673.40 348,487 2,486,236 673.60 349,871 2,556,071 673.80 351,256 2,626,184 674.00 352,640 2,696,574 674.20 354,024 2,767,240 ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 80 [79] Warning: Inflow Area = Inflow = Outflow = Primary = Summary for Pond Pond C2: Pond C2 Submerged Pond Pond C1 Primary device # 1 OUTLET by 1.10' 533.800 ac, 0.00% Impervious, Inflow Depth > 3.97" for NRCC-10yr-24hr event 443.22 cfs @ 13.05 hrs, Volume= 176.812 af 387.58 cfs @ 14.17 hrs, Volume= 153.916 af, Atten= 13%, Lag= 67.5 min 387.58 cfs @ 14.17 hrs, Volume= 153.916 af Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs Starting Elev= 650.00' Surf.Area= 386,547 sf Storage= 1,749,912 cf Peak Elev= 655.10' @ 14.17 hrs Surf.Area= 430,024 sf Storage= 3,841,601 cf (2,091,689 cf above start) Plug -Flow detention time= 336.5 min calculated for 113.743 af (64% of inflow) Center -of -Mass det. time= 132.0 min (1,053.1 - 921.1 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 644.00 646.00 648.00 650.00 652.00 654.00 656.00 657.50 644.00' 4,893,576 cf Custom Stage Data (Prismatic)Listed below (Recalc) Surf.Area (sq-ft) 223,281 260,873 309,169 386,547 406,548 421,590 436,857 448,455 Device Routing Invert Inc.Store (cubic -feet) 0 484,154 570,042 695,716 793,095 828,138 858,447 663,984 Outlet Devices Cum.Store (cubic -feet) 0 484,154 1,054,196 1,749,912 2,543,007 3,371,145 4,229,592 4,893,576 #1 Primary 644.00' #2 Device 1 #3 Device 1 650.00' 653.00' 72.0" Round Culvert L= 424.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 644.00' / 626.00' S= 0.0425'/' Cc= 0.900 n= 0.013, Flow Area= 28.27 sf 10.0" Vert. Orifice/Grate C= 0.600 40.0' long Sharp -Crested Rectangular Weir 0 End Contraction(s) Primary OutFlow Max=387.57 cfs @ 14.17 hrs HW=655.10' (Free Discharge) t1=Culvert (Inlet Controls 387.57 cfs @ 13.71 fps) 12=Orifice/Grate (Passes < 5.69 cfs potential flow) 3=Sharp-Crested Rectangular Weir(Passes < 399.36 cfs potential flow) ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 81 Elevation (feet) 480= • 460= 440' 420= 400i 380` 340 320'' 300= 280 - 260 240 ` 220= 200 180= 160j , 140= 120` 100. 80=• 604 40- 20=' 0' Pond Pond C2: Pond C2 Hyd rog raph HI HI 1 HI +--+--1--+--+--+--1--H--+--+--I--+--+--I --i--r-144 HI I 1 1 HI 41 + 8 1387.58 cfs + H + + 1 H + + 1 1 + 1 + inflow �Area1+ 51 8:0oac + + Storage=3,84i s6G1-cfi 4--+ 1 I I H I IF I + HI - 11 I 11 HI I + — — + 1 HI HI HI + I +HI HI + r + t + 1I + r 1 + 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Pond Pond C2: Pond C2 Stage -Discharge 657� 656� 655� 654� 1 Sharp -Crested Rectangular Weir 653: 650- % 652- 651 649- 648- 647-- 646- 645 644 Orifice/Grata 4 + 1 1 1 + -r Culvert T i r• 0 50 100 150 200 250 Discharge (cfs) 300 350 400 ® Inflow ❑ Primary ❑ Primary ProposedConditions 11.10.21 Prepared by HDR, Inc HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Printed 11/15/2021 Page 82 Elevation (feet) 657- 656 655e 654-; 653- 652-; 651 -, 650- 649= 6487, 647= 646- 645, 644 Pond Pond C2: Pond C2 Stage -Area -Storage arizontal/V €ed Area (s: 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 1 1 1 1 I I I 1 I I I I I I I I + ++ + -+ +---+ 1 + 1 1 1 1 I I I I I I I 1 1 Custom Stage Data 400,000 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 4,500,000 Storage (cubic -feet) Surface El Storage ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 83 Stage -Discharge for Pond Pond C2: Pond C2 Elevation Primary Elevation Primary (feet) (cfs) (feet) (cfs) 644.00 0.00 651.80 3.09 644.15 0.00 651.95 3.25 644.30 0.00 652.10 3.41 644.45 0.00 652.25 3.56 644.60 0.00 652.40 3.70 644.75 0.00 652.55 3.84 644.90 0.00 652.70 3.97 645.05 0.00 652.85 4.10 645.20 0.00 653.00 4.22 645.35 0.00 653.15 11.94 645.50 0.00 653.30 25.95 645.65 0.00 653.45 44.06 645.80 0.00 653.60 65.48 645.95 0.00 653.75 89.75 646.10 0.00 653.90 116.58 646.25 0.00 654.05 145.74 646.40 0.00 654.20 177.05 646.55 0.00 654.35 210.38 646.70 0.00 654.50 245.60 646.85 0.00 654.65 282.63 647.00 0.00 654.80 321.37 647.15 0.00 654.95 361.76 647.30 0.00 655.10 387.46 647.45 0.00 655.25 391.03 647.60 0.00 655.40 394.57 647.75 0.00 655.55 398.08 647.90 0.00 655.70 401.56 648.05 0.00 655.85 405.00 648.20 0.00 656.00 408.42 648.35 0.00 656.15 411.81 648.50 0.00 656.30 415.17 648.65 0.00 656.45 418.51 648.80 0.00 656.60 421.82 648.95 0.00 656.75 425.10 649.10 0.00 656.90 428.36 649.25 0.00 657.05 431.59 649.40 0.00 657.20 434.80 649.55 0.00 657.35 437.98 649.70 0.00 657.50 441.14 649.85 0.00 650.00 0.00 650.15 0.09 650.30 0.33 650.45 0.69 650.60 1.11 650.75 1.52 650.90 1.83 651.05 2.09 651.20 2.32 651.35 2.54 651.50 2.73 651.65 2.92 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 84 Stage -Area -Storage for Pond Pond C2: Pond C2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 644.00 223,281 0 651.80 404,548 2,461,897 644.15 226,100 33,704 651.95 406,048 2,522,692 644.30 228,920 67,830 652.10 407,300 2,583,699 644.45 231,739 102,380 652.25 408,428 2,644,879 644.60 234,559 137,352 652.40 409,556 2,706,228 644.75 237,378 172,747 652.55 410,685 2,767,746 644.90 240,197 208,565 652.70 411,813 2,829,433 645.05 243,017 244,806 652.85 412,941 2,891,290 645.20 245,836 281,470 653.00 414,069 2,953,316 645.35 248,656 318,557 653.15 415,197 3,015,510 645.50 251,475 356,067 653.30 416,325 3,077,875 645.65 254,294 394,000 653.45 417,453 3,140,408 645.80 257,114 432,355 653.60 418,582 3,203,111 645.95 259,933 471,134 653.75 419,710 3,265,983 646.10 263,288 510,362 653.90 420,838 3,329,024 646.25 266,910 550,127 654.05 421,972 3,392,234 646.40 270,532 590,435 654.20 423,117 3,455,616 646.55 274,154 631,287 654.35 424,262 3,519,169 646.70 277,777 672,681 654.50 425,407 3,582,894 646.85 281,399 714,620 654.65 426,552 3,646,791 647.00 285,021 757,101 654.80 427,697 3,710,860 647.15 288,643 800,126 654.95 428,842 3,775,100 647.30 292,265 843,694 655.10 429,987 3,839,512 647.45 295,888 887,805 655.25 431,132 3,904,096 647.60 299,510 932,460 655.40 432,277 3,968,852 647.75 303,132 977,658 655.55 433,422 4,033,779 647.90 306,754 1,023,400 655.70 434,567 4,098,878 648.05 311,103 1,069,703 655.85 435,712 4,164,149 648.20 316,907 1,116,804 656.00 436,857 4,229,592 648.35 322,710 1,164,775 656.15 438,017 4,295,208 648.50 328,514 1,213,617 656.30 439,177 4,360,997 648.65 334,317 1,263,329 656.45 440,336 4,426,961 648.80 340,120 1,313,912 656.60 441,496 4,493,098 648.95 345,924 1,365,365 656.75 442,656 4,559,409 649.10 351,727 1,417,689 656.90 443,816 4,625,895 649.25 357,530 1,470,883 657.05 444,976 4,692,554 649.40 363,334 1,524,948 657.20 446,135 4,759,387 649.55 369,137 1,579,883 657.35 447,295 4,826,395 649.70 374,940 1,635,689 657.50 448,455 4,893,576 649.85 380,744 1,692,365 650.00 386,547 1,749,912 650.15 388,047 1,808,007 650.30 389,547 1,866,326 650.45 391,047 1,924,871 650.60 392,547 1,983,640 650.75 394,047 2,042,635 650.90 395,547 2,101,855 651.05 397,048 2,161,299 651.20 398,548 2,220,969 651.35 400,048 2,280,863 651.50 401,548 2,340,983 651.65 403,048 2,401,328 ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 85 Summary for Link A-1: Outfall Al Inflow Area = 278.500 ac, 0.00% Impervious, Inflow Depth > 3.62" for NRCC-10yr-24hr event Inflow = 278.19 cfs @ 12.50 hrs, Volume= 84.099 af Primary = 278.19 cfs @ 12.50 hrs, Volume= 84.099 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs U 0 LL Link A-1: Outfall Al Hyd rog raph 300� 280 - 260 240i- 220� 200i- 180_ 160 - 140� 1204- 100� 80 60= 40 20i" 0 4 I— I I ▪ 1 27 78i19 T 1 i T 1 T T 4 L T r 4 if r 1 L L -I 4 L 1 -I 4 Inflow Are4=Z78-.5-00 L T L I L Ir L ✓ T r r + L 1 ▪ 1 L rl T L -4 L r T L I i T 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) • Inflow ❑ Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 86 Summary for Link A-2: Outfall A2 Inflow Area = 37.000 ac, 0.00% Impervious, Inflow Depth = 2.75" for NRCC-10yr-24hr event Inflow = 87.90 cfs @ 12.32 hrs, Volume= 8.466 af Primary = 87.90 cfs @ 12.32 hrs, Volume= 8.466 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs N U 0 LL Link A-2: Outfall A2 Hyd rog raph + + 95= 9O- 85= 80_ 75= 70= 65=' 60= 55= 50=' 45= 40=' 35 30= 25 20= 15a 10_ 5= r - -I— I 187.90 cfs 187.90 c r + + + H I Area=3-7;0-0 i 4- L 1- L L L L 4- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ® Inflow ❑ Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 87 Summary for Link B-1: Total DA B Inflow Area = 312.300 ac, 0.00% Impervious, Inflow Depth > 3.73" for NRCC-10yr-24hr event Inflow = 347.70 cfs @ 13.01 hrs, Volume= 96.945 af Primary = 347.70 cfs @ 13.01 hrs, Volume= 96.945 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs 380= 360= 340i' 320- 300=' 280" 260 240=' 220= 200= 180 160i'„ 140i 120 100= 80 60i' 40. 20€ 0 Link B-1: Total DA B Hyd rog raph T T 347.70 cfs 347.70 cfs 8 10 12 14 1 + + 1 1 16 18 20 22 24 26 28 Time (hours) nfl-ow-Are =312,300 a - - i 1 30 32 34 36 38 40 42 44 46 48 • Inflow ❑ Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 88 Summary for Link B-2: Outfall B2 Inflow Area = 62.000 ac, 0.00% Impervious, Inflow Depth = 1.99" for NRCC-10yr-24hr event Inflow = 88.85 cfs @ 12.44 hrs, Volume= 10.263 af Primary = 88.85 cfs @ 12.44 hrs, Volume= 10.263 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs 95' 90 85 80 75 70i 65 60= u 55 50= , 0 45- u- 40' 35' 30= 25� 20= 15= 5= L 1_-1--I 88.85cfs + 1 1 1 1 7 7 1 Link B-2: Outfall B2 Hyd rog raph L I I 1 L L Ihfo r Area=S2 OQ0 a - 1 4 1 7 7 r r 4- ✓ L L 1 1 1 7 r 1 1 L L + + + ✓ r r 4 L 1 4 L 4 7 r r r r 1 L L 1 L L 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ® Inflow ❑ Primary ProposedConditions 11.10.21 NRCC 24-hr B NRCC-10yr-24hr Rainfall=5.04" Prepared by HDR, Inc Printed 11/15/2021 HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Page 89 Summary for Link C: Total DA C Inflow Area = 879.200 ac, 0.00% Impervious, Inflow Depth > 3.03" for NRCC-10yr-24hr event Inflow = 511.88 cfs @ 13.47 hrs, Volume= 221.924 af Primary = 511.88 cfs @ 13.47 hrs, Volume= 221.924 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-48.00 hrs, dt= 0.05 hrs 550— 500-'' 450-' 400-' 350 N - -� 300 0 LL 250-- 2001" 150� 100— 50 Link C: Total DA C Hyd rog raph L 1151 8 T + Ti T Ti T L L L T $nf;low re0=879.200' ac ▪ T � i T + T + 44. 1' 1 ( , I ( 1 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 Time (hours) Ti 38 40 42 44 46 48 ® Inflow ❑ Primary DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Greensboro -Randolph Megasite 2. Location of Project (street address): 5525 Browns Meadow Road City:Liberty County:Randolph Zip:27298 3. Directions to project (from nearest major intersection): Travel south on US 421 from Greensboro. The site generally lies to the north of the intersection of US 421 and Julian Airport Road and to the north of the intersection of US 421 and Starmount Road. The site is south of Old 421 Road. 4. Latitude:35° 53' 36.4158" N Longitude:-79° 37' 38.877" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ZNew Modification ['Renewal w/ Modificationt tRenewals with modifications also requires SVVU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: Not Started ❑Partially Completed* ['Completed* *provide a designer's certification 2. Specify the type of project (check one): ▪ Low Density ZHigh Density Drains to an Offsite Stormwater System Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑ CAMA Major Sedimentation/Erosion Control: 1000 ac of Disturbed Area ❑ NPDES Industrial Stormwater Z404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? No Yes Four SWU-101 Version Oct. 31, 2013 Page 1 of 6 If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/lr/rules-and-regulations III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Greensboro Randolph Megasite Foundation Signing Official & Title:Jim Melvin b.Contact information for person listed in item la above: Street Address:324 West Wendover Avenue # 207 City:Greensboro State:NC Zip:27408 Mailing Address (if applicable): City: State: Zip: Phone: (336 ) 691-9803 Fax: ( Email:jimmelvin@aol.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ['Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ['Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ['Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:NCRR and Randolph County are co -owners Signing Official & Title:Anna Lea Moore(NCRR) and Hal Johnson (Randolph County) b.Contact information for person listed in item 2a above: Street Address:NCRR - 2809 Highwoods Blvd City:Raleigh State:NC Mailing Address (if applicable):Randolph County - 725 McDowell Road City:Asheboro Phone: (336 ) 318.6300 Email: Zip:27604 State:NC Zip:27205 Fax: ( ) 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Vickie Miller or Ken Trefzger/ HDR Signing Official & Title:Authorized Agent for Owners b.Contact information for person listed in item 3a above: Mailing Address:555 Fayetteville Street Suite 900 City:Ralegih State:NC Zip:27601 Phone: (919 ) 232-6600 Fax: ( Email:vickie.miller@hdrinc.com 4. Local jurisdiction for building permits: Randolph County Point of Contact:David Bryant Phone #: (336 318-6565 Four SWU-101 Version Oct. 31, 2013 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. All of the built upon area will drain into a combination of swales and storm drainage system that will outlet either to a wet pond located off the site pad or dry basins located on the pad and then to the wet ponds. Dry basins will reduce the peak discharges and the wet ponds will provide water quality. When BUA drains directly to a wet pond, the wet pond will reduce peak discharges and provide water quality. pond sized to meet the NCDEQ Stormater Desing Manual minimum design criteria. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ['Approval of a Site Specific Development Plan or PUD Approval Date: ['Valid Building Permit Issued Date: ['Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ['Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 1800 acres 5. Total Coastal Wetlands Area: 6. Total Surface Water Area: acres acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+: acres Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHIN) line or Mean High Water (MHIN) line, and coastal wetlands landward from the NHW (or MHVV) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHIN) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 9. How many drainage areas does the project have?5 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Four SWU-101 Version Oct. 31, 2013 Page 3 of 7 Basin Information Drainage Area A3 Drainage Area B1 Drainage Area B2 Drainage Area C1 Receiving Stream Name Dodson Lake Dodson Lake Dodson Lake Dodson Lake Stream Class * WS-III WS-III WS-III WS-III Stream Index Number * 17-16-2 17-16-2 17-16-2 17-16-2 Total Drainage Area (sf) 9783576 12144528 12144528 23252328 On -site Drainage Area (sf) 9783576 12144528 12144528 23252328 Off -site Drainage Area (sf) 0 0 0 0 Proposed Impervious Area** (sf) 4817736 7749324 7749324 14170068 Impervious Area** (total) 49 63.8 63.8 60.9 Impervious** Surface Area Drainage Area _ Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (sf) On -site Streets (sf) On -site Parking (sf) On -site Sidewalks (sf) Other on -site (sf) Future (sf) Off -site (sf) Existing BUA*** (sf) Total (sf): * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications ** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. NA Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http:// portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program Four SWU-101 Version Oct. 31, 2013 Page 4 of 7 and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http: / /www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state- stormwater-forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Four SWU-101 Version Oct. 31, 2013 Page 5 of 7 VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Kenneth Trefzger Consulting Firm: HDR Engineering Inc. of the Carolinas Mailing Address:555 Fayetteville Street, Suite 900 City:Raleigh Phone: (919 ) 232-6651 Email:kenneth.trefzer@hdrinc.com State:NC Zip:27601 Fax: (919 ) 232-6654 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this _ day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Four SWU-101 Version Oct. 31, 2013 Page 6 of 7 X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature: Date: I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this _ day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Four SWU-101 Version Oct. 31, 2013 Page 7 of 7 SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS PROJECT INFORMATION 1 Project Name 2 Project Area (ac) 3 Coastal Wetland Area (ac) 4 5 6 Surface Water Area (ac) Is this project High or Low Density? Does this project use an off -site SCM? Greensboro -Randolph Megasite 1800 acres 0 High No MPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 8 Will the vegetated setback remain vegetated? 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 3 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 2 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: Kenneth Trefzger, Senior Project Manage 28 Organization: HDR Engineering Inc. of the Carolinas 29 Street address: 555 Fayetteville Street, Suite 900 30 City, State, Zip: Raleigh, NC, 27612 31 Phone number(s): 919-232-6651 32 Email: kenneth.trefzger@hdrinc.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer Seal Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No CLICK TO LOAD FORM DRAINAGE AREA INFORMATION Entire Site 1 2 3 4 4 Type of SCM Wet Pond A3 Dry Pond B1 Wet Pond B2 Dry Pond C1 5 Total drainage area (sq ft) 9783576 12144528 12144528 23252328 6 Onsite drainage area (sq ft) 9783576 12144528 12144528 23252328 7 Offsite drainage area (sq ft) 0 0 0 0 8 Total BUA in project (sq ft) 9783576 sf 12144528 12153240 23252328 9 New BUA on subdivided lots (subject to permitting) (sq ft) 10 New BUA not on subdivided lots (subject to permitting) (sf) 9783576 sf 12144528 23252328 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 4817736 sf 7749324 sf 14170068 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 100% 100% 19 Design storm (inches) 1.0 in 1.0 in 20 Design volume of SCM (cu ft) 402095 cf 631802 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Total .mpervious area. The breakdown of the types of impervious surface is not known at this time. DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 5 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No CLICK TO LOAD FORM DRAINAGE AREA INFORMATION Entire Site 5 6 7 4 Type of SCM Wet Pond C2 5 Total drainage area (sq ft) 23252328 6 Onsite drainage area (sq ft) 23252328 7 Offsite drainage area (sq ft) 0 8 Total BUA in project (sq ft) 23252328 9 New BUA on subdivided lots (subject to permitting) (sq ft) 10 New BUA not on subdivided lots (subject to permitting) (sf) 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) - Sidewalk (sq ft) - Roof (sq ft) - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 100% 19 Design storm (inches) 1.0 in 20 Design volume of SCM (cu ft) 1159640 cf 21 Calculation method for design volume Simple Method ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): Total .mpervious area. The breakdown of the types of impervious surface is not known at this time. WET POND Drainage area number 2IMinimum required treatment volume (cu ft) GENERAL MDC FROM 02H .1050 A3 I B2 I C2 I 402095 cf 631802 cf 1159640 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? No No No 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice Drawdown Orifice Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? 11 Does the maintenance access comply with General MDC (8)? 12 Does the drainage easement comply with General MDC (9)? 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? 15 Is there an O&M Plan that complies with General MDC (12)? 16 Does the SCM follow the device specific MDC? Yes Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes Yes WET POND MDC FROM 02H .1053 18 Sizing method used SA/DA SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 671.00 607.00 643.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 672.00 608.00 644.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 677.50 613.50 649.50 23 Elevation of the permanent pool (fmsl) 678.00 614.00 650.00 24 Elevation of the top of the vegetated shelf (fmsl) 678.50 614.50 650.50 25 Elevation of the temporary pool (fmsl) 26 Surface area of the main permanent pool (square feet) 168544 214613 386547 27 Volume of the main permanent pool (cubic feet) 783488 cf 1113926 cf 1763487 cf 28 Average depth of the main pool (feet) 4.80 ft 5.30 ft 4.60 ft 29 Average depth equation used Equation 3 Equation 3 Equation 3 30 If using equation 3, main pool perimeter (feet) 1394.0 ft 1874.0 ft 2417.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 3.0 ft 3.0 ft 32 Volume of the forebay (cubic feet) 107084 cf 183485 cf 286058 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes Yes 34 Clean -out depth for forebay (inches) 36 in 48 in 72 in 35 Design volume of SCM (cu ft) 36 Is the outlet an orifice or a weir? Orifice Orifice Orifice 37 If orifice, orifice diameter (inches) 6 in 7 in 10 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 4 4.6 4.2 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes Yes 42 Are berms or baffles provided to improve the flow path? No No No 43 Depth of forebay at entrance (inches) 48 in 66 in 66 in 44 Depth of forebay at exit (inches) 6 in 6 in 6 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? 53 Species of turf that will be used on the dam and embankment 54 Has a planting plan been provided for the vegetated shelf? ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 4 8:23 PM 1/31/2022 DRY POND 1 2 Drainage area number Minimum required treatment volume (cu ft) GENERAL MDC FROM 02H .1050 B1 i C1 i 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the design volume? No No 9 What is the method for dewatering the SCM for maintenance? 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? 12 Does the drainage easement comply with General MDC (9)? 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? 15 Is there an O&M Plan that complies with General MDC (12)? 16 Does the SCM follow the device specific MDC? 17 Was the SCM designed by an NC licensed professional? Yes Yes DRY POND MDC FROM 02H .1062 18 SHWT elevation (fmsl) 19 Elevation of the bottom of the dry pond (fmsl) 676 664 20 Distance from bottom to SHWT (feet) 21 Elevation of the temporary pool during the design storm (feet) 22 Ponding depth of the design storm (feet) 23 Will the dry pond be uniformly graded to flow toward the outlet? Yes Yes 24 Is a low flow channel being provided? Yes Yes 25 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? 26 Will berms or baffles be provided to increase the flow path? No No 27 What method of pretreatment will be provided? 28 Design volume of SCM (cu ft) 29 Diameter of drawdown orifice (in) 30 Drawdown time for the temporary pool (hours) 31 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Yes 32 Is there a small permanent pool near the orifice to prevent clogging? No No 33 Will the outlet be designed to prevent clogging? 34 Are the dam and embankment planted in non -clumping turf grass? 35 Species of turf that will be used on the dam and embankment 36 Will trees and shrubs be prevented from growing on the dam and embankment? ADDITIONAL INFORMATION 37 Please use this space to provide any additional information about the dry pond(s): The dry ponds are only being used to provide peak attenuation and not designed to provide water quality. Dry Pond 5 8:23 PM 1/31/2022