Loading...
HomeMy WebLinkAboutNC0004979_316(b) Compliance Report_20220201 (� DUKE Allen Steam Station 253 Plant Allen Roao ENERGY. Belmont, NC 28012 RECEIVED January 24, 2022 F1 0 1 2022 North Carolina Department of Environmental Quality NCDEQIDWR/NPDES Division of Water Resources 1617 Mail Service Center Raleigh NC 27699-1617 RE: Duke Energy Carolinas, LLC Allen Steam Station, NPDES Permit NC0004979 Part A. (22.) Clean Water Act Section 316(b) Submittal Dear Sir or Madam: In accordance with the provisions of NPDES Permit NC0004979, Part A. (22.),following and enclosed is our timely submittal of the requested Clean Water Act § 316(b) information for the Allen Steam Station. Specifically,the Department has requested that the submitted 316(b) information be provided by January 31, 2022. We believe that this submittal completely satisfies this obligation. As detailed in the enclosed reports, the Allen Steam Station meets Best Technology Available for impingement and entrainment through a system of technologies, including flow reductions resulting from the retirement of three of the five Allen units during 2021. The system of technologies alternative is justified due to the design of the intake structure and the intake flow reductions associated with the retirements of Units 2, 3, and 4. Please contact Michael Smallwood (Michael.Smallwood@duke-energy.com, 704-382-4117)or Elizabeth Glenn (Elizabeth.Glenn@duke-energy.com, 980-737-0530) if there are any questions regarding this submittal. Sincerely, 6 Jeff Flana General Manager, Allen Steam Stati Attachment: 316(b) study reports for Allen Steam Station (pdf) Cc: North Carolina Department of Environmental Quality (pdf and hardcopy) Water Sciences Section 1623 Mail Service Center Raleigh NC 27699-1623