HomeMy WebLinkAboutNCC220501_ESC Approval Submitted_20220201Will Wolfe
From: Matthew Osborne <matthewo@cityofws.org>
Sent: Friday, January 21, 2022 2:48 PM
To: Will Wolfe
Cc: David Evans
Subject: EN2200011 Approval Email
See below is you approval email to be used when uploading you NCGO 1
application.
Number of Recipients
Sent: 01/21/2022 9:27:18 AM
Sent by: Matthew Osborne
To: will.wolfe(a wolfehomes.com
Cc:
Bee:
Subject: Review Completed - Coldwater - Lot 5, 10, 29,
and 51-53
Attachments:
Application Type: 04.02) Grading/Erosion Control Permit
Workflow: 04.02) Grading & Erosion Control
Project: Coldwater - Lot 5,10, 29, and 51-53
A/P #: EN2200011
Acreage to be Disturbed: 1.84
https: //wnston-salem. idtplans.com/secure/project/?proj ectid=692912
Hello Wolfe Homes,
Thank you for submitting your project to City of Winston-Salem. Review of the plans for this project have been
completed. The design is adequate to meet the ordinance standards and the plans have been approved.
If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership
(FRO) form as applicable. This document is required prior to the issuance of the Grading/Erosion Control Permit. If this
has already been provided, then please disregard this statement. Reminder that a completed FRO form is not required in
the instance where a project qualifies to use the HB 489 Sketch Erosion Control Plan document.
If this project will disturb more than 1 acre or is part of a larger common plan of development, the Grading/Erosion
Control Permit cannot be issued until documentation is provided that coverage under the NCGO 1 Construction
Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the permit at the following website
(https://edoes.deg.ne.2ov/Forms/NCGOI-NOI). Once coverage is obtained please upload a copy to the project
documents in the electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof of
coverage under NCGO 1 is provided.
As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village of Clemmons,
Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may periodically inspect sites of land
disturbing activity to determine compliance with the Erosion Control ordinances and the approved Erosion Control
Plan. No person shall willfully resist, delay, or obstruct an authorized representative, employee, or agent of the Erosion
Control Division while that person is inspecting or attempting to inspect a land disturbing activity under the ordinance.
Should you have any questions as you move forward please feel free to contact Matthew Osborne at 336-462-7480 or
matthewokcityofws.org.
Matthew Osborne, CFM, CPESC
Erosion Control/Floodplain Program Manager
City Of Winston-Salem
Field Operations Department
Erosion Control Division
PO Box 2511 (Mailing)
100 E. First Street, Suite 328 (Physical)
Winston-Salem, NC 27101
Office: 336-747-7453
Mobile: 336-462-7480
Fax: 336-727-2792
Electronic Plan Review Application Portal:
htti)s:Hwinston-salem.idti)lans.com/secure/
Electronic Plan Review Application Instructions:
htti)s:Hwinston-salem.idti)lans.com/secure/training/manual/
NOTICE: Beginning May 1, 2018, all Grading/Erosion Control, Floodplain Development, and Watershed
Protection Permit Submittals MUST be submitted electronically.
City of Winston-Salem
ONE TEAM
Committed to Excellence
All a -mails including attachments sent to and from this address are subject to being released to the media and the public in accordance with the North Carolina
Public Records Law.