HomeMy WebLinkAboutNCC200108_NOT Closeout Documents_20220127ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Dfrector
NORTH CAROLINA
Envfronmential Qualify
INSPECTION REPORT
Attacheel is a copy -of the inspection rep6rt.prepared following an. onsite inspection. of this
Project, This report is intended to inform'you of the projecf8 comp iarice with -the North Carolina
Sedimentation Pollution. Control Act of1973 and the,NPDES StormWatcr Discharge Perriot. Note
that effective August-1, 2013 the NPDES and State Stomwater progxams were transferred to oixr
Division. Please jao_te that the attached ixispectim report has been expanded to. in_ cl..ude:the'NPDES
compliance items including reporting -an4ra#u gauge.. requirements.".
Please review this i epoi t carefiilly a's it may -contain coireciiveActions needed or comments,
which will assist yoti ixl me' ' * 'the required. performance: standards -of the Act a -ad the NPDES - .
Stormwatex permit conditions. Ifyou heed additional hiformatio-npertaining to the North Carolina -
Sedimentation Pollution. CuRtrol Act and the-NPDES Stor_mwater'program, -refex to the'Nozffi
Carolina Division of Biergy, Mineral, and Laud Resources 'website- at:
h4://portal.n6denr.orgfweb/lr/.
It is -our desire that any and all problems be discussed and resolved at the earliest possible
time. Please contact me at (828)296-4500 if you have any questions.
Sincerely,
Mack Granger '
Environmental .Specialist
North Carolina Department ofEnvironmental Quality [ Division of Energy, Mineral and Land Resources
Asheville Regional Office 12090 U.S. Highway 70 j Swannanoa, North Carolina 28778
828.296,4500
Division of Energy, Mineral and Land Resources
County: Burke Project: Conner Property
River basin: Catawba
Person financially responsible: Conner & Conner, LLC
Project # BURKE-2020-012
Address: 820 2nd Ave, SW Hickory, NC 28602
Case #
1. Project Iocation. 5436 Laurel Haven Ave, Morganton
Pictures: No: ❑ Yes: ❑✓ Video: ❑ Digital: ✓❑
2. Weather and soil conditions: Cloudy, Dry
First inspection: Yes: ❑✓ No: ❑
3.a. Has NCG01 Certificate of Coverage been issued at time of inspection? Yes: ❑✓ No: ❑
3.b- NCG01 Certificate of Coverage onsite? Yes: 0 No: ❑ Not Applicable: ❑
4. is site currently under notice of violation? Yes: ❑ No: 0
5. Is the site in compliance with S.P.C.A. and rules? Yes: 0 No: ❑
If no, check violations below:
6. Violations:
❑ a. No approved plan, G.S. I I3A-57 (4) and 15A N.C.A.0 413.0107(c)
H
g. Inadequate buffer zone, G.S. 113A-57(1)
❑ b. Failure to follow approved plan, G.S. 113A-57(5)
h. Graded slopes and fills too steep.
❑ c. Failure to submit revised plan, G.S. 113A-541(b) and
G.S. 113A-57(2) or 15A N.C.A.C. 413.0124(e)
15A N.C.A.C. 413.0118(a)
❑ i. Unprotected exposed slopes, G.S. 113A-57(2)
❑ d. Failure to provide adequate groundcover, G.S. 113A-57(3) and
❑ j. Failure to install and maintain measures,
15A N.C.A.C. 413.0107(b)
15A N.C.A.C. 413.0113
El Insufficient
Elk. Failure to self -inspect G.S. 113A-54,l(e) and
e. measures to retain sediment on site, G.S. 113A-57(3)
15A N.C_A.C. 413.0131
❑ f. Failure to take measures to protect property, 15A N.C.A.C. 413.0105
❑ 1. Other (describe)
7. Is the site in compliance with NPDES Permit NCG 010000? Yes: 0 No: ❑ Not Applicable: ❑ Uno, check violations below:
❑ m. Discharge without a permit, G.S. 143-215.1(a) and
15A N.C.A.C. 02HI 0126
❑ n. Failure to develop or adhere to approved plan,
NCG 010000, Part I
❑ o. Failure to manage construction site pollutants, NCG 010000 Part II, F
❑ p. Failure to provide ground stabilization, NCG 010000 Part II, E
❑ q. Failure to meet self -inspection, reporting and record -keeping
requirements, NCG 010000, Part III
❑ r. Failure to install and maintain BMP's,
NCG 010000 Part II, G.2-3
❑ s. Failure to dewater sediment basin from surface,
NCG 010000, Part Il, B.8 or 6.4
❑ t. Bypass of stotmwater control facilities,
NCG 010000, Part 11, G.5-6
❑ u. Other (describe)
8. Site out of compliance with NOV deadline? Yes: ❑ No: ❑ Not Applicable: ❑✓
9. Has sedimentation damage occurred since last inspection or at 1�1 inspection? Yes: ❑ If yes, where? (check all that apply) No: ❑✓
Lake/natural watercourse on the tract: ❑ Lake/natural watercourse off the tract: ❑ Other property: ❑
Description:
Stormwater Discharge Outfall with sediment lo:
Degree of damage: slight: ❑ moderate
10. Contact made with (name):
❑ severe: ❑
Title:
Inspection report given: ❑ or sent: 0 to person financially responsible. Date given/sent: 1 /14/22
11. Corrective actions needed:
Inspection performed per request for closeout. Site is stabilized, no corrective actions noted.
Site is approved for permit closeout. File an electronic Notice of Termination e(NOT) at deq.ne.gov/NCGOI
Report by: Mack Granger
Date of inspection: 1/13/22
cc:
Others present:_
Time arriving on site: 12:55 PM
Time leaving site: 1:25 PM
Page 1 of 3
Revised 06222020
Division of Energy, Mineral and Land Resources
County: Burke Project: Conner Property Project # BURKE-2020-012
11. Corrective actions needed (continued)
❑ Submit an adequate sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed.
❑ Install all sedimentation and erosion control measures as shown on the approved plan.
❑ Submit a revised sedimentation and erosion control plan for approval for the following areas:
❑ Provide adequate permanent ground cover on all areas where development has been completed according to the time limits in the
approved plan, including the following areas:
❑ Install erosion and sediment control devices sufficient to retain sediment on the tract at the following areas:
❑ Install temporary sediment traps or basins and associated diversions as shown on the approved plan, including the following locations:
❑ Install adequate drop inlet protection as shown on the approved plan, including the following locations:
❑ Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25 % of the buffer nearer the land
disturbance using natural or artificial means (minimum 25-foot width in Trout Waters) including the following areas:
❑ Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established including the following locations:
❑ For disturbed areas less than one acre, provide adequate temporary or permanent ground cover on all graded slopes where rough or fine
grading has been completed for 21 calendar days, including the following locations:
❑ Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation
damage including the following
❑ Inspect site and document self -inspections during or after each phase of the plan.
❑ Obtain NCGO10000 Certificate of Coverage as required.
❑ Properly handle concrete to avoid contact with surface waters, wetlands or buffers and prevent discharge from site.
n Relocate soil stockpiles at least SO feet ay.-ay from storn drain inlets or surface waters.
❑ Provide adequate temporary or permanent ground cover on areas where land -disturbing activity has ceased in 7 or 14 days according to
NCG 01000 permit conditions at the following areas:
❑ Provide and dewater sediment basins with a drainage area of one acre or greater with a skimmer or flashboard riser.
❑ Route the flow of stormwater from the following location(s) into a control facility or measure:
❑ Inspect all erosion and sedimentation control measures and storm discharge outfalls at least weekly and within 24 hours of a rainfall
event of 1.0 inch or greater and complete self -monitoring reports.
❑ Maintain a rain gauge in good working order and record daily rainfall amounts.
12. Comments:
Report by: Mack Granger Date of inspection: 1/13/22
Page 2 of 3
Revised 06222020
Division of Energy, Mineral and Land Resources
County: Burke Project: Canner Property Project # BURKE.-2020-012
Check only one box, if closing out project.
❑ Permanent ground cover sufficient to restrain erosion has been established. No additional self -inspection or monitoring is required. Project is
released and coverage under the NPDES General Stormwater Permit for Construction Activities is terminated.
j �j Permanent ground cover sufficient to restrain erosion has been established. No additional self -inspection or monitoring is required and the
project is released under the SPCA. If this project has a Certificate of Coverage (COC) under the NCGO1 permit, then complete the electronic
Notice of Termination (eNOT) form at deq.nc.gov/NCGO1.
Report by: Mack Granger Date of inspection. 1/13/22 Page 3 of 3
Revised 06222020